general notes - site plan - teciftp.us under construction/pfg phx... · ct current transformer np...

22
33' CLEAR HIGH BAY WAREHOUSE (1994 ADDITION) 22' CLEAR HIGH BAY WAREHOUSE 1 STORY COLD DOCK DOCK AREA WITH OFFICE LEVEL ABOVE 1 STORY OFFICE AREA ENGINE ROOM W/ ROOFTOP REFRIGERATION EQUIPMENT RAIL DOCK TRUCK PARKING (13 STALLS) AUTO PARKING (72 STALLS) TRUCK PARKING (9 STALLS) TRUCK PARKING (15 STALLS) 02:E03 02:E04 02:E04 02:E03 02:E01 02:E01 02:E08 02:E02 02:E02 02:E01 02:E05 02:E01 02:E01 02:E08 02:E04 02:E04 02:E05 02:E06 02:E01 02:E02 02:E07 02:E03 02:E01 A. SITE PLAN IS PROVIDED FOR REFERENCE ONLY B. NO REMODEL OR RENOVATION WORK WILL BE PERFORMED AS PART OF THIS CONTRACT. GENERAL NOTES - SITE PLAN DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: Architectural NEXUS, Inc. 2505 East Parleys Way Salt Lake City, Utah 84109 T 801.924.5000 http://www.archnexus.com Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect. © Architectural Nexus, Inc. 2014 6 5 4 3 2 1 E D C B A 3/13/2017 11:55:07 AM ARCHITECTURAL SITE PLAN MDS 455 SOUTH 75TH AVE. PHOENIX, AZ 85043 PERFORMANCE FOOD GROUP 16094 3/13/2017 NEW PHOENIX AZ. FACILITY REMODEL PERMIT SET AS101 MAD 1" = 40'-0" AS101 1 SITE PLAN N 0' 40' 80' 20' KEYNOTE LEGEND 02:E01 EXISTING CONCRETE PAVING 02:E02 EXISTING ASPHALT PAVING 02:E03 DESIGNATED FIRE DEPARTMENT ACCESS PATH 02:E04 EXISTING STORM WATER RETENTION FACILITY 02:E05 EXISTING STORAGE TANK 02:E06 EXISTING PUMP HOUSE 02:E07 EXISTING CONTAINER 02:E08 EXISTING DOCK APRON # Date Revision

Upload: ngominh

Post on 07-Jul-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

33' CLEARHIGH BAY

WAREHOUSE (1994 ADDITION)

22' CLEARHIGH BAY

WAREHOUSE

1 STORY COLD DOCK

DOCK AREA WITH OFFICE LEVEL ABOVE

1 STORY OFFICE AREA

ENGINE ROOM W/ ROOFTOP

REFRIGERATION EQUIPMENT

RAIL DOCK

TRUCK PARKING(13 STALLS)

AUTO PARKING(72 STALLS)

TRUCK PARKING(9 STALLS)

TRUCK PARKING(15 STALLS)

02:E03

02:E0402:E04

02:E03

02:E0102:E01

02:E08

02:E0202:E02

02:E01

02:E05

02:E0102:E01

02:E08

02:E0402:E04

02:E05

02:E06

02:E01 02:E02

02:E07

02:E03

02:E01

A. SITE PLAN IS PROVIDED FOR REFERENCE ONLYB. NO REMODEL OR RENOVATION WORK WILL BE

PERFORMED AS PART OF THIS CONTRACT.

GENERAL NOTES - SITE PLAN

DATE:DRAWN BY:CHECKED BY:NEXUS PROJECT #:

Architectural NEXUS, Inc.2505 East Parleys WaySalt Lake City, Utah 84109T 801.924.5000 http://www.archnexus.com

Original drawings remain the property of the Architect and as such the Architect retains total ownership and control. The design represented by these drawings is sold to the client for a one time use, unless otherwise agreed upon in writing by the Architect.© Architectural Nexus, Inc. 2014

654321

E

D

C

B

A

3/1

3/2

017

11:5

5:0

7 A

M

ARCHITECTURALSITE PLAN

MDS

455 S

OU

TH

75T

H A

VE

.P

HO

EN

IX, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

16094

3/13/2017

NE

W P

HO

EN

IX A

Z. F

AC

ILIT

Y R

EM

OD

EL

PERMIT SET

AS101

MAD

1" = 40'-0"AS1011 SITE PLAN N

0' 40' 80'20'

KEYNOTE LEGEND02:E01 EXISTING CONCRETE PAVING

02:E02 EXISTING ASPHALT PAVING

02:E03 DESIGNATED FIRE DEPARTMENT ACCESSPATH

02:E04 EXISTING STORM WATER RETENTION FACILITY

02:E05 EXISTING STORAGE TANK

02:E06 EXISTING PUMP HOUSE

02:E07 EXISTING CONTAINER

02:E08 EXISTING DOCK APRON

# Date Revision

ts$
Text Box
SES
ts$
Typewritten Text
J
ts$
Typewritten Text
J
ts$
Rectangle
ts$
Rectangle
ts$
Polygonal Line
ts$
Callout
Fire Pump (2) 2 1/2 C. (3) 3/0, 3/0 Gnd
ts$
Callout
Building Power 1" C. (2) #10, #10 Gnd
ts$
Callout
Jockey Pump 2 1/2" C. (3) #10, #10 Gnd
ts$
Callout
Fire Alarm 1" C. 14-2 FPL Cable
ts$
Typewritten Text
ts$
Rectangle
ts$
Typewritten Text
J
ts$
Callout
Gate Control J-box
ts$
Polygonal Line
ts$
Callout
Gate Control 1 1/2" C.
ts$
Line
ts$
Typewritten Text
3/4" C, to Panel RPE
ts$
Rectangle
ts$
Typewritten Text
J
ts$
Line
ts$
Callout
Phone Utility
ts$
Callout
Phone 2" C.
ts$
Polygonal Line
ts$
Polygonal Line
ts$
Polygonal Line
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 2: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

A. CONTRACTOR SHALL OBTAIN NECESSARY PERMITS AND INSPECTIONS REQUIRED BY THE GOVERNING

AUTHORITIES.

B. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ADOPTED (OR CURRENT WHERE NONE HAVE

BEEN ADOPTED) BUILDING CODES: 2012 IBC, 2012 IECC, 2012 IRC, 2012 IFC, 2012 IMC, 2012 IPMC, 2012 IPC,

2012 IFGC, 2011 NEC, ALL APPLICABLE LOCAL CODES, ORDINANCES AND AMENDMENTS.

C. ALL WORK SHALL BE DONE IN A NEAT, WORKMANLIKE, FINISHED AND SAFE MANNER UNDER COMPETENT

SUPERVISION.

D. ALL MATERIALS SHALL BE NEW AND OF THE BEST QUALITY, MANUFACTURED IN ACCORDANCE WITH

NEMA, ANSI, U.L. OR OTHER APPLICABLE STANDARDS. THE USE OF MANUFACTURER'S NAMES, MODELS

AND NUMBERS IS INTENDED TO ESTABLISH STYLE, QUALITY, APPEARANCE, USEFULNESS AND BID PRICE.

PROPOSED SUBSTITUTIONS SHALL BE SUBMITTED IN WRITING AND REVIEWED BY THE ENGINEER PRIOR

TO MATERIAL PROCUREMENT.

E. ALL ELECTRICAL EQUIPMENT SHALL BE CAPABLE OF OPERATING SUCCESSFULLY AT FULL-RATED LOAD,

WITHOUT FAILURE, AT AN AMBIENT AIR TEMPERATURE OF 0°F TO 120°F AND AN ELEVATION OF 1,200 FEET

(ABOVE SEA LEVEL). WHERE THESE CRITERIA CANNOT BE MET, ANCILLARY EQUIPMENT AND/OR SPECIAL

DERATING FACTORS AS APPROVED BY THE ENGINEER SHALL BE UTILIZED.

F. PROTECT ALL ELECTRICAL MATERIAL AND EQUIPMENT INSTALLED UNDER THIS CONTRACT AGAINST

DAMAGE BY OTHER TRADES, WEATHER CONDITIONS OR ANY OTHER CAUSES. EQUIPMENT FOUND

DAMAGED OR IN OTHER THAN NEW CONDITION WILL BE REJECTED AS DEFECTIVE.

G. LEAVE THE SITE CLEAN. REMOVE ALL DEBRIS, EMPTY CARTONS, TOOLS, CONDUIT, WIRE SCRAPS AND

ALL MISCELLANEOUS SPARE EQUIPMENT AND MATERIALS USED IN THE WORK DURING CONSTRUCTION.

ALL COMPONENTS SHALL BE FREE OF DUST, GRIT AND FOREIGN MATERIALS BEFORE FINAL

ACCEPTANCE OF WORK.

H. THESE CONSTRUCTION DRAWINGS ARE SUBJECT TO THE INTERPRETATION OF THE DESIGN ENGINEER.

ALL QUESTIONS REGARDING THESE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE

ENGINEER. ANYONE WHO TAKES UPON THEMSELF THE INTERPRETATION OF THESE CONSTRUCTION

DOCUMENTS OR MAKES REVISIONS TO THE SAME WITHOUT CONFERRING WITH THE DESIGN ENGINEER

SHALL BE RESPONSIBLE FOR THE CONSEQUENCES THEREOF.

I. REFER TO OTHER PLANS FOR EXACT LOCATION OF EQUIPMENT AND ARCHITECTURAL FEATURES.

J. ALL WIRING SHALL BE COPPER UNLESS OTHERWISE NOTED. INSULATION SHALL BE TYPE XHHW OR

THWN. NONMETALIC-SHEATHED CABLE WILL NOT BE PERMITTED.

K. ALL WIRING DEVICES AND ELECTRICAL EQUIPMENT SHALL BE COMMERCIAL GRADE.

L. VERIFY EXACT LOCATION, MOUNTING HEIGHT AND ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT

PROVIDED BY OTHERS PRIOR TO ROUGH-IN. PROVIDE ALL ASSOCIATED EQUIPMENT FOR PROPER

OPERATION AND FINAL CONNECTIONS TO EQUIPMENT PER OWNER.

M. PROVIDE GROUND WIRE IN ALL RACEWAYS SIZED PER NEC ARTICLE 250. INSTALL 250-LB PULL CORD IN

ALL EMPTY CONDUITS INSTALLED AS PART OF THIS PROJECT.

N. ALL UNDERGROUND CONDUIT TO BE SCHEDULE 40 PVC. MINIMUM DEPTH SHALL BE 24", MINIMUM SIZE

3/4". ALL EXPOSED CONDUIT SHALL BE TYPE GRS OR IMC, MINIMUM SIZE 3/4".

O. CONDUIT SHALL BE BURIED A MINIMUM OF 24-INCHES BELOW FINISHED GRADE TO TOP OF CONDUIT(S).

WHERE CONDUIT STUBS UP OUT OF THE EARTH TO ELECTRICAL EQUIPMENT, THE CONDUIT SWEEP AND

CONDUIT LEAVING THE EARTH MUST BE PVC COATED GRS CONDUIT OR RIGID STEEL CONDUIT WRAPPED

WITH 20-MIL RUBBER TAPE HALF-LAPPED TO A THICKNESS OF 40-MILS.

P. ALL CIRCUIT CONDUCTORS, #6 AWG OR SMALLER, SHALL BE "THHN/THWN-2" OR "XHHW" STRANDED

COPPER. ALL OTHER CONDUCTORS SHALL BE "XHHW" STRANDED COPPER. MINIMUM CONDUCTOR SIZE

SHALL BE #12 AWG WITH #12 AWG GROUND FOR POWER CIRCUITS.

GENERAL NOTES

ELECTRICAL ABBREVIATIONS

A, AMP AMP(S), AMPERE(S)

AC ALTERNATING CURRENT MC MANUFACTURER CABLE

AIC AMPS INTERRUPTING CAPACITY MCC MOTOR CONTROL CENTER

AFF ABOVE FINISHED FLOOR MCP MOTOR CIRCUIT PROTECTOR

AFG ABOVE FINISHED GRADE MECH MECHANICAL

AICAMPS INTERRUPTING CAPACITY, SYMM. MFR(S) MANUFACTURER(S)

AL ALUMINUM MH MANHOLE

ARCH

ARCHITECT(URAL)

MIC MICROPHONE

ASYM ASYMMETRICAL MIN MINIMUM

ATS AUTOMATIC TRANSFER SWITCH MISC MISCELLANEOUS

AUTO AUTOMATIC MLO MAIN LUG ONLY

AUX AUXILIARY MOV MOTOR OPERATED VALVE

AWG AMERICAN WIRE GAUGE MPC MINI-POWER CENTER

BC BARE COPPER MPR MOTOR PROTECTION RELAY

BLDG BUILDINGMV, mV MEDIUM VOLTAGE, MILLIVOLT

BOT BOTTOM MVMC MEDIUM VOLTAGE MOTOR CONTROL

CCONDUCTOR, CONDUIT

N.C. NORMALLY CLOSED

CB CIRCUIT BREAKER N.O. NORMALLY OPEN

CKT CIRCUIT N/A NOT APPLICABLE

CLG CEILINGNEUT, N

NEUTRAL

CMU CONCRETE MASONRY UNIT NF NON-FUSED

CNTL CONTROL NG NATURAL GAS

CONC CONCRETE NIC NOT IN CONTRACT

CPT CONTROL POWER TRANSFORMER No. NUMBER

CSI COMMUNICATION SYSTEM INSTALLER NOM NOMINAL

CT CURRENT TRANSFORMER NP NAMEPLATE

Cu COPPER NTS NOT TO SCALE

CV CONTROL VALVE OD OUTSIDE DIAMETER

DB DIRECT BURIAL OH OVERHEAD

DCDIRECT CURRENT, DATA CABLE

OIT OPERATOR INTERFACE TERMINAL

DET DETAIL OL OVERLOAD

DIAG DIAGRAM OWS OPERATOR WORKSTATION

DISC DISCONNECT PBPUSHBUTTON, PULLBOX

DIST DISTRIBUTION PKG'D PACKAGED

DWG DRAWING PMM POWER MONITORING MODULE

(E), (N)

EXISTING / NEW PNL PANEL

EA EACH PP POWER PANEL

EDB ELECTRICAL DUCTBANK PR PAIR

ELECELECTRIC, ELECTRICAL

PRI PRIMARY

ELP EXTRA LONG POND PT POTENTIAL TRANSFORMER

EMH ELECTRICAL MANHOLE PVC POLYVINYL CHLORIDE

ENCLENCLOSURE, ENCLOSED

PWR POWER

EP EXPLOSION PROOF RCPT RECEPTACLE

EPB ELECTRICAL PULLBOX PVC POLYVINYL CHLORIDE

EQUIP EQUIPMENT PW POTABLE WATER

FFUSE, FUSED

PWR POWER

FDR FEEDER RCPT RECEPTACLE

FL FLUORESCENT REF REFERENCE

FLA FULL LOAD AMPS REQ'D REQUIRED

FO FIBER OPTIC REQ'TS REQUIREMENTS

FVNR FULL VOLTAGE NON-REVERSING RMS ROOT MEAN SQUARE

FVR FULL VOLTAGE REVERSING RTU REMOTE TERMINAL UNIT

GDR GROUNDING RESISTOR RVNS REDUCED VOLTAGE NON-REVERSING

GEC GROUNDING ELECTRODE CONDUCTOR RVSS REDUCED VOLTAGE SOFT STARTER

GF GROUND FAULT SA SURGE ARRESTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER SCR SILICON CONTROLLED RECTIFIER

GFP GROUND FAULT PROTECTION SD SMOKE DETECTOR

GND GROUND SEC SECONDARY

GRS GALVANIZED RIGID STEEL SES SERVICE ENTRANCE SECTION

H, HIHIGH SPEC SPECIFICATION

HMI HUMAN MACHINE INTERFACE SPC SPARE CONDUIT

HP HORSEPOWER SPD SURGE PROTECTION DEVICE

HTR HEATER SSI SECURITY SYSTEM INSTALLER

HTU HEAT TRACE UNIT SSS SOLID-STATE SOFT STARTER

HZ

HERTZ (CYCLES PER SECOND)

ST SHORT TIME

ICOM INTERCOM SWBD SWITCHBOARD

ID INSIDE DIAMETER SWGR SWITCHGEAR

INSTINSTANTANEOUS, INSTRUMENT

SYMM SYMMETRICAL

INTLK INTERLOCK SYS SYSTEM

IPB INSTRUMENT PULLBOX TELCO TELEPHONE COMPANY

JB JUNCTION BOX TEMP TEMPERATURE

KCMIL 1000 CIRCULAR MILS TSP TWISTED SHIELDED PAIR

kV KILOVOLT TST TWISTED SHIELDED TRIAD

kVA KILOVOLT-AMPERE TTB TELEPHONE TERMINAL BOARD

Kvar KILOVOLT-AMPERE REACTIVE TYP TYPICAL

KW KILOWATT UG U/G UNDERGROUND

KWH KILOWATT-HOUR UPS UNINTERRUPTIBLE POWER SUPPLY

LLONG, LENGTH

V VOLT

LAN LOCAL AREA NETWORK VA VOLT-AMPERE

LCP LOCAL CONTROL PANEL VAR VOLT-AMPERE REACTIVE

LCS LOCAL CONTROL STATION VC VACUUM CONTACTOR

LFMC LIQUIDTIGHT FLEXIBLE METAL CONDUT VD VOLTAGE DROP

LT LONG TIME WWATT, WIRE, WIDE

LTG LIGHTING WAN WIDE AREA NETWORK

LV LOW VOLTAGE WP WEATHERPROOF

mA MILLIAMPERE WPWIU WEATHERPROOF WHILE-IN-USE

MAG MAGNETIC XMTR TRANSMITTER

MBJ MAIN BONDING JUMPER Z IMPEDANCE

ELECTRICAL PLAN SYMBOLS

IDENTIFICATION SYMBOLS

XX

#

#

#X

INDICATES KEY NOTE # REFERENCED,

(APPLICABLE ONLY TO SHEET WITH NOTE

IS FOUND)

INDICATES BILL OF MATERIAL #

REFERENCED, (MAY BE APPLICABLE

ACROSS ALL PROJECT SHEETS)

INDICATES BRIEF INSTRUMENT

REFERENCE

INDICATES MISCELLANEOUS REFERENCE

NUMBER OR LETTER (DESCRIBED

FURTHER WITHIN PLANSET WHERE

APPLICABLE)

CXXXX

CONDUIT IDENTIFICATION

(#### = CONDUIT NUMBER,

REFER TO CONDUIT SCHEDULE)

RACEWAYS AND LINETYPES

GROUNDING SYSTEM CONDUCTOR

EXPOSED CONDUIT

UTILITY CONDUIT DUCTBANK

CONDUIT TURNED DOWN

CONDUIT STUBUP

EXISTING CONCEALED CONDUIT

CONDUIT RUN CONCEALED IN

CEILING, FLOOR, OR IN WALLS

GGG

XXXX

XXXX

EXISTING EXPOSED CONDUIT

UNDERGROUND CONDUIT

DUCTBANK

EXISTING UNDERGROUND CONDUIT

DUCTBANK

EXISTING UTILITY CONDUIT

DUCTBANK

OHEOHE

OHEOHE

CHAIN LINK FENCE

EXISTING CHAIN LINK FENCE

UTILITY OVERHEAD ELECTRIC

EXISTING UTILITY OVERHEAD

ELECTRIC

GROUNDING

GROUND SYSTEM CONNECTION

GGG

G

LIGHTNING ROD

GROUND ROD AND WELL

GROUND ROD WITHOUT WELL

RECEPTACLES

SWITCH AND SIMPLEX RECEPTACLE

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE

DUPLEX RECEPTACLE WITH SPLIT WIRE

QUADRAPLEX RECEPTACLE

RECESSED FLOOR DUPLEX RECEPTACLE

RECESSED FLOOR QUADRAPLEX RECEPTACLE

SPECIALTY PURPOSE RECEPTACLE

480V RECEPTACLE

WELDING OR APPLIANCE RECEPTACLE

#

x

S

#

x

#

x

#

x

#

x

#

x

#

x

#

x

#

x

#

x

WHERE,

# = CIRCUIT DESIGNATION

x = DEVICE TYPE DESIGNATION, WHERE

GF = GROUND FAULT CIRCUIT INTERRUPTER

WP = WEATHERPROOF

WPWIU = WP WHILE-IN-USE

SWITCHES

SINGLE POLE SWITCH

SINGLE POLE SWITCH WITH MODIFIER

WHERE,

# = CIRCUIT DESIGNATION

x1 = DESIGNATION OF DEVICE SWITCHED (I.E. a, b, c, etc.)

x2 = SWITCH SUBSCRIPT MODIFIER, WHERE

2 = GROUND FAULT CIRCUIT INTERRUPTER

3 = WEATHERPROOF

4 = WP WHILE-IN-USE

K = KEY OPERATED

M = HORSEPOWER RATED MANUAL STARTER

MC = MOMENTARY CONTACT, THREE POSITION

MO = SWITCH WITH MOTION SENSOR

MS = MANUAL (MOTOR) STARTER OR SWITCH

TC/P = TIME CLOCK / PROGRAMMABLE

R = RHEOSTAT (DIMMER OR SPEED CONTROL)

F = FLUSH MOUNTED

WP = WEATHERPROOF

HOMERUN

MISCELLANEOUS

xx UNDERGROUND BOX

xx = BOX TYPE/DESIGNATION (I.E. EMH, EPB, IPB)

SAFETY SWITCH

xx = DISCONNECT TYPE (I.E. F, NF, CB)

#A = CURRENT RATING OF SWITCH

xx

#A

COMBINATION MOTOR STARTER

LOCAL/PUSHBUTTON CONTROL STATION

IDENTIFICATION SYMBOLS

a

b

c

d

e

f

LOW VOLTAGE CIRCUIT BREAKER

a = BREAKER DESIGNATION

b = AMPS & TRIP SETTING

(AT - AMP TRIP)

(AC - CONTINUOUS RATING)

c = FRAME SIZE (MFR TO

DETERMINE FRAME SIZE UNLESS

INDICATED)

d = BREAKER TYPE

MCP - MOTOR CIRCUIT

PROTECTOR

SS - SOLID-STATE

TM - THERMAL MAGNETIC

e = NUMBER OF POLES

f = WITHSTAND RATING

LOW VOLTAGE DISCONNECT SWITCH

a = DISCONNECT DESIGNATION

b = AMPS RATING

c = NUMBER OF POLES

d = ENCLOSURE RATING (IF

MOUNTED IN SEPARATE ENCL) (I.E.

NEMA 1, 12, 3R, 4X, 7)

e = WITHSTAND RATING

a

b

c

d

f

a

b

FUSE

a = AMPS RATING

b = FUSE TYPE

MOTOR STARTER

a = STARTER SIZE

b = STARTER TYPE (NEMA/IEC)

a

b

OVERLOAD RELAY

a = OVERLOAD TYPE (I.E. OL, EOL)

a

M <UTILITY>

POWER

METER

UTILITY

METER

HP

MOTOR

HP = HORSEPOWER RATING

ONE LINE DIAGRAM

SYMBOLS

DESCRIPTION

120V, 2'x4' FLUORESCENT LUMINAIRE, GRID/LAY-IN MOUNT,

SPECIFICATION GRADE T8 TROFFER, FLAT WHITE STEEL DOOR, #12

ACRYLIC PATTERN, UNIVERSAL VOLTAGE, ELECTRONIC START

BALLAST.

LUMINAIRE SCHEDULE

SYMBOL LAMP(S) FIXTURE MANUFACTURER

METALUX (2GC8-232A-UNV-EB81)

(2) 32W T8

FLUORESCENT

LAMPS

120V, 2'x4' FLUORESCENT LUMINAIRE, GRID/LAY-IN MOUNT,

SPECIFICATION GRADE T8 TROFFER, FLAT WHITE STEEL DOOR, #12

ACRYLIC PATTERN, UNIVERSAL VOLTAGE, ELECTRONIC START

BALLAST. INCLUDE EMERGENCY BATTERY PACK.

METALUX (2GC8-232A-UNV-EB81 + BATTERY PACK)

x1 #

x1 #

x2

A

B

BP

(3) 32W T8

FLUORESCENT

LAMPS

(2) 32W T8

FLUORESCENT

LAMPS

(2) 2W

AC LED

LAMPS

OS OCCUPANCY SENSOR

SP SWITCHPACK / POWER SUPPLY

METALUX (2GC8-332A-UNV-EB81)

COOPER LIGHTING - ALL PRO (APW-GPW232-32W)

SURE-LITES (APX6-R)120V, AC ONLY LED, ALL-PRO EXIT, RED.

EXIT

D

C

(2) 32W T8

FLUORESCENT

LAMPS

METALUX (SSF-232-UNV-EB81-AYC-CHAIN/SET)

120V, 4"x4' FLUORESCENT LUMINAIRE, COMMERCIAL STANDARD

STRIPLITE, PENDANT MOUNT, ELECTRONIC INSTANT START BALLAST.

F

(2) 32W R.S.

FLUORESCENT

LAMPS

DAY BRITE (DWAE232-120-EB10R)

LITHONIA (DMW232AR123-STSL-GEB10RS)

COLUMBIA (LUN4-232-EB8LH120-CPSSL)

120V, 8"x4' VAPORTIGHT (FULLY GASKETED) FLUORESCENT LUMINAIRE,

SURFACE MOUNTED, ONE PIECE, IMPACT RESISTANT ACRYLIC

DIFFUSER WITH SMOOTH SURFACE. UL LISTED FOR WET LOCATIONS.

G

(2) 32W T8

FLUORESCENT

LAMPS

120V, 8"x4' FLUORESCENT LUMINAIRE, SURFACE MOUNT, GENERAL

PURPOSE WRAP.

120V, 2'x4' FLUORESCENT LUMINAIRE, GRID/LAY-IN MOUNT,

SPECIFICATION GRADE T8 TROFFER, FLAT WHITE STEEL DOOR, #12

ACRYLIC PATTERN, UNIVERSAL VOLTAGE, ELECTRONIC START

BALLAST.

120V, 4.5"x2' T8 FLUORESCENT LUMINAIRE, WHITE ACRYLIC.

H

LITHONIA (2RE-120)

(2) 17W

FLUORESCENT

LAMPS

(4) 32W T8

FLUORESCENT

LAMPS

COOPER LIGHTING - ALL PRO (APW-GPW432-32W)

E

120V, 12"x4' FLUORESCENT LUMINAIRE, SURFACE MOUNT, GENERAL

PURPOSE WRAP.

E1

(6) T8

FLUORESCENT

LAMPS

(2) T8

FLUORESCENT

LAMPS

EXISTING 2'x4' FLUORESCENT LUMINAIRE, PENDANT OR SURFACE

MOUNT.

EXISTING 8"X4' VAPORTIGHT FLUORESCENT LUMINAIRE, PENDANT OR

SURFACE MOUNT.

E2

(6) T5

FLUORESCENT

LAMPS

EXISTING 2'x4' FLUORESCENT LUMINAIRE, PENDANT OR SURFACE

MOUNT.

E3

J

(2) LAMPS

INCANDESCENT

COOPER LIGHTING - ALL PRO (AP2SQ)120/277V, EMERGENCY LUMINAIRE WITH 1½ HOUR BATTERY,

THERMOPLASTIC HOUSING.

(4) T8

FLUORESCENT

LAMPS

EXISTING 8"X8' VAPORTIGHT FLUORESCENT LUMINAIRE, PENDANT OR

SURFACE MOUNT.

E4

480V, 3PH LOAD CALCULATIONS

LOAD DESCRIPTION KVA H.P. AMPS

FIRE PUMP -- 250 302.0

SWITCHBOARD (SWBA)

703.0

480V PANEL LPA2 84.2 -- 101.2

480V PANEL LPA 49.7 -- 59.8

480V PANEL LPE ** EXISTING - NO CHANGES ** 18.0 -- 21.7

480V PANEL LPF 228.9 -- 275.4

MOTOR CONTROL CENTER (MCCA) ** EXISTING - NO CHANGES **

245.0

FREEZER FAN D2-A -- 2 3.4

FREEZER FAN D2-A -- 2 3.4

FREEZER FAN D2-B -- 2 3.4

FREEZER FAN D2-B -- 2 3.4

FREEZER FAN D3-A -- 2 3.4

FREEZER FAN D3-A -- 2 3.4

FREEZER FAN D3-B -- 2 3.4

FREEZER FAN D3-B -- 2 3.4

FREEZER FAN D4-A -- 2 3.4

FREEZER FAN D4-A -- 2 3.4

FREEZER FAN D4-B -- 2 3.4

FREEZER FAN D4-B -- 2 3.4

FREEZER FAN D5-A -- 2 3.4

FREEZER FAN D5-A -- 2 3.4

FREEZER FAN D5-B -- 2 3.4

FREEZER FAN D5-B -- 2 3.4

FREEZER FAN D6-A -- 2 3.4

FREEZER FAN D6-A -- 2 3.4

FREEZER FAN D6-B -- 2 3.4

FREEZER FAN D6-B -- 2 3.4

FREEZER FAN D1-C -- 2 3.4

FREEZER FAN D1-B -- 1 1.8

FREEZER FAN D1-A -- 1 1.8

UNDER FLR VENT FAN -- 2 3.4

EF-2 VENT FAN -- 1 1.8

MAINTENANCE ROOM EXHAUST FAN -- 0.5 1.0

GLYCOL PUMP 1 -- 1.5 2.6

GLYCOL PUMP 2 (BACKUP)

-- 1.5 0.0

PURGE PUMP -- 3 4.8

AMMONIA PUMP 1 -- 3 4.8

WATER JACKET PUMP 1 -- 3 4.8

WATER JACKET PUMP 2 (BACKUP)

-- 3 0.0

AMMONIA PUMP -- 5 7.6

AMMONIA PUMP (BACKUP)

-- 5 0.0

CONDENSOR PUMP -- 5 7.6

CONDENSOR PUMP -- 5 7.6

DOCK HOLDING COND FAN (AC-1)

-- 1 1.8

DOCK HOLDING COND FAN (AC-2)

-- 1 1.8

DOCK HOLDING COND FAN (AC-3)

-- 1 1.8

DOCK HOLDING COND FAN (AC-4)

-- 1 1.8

DOCK HOLDING COND FAN (AC-5)

-- 1 1.8

DOCK HOLDING COND FAN (AC-6)

-- 1 1.8

BLAST FREEZER (B-1) (7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER (B-1) (7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER (B-2) (7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER (B-2) (7.5 HP) <REMOVED>

-- 0 0.0

ROOF CONDENSOR FAN -- 10 14.0

ROOF CONDENSOR FAN -- 10 14.0

AMMONIA PUMP -- 3 4.8

ROOF CONDENSOR HEATER <REMOVED> 18 -- 0.0

ROOF CONDENSOR HEATER <REMOVED> 18 -- 0.0

BLAST FREEZER #3 (2 X 7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER #4 (2 X 7.5 HP) <REMOVED>

-- 0 0.0

FREEZER EVAPORATOR #1 -- 7.5 11.0

FREEZER EVAPORATOR #2 -- 7.5 11.0

FREEZER EVAPORATOR #3 -- 7.5 11.0

FREEZER EVAPORATOR #4 -- 7.5 11.0

FREEZER EVAPORATOR #5 -- 7.5 11.0

DOCK EVAPORATOR #1 -- 3 4.8

DOCK EVAPORATOR #2 -- 3 4.8

DOCK EVAPORATOR #3 -- 3 4.8

FREEZER EVAPORATOR #6 -- 7.5 11.0

SWITCHBOARD (SWBB)

578.6

480V PANEL LPC 62.3 -- 74.9

480V PANEL LPD 53.7 -- 64.6

480V PANEL HVP3 197.9 -- 238.0

SWITCHBOARD (TE)

201.0

480V PANEL HVP1 31.8 -- 38.2

480V PANEL HVP2 38.9 -- 46.8

480V PANEL LPB 73.9 -- 88.9

208V PANEL RPD TRANSFORMER 21.0 -- 25.3

208V PANEL LVP4 TRANSFORMER 1.5 -- 1.8

MOTOR CONTROL CENTER (MCCB) ** EXISTING - NO CHANGES **

0.0

CP-3B (STANDBY)

-- 100 0.0

CP-4B (STANDBY)

-- 100 0.0

CP-3 (STANDBY)

-- 150 0.0

CP-4 (STANDBY)

-- 150 0.0

MOTOR CONTROL CENTER (MCCC) ** EXISTING - NO CHANGES **

608.0

CP-1B (DUTY)

-- 100 124.0

CP-2B (DUTY)

-- 100 124.0

CP-1 (DUTY)

-- 150 180.0

CP-2 (DUTY)

-- 150 180.0

MOTOR CONTROL CENTER (MCCD) ** EXISTING - NO CHANGES **

0.0

CP-5 (STANDBY)

-- 407 0.0

SURGE PROTECTION DEVICE 0 -- 0.0

SUBTOTAL = 2436.6

+25% OF CONTINUOUS LIGHTING LOADS = 45.2

+25% OF LARGEST MOTOR (407HP) =

75.5

MINIMUM SERVICE SIZE = 2557.3

EXISTING SERVICE SIZE = 3000A

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

ELECTRICAL

COVER

SHEET

E100

4

ts$
Typewritten Text
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 3: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

1

1

3

3

4

4

B4

B

5

5

7

7

6

6

8

8

9

9

10

10

11

11 12 13 14 15 16 17 18 19 20 21 22

23

23

23.2

23.2

24

24

25

25

26

26

26.6 27

27

29

29

30

30

31

31

32

3222.8 23.6" 26.2 26.9 28 30.6 31.4

B1

B7

B8

B9

C

D1

E

F

G

H

I

J

K1

L1

F-01

C2 C1

C3C3

RB

RC RD

RE

C1

C1

C1

C2 C2

C2 C2

C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1

C1

P5

P5

P5

P5

P5

P5

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P5

P5

P5

P5

P5

P5

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

FA FB FC FD FE FF

C3 C3C3

C2C2 C2 C2

C2 C2

C2 C2

C1

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C4

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C4

C4

C2 C2 C2 C3C1

C4

C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C4

C4

RARF

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2

C3

C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

DR

C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3

DQDPDNDMDLDKDJDHDGDFDDDCDBDA DEC4C1C1C2C2

C2C2C2

C2C2C2C2C1C1C2C2C2C2C2C2C2C2C2

P4

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2

C1C1C2C2

C1C1C2C2

C1C1C2C2

C1C1C2C2

C2

C2

C2

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C2C2C2C2C2C2

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C3 C3 C3 C3 C3C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

P5

P5

PIR

C1C1

PIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

C3C3

C3C3

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

C2

C2

C2

C2

C2

C2

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C2

P3

P4

P4

C1

E1

LPC

29

E1

LPC

27

E1

LPC

29

E1

LPC

27

E1

LPC

29

E1

LPC

27

E1

LPB

1

EXIT

E1

LPB

1

E1

LPB

1

E1

LPB

1

E1

LPB

1

E1

LPB

2

E1

LPB

1

E1

LPB

2

E1

LPB

2

E1

LPB

2

E1

LPB

2

E1

LPB

2

E1

LPB

2

E1

LPB

2

E1

LPB

2

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

HVP1

4

E1

LPC

4

E1

LPC

4

E1

LPC

5

E1

LPC

5

E1

LPC

4

E1

LPC

4

E1

LPC

4

E1

LPC

4

E1

LPC

5

E1

LPC

4

E1

LPC

4

E1

EM

8

NL

E1

LPC

5

E1

LPC

5

E1

LPC

4

E1

LPC

4

E1

LPC

4

E1

LPC

5

E1

LPC

5

E1

LPC

4

E1

LPC

4

E1

LPC

5

E1

LPC

7

E1

LPC

7

E1

LPC

5

E1

LPC

7

E1

LPC

7

E1

LPC

5

E1

LPC

5

E1

LPC

7

E1

LPC

7

E1

LPC

7

E1

LPC

7

E1

EM

8

NL

E1

LPC

5

E1

LPC

7

E1

LPC

7

E1

EM

8

NL

E1

LPC

7

E1

LPC

5

E1

LPC

7

E1

LPC

7

E1

LPC

9

E1

LPC

25

E1

LPC

25

E1

LPC

9

E1

LPC

25

E1

LPC

25

E1

LPC

25

E1

LPC

25

E1

LPC

9

E1

LPC

25

E1

LPC

25

E1

LPC

25

E1

EM

4

NL

E1

LPC

9

E1

LPC

9

E1

LPC

25

E1

LPC

25

E1

LPC

25

E1

LPC

25

E1

LPC

9

E1

LPC

9

E1

LPC

25

E1

LPC

25

E1

LPC

9

E1

HVP2

8

E1

HVP2

8

E1

HVP2

8

E1

HVP2

8

E1

HVP2

8

E1

HVP2

8

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

LPC

6

E1

EM

4

NL

E1

EM

4

NL

E1

EM

2

NL

E1

EM

2

NL

E1

EM

2

NL

E1

EM

6

NL

E1

EM

6

NL

E1

EM

6

NL

E1

EM

4

NL

E1

EM

4

NL

E1

EM

2

NL

E1

EM

2

NL

E1

EM

2

NL

E1

EM

6

NL

E1

EM

6

NL

E1

EM

6

NL

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

17

E1

LPD

19

E1

LPD

6

E1

LPD

2

E1

LPD

2

E1

LPD

6

E1

LPD

2

E1

LPD

2

E1

LPD

2

E1

LPD

2

E1

LPD

6

E1

LPD

6

E1

LPD

2

E1

LPD

2

E1

LPD

2

E1

LPD

2

E1

LPD

6

E1

LPD

6

E1

LPD

2

E1

LPD

2

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

LPD

4

E1

EM

6

NL

E1

EM

6

NL

E1

EM

6

NL

E1

EM

2

NL

E1

EM

2

NL

E1

EM

2

NL

E1

EM

4

NL

E1

EM

4

NL

E1

EM

4

NL

E1

EM

4

NL

E1

EM

4

NL

E1

EM

4

NL

E1

LPD

11

E1

LPD

11

E1

LPD

11

E1

LPD

11

E1

LPD

11

E1

LPD

11

E1

LPD

1

E1

LPD

1

E1

LPD

1

E1

LPD

1

E1

LPD

1

E1

LPD

1

E1

LPD

5

E1

LPD

5

E1

LPC

16

E1

LPC

14

E1

LPC

16

E1

LPC

14

E2

LPC

12

E2

LPC

10

E2

LPC

10

E2

LPC

12

E2

LPC

10

E2

LPC

12

E2

LPC

12

E2

LP

C

10

E2

LPC

14

E2

LPC

16

E2

LPC

14

E2

LPC

14

E2

LPC

16

E2

LPC

16

E2

LPC

14

E2

LPC

14

E2

LPC

16

E1

LPC

16

E1

LPC

14

E1

LPC

16

E1

LPC

14

E1

LPC

16

E1

LPC

16

E1

LPC

10

E1

LPC

12

E1

LPC

12

E1

LPC

10

E1

LPC

10

E1

LPC

12

E1

LPD

6

E1

LPD

6

E1

EM

4

NL

E1

HVP1

4

E1

EM

8

NL

E1

EM

8

NL

E1

EM

8

NL

E1

LPB

2

E1

LPB

2

E1

HVP1

4

E1

HVP1

4

E1

EM

4

NL

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FU

SE

PN

LE

M

E3

EX

IT

EX

IT

EXIT EXIT

EXIT

EXIT

EXIT EXIT EXIT EXIT

EX

IT

EX

IT

EX

IT

EXIT

EXIT

EX

IT

EXIT EXIT

EXIT

EM-2

EXIT

EX

IT

EXIT

EXIT

EXIT

E4 E4 E4 E4 E3 E3 E3

J

EXIT

EX

IT

EX

IT

EXIT

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

ELECTRICAL

BUILDING

PLAN

E110

N

0 2 1

SCALE 1/16" = 1'

1

GENERAL NOTES KEY NOTES

1

2

3

EXISTING TRANSFER SWITCH AND 480V PANEL "EM"

1

EXISTING 480V PANEL "LPF", 208V PANEL "RPE" AND TRANSFORMER

EXISTING STANDBY GENERATOR

3

2

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E122, E123 AND E124 FOR RAIL DOCK, ACCESS CORRIDORS, AND

WAREHOUSE EXISTING LIGHTING PLAN AND MODIFICATIONS.

F. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

G. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

H. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

LEVEL 01 EXISTING

ELECTRICAL EQUIPMENT

INDICATED ON THIS SHEET

2

REFER TO SHEET E122 FOR

RAIL DOCK, CORRIDOR AND

WAREHOUSE EXISTING

LIGHTING AND MODIFICATIONS

2

REFER TO SHEET E123 FOR

CORRIDOR AND WAREHOUSE

EXISTING LIGHTING AND

MODIFICATIONS

2

REFER TO SHEET E124 FOR

CORRIDOR AND WAREHOUSE

EXISTING LIGHTING AND

MODIFICATIONS

2

REFER TO SHEETS E120

AND E121 FOR LEVEL 01

OFFICE REMODEL LIGHTING

AND POWER PLANS

REFER TO SHEETS E130, E131,

E132, AND E133 FOR LEVEL 02

OFFICE REMODEL LIGHTING

AND POWER MODIFICATIONS

2

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 4: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

FR

ON

T

FR

ON

T

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

LEVEL 01

POWER

PLAN

E120

N

0 2 1

SCALE 1/4" = 1'

1

KEY NOTES

GENERAL NOTES

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR OFFICE REMODEL LEVEL 01 POWER AND

LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

H. REFER TO SHEET E110 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

I. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

J. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

K. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

L. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

1

2

3

4

5

6

7

8

EXISTING SERVICE ENTRANCE SECTION (NO MODIFICATION; FOR REFERENCE ONLY)

9

EXISTING UTILITY TRANSFORMER (NO MODIFICATION; FOR REFERENCE ONLY)

10

EXISTING SWBD "SWBA1" (NO MODIFICATION; FOR REFERENCE ONLY)

11

EXISTING SWBD "SWBA2" (NO MODIFICATION; FOR REFERENCE ONLY)

12

EXISTING SWBD "SWBB" (NO MODIFICATION; FOR REFERENCE ONLY)

13

14

EXISTING SWBD "TE" (NO MODIFICATION; FOR REFERENCE ONLY)

15

EXISTING MCCA (NO MODIFICATION; FOR REFERENCE ONLY)

16

EXISTING MCCB (NO MODIFICATION; FOR REFERENCE ONLY)

17

EXISTING MCCC (NO MODIFICATION; FOR REFERENCE ONLY)

18

EXISTING MCCD AND J-BOX (NO MODIFICATION; FOR REFERENCE ONLY)

19

EXISTING 480V PANEL LPA2 (REFER TO PANEL SCHEDULE FOR CHANGES)

20

EXISTING 208V PANEL RPA2 (REFER TO PANEL SCHEDULE FOR CHANGES)

EXISTING 208V PANEL RPA (REFER TO PANEL SCHEDULE FOR CHANGES)

EXISTING 208V PANEL RPAA (REFER TO PANEL SCHEDULE FOR CHANGES)

FC-1 (IU-1). INSTALL 240VAC, 30A FUSED DISCONNECT SWITCH. DISCONNECT SWITCH

ENCLOSURE SHALL HAVE TYPE 1 RATING. INSTALL FUSES SIZED PER HVAC MFR

RECOMMENDATIONS. INSTALL 2-#10, #10 GND, 3/4"C. CIRCUITED TO PANEL

RPA-16,18.

ROOF MOUNTED CU-1 (OU-1). INSTALL 240VAC, 60A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 2-#8, #10 GND, 3/4"C. CIRCUITED

TO PANEL RPA2-35,37.

FC-2 (IU-2). INSTALL 240VAC, 30A FUSED DISCONNECT SWITCH. DISCONNECT SWITCH

ENCLOSURE SHALL HAVE TYPE 1 RATING. INSTALL FUSES SIZED PER HVAC MFR

RECOMMENDATIONS. INSTALL 2-#10, #10 GND, 3/4"C. CIRCUITED TO PANEL

RPA2-26,28.

ROOF MOUNTED CU-2 (OU-2). INSTALL 240VAC, 60A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 2-#8, #10 GND, 3/4"C. CIRCUITED

TO PANEL RPA2-39,41.

ROOF MOUNTED EF-1. INSTALL 7-DAY PROGRAMMABLE WALL SWITCH IN SINGLE OR

DOUBLE GANG BOX.

HR

OFFICE

TRANSPORT

BREAK

ROOM

MENWOMEN

ROUTING &

BILLING

INVENTORY

HALL

WILL CALL &

RECIEVING

DRIVER

WAITING

DRIVERS

WAREHOUSE

ELEV.

STAIR 2

HALL

HALL

MAINTENANCE

SHOP

LOCKERS

STORAGE

ENGINE

ROOM

LOBBY /

RECEPTION

TOILET

J-BOX (E)

RP

A2-1

RP

A2-3

RP

A2-5

RP

A2-7

RPA2-9

RPA2-38

RPA2-9

RP

A2-9

RPA2-9

RPA-1

RPA2-11

RP

A2-11

RP

A2-11

RP

A2-38

RP

A2-38

RPA-7

RP

A-1

1

2

34 5 6

10

9 8 7

11 12 13 14

15

F

30A

F

30A

F

60A

F

60A

1917

1816

#

TC/P

#

TC/P

20 21

RPA2-16

RPA2-38RPA2-11

RPAA-14

RPAA-14

RPA2-9

RPA-7

RPA2-36

RPA2-34

RP

AA

-18

RP

AA

-18

RPAA-18

RP

AA

-18

RP

AA

-18

RPAA-18

HALL

RPAA-18

RP

A-7

RP

A-7

RP

AA

-18

RP

A-9

RP

A-9

RPA-7

RPA2-9

RP

A-1

RPA2-11

RPA2-11

RPA2-38

RPA2-38

RPA-1

RP

A2-9

RP

A2-9

RP

A2-9

RP

A2-9

RPAA-18

21

RPA2-16

21ROOF MOUNTED EF-2. INSTALL 7-DAY PROGRAMMABLE WALL SWITCH IN SINGLE OR

DOUBLE GANG BOX.

RPA2-19

GFCI

RP

A-15

F

RP

A-17

GF

CI

ELEVATOR SUMP

PUMP (SP-1)

GFCI

RPA-29

RECIRC PUMP

(RP-1) (RPA-30)

WATER HEATER

(WH-1) (RPA2-2,4)

22600V, 60A ELEVATOR MOTOR DISCONNECT SWITCH (LPA2-6,8,10). INSTALL 3-#4, #10

GND, 1¼"C. SIZE FUSES PER MFR REQ'TS.

22

23INSTALL FLUSH MOUNT J-BOX COVER AND CONDUIT IN WALL EXTENDING ABOVE

CEILING GRID FOR TV LOCATION.

J

23

J23

J23

23

J

LEVEL 01 OFFICE

AREA REMODEL

INDICATED

ON THIS SHEET

24MOUNTED ON ROOF NEXT TO AIR CONDITIONING UNIT.

GFCI

RPA2-24

24

1

SHADED AREA(S) REPRESENT

AREA(S) BEING REMODELED

ON THIS SHEET

EXISTING BUILDING

FOOTPRINT

F

25

25INSTALL 250V, 30A, 2P FUSED DISCONNECT SWITCH IN MECHANICAL SPACE FOR

ELEVATOR CAR LIGHTS (RPA-3). INSTALL 15A FUSES.

4

REFER TO SHEET

E150, 480 PANEL

LPA2, CKT 6,8,10 FOR

ADDITIONAL INFO

FOR ELEVATOR PUMP

4

4BEING DEMOLISHED

BEING DEMOLISHED

INSTALL NEW

TRANSFORMER PAD PER

SRP REQUIREMENTS

EXISTING PRIMARY CONDUIT

VAULT FOR SECONDARY

CONDUITS PER SRP REQ'TS

EXISTING 480V PANEL LPA TO BE REPLACED WITH NEW (REFER TO PANEL SCHEDULE

AND SINGLE LINE DIAGRAM)

4

26COORDINATE WITH SRP FOR DISCONTINUANCE OF POWER AND REMOVAL OF SRP

PRIMARY CONDUCTORS AND TRANSFORMER.

27CUT EXISTING 4" PRIMARY CONDUIT AND EXTEND TO NEW TRANSFORMER.

26

27

EXISTING PLATFORM

AND CONCRETE PAD

286" CONCRETE PAD

29SHEARED WELDED STEEL WIRE REMESH. SUPPORT IN PLACE WITH DOBIE BLOCKS.

28

29

5'

3'

G

GG

GG

GG

GG

GG

GG

GG

G

G G

G G

30INSTALL 10'X3/4" Cu-CLAD GROUND ROD AND 8"-DIA WELL WITH COVER.

30

30

G

31INSTALL #4/0 BARE Cu GROUNDING ELECTRODE CONDUCTOR (GEC) AT 30" MINIMUM

DEPTH. EXOTHERMICALLY WELD (OR NON-REVERSIBLE CRIMP) TO GROUND RODS.

31

32BOND #4/0 BARE Cu CONDUCTOR TO GROUND RING VIA EXOTHERMICALLY WELD (OR

NON-REVERSIBLE CRIMP) AND EXTEND TO SWGR GROUND BUS (SWGR-SES /

SWGR-MDP). INSTALL CONDUCTOR AT 30" MINIMUM DEPTH.

33BOND #4/0 BARE Cu CONDUCTOR TO GROUND RING VIA EXOTHERMICALLY WELD (OR

NON-REVERSIBLE CRIMP) AND EXTEND TO EXISTING GROUNDING SYSTEM. INSTALL

CONDUCTOR AT 30" MINIMUM DEPTH.

31

31

32

32

33

KEY NOTES

34 SWGR-SES (NEW)

35 SWGR-MDP (NEW)

34

35

36 INSTALL SECONDARY CONDUITS PER SRP REQ'TS (19-4"C PER TABLE 1,

PAGE 6-1)

36

37 INSTALL CONDUIT AND CONDUCTORS BETWEEN SWGR-SES AND

SWGR-MDP PER SINGLE LINE DIAGRAM.

38 INSTALL CONDUIT AND CONDUCTORS BETWEEN SWGR-SES AND

EXISTING FIRE PUMP CONTROLLER PER SINGLE LINE DIAGRAM

(APPROX 300-LF TO SOUTH).

38

37

EXISTING FIRE PUMP BUILDING

4

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 5: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

LEVEL 01

LIGHTING

PLAN

E121

N

0 1 2

SCALE 1/4" = 1'

2

KEY NOTES

GENERAL NOTES

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 OFFICE REMODEL POWER AND

LIGHTING PLANS.

E. REFER TO SHEETS E122, E123 AND E124 FOR LEVEL 01 DOCK AND WAREHOUSE LIGHTING

PLANS.

F. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

G. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

H. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

I. REFER TO SHEET E110 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

J. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

K. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

L. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

M. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

1 EXISTING 480V PANEL LPA

2 EXISTING 480V PANEL LPA2

HR

OFFICE

TRANSPORT

BREAK

ROOM

MEN

WOMEN

ROUTING &

BILLING

INVENTORY

HALL

DRIVER

WAITING

WAREHOUSE

ELEV.

STAIR 2

HALL

HALL

MAINTENANCE

SHOP

STORAGE

LOBBY /

RECEPTION

TOILET

1

MO

B

LPA-19BP

2

C

LP

A-21

3

3

MO

4

MO

5

MO

A

LPA-23

6

B

LPA-19BP

6

A

LPA-23

6

A

LPA-23

6

A

LPA-23

6

B

LPA-19BP

6

A

LPA-23

8

A

LPA-23

8

A

LPA-23

7

A

LPA-23

7

7

MO

8

MO

A

LP

A-23

12

9

MO

10

MO

12

MO

13

MO

14

MO

ENGINE

ROOM

208V PANEL RPAA

PS

PS

2 1

OS

6

OS

6

OS

2

OS

2

A

LP

A-23

12

WILL CALL &

RECIEVING

DRIVERS

OFFICE

HALL

A

LPA-21

2

11

MO

1

LPA-21

D

1

LPA-21

D

13

LPA-23

D

14

LPA-23

E

14

LPA-23

E

13

LPA-23

D

12

MO

H

16

LPA-7

16

15

LP

A-1

9

EX

IT

LP

A-1

9

EX

IT

LPA-19

EXIT

LPA-19

EXIT

15

LP

A-7

G

LEVEL 01 OFFICE

AREA REMODEL

INDICATED

ON THIS SHEET

SHADED AREA(S) REPRESENT

AREA(S) BEING REMODELED

ON THIS SHEET

EXISTING BUILDING FOOTPRINT

A

LPA-23

2

A

LPA-23

2

A

LP

A-21

11

A

LP

A-21

11

A

LPA-21

2

A

LP

A-23

11

B

LPA-19BP

2

A

LPA-21

2

A

LPA-21

2

C

LPA-21

4

C

LP

A-21

5

A

LPA-21

2

A

LPA-21

2

C

LP

A-21

5

A

LPA-21

2

A

LP

A-23

12

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 6: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

C3

C3

C3

C3

C3

C3

C3

C3

DG

DF

DD

DC

DB

DA

DE

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

P4

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C2

C2

C2

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C2

C2

C2

C2

C2

C2

C1

C1

C2

C2

C2

C2

C2

C2

C1

C1

C2

C2

C2

C2

C2

C2

C1

C1

C2

C2

C2

C2

C2

C2

C1

C1

C2

C2

C2

C2

C2

C2

C1

C1

C2

C2

C2

C2

C2

C2

C1

C1

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C1

C1

C3

C3

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

E1

LP

C

29

E1

LP

C

27

E1

LP

C

29

E1

LP

C

27

E1

LP

C

29

E1

LP

C

27

E1

LP

B

1

HVP3-1,3,5

L16-20R

HV

P3-7,9,11

L16-20R

HV

P3-8,10,12

L16-20R

HV

P3-13,15,17

L16-20R

HV

P3-14,16,18

L16-20R

HV

P3-19,21,23

L16-30R

HV

P3-20,22,24

L16-30R

E1

LP

B

1

E1

LP

B

1

E1

LP

B

1

E1

LP

B

1

E1

LP

B

2

E1

LP

B

1

E1

LP

B

2

E1

LP

B

2

E1

LP

B

2

E1

LP

B

2

E1

LP

B

2

E1

LP

B

2

E1

LP

B

2

E1

LP

B

2

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

HV

P1

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

EM

8NL

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E1

LP

C

4

E2

LP

C

12

E2

LP

C

10

E2

LP

C

10

E2

LP

C

12

E2

LP

C

10

E2

LP

C

12

E2

LP

C

12

E2

LPC

10

E1

LP

C

12

E1

LP

C

10

E1

LP

C

10

E1

LP

C

12

E1

HV

P1

4

E1

EM

8NL

E1

EM

8NL

E1

EM

8NL

E1

LP

B

2

E1

LP

B

2

E1

HV

P1

4

E1

HV

P1

4

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

EXIT

EXIT

EX

IT

EX

IT

EX

IT

EXIT

EX

IT

EX

IT

HVP3-2,4,6

L16-20R

E4

E4

E4

E4

J

EX

IT

EX

IT

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

WAREHOUSE

LEVEL 01

LIGHTING

PLAN - 1

E122

N

1" 2" 3"

SCALE 1/8" = 1'

0

GENERAL NOTES KEY NOTES

1

2

3

4

1

2

5

6

3

7

8

9

10

11

12

13

14

15

16

17

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

H. REFER TO SHEET E160 FOR CONTROL SCHEMATICS.

LEVEL 01 EXISTING

ELECTRICAL EQUIPMENT

INDICATED ON THIS SHEET

4

REFER TO SHEET E123 FOR CONTINUATION

ACCESS

CORRIDOR

DRY

WAREHOUSE

BATTERY

CHARGING ROOM

(RAIL DOCK)

COLD

DOCK

EXISTING 480V PANEL "LPB", 208V PANEL "RPB1" AND TRANSFORMER

EXISTING 480V PANEL "HVP1", 208V PANEL "LVP1" AND TRANSFORMER

EXISTING 480V DISCONNECT SWITCH, 208V PANEL "LVP3" AND TRANSFORMER

EXISTING 240V PANEL "LVP4" AND TRANSFORMER

INSTALL NEW 480V PANEL HVP3 NEXT TO EXISTING 208V PANEL LVP3. INSTALL FEEDER

CONDUIT AND CONDUCTORS PER SINGLE LINE DIAGRAM. INSTALL JUNCTION BOX(ES)

AS NECESSARY TO FACILITATE CONDUCTOR PULL AND NOT EXCEED 360° ALLOWABLE

BENDS.

INSTALL L16-20R RECEPTACLE IN BOX. EXTEND 3-#12, #12 GND, 3/4"C TO CONTACTOR

CONTROL PANEL.

INSTALL L16-30R RECEPTACLE IN BOX. EXTEND 3-#10, #10 GND, 3/4"C TO CONTACTOR

CONTROL PANEL.

INSTALL NEW EXIT LIGHT. INSTALL 2-#12, #12 GND, 1/2"C TO NEAREST EMERGENCY CKT

FROM 480V PANEL EM.

EXISTING EXIT LIGHT

EXISTING EMERGENCY LIGHT WITH BATTERY PACK

EXISTING EMERGENCY FLOOD LIGHT ON STANDBY POWER; CONNECTED TO FUSE

PANEL.

EXISTING EMERGENCY FLUORESCENT LUMINAIRE ON STANDBY POWER; CONNECTED

TO FUSE PANEL.

EXISTING LUMINAIRE TO REMAIN. WHERE INDICATED BY "NL", NIGHT LIGHT CIRCUIT

WILL REMAIN ENERGIZED AT ALL TIMES (UTILITY POWER AND GENERATOR VIA 480V

PANEL EM WHEN UTILITY POWER IS LOST).

EXISTING LUMINAIRE TO BE RELOCATED TO ALIGN WITH STORAGE RACK ISLES.

WHERE INDICATED BY "NL", NIGHT LIGHT CIRCUIT WILL REMAIN ENERGIZED AT ALL

TIMES (UTILITY POWER AND GENERATOR VIA 480V PANEL EM WHEN UTILITY POWER IS

LOST).

RE-CIRCUIT LUMINAIRE TO OPERATE ON CIRCUIT EM-8.

REPLACE EMERGENCY LUMINAIRE WITH NEW. REFER TO SHEET E100 FOR ADDITIONAL

REQUIREMENTS.

INSTALL 8"X4' LUMINAIRE WITH 1½ HOUR BATTERY PACK ON ALL STAIR LANDINGS.

6666

17

17

5

12

1212121212

9

8

8

6

6

8

8

7

8

8

12

12

12 12

12

12

12

12

12

11

11

12

12

12 14

12

12

12

1212

1212

12

12

12

12

12

12

12

12

12

12

12

12

12

12

12 12 12

8

11

11

12

12

13 13 13 13 13

1313

13 1313

13

1313

13

13

13

13

13

13 13 13 13

1313

9

10

10

16

8

16

18

INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH FOR TRASH COMPACTOR.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 1 RATING. INSTALL FUSES SIZED

PER TRASH COMPACTOR MFR RECOMMENDATIONS. INSTALL 3-#12, #12 GND, 3/4"C

(FROM 480V PANEL HPV3, CIRCUIT 25,27,29).

9

7

15

18

19

INSTALL COMBINATION MOTOR STARTER FOR EXHAUST FAN EF-6. MOTOR STARTER

ENCLOSURE SHALL HAVE TYPE 1 RATING. INSTALL 3-#12, #12 GND, 3/4"C (FROM 480V

PANEL HPV3, CIRCUIT 31,33,35). REFER TO MOTOR CONTROL SCHEMATIC ON SHEET

E160.

20 19

20

CONTACTOR CONTROL PANEL. CONTACTOR CONTROL PANEL ENCLOSURE SHALL

HAVE TYPE 1 RATING. INSTALL 24-#12, #12 GND IN 1-1/4" NIPPLE BETWEEN CONTROL

PANEL AND 480V PANEL HVP3. REFER TO CONTACTOR CONTROL SCHEMATIC ON

SHEET E160.

RAIL DOCK

3

AFS

21

21

AIR FLOW SWITCH PER MECHANICAL PLANS. INSTALL 2-#14, #14 GND, 3/4"C BETWEEN

FLOW SWITCH AND EXHAUST FAN STARTER.

3

3

3

3

22

INSTANT WATER HEATER FOR EYEWASH (IWH-1). INSTALL 3-#3/0, #6 GND, 2"C (FROM

480V PANEL HPV3, CIRCUIT 26,28,30).

22

23

EXHAUST FAN EF-6. INSTALL 3-#12, #12 GND, 3/4"C BETWEEN EXHAUST FAN EF-6

STARTER AND EXHAUST FAN EF-6.

3

23

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 7: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

RB

RC

RD

RE

C1

C1

C1

C2

C2

C2

C2

C2

C2

C1

C2

C2

C1

C2

C2

C1

C2

C2

C1

C2

C2

C1

C2

C2

C1

C2

C2

C1

C1

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

C3

C3

C3

DR

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

DQ

DP

DN

DM

DL

DK

DJ

DH

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C4

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C2

C2

C1

C1

C2

C2

C1

C1

C2

C2

C1

C1

C2

C2

C1

C1

C2

C2

C2

C2

C2

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C3

C3

C3

C3

C3

C3

C3

C3

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

C2

C2

C2

C2

C2

C2

C3

C3

C3

P3

EX

IT

E1

LP

C

5

E1

LP

C

5

E1

LP

C

5

E1

LP

C

5

E1

LP

C

5

E1

LP

C

5

E1

LP

C

5

E1

LP

C

5

E1

LP

C

7

E1

LP

C

7

E1

LP

C

5

E1

LP

C

7

E1

LP

C

7

E1

LP

C

5

E1

LP

C

5

E1

LP

C

7

E1

LP

C

7

E1

LP

C

7

E1

LP

C

7

E1

EM

8NL

E1

LP

C

5

E1

LP

C

7

E1

LP

C

7

E1

EM

8NL

E1

LP

C

7

E1

LP

C

5

E1

LP

C

7

E1

LP

C

7

E1

LP

C

9

E1

LP

C

25

E1

LP

C

25

E1

LP

C

9

E1

LP

C

25

E1

LP

C

25

E1

LP

C

25

E1

LP

C

25

E1

LP

C

9

E1

LP

C

25

E1

LP

C

25

E1

LP

C

25

E1

EM

4NL

E1

LP

C

9

E1

LP

C

9

E1

LP

C

25

E1

LP

C

25

E1

LP

C

25

E1

LP

C

25

E1

LP

C

9

E1

LP

C

9

E1

LP

C

25

E1

LP

C

25

E1

LP

C

9

E1

HV

P2

8

E1

HV

P2

8

E1

HV

P2

8

E1

HV

P2

8

E1

HV

P2

8

E1

HV

P2

8

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

6

E1

LP

C

16

E1

LP

C

14

E1

LP

C

16

E1

LP

C

14

E2

LP

C

14

E2

LP

C

16

E2

LP

C

14

E2

LP

C

14

E2

LP

C

16

E2

LP

C

16

E2

LP

C

14

E2

LP

C

14

E2

LP

C

16

E1

LP

C

16

E1

LP

C

14

E1

LP

C

16

E1

LP

C

14

E1

LP

C

16

E1

LP

C

16

E1

LP

C

10

E1

LP

C

12

E1

EM

4NL

E1

EM

4NL

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FUSE

PNL EM

E3

FU

SE

PN

LE

M

E3

FU

SE

PN

LE

M

E3

FUSE

PNL EM

E3

EX

IT

EX

IT

EX

IT

EXIT

EX

IT

EX

IT

EX

IT

E3

E3

E3

EXIT

EXIT

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

WAREHOUSE

LEVEL 01

LIGHTING

PLAN - 2

E123

N

1" 2" 3"

SCALE 1/8" = 1'

0

GENERAL NOTES KEY NOTES

1

2

3

4

5

6

7

8

9

10

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

LEVEL 01 EXISTING

ELECTRICAL EQUIPMENT

INDICATED ON THIS SHEET

1

2

REFER TO SHEET E124 FOR CONTINUATION

REFER TO SHEET E122 FOR CONTINUATION

3

DRY

WAREHOUSE

COOLER COOLER

COLD

DOCK

ACCESS

CORRIDOR

EXISTING 480V PANEL "LPC", 480V PANEL LPCA, 208V PANEL "RPB" AND TRANSFORMER

EXISTING 480V PANEL "HVP2", 208V PANEL "LVP2" AND TRANSFORMER

EXISTING IDF #2

INSTALL 8"X4' LUMINAIRE WITH 1½ HOUR BATTERY PACK ON ALL STAIR LANDINGS.

INSTALL NEW EXIT LIGHT. INSTALL 2-#12, #12 GND, 1/2"C TO NEAREST EMERGENCY CKT

FROM 480V PANEL EM.

EXISTING EXIT LIGHT

EXISTING EMERGENCY LIGHT WITH BATTERY PACK

RE-CIRCUIT LUMINAIRE TO OPERATE ON CIRCUIT EM-8.

RELOCATE EXISTING EMERGENCY LIGHT WITH BATTERY PACK.

11

12

13

EXISTING EMERGENCY FLOOD LIGHT ON STANDBY POWER; CONNECTED TO FUSE

PANEL.

EXISTING EMERGENCY FLUORESCENT LUMINAIRE ON STANDBY POWER; CONNECTED

TO FUSE PANEL.

EXISTING LUMINAIRE TO REMAIN. WHERE INDICATED BY "NL", NIGHT LIGHT CIRCUIT

WILL REMAIN ENERGIZED AT ALL TIMES (UTILITY POWER AND GENERATOR VIA 480V

PANEL EM WHEN UTILITY POWER IS LOST).

EXISTING LUMINAIRE TO BE RELOCATED TO ALIGN WITH STORAGE RACK ISLES.

WHERE INDICATED BY "NL", NIGHT LIGHT CIRCUIT WILL REMAIN ENERGIZED AT ALL

TIMES (UTILITY POWER AND GENERATOR VIA 480V PANEL EM WHEN UTILITY POWER IS

LOST).

4 4

5

6

6

4 4

5

5

7

7

12

12

12

11

12

12

12

12

11

12

12

11

12

13

12

12

1212

1212

12 12

12

12

12 12

12

1212

12 12 12

121212

12 12 12 12

12 12 12

12 12 12

12 12 12 12 12

121212

1212 12

121212

12 1212

11

11

11

11

11

11

11

11

11

11

11

8

8

13

7

13

13

13

5

7

13 13 13

13

13

55

5

5

12

12

12

1212

12 12

121212

12

1212

12 12

9

129

12

12

12

12

12

12

8

8

10

2

11

11

11

12

12

12

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 8: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

C2

C1

C3

C3

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

FA

FB

FC

FD

FE

FF

C2

C2

C2

C2

C2

C2

C2

C2

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C4

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C2

C2

C2

C3

C4

C1

C4

C4

C2

C2

C2

C3

C1

C4

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C2

C2

C2

C3

C1

C4

C4

C4

RA

RF

C2

C1

C2

C1

C2

C1

C2

C1

C2

C1

C2

C1

C2

C1

C2

C1

C2

C1

C2

C3

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C1

C1

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

P5

P5

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C2

P4

P4

C1

E1

EM

4NL

E1

EM

4NL

E1

EM

2NL

E1

EM

2NL

E1

EM

2NL

E1

EM

6NL

E1

EM

6NL

E1

EM

6NL

E1

EM

4NL

E1

EM

4NL

E1

EM

2NL

E1

EM

2NL

E1

EM

2NL

E1

EM

6NL

E1

EM

6NL

E1

EM

6NL

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

17

E1

LP

D

19

E1

LP

D

6

E1

LP

D

2

E1

LP

D

2

E1

LP

D

6

E1

LP

D

2

E1

LP

D

2

E1

LP

D

2

E1

LP

D

2

E1

LP

D

6

E1

LP

D

6

E1

LP

D

2

E1

LP

D

2

E1

LP

D

2

E1

LP

D

2

E1

LP

D

6

E1

LP

D

6

E1

LP

D

2

E1

LP

D

2

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

LP

D

4

E1

EM

6NL

E1

EM

6NL

E1

EM

6NL

E1

EM

2NL

E1

EM

2NL

E1

EM

2NL

E1

EM

4NL

E1

EM

4NL

E1

EM

4NL

E1

EM

4NL

E1

EM

4NL

E1

EM

4NL

E1

LP

D

11

E1

LP

D

11

E1

LP

D

11

E1

LP

D

11

E1

LP

D

11

E1

LP

D

11

E1

LP

D

1

E1

LP

D

1

E1

LP

D

1

E1

LP

D

1

E1

LP

D

1

E1

LP

D

1

E1

LP

D

5

E1

LP

D

5

E1

LP

D

6

E1

LP

D

6

EX

IT

EX

IT

EXIT

EXIT

EX

IT

EX

IT

EM

-2

EX

IT

EXIT

EX

IT

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

WAREHOUSE

LEVEL 01

LIGHTING

PLAN - 3

E124

N

1" 2" 3"

SCALE 1/8" = 1'

0

GENERAL NOTES KEY NOTES

1

2

3

4

5

6

1

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

LEVEL 01 EXISTING

ELECTRICAL EQUIPMENT

INDICATED ON THIS SHEET

2

REFER TO SHEET E123 FOR CONTINUATION

COLD

DOCK

FREEZER

FREEZER

COOLER

EXISTING 480V PANEL "LPD", 480V PANEL "LPE", 208V PANEL "RPC" AND TRANSFORMER

EXISTING IDF #3

EXISTING EXIT LIGHT

EXISTING LUMINAIRE TO REMAIN. WHERE INDICATED BY "NL", NIGHT LIGHT CIRCUIT

WILL REMAIN ENERGIZED AT ALL TIMES (UTILITY POWER AND GENERATOR VIA 480V

PANEL EM WHEN UTILITY POWER IS LOST).

EXISTING LUMINAIRE TO BE RELOCATED TO ALIGN WITH STORAGE RACK ISLES.

WHERE INDICATED BY "NL", NIGHT LIGHT CIRCUIT WILL REMAIN ENERGIZED AT ALL

TIMES (UTILITY POWER AND GENERATOR VIA 480V PANEL EM WHEN UTILITY POWER IS

LOST).

INSTALL NEW EXIT LIGHT. INSTALL 2-#12, #12 GND, 1/2"C TO NEAREST EMERGENCY CKT

FROM 480V PANEL EM.

3

3

3

3

3

3

4

5

555

5 5 5

5

5

5

5 5 5

555

5

5

5 5

5 5

5

5 5 5

55

5 5 5

5

5 5

5

5 5

5

5

5

5

5

5

55

55

5

6

5

5

5 5 5

5

555

5 5 5

5 5 5 5 5 5 5 5 5

555555555

5 5 5

6

6

66666

6 6

3

3

7

4

7

INSTALL 600VAC, 60A FUSED DISCONNECT SWITCH FOR BALER. DISCONNECT SWITCH

ENCLOSURE SHALL HAVE TYPE 1 RATING. INSTALL FUSES SIZED PER BALER MFR

RECOMMENDATIONS. INSTALL 3-#8, #10 GND, 3/4"C (FROM 480V PANEL LPF, CIRCUIT

31,33,35).

4

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 9: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

LEVEL 02 -

POWER

PLAN

E130

N

0 2 1

SCALE 1/4" = 1'

1

OFFICE

(RYAN)

HALL

COPY CSR

FINANCE

OFFICE

(TOM)

REGIONAL

DSM

UTILITY

ROOM

OFFICE

(ED)

PROCUREMENT

CONFERENCE

LVP1-10

LVP1-4

LV

P1-4

LVP1-22

LV

P1-22

LVP1-14

WOMENS

MENS

OFFICE

(GLENN)

OFFICE

(DAVE)

LVP1-6

FILE

RPD

KEY NOTES

GENERAL NOTES

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

H. REFER TO SHEET E110 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

I. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

J. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

K. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

L. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

1NOT USED.

2ROOF MOUNTED HP-4. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL LPCA-1,3,5.

3ROOF MOUNTED HP-3. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL LPC-38,40,42.

F

30A

2

F

30A

3

F

30A

4

F

30A

5

4ROOF MOUNTED HP-2. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL LPB-13,15,17.

5ROOF MOUNTED HP-1. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL LPB-7,9,11.

6ROOF MOUNTED EF-3. INSTALL 7-DAY PROGRAMMABLE WALL SWITCH IN SINGLE OR

DOUBLE GANG BOX.

LV

P1-4

LV

P1-10

8

F

60A

COMPUTER / TELCO

#

TC/P

6

LVP1-10

LV

P1-10

LV

P1-10

LVP1-4

LV

P1-4

LV

P1-6

LVP1-4

LVP1-8

LV

P1-22

LV

P1-14

LVP1-14

LV

P1-12

LV

P1-12

LV

P1-12

LV

P1-12

LV

P1-8

LV

P1-8

LV

P1-8

LV

P1-8

RP

D-23

RPD-23

RPD-23

RP

D-23

LVP1-16 LVP1-16

LV

P1-16

LVP2-17 LVP2-17

LV

P2-17

LV

P2-17

LV

P1-12

LV

P1-12

LV

P1-12

LVP2-9

LV

P2-9

LV

P2-9

LV

P2-9

LV

P1-12

LVP2-11 LVP2-11

LV

P2-11

RPD-21

RP

D-27

RP

D-25

LVP1-10 LVP1-10

RPD-17

6

IWH-205

(LPC-21)

IWH-206

(LPC-23)

8WALL MOUNTED DSI-1. INSTALL 240VAC, 60A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 1 RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 2-#8, #10 GND, 3/4"C. CIRCUITED

TO PANEL RPD-40,42.

F

60A

7

7ROOF MOUNTED DSO-1. INSTALL 240VAC, 60A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#8, #10 GND, 1"C. CIRCUITED

TO PANEL RPD-40,42.

HP-1

HP-2

HP-3

HP-4

9

9MOUNTED ON ROOF NEXT TO AIR CONDITIONING UNIT.

LEVEL 02 OFFICE

AREA REMODEL

INDICATED

ON THIS SHEET

10INSTALL 277V, 20A SNAP SWITCH NEXT TO WATER HEATER TO SERVE AS

DISCONNECTING MEANS.

SHADED AREA REPRESENT

AREA BEING REMODELED

ABOVE

EXISTING BUILDING FOOTPRINT

SHADED AREA REPRESENTS

AREA BEING REMODELED

ABOVE

EXISTING BUILDING FOOTPRINT

10 10

LVP1-6

RE

FE

R T

O LO

WE

R LE

FT

F

OR

C

ON

TIN

UA

TIO

N

RE

FE

R T

O U

PP

ER

R

IG

HT

F

OR

C

ON

TIN

UA

TIO

N

RE

FE

R T

O S

HE

ET

E

131 F

OR

C

ON

TIN

UA

TIO

N

RPD-14

GFCI

2

9

RPD-16

GFCI

2

9

RPD-18

GFCI

2

ts$
Rectangle
ts$
Callout
UPS 20KVA
ts$
Rectangle
ts$
Callout
UPS Panel
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 10: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

LEVEL 02 -

POWER

PLAN

E131

N

0 2 1

SCALE 1/4" = 1'

1

PROCUREMENT

STORAGE STORAGE

MENS WOMENS JAN.

TRAINING

SALES MTG.

STAIR 3

LVP2-8

GFCI

KEY NOTES

GENERAL NOTES

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

H. REFER TO SHEET E110 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

I. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

J. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

K. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

L. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

1ROOF MOUNTED HP-7. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL HPV2-24,26,28.

F

30A

F

30A

2ROOF MOUNTED HP-6. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL LPC-18,20,22.

2 1

3ROOF MOUNTED HP-5. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUITED

TO PANEL LPCA-7,9,11.

F

30A

3

4ROOF MOUNTED EF-4. INSTALL 7-DAY PROGRAMMABLE WALL SWITCH IN SINGLE OR

DOUBLE GANG BOX.

5ROOF MOUNTED EF-5. INSTALL 120V, 15A, SPST WALL SWITCH IN SINGLE OR DOUBLE

GANG BOX.

TC/P TC/P

4

4 5

5

CO

AT

LOBBY

HALL

LVP2-7

LVP2-7

LVP2-5

LVP2-5

LVP2-7

LV

P2-13

LVP2-13

LV

P2-13

LV

P2-13

LVP2-13

LVP2-13 LVP2-15

LVP2-15

LV

P2-15

LV

P2-10

LV

P2-10

LVP2-10

LVP2-10

LVP2-10

LV

P2-7

LV

P2-5

LV

P2-7

LV

P2-5

LV

P2-7

LV

P2-7

LV

P2-5

LV

P2-7

LV

P2-5

LVP2-5

RPD-17

RPD-15

GFCI

HP-5

HP-7HP-6

6MOUNTED ON ROOF NEXT TO AIR CONDITIONING UNIT.

6

LVP2-5

LEVEL 02 OFFICE

AREA REMODEL

INDICATED

ON THIS SHEET

RPD-17

SHADED AREA REPRESENT

AREA BEING REMODELED

ABOVE

EXISTING BUILDING FOOTPRINT

FUTURE

OFFICE

LVP2-19

LVP2-19

LV

P2-19

LV

P2-19

LV

P2-19

LV

P2-19

LVP2-19

LVP2-19

RE

FE

R T

O S

HE

ET

E

130 F

OR

C

ON

TIN

UA

TIO

N

RPD-15

GFCI

6

2

HP-8

F

60A

7

7ROOF MOUNTED HP-8. INSTALL 240VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 2-#10, #10 GND, 3/4"C.

CIRCUITED TO PANEL RPD-2,4.

6

2

RPD-13

GFCI

6

2

2

2

RP

D-6

GF

CI

2

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 11: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

LEVEL 02 -

LIGHTING

PLAN

E132

N

0 2 1

SCALE 1/4" = 1'

1

OFFICE

(RYAN)

HALL

COPY

CSR

FINANCE

OFFICE

(TOM)

DSM

UTILITY

ROOM

OFFICE

(ED)

PROCUREMENT

GENERAL NOTES

CONFERENCE

REGIONAL

WOMENS

MENS

OFFICE

(GLENN)

OFFICE

(DAVE)

FILE

RPD

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

H. REFER TO SHEET E110 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

I. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

J. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

K. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

L. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

C

LPCA-26

37

C

LPCA-26

37

C

LPCA-26

37

C

LPCA-26

37

35

MO

37

MO

C

LP

CA

-26

36

36

MO

33

MO

32

MO

31

MO

A

LPCA-26

33

A

LPCA-26

33

A

LPCA-26

33

A

LPCA-26

33

C

LP

CA

-26

32

C

LPCA-26

31

C

LPCA-26

31

C

LPCA-26

31

C

LPCA-26

31

B

LPC-32BP

38

A

LPCA-26NL

38

A

LPCA-26

39

A

LPCA-26

38

A

LPCA-26

38

A

LPCA-26

38

A

LPCA-26

38

25

MO

24

MO

21

MO

22

MO

A

LPCA-30

23

A

LPCA-30

23

A

LPCA-30

23

B

LPC-32BP

23

A

LPCA-30

28

A

LPCA-30

28

A

LPCA-30

28

A

LPCA-30

28

A

LPCA-30

28

A

LPCA-30

28

C

LP

CA

-30

27

C

LPCA-30

26

A

LPCA-30

23

A

LPCA-30

23

C

LPCA-30

21

C

LPCA-30

21

26

MO

27

MO

A

LPCA-26

38

A

LPCA-26

38

A

LPCA-26

39

23

OS

PS

28

OS

38

OS

PSOS

C

LP

CA

-26

36

C

LP

CA

-26

32

34

MO

COMPUTER / TELCO

C

LPCA-30

21

C

LPCA-30

21

C

LPCA-30

26

C

LP

CA

-30

27

35

LP

C-37

F

35

LP

C-37

F

35

LP

C-37

F

35

LP

C-37

F

C

LPCA-30

22

C

LPCA-30

22

C

LPCA-30

22

C

LPCA-30

22

B

LPC-32BP

28

16

LP

A-7

G

LPC-32

EXIT

LP

C-3

2

EX

IT

34

LPCA-26

E

FROM SHEET E121

LEVEL 02 OFFICE

AREA REMODEL

INDICATED

ON THIS SHEET

SHADED AREA REPRESENT

AREA BEING REMODELED

ABOVE

EXISTING BUILDING FOOTPRINT

SHADED AREA REPRESENT

AREA BEING REMODELED

ABOVE

EXISTING BUILDING FOOTPRINT

A

LP

CA

-30

24

A

LP

CA

-30

25

RE

FE

R T

O LO

WE

R LE

FT

F

OR

C

ON

TIN

UA

TIO

N

RE

FE

R T

O U

PP

ER

R

IG

HT

F

OR

C

ON

TIN

UA

TIO

N

RE

FE

R T

O S

HE

ET

E

133 F

OR

C

ON

TIN

UA

TIO

N

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 12: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

LEVEL 02 -

LIGHTING

PLAN

E133

N

0 2 1

SCALE 1/4" = 1'

1

PROCUREMENT

STORAGE STORAGE

MEN

WOMEN

JAN.

TRAINING

SALES MTG.

STAIR 3

GENERAL NOTES

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEETS E120 AND E121 FOR LEVEL 01 POWER AND LIGHTING PLANS.

E. REFER TO SHEETS E130, E131, E132 AND E133 FOR LEVEL 02 POWER AND LIGHTING

PLANS.

F. REFER TO SHEETS E140 AND E141 FOR SINGLE LINE DIAGRAM.

G. REFER TO SHEETS E150 AND E151 FOR PANEL SCHEDULES.

H. REFER TO SHEET E110 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

I. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

J. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

K. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

L. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

44

MO

C

LPCA-28

41

C

LPCA-28

41

C

LPCA-28

41

C

LPCA-28

41

A

LPCA-28

47

A

LPCA-28

39

B

LPC-32BP

47

A

LPCA-28

47

A

LP

CA

-28

45

B

LP

C-32

BP

45

A

LPCA-28

47

B

LPC-32BP

47

A

LPCA-28

47

A

LPCA-28

47

A

LPCA-28

47

A

LPCA-28

47

A

LPCA-28

47

A

LPCA-28

47

B

LPC-32BP

47

A

LPCA-28

47

A

LPCA-28

47

A

LPCA-28

47

A

LPCA-28

47

43

MO

17

MO

45

MO

42

MO

46

MO

47

MO

41

MO

PS

47

OS

47

OS

B

LPC-32BP

39

C

LP

CA

-28

42

C

LP

CA

-28

42

A

LP

CA

-28

45

CO

AT

LOBBY

HALL

39

OS

A

LPCA-28

47

A

LP

CA

-28

45

A

LPCA-28

47

41

MO

LP

C-3

2

EX

IT

LP

C-3

2

EX

IT

LPC-32

EXIT

LPC-32

EXIT

LEVEL 02 OFFICE

AREA REMODEL

INDICATED

ON THIS SHEET

1

1

SHADED AREA REPRESENT

AREA BEING REMODELED

ABOVE

EXISTING BUILDING FOOTPRINT

B

LPC-32BP

48

48

OS

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

A

LPCA-28

48

B

LPC-32BP

48

PS

A

LPCA-26

39

RE

FE

R T

O S

HE

ET

E

132 F

OR

C

ON

TIN

UA

TIO

N

48

OS

A

LP

CA

-28

46

A

LPCA-28

43

A

LPCA-28

44

FUTURE

OFFICE

LP

C-3

2

EX

IT

2

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 13: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

T-3

45KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPD"

(10KA SCCR)

100A

3P

45KVA

480V

208V

3PH

EXISTING

208V PANEL

"LVP3"

(10KA SCCR)

60A

3P

15KVA

480V

208V

3PH

EXISTING

208V PANEL

"LVP1"

(10KA SCCR)

EXISTING

480V PANEL

"HVP1"

(14KA SCCR)

15KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPB1"

(10KA SCCR)

EXISTING

480V PANEL

"LPB"

(14KA SCCR)

XFMR-T2

30KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPB"

(10KA SCCR)

480V PANEL

"LPC"

(35KA SCCR

REQ'D)

EXISTING

480V PANEL

"LPCA"

(14KA SCCR)

EXISTING

SERVICE FROM SRP

N

G

SPD

(E) GROUNDING

SYSTEM

1200A

3P

800A

3P

800A

3P

800A

3P

800A

3P

800A

3P

TO FIRE PUMP

(250HP)

MCCD

(CB-5)

SWBB MCCC SWBA MCCB

EXISTING

480V PANEL

"EM"

(14KA SCCR)

(E

) S

TA

ND

BY

G

EN

ER

AT

OR

FROM SWBD-MDP

(E) SWBD "SWBB"

M

100A

3P

100A

3P

100A

3P

100A

3P

100A

3P

400A-FRS

3-FUSES

400A

3P

M M M M M

MLO

400A

3P

200A

3P

200A

3P

SPACE

(E) SWBD "TE"

EXISTING

480V PANEL

"LPE"

(14KA SCCR)

EXISTING

480V PANEL

"LPD"

(14KA SCCR)

EXISTING

208V PANEL

"RPC"

(10KA SCCR)

RPA2-XFMR

75KVA

480V

208V

3PH

F28

F29

EXISTING

208V PANEL

"RPA2"

(10KA SCCR)

EXISTING

480V PANEL

"LPA2"

(35KA SCCR)

FROM SWBD-MDP

(E) SWBD "SWBA1"

200A

3P

200A

3P

200A

3P

(E) SWBD "SWBA2"

SPACE SPACE

400A

3P

MCCA

400A

3P

FROM SWBD-MDP

(E) MCC "MCCB"

FROM SWBD-MDP

(E) MCC "MCCC" (E) MCC "MCCD"

100

CP-3B

100

CP-4B

150

CP-3

150

CP-4

100

CP-1B

100

CP-2B

150

CP-1

150

CP-2

FROM SWBD-MDP

407

CP-5

(450FLA)

MLO MLOMLO

45KVA

480V

208V

3PH

F24

30KVA

480V

208V

3PH

EXISTING

208V PANEL

"LVP2"

(10KA SCCR)

480V PANEL

"HVP2"

(35KA SCCR

REQ'D)

EXISTING

480V PANEL

"LPF"

(25KA SCCR)

30KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPE"

(10KA SCCR)

SPARE

F27

F4

F5

F7

F8

F26

F3 F6 F9 F19

F22

F2

DISCONNECT

AND REMOVE

SPACE

9KVA

480V

208V

3PH

EXISTING

FUSE PANEL

"EM"

(200KA SCCR)

30A

3P

10A

3P

100A

3P

EXISTING TRANSFER

SWITCH (10KA SCCR MIN)

7

KEY NOTES

8

DISCONNECT EXISTING CONDUCTOR(S).

75KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPA"

(10KA SCCR)

480V PANEL

"LPA"

(35KA SCCR

REQ'D)

EXISTING

208V PANEL

"RPAA"

(10KA SCCR)

F31

F32

F30

EXTEND EXISTING CONDUCTORS TO NEW SERVICE ENTRANCE AND DISTRIBUTION

PANELS.

T-4

30KVA

480V

240V

3PH

EXISTING

240V PANEL

"LVP4"

(10KA SCCR)

60A

3P

50A

SPACE

(E) 480V, 3∅, 4W, 3000A

SERVICE FROM SRP

(SCA = 43,490A)

N

G

F0

3000AT

LSIG

3P

65KA

SERVICE ENTRANCE SWITCHGEAR (SWBD-SES)

480Y/277V, 3∅, 4W, 3000A BUS

65KA SCCR, TYPE 3R ENCLOSURE

SPD

MCCD

(CB-5)

SWBB MCCC SWBA MCCB

F1

MAIN DISTRIBUTION PANEL (SWBD-MDP)

480Y/277V, 3∅, 4W, 3000A BUS

65KA SCCR, TYPE 3R ENCLOSURE

800AT

LSI

3P

65KA

800AT

LSI

3P

65KA

800AT

LSI

3P

65KA

800AT

LSI

3P

65KA

800AT

LSI

3P

65KA

400AT

LSI

3P

65KA

400AT

LSI

3P

65KA

400AT

LSI

3P

65KA

M SRP

POWER

METER

2000AT

LSI

3P

65KA

MLO

REFER TO PANEL

SCHEDULE

M EXISTING SRP

POWER

METER

EXISTING SES

GG

GG

GG

G

GG

EXTEND #4/0 BARE Cu GEC TO

EXISTING BUILDING GROUNDING

ELECTRODE SYSTEM

7 7 7 7 7 7

4

3 3 3 3 3

3REFER TO FAULT CURRENT TABLE FOR EXISTING CONDUCTOR SIZES AND NUMBER OF

PARALLEL FEEDERS.

8 8 8 8 8

4EXOTHERMIC WELD GEC

7

REFER TO SITE PLAN

FOR GROUNDING

REQ'TS

100A

F10

F12 F14 F16

F11 F13 F15 F17

F21 F25

F40F37

F36

F35

F38

F41

F43 F44 F45

F20

F23

F34

F39

(8 SETS) 4-#500KCMIL,

#400KCMIL GND, 4"C

SRP SECONDARY CONDUITS

PER SRP REQ'TS

5REPLACE EXISTING PANELBOARD WITH NEW. REFER TO PANEL SCHEDULE ON SHEET

E150.

5 5

TO FIRE PUMP

CONTROLLER

(250HP)

F46

6

6DISCONNECT AND REMOVE EXISTING SERVICE ENTRANCE EQUIPMENT.

1

2

RELOCATE EXISTING FEEDER TO EXISTING 480V PANEL LPA AS INDICATED. SPLICE

AND EXTEND WITHIN SWITCHGEAR ENCLOSURE AS REQUIRED.

INSTALL 2 PARALLEL SETS OF 3-#3/0, #3 GND, 2½"C

4

4

4

4

4

4

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

4

4

4

4

TO EXISTING 480V

PANEL "LPA"

(CONNECTED TO

DIFFERENT

SOURCE)

1

NEW

480V PANEL

"HVP3"

(14KA SCCR

MIN)

REFER TO PANEL

SCHEDULE

2

F18

4

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

1

NOTES:

1. FAULT CURRENT CALCULATION RELOCATED TO

SHEET E160.

2. FAULT SOURCE POINTS HAVE BEEN REVISED.

3. SCCR FOR EACH PANELBOARD INDICATED ON

THIS SHEET.

REFER TO PANEL

SCHEDULE

5

4

208V PANEL

"UPS1"

(10KA MIN

SCCR REQ'D)

REFER TO PANEL

SCHEDULE ON SHT E160

20KW UPS

94-#1, #6 GND, 2"C

9

9

4

NOTE: ALL EQUIPMENT INDICATED

ON THIS SHEET IS EXISTING.

MODIFICATIONS TO PANELBOARDS

HAVE BEEN INDICATED HEREIN.

9

4

SPARE SPARE SPARE

F47

400A

3P

3R

TO JOCKEY PUMP

CONTROLLER

(3HP)

3-#10, #10 GND, 3/4"C

(2 SETS) 3-#3/0,

#3/0 GND, 2½"C

(2 SETS) 3-#3/0, 3/0 GND, 2½"C

(APPROX 300-LF TO SOUTH)

10DISCONNECT AND REMOVE EXISTING CONDUIT AND CONDUCTOR.

10

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

4

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

SINGLE

LINE

DIAGRAM

E140

DISCONNECT SWITCH MTD

TO FIRE PUMP BLDG

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 14: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

FROM SWBD "SWBA2"

(E) MCC "MCCA"

MLO

1

EXHAUST FAN

0.5

MAINT RM

EXHAUST FAN

2

C4-2 UNIT #13

2

C4-2

2

C4-1 UNIT #12

SOUTH FAN

2

C4-1 NORTH

FAN

2

C3-6 UNIT #11

2

C3-6

2

C3-5 UNIT #10

2

C3-5

2

C3-4 UNIT #9

2

C3-4

2

C3-3 UNIT #8

2

C3-3

2

C3-2 UNIT #7

2

C3-2

2

C3-1 UNIT #6

2

C3-1.

2

C2-2 UNIT #5

2

C2-2

2

C2-1 UNIT #4

2

C2-1

(E) MCC "MCCA"

(E) MCC "MCCA"

2

C1-2

1

C1-3 UNIT #3

2

UNDER

FLOOR VENT

FAN

1

C1-1 UNIT #1

SPACE SPACE

ASILE

EVAPORATOR

#3

1.5

GLYCOL PUMP

#1

1.5

GLYCOL PUMP

#2

3

AMMONIA

PUMP RIGHT

SIDE 2

(PURGE

PUMP)

3

AMMONIA

PUMP #1

SPARE

3

JACKET

WATER PUMP

#1

3

JACKET

WATER PUMP

#2

5

AMMONIA

PUMP #1

5

AMMONIA

PUMP #2

5

CONDENSER

WATER PUMP

#1

5

CONDENSER

WATER PUMP

#2

7.5

BLAST

FREEZER FAN

#1

7.5

BLAST

FREEZER FAN

#2

7.5

BLAST

FREEZER FAN

#3

7.5

BLAST

FREEZER FAN

#4

10

ROOF

CONDENSER

FAN #1

10

ROOF

CONDENSER

FAN #2

D-1

1

DOCK

EVAPORATOR

#2

1

DOCK

EVAPORATOR

#3

1

DOCK

EVAPORATOR

#4

1

DOCK

EVAPORATOR

#5

1

DOCK

EVAPORATOR

#6

7.5

BLAST 3

7.5

BLAST 3

7.5

BLAST 4

7.5

B-4

7.5

C5-1

7.5

C5-3

7.5

C5-4

7.5

C6-1

7.5

C6-2

3

D-9

3

D-7

3

D-8

7.5

C5-2 FRICK

CONDENSER

FANS

FRICK

CONDENSER

PUMP

2

2

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

SINGLE

LINE

DIAGRAM

E141

NOTE: ALL EQUIPMENT INDICATED

ON THIS SHEET IS EXISTING.

SHEET IS FOR REFERENCE ONLY.

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 15: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

VOLTS 277/480V PANEL

EM

(EXISTING)

MAIN 150A MCB

PHASE 3PH, 4 WIRELOCATION BLDG EXT NEAR GENSET BUS 225A

A.I.C. FED FROM LPF MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

EF-1 COMPRESSOR ROOM

1

20 3

1 720

20 1 LIGHTS C5

1920 2 1

1 3 720

20 1 LIGHTS C5

3120 4 1

1 5 720

20 1 LIGHTS C6 / DOCK / MAINT

2160 6 1

EF-2 COMPRESSOR ROOM 15 3

7 720

20 1

LIGHTS DRY WAREHOUSE

(RE-PURPOSE BREAKER)1440 8 1

9 720

SPACE

-- 10

11 720

SPACE

-- 12

SPARE 30 1

13 0

SPACE

-- 14

SPACE

15 --

SPACE

-- 16

SPACE

17 --

SPACE

-- 18

SPACE19 --

SPACE

-- 20

SPACE

21 --

SPACE

-- 22

SPACE

23 --

SPACE

-- 24

SPACE

25 --

SPACE

-- 26

SPACE

27 --

SPACE

-- 28

SPACE

29 --

SPACE

-- 30

12960 VA - 3PH TOTAL CONNECTED 4800 4560 3600

10800VA - CONTINUOUS X 0.25 (*)

= 2700 VA

2160 VA - NON-CONTIN X 1.00 = 2160 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)17100

FEEDER TOTAL (VA) (***)

0 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

21 LARGEST PHASE CURRENT 6/1/2017 9:42

COMMENT:

VOLTS 277/480V PANEL

LPA2

(EXISTING)

MAIN 225A MCB

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 35KA IC MIN FED FROM SWBD "SWBA1" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

RPA2 TRANSFORMER 100 3

1 18979

30 1 HEAT TRACE

2400 2

3 18979

30 1 HEAT TRACE

2400 4

5 18979

60 3

ELEVATOR MOTOR (20HP)

7479 6

SPARE 30 3

7 0

7479 8

9 0

7479 10

11 0

20 2 SPARE

0 12

SPARE 30 1

13 0

0 14

SPARE 30 1

15 0

20 2 SPARE

0 16

SPARE 20 1

17 0

0 18

SPARE 20 1

19 0

20 1 SPARE

0 20

SPACE

21 --

SPACE

-- 22

SPACE

23 --

SPACE

-- 24

SPACE25 --

SPACE

-- 26

SPACE

27 --

SPACE

-- 28

SPACE

29 --

SPACE

-- 30

SPACE

31 --

SPACE

-- 32

SPACE

33 --

SPACE

-- 34

SPACE

35 --

SPACE

-- 36

SPACE37 --

SPACE

-- 38

SPACE

39 --

SPACE

-- 40

SPACE

41 --

SPACE

-- 42

84174 VA - 3PH TOTAL CONNECTED 28858 28858 26458

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

84174 VA - NON-CONTIN X 1.00 = 84174 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

86574FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)104

LARGEST PHASE CURRENT

11/15/2017 7:34

COMMENT:

VOLTS 277/480V PANEL

LPC

(EXISTING)

MAIN 200A MCB

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 35KA IC MIN FED FROM SWITCHBOARD SWBB MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPACE

1 --

20 1 SPARE

0 2

SPACE

3 --

20 1

DRY WH LTS (ROWS DF/DG)3120 4 1

DRY WH LTS (ROWS DH/DJ)

1

20 1

5 3120

20 1

COOLER / DRY WH LTS (ROWS RB-RE)

2160 6 1

DRY WH LTS (ROWS DK/DL)

1

20 1

7 3120

20 1 SPARE

0 8

DRY WH LTS (ROW DM)

1

20 1

9 1920

-- 10

SPARE 20 1

11 0

20 1 DRY DOCK NORTH LTS

2340 12 1

SPARE 20 1

13 0

20 1 DRY DOCK MIDDLE LTS

2985 14 1

DRY DOCK NORTH LIGHTS

1

20 1

15 2340

20 1 DRY DOCK MIDDLE LTS

3060 16 1

SPARE 20 1

17 0

15 3

LEVEL 02 HVAC (HP-5)

2853 18

SPARE 20 1

19 0

2853 20

SPARE 20 1

21 0

2853 22

SPARE 20 1

23 0

20 1 WALL PACK LTS

4232 24 1

DRY WH LTS (ROWS DN/DP)

1

20 1

25 3600

60 3 SPARE

0 26

RAIL DOCK LTS

1

20 1

27 1440

0 28

ACCESS CORRIDOR LTS

1

20 1

29 960

0 30

RPB TRANSFORMER 60 3

31 4370

SPACE

0 32

33 4370

SPACE

0 34

35 4370

0 36

LEVEL 02 LTS - MID & EXIT

1

20 1

37 2880

20 3 SPARE

38

LEVEL 02 LTS - SOUTH & EXIT

1

20 1

39 880

40

LEVEL 02 LTS - NORTH & EXIT

1

20 1

41 2480

42

62306 VA - 3PH TOTAL CONNECTED 19808 19983 22515

40637VA - CONTINUOUS X 0.25 (*)

= 10159 VA

21669 VA - NON-CONTIN X 1.00 = 21669 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

77705FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

94

LARGEST PHASE CURRENT

11/15/2017 7:34

COMMENT:

VOLTS 277/480V PANEL

LPCA

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 14KA IC MIN FED FROM LPC MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

LEVEL 02 HVAC (HP-4)

(RE-PURPOSED BREAKER)

15 3

1 3019

15 3

FREEZER DOOR - (FD3)

368 2 1

3 3019

506 4 1

5 3019

506 6 1

LEVEL 02 HVAC (HP-5)

(RE-PURPOSED BREAKER)

15 3

7 2853

15 3

FREEZER DOOR - (FD4)

506 8

9 2853

506 10

11 2853

506 12

SPARE 15 3

13 0

15 3

FREEZER DOOR - (FD5)

506 14

15 0

506 16

17 0

506 18

SPARE 15 3

19 0

15 3

FREEZER DOOR - BACK (SE DOCK)

506 20

21 0

506 22

23 0

506 24

SPACE

(RELOCATE BREAKER TO PNL LPB)

(INSTALL COVER PLATE OVER SPACE)

25 --

15 3

LEVEL 02 LTS - MID

(RE-PURPOSE BREAKER)2560 26 1

27 --

LEVEL 02 LTS - SOUTH

3280 28 1

29 --

LEVEL 02 LTS - NORTH

(RE-PURPOSED BREAKER)

2480 30 1

SPACE

(RELOCATE BREAKER TO PNL LPB)

(INSTALL COVER PLATE OVER SPACE)

31 --

SPACE

(RELOCATE BREAKER TO PNL LPB)

(INSTALL COVER PLATE OVER SPACE)

0 32

33 --

0 34

35 --

0 36

SPACE

37 --

SPACE

-- 38

SPACE

39 --

SPACE

-- 40

SPACE

41 --

SPACE

-- 42

31871 VA - 3PH TOTAL CONNECTED 10318 11176 10376

9700VA - CONTINUOUS X 0.25 (*)

= 2425 VA

22171 VA - NON-CONTIN X 1.00 = 22171 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

35954FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

43

LARGEST PHASE CURRENT

6/1/2017 9:44

COMMENT:

VOLTS 277/480V PANEL

LPD

(EXISTING)

MAIN 225A MCB

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 14KA IC MIN FED FROM SWBD "SWBB" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

DOCK LIGHTS

1

20 1

1 1440

20 1

FREEZER LTS (ROWS FB/FC)2880 2 1

SPARE 20 1

3 0

20 1

COOLER LTS (ROWS RF/RA)

2880 4

DOCK LIGHTS

1

20 1

5 480

20 1

FREEZER LTS (ROW FA)1920 6 1

SPARE 20 1

7 0

20 1 SPARE

0 8 1

SPARE 20 1

9 0

20 1 SPARE

0 10 1

DOCK LIGHTS

1

20 1

11 1440

20 1 SPARE

0 12 1

SPARE 20 1

13 0

20 1 SPARE

0 14 1

SPARE 20 1

15 0

20 1 SPARE

0 16 1

FREEZER LTS (ROWS FE/FE)

1

20 1

17 2160

20 1 SPARE

0 18

FREEZER LTS (ROWS FE/FE)

1

20 1

19 2160

20 1 SPARE

0 20

SPARE 20 1

21 0

20 1 SPARE

0 22

SPARE 20 1

23 0

20 1 SPARE

0 24

PANEL "RPC" TRANSFORMER 70 3

25 6520

SPACE

-- 26

27 6520

SPACE

-- 28

29 6520

SPACE

-- 30

CANOPY & RISER RM LTS

1

20 1

31 1000

20 1 EXTERIOR LTS

500 32 1

SPARE 20 1

33 0

20 1 EXTERIOR LTS

500 34 1

SPARE 20 1

35 0

20 1 EXTERIOR LTS

500 36 1

SPARE 20 3

37 0

20 1 SPARE

0 38

39 0

20 1 SPARE

0 40

41 0

20 1 SPARE

0 42

37420 VA - 3PH TOTAL CONNECTED 14500 9900 13020

14980VA - CONTINUOUS X 0.25 (*)

= 3745 VA

22440 VA - NON-CONTIN X 1.00 = 22440 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)47245

FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)57

LARGEST PHASE CURRENT

6/1/2017 9:44

COMMENT:

VOLTS 277/480V PANEL

HVP1

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION

ACCESS CORR (NEAR FD2)

BUS 100A

A.I.C. 14KA IC MIN FED FROM SWBD "TE" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPARE 20 1

1 0

20 1 SPARE

0 2

SPARE

1

20 1

3 0

20 1

DRY WH LTS (ROWS DD/DE)2640 4 1

SPARE

1

20 1

5 0

20 1 SPARE

0 6

LEVEL 02 HVAC (HP-4) 15 3

7 3019

15 3 SPARE

0 8 1

9 3019

0 10 1

11 3019

0 12 1

PANEL LVP1 TRANSFORMER 30 3

13 3420

30 3

LEVEL 02 HVAC (HP-3)

3269 14

15 3420

3269 16

17 3420

3269 18

31764 VA - 3PH TOTAL CONNECTED 9708 12348 9708

2640VA - CONTINUOUS X 0.25 (*)

= 660 VA

29124 VA - NON-CONTIN X 1.00 = 29124 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

37704FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

45

LARGEST PHASE CURRENT

11/15/2017 7:33

COMMENT:

VOLTS 277/480V PANEL

LPE

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 14KA IC MIN FED FROM SWBD "SWBA1" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

FREEZER DOOR C5 NORTH 30 3

1 1000

30 3 AIR COMPRESSOR AT FIRE RISER

3000 2 1

3 1000

3000 4 1

5 1000

3000 6 1

FREEZER DOOR C5 SOUTH 30 3

7 1000

30 3 FREEZER DOOR C6

1000 8

9 1000

1000 10

11 1000

1000 12

SPARE 20 1

13 0

30 3 SPARE

0 14

SPARE 20 1

15 0

0 16

SPARE 20 1

17 0

0 18

SPARE 20 1

19 0

20 3 SPARE

0 20

SPARE 20 1

21 0

0 22

SPARE 20 1

23 0

0 24

SPACE

25 --

20 1 SPARE

0 26

SPACE

27 --

20 1 SPARE

0 28

SPACE

29 --

20 1 SPARE

0 30

SPACE

31 --

20 1 SPARE

0 32

SPACE

33 --

20 1 SPARE

0 34

SPACE35 --

20 1 SPARE

0 36

SPARE 20 1

37 0

20 1 SPARE

0 38

SPARE 20 1

39 0

20 1 SPARE

0 40

SPARE 20 1

41 0

20 1 SPARE

0 42

18000 VA - 3PH TOTAL CONNECTED 6000 6000 6000

9000

VA - CONTINUOUS X 0.25 (*)

= 2250 VA

9000 VA - NON-CONTIN X 1.00 = 9000 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

20250FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

24

LARGEST PHASE CURRENT

6/1/2017 9:44

COMMENT:

VOLTS 277/480V PANEL

HVP2

(NEW)

MAIN 100A MCB

PHASE 3PH, 4 WIRELOCATION

COLD DOCK (NEAR STAIRS)

BUS 100A

A.I.C. 35KA IC MIN FED FROM SWBD "TE" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPACE

1 --

20 1

DRY WH LTS (ROWS DQ/DR)1440 2 1

SPACE

3 --

SPACE

-- 4

SPACE

5 --

SPACE

-- 6

LEVEL 02 LTS - RM 229 20 1

7 960

SPACE

-- 8

LEVEL 02 LTS - RM 228 20 1

9 1440

20 1 SPARE

0 10

SPACE

11 --

20 3

LEVEL 02 HVAC (HP-7)

2853 12

13 --

2853 14

15 --

2853 16

FREEZER DOOR

1

15 3

17 1000

40 3 PANEL LVP2 TRANSFORMER

2880 18

1 19 1000

2880 20

1 21 1000

2880 22

LEVEL 02 HVAC (HP-6) 30 3

23 4958

100 3 SPARE

0 24

25 4958

0 26

27 4958

0 28

SPARE 20 1

29 0

SPACE

0 30

38914 VA - 3PH TOTAL CONNECTED 14091 13131 11691

4440VA - CONTINUOUS X 0.25 (*)

= 1110 VA

34474 VA - NON-CONTIN X 1.00 = 34474 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

43384

FEEDER TOTAL (VA) (***)

0 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

52 LARGEST PHASE CURRENT 11/15/2017 7:33

COMMENT:

VOLTS 277/480V PANEL

LPF

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION CHARGING / BATTERY RM BUS 400A

A.I.C. 25KA IC MIN FED FROM SWBD "SWBA2" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

PANEL "RPE" TRANSFORMER 50 3

1 2820

40 3 BATTERY CHARGER

9140 2

3 2820

9140 4

5 2820

9140 6

BATTERY CHARGER 40 3

7 9140

40 3 BATTERY CHARGER

9140 8

9 9140

9140 10

11 9140

9140 12

BATTERY CHARGER 40 3

13 9140

40 3 BATTERY CHARGER

9140 14

15 9140

9140 16

17 9140

9140 18

BATTERY CHARGER 40 3

19 9140

40 3 BATTERY CHARGER

9140 20

21 9140

9140 22

23 9140

9140 24

LIGHTS

1

20 1

25 2100

20 1 LIGHTS

400 26 1

SPARE 20 1

27 0

20 1 SPARE

0 28

SPARE 20 1

29 0

20 1 SPARE

0 30

BALER 35 3

31 3880

40 3 PANEL "EM" VIA TRANSFER SWITCH

4800 32

33 3880

4800 34

35 3880

4800 36

BATTERY CHARGER

*** BACKUP CHARGER - CANNOT BE USED AT

SAME TIME AS OTHER 7 CHARGERS ***

60 3

37 0

60 3

BATTERY CHARGER

*** BACKUP CHARGER - CANNOT BE USED AT

SAME TIME AS OTHER 7 CHARGERS ***

0 38

39 0

0 40

41 0

0 42

228939 VA - 3PH TOTAL CONNECTED 77980 75480 75480

2500

VA - CONTINUOUS X 0.25 (*)

= 625 VA

226439 VA - NON-CONTIN X 1.00 = 226439 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

234564FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

282

LARGEST PHASE CURRENT

11/15/2017 7:35

COMMENT:

VOLTS 480V PANEL

HVP3

MAIN 400A MCB

PHASE 3PH, 3 WIRELOCATION RAIL DOCK / BATTERY ROOM BUS 400A

A.I.C. 14KA IC MIN FED FROM SWITCHBOARD SWBB

MOUNTING SURFACE (TYPE 1)

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

BATTERY CHARGER 1 RECEPT 20 3

1 2355

20 3 BATTERY CHARGER 2 RECEPT

1634 2

3 2355

1634 4

5 2355

1634 6

BATTERY CHARGER 3 RECEPT 20 3

7 2355

20 3 BATTERY CHARGER 4 RECEPT

1634 8

9 2355

1634 10

11 2355

1634 12

BATTERY CHARGER 5 RECEPT 20 3

13 2355

20 3 BATTERY CHARGER 6 RECEPT

2548 14

15 2355

2548 16

17 2355

2548 18

BATTERY CHARGER 7 RECEPT 25 3

19 5097

25 3 BATTERY CHARGER 8 RECEPT

4737 20

21 5097

4737 22

23 5097

4737 24

TRASH COMPACTOR

1

20 3

25 4432

200 3

INSTANT WATER HEATER (IWH-1)

38503 26

1 27 4432

38503 28

1 29 4432

38503 30

EXHAUST FAN (1/2 HP) 20 3

31 305

SPACE

-- 32

33 305

SPACE

-- 34

35 305

SPACE

-- 36

SPACE

37 --

SPACE

-- 38

SPACE

39 --

SPACE

-- 40

SPACE

41 --

SPACE

-- 42

197861 VA - 3PH TOTAL CONNECTED 65954 65954 65954

13296VA - CONTINUOUS X 0.25 (*)

= 3324 VA

184565 VA - NON-CONTIN X 1.00 = 184565 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

201185FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

242

LARGEST PHASE CURRENT

7/13/2017 10:21

COMMENT:

VOLTS 277/480V PANEL

LPB

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION

ACCESS CORR (NEAR FD1)

BUS 200A

A.I.C. 14 KAIC FED FROM SWBB MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

DRY WH LTS (ROW DA)

1

20 1

1 1680

15 3

LEVEL 02 HVAC (HP-2)

2853 2

DRY WH LTS (ROWS DB)

1

20 1

3 1440

2853 4

DRY WH LTS (ROWS DA/DB ENDCAPS)

1

20 1

5 500

2853 6

<POLE NOT USED> 30 3

7 --

60 3 208V PANEL RPB1 TRANSFORMER

8410 8

LEVEL 02 IWH-205

9 5540

5030 10

LEVEL 02 IWH-206

11 5540

7950 12

LEVEL 02 HVAC (HP-1) 15 3

13 2853

60 3 208V PANEL LVP3 TRANSFORMER

6900 14

15 2853

6900 16

17 2853

6900 18

73909 VA - 3PH TOTAL CONNECTED 22696 24616 26596

3620VA - CONTINUOUS X 0.25 (*)

= 905 VA

70289 VA - NON-CONTIN X 1.00 = 70289 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)80694

FEEDER TOTAL (VA) (***)

0 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

97 LARGEST PHASE CURRENT 11/15/2017 7:34

COMMENT:

VOLTS 277/480V PANEL

LPA

(NEW)

MAIN 200A MCB

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 35KA IC MIN FED FROM SWBA1 MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPACE

1 --

SPACE

-- 2

MACHINE ROOM LTS

1

20 1

3 2660

SPACE

-- 4

MAINTENANCE ROOM LTS

1

20 1

5 1528

SPACE

-- 6

ELEVATOR LIGHTS

1

20 1

7 280

SPACE

-- 8

LEVEL 01 LTS - SOUTH & EXIIT

1

20 1

9 1280

SPACE

-- 10

LEVEL 01 LTS - NORTH & EXIT

1

20 1

11 1680

SPACE

-- 12

MAINTENANCE ROOM LTS 20 1

13 1528

15 3 36V BATTERY CHARGER

3324 14

PARKING LOT LTS VIA TIME SWITCH

1

20 1

15 800

3324 16

N&S STAIR LIGHTING

1 17 640

3324 18

SPARE 20 1

19 0

SPACE

-- 20

SPACE

21 --

SPACE

-- 22

SPACE

23 --

SPACE

-- 24

SPACE

25 --

SPACE

-- 26

SPACE

27 --

SPACE

-- 28

SPACE

29 --

SPACE

-- 30

SPACE31 --

SPACE

-- 32

SPACE

33 --

SPACE

-- 34

SPACE

35 --

SPACE

-- 36

SPACE

37 --

100 3 TRANSFORMER FEED PANEL RPA

9772 38

SPACE

39 --

9772 40

SPACE

41 --

9772 42

49684 VA - 3PH TOTAL CONNECTED 14904 17836 16944

8868VA - CONTINUOUS X 0.25 (*)

= 2217 VA

40816 VA - NON-CONTIN X 1.00 = 40816 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)55725

FEEDER TOTAL (VA) (***)

0 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

67 LARGEST PHASE CURRENT 11/15/2017 7:37

COMMENT:

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

480V

PANEL

SCHEDULES

E150

EXISTING 480V PANEL EM SCHEDULE

480V PANEL LPA SCHEDULE

(REPLACE EXISTING PANELBOARD WITH NEW ONE HAVING HIGHER SCCR)

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 480V PANEL HVP1 SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 480V PANEL LPB SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 480V PANEL LPA2 SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

480V PANEL LPC SCHEDULE

(REPLACE EXISTING PANELBOARD WITH NEW ONE HAVING HIGHER SCCR)

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 480V PANEL LPCA SCHEDULE

(FREEZER LOADS REMOVED; OTHER LOADS RELOCATED) (REMOVED PANELBOARD)

EXISTING 480V PANEL LPF SCHEDULE

(ADDED BALER CIRCUIT)

EXISTING 480V PANEL LPD SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 480V PANEL LPE SCHEDULE

(REFERENCE ONLY; NO CHANGES)

480V PANEL HVP2 SCHEDULE

(REPLACE EXISTING PANELBOARD WITH NEW ONE HAVING HIGHER SCCR)

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

NEW 480V PANEL HVP3 SCHEDULE

4

4

4

4

4

4 4

44

4

4

4

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
ts$
Text Box
20
ts$
Text Box
3
ts$
Text Box
Jockey Pump
Page 16: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

VOLTS 120/208V PANEL

RPA

(EXISTING)

MAIN 225A MCB

PHASE 3PH, 4 WIRELOCATION MAINTENANCE ROOM BUS 225A

A.I.C. 10KA IC MIN FED FROM LPA VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

EXHAUST FANS (EF-1 & 2) 20 1

1 200

20

1 MAINT ROOM RECEPTS - NE

0 2 1

MAINT RM RECEPT

1

20 1

3 180

1

WATER HEATER RECIRC PUMP (RP-1)

528 4 1

FIRE HOUSE RECEPT, LTS, SPRINKLER 20 1

5 250

1 MAINT ROOM RECEPTS - NW

0 6 1

LEVEL 01 - DF 20 1

7 480

20 1 MAINT ROOM RECEPTS - S

360 8 2

LEVEL 01 RECEPTS - DRIVER / WAITING

2

20 1

9 360

20 1 MAINT ROOM RECEPTS

180 10 1

LEVEL 01 RECEPTS - REC / HALL

4

20 1

11 720

20 1 MAINT OFFICE - LIGHT / RECEPT

520 12 2 1

MAINT OFFICE RECEPT

2

20 1

13 360

20 1 AMERICOLD ELEC CASCADE METER

100 14

FACP 20 1

15 500

15 2 HVAC INDOOR UNIT IU-2

492 16

LEVEL 01 RECEPTS - RM 113,118,120

11

20 1

17 1980

492 18

MAINT RM RECEPT

1

20 1

19 180

20 1 MAIN ENTRANCE SECURITY DOOR

500 20

LOW ROOFTOP RECEPTS

3

15 1

21 540

20 1 SPARE

0 22

MAINT RM RECEPT

1

20 1

23 180

20 1 FIRE SYSTEM

500 24

SPARE 20 1

25 0

20 2 SUMP PUMP

500 26

SPARE 20 1

27 0

500 28

MAINT RM RECEPT

1

20 1

29 180

20 1 SPARE

0 30

AMMONIA STORAGE TANK 20 1

31 250

100 3 PANEL RPAA MAIN FEED ENGINE RM

4270 32

SPARE 20 1

33 0

4270 34

AMMONIA EXHAUST FAN 60 1

35 500

4270 36

SPARE 60 1

37 0

60 3 SPARE

0 38

SPARE 30 1

39 0

0 40

MAINT RM RECEPT

1

20 1

41 180

0 42

24522 VA - 3PH TOTAL CONNECTED 7200 7550 9772

520

VA - CONTINUOUS X 0.25 (*)

= 130 VA

6300

VA - GP RECEPTS X (**)

= 6300 VA

17702 VA - NON-CONTIN X 1.00 = 17702 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

29446

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

35 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

82 LARGEST PHASE CURRENT 11/15/2017 7:59

COMMENT:

VOLTS 120/208V PANEL

RPA2

(EXISTING)

MAIN 200A MCB

PHASE 3PH, 4 WIRELOCATION MAINTENANCE ROOM BUS 200A

A.I.C. 10KA IC MIN FED FROM LPA2 VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

LEVEL 01 RECEPT - BREAK RM VENDING

(RE-PURPOSED BREAKER)

1

20 1

1 180

20

1 ELEVATOR PIT LT & RECEPT

420 2 1 1

LEVEL 01 RECEPT - BREAK RM VENDING

(RE-PURPOSED BREAKER)

1

20

3 180

20

250 4

LEVEL 01 RECEPT - BREAK RM REF

1

20

5 180

20 1 ELEVATOR CAB LTG & RECEPT

380 6

LEVEL 01 RECEPT - BREAK RM MICRO

1

20 1

7 180

1080 8

LEVEL 01 RECEPTS - RM 107 COUNTER

2

20

9 360

0 10

LEVEL 01 - DISPOSAL 20

11 1656

30 2 WATER HEATER

1500 12

IDF #2 ROOM 120V 30 1

13 2000

1500 14

IDF #2 ROOM LIGHTS/RECEPT

1 1

20 1

15 260

20 1 SPARE

0 16

DOCK EM LTS 20 1

17 500

100 3 208V PANEL UPS1

6667 18

DOCK RECEPTS

2

20 3

19 360

6667 20

DOCK RECEPTS

2 21 360

6667 22

DOCK RECEPTS

2 23 360

20 1 SPARE

0 24

IDF #3 SOUTH RECEPTS

2

20 1

25 360

30 2 LEVEL 01 HVAC INDOOR UNIT IU-1

720 26

SPARE 20

27 0

720 28

CONT ENGINE RM EX FAN 20 1

29 500

20 2 SPARE

0 30

AMMONIA PUMP HEATER (AP-2) 20 1

31 1000

0 32

AMMONIA PUMP HEATER (AP-1) 20 1

33 1000

20 1 LEVEL 01 RECEPTS - INVENTORY

1080 34 6

LEVEL 01 HVAC OUTDOOR UNIT OU-1 40 2

35 2760

20 1 SPARE

0 36

37 2760

20 1 LEVEL 01 RECEPTS - ROUTING

1080 38 6

LEVEL 01 HVAC OUTDOOR UNIT OU-2 40 2

39 2676

20 1 SPARE

0 40

41 2676

20 1 LEVEL 01 RECEPTS - BRK RM / TRANS / HR

1800 42 10

50838 VA - 3PH TOTAL CONNECTED 18307 13553 18979

680VA - CONTINUOUS X 0.25 (*)

= 170 VA

6840

VA - GP RECEPTS X (**)

= 6840 VA

43318 VA - NON-CONTIN X 1.00 = 43318 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)57106

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

38 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

159 LARGEST PHASE CURRENT 11/15/2017 7:59

COMMENT:

VOLTS 120/208V PANEL

RPAA

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION MAINTENANCE ROOM BUS 100A

A.I.C. 10KA IC MIN FED FROM RPA MOUNTING SURFACE

LOAD VA LOAD LOAD

DESCRIPTION LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG DESCRIPTION

ENGINE RM RECEPT - NW

1

20 1

1 180

20 1 CHART RECORDERS

100 2

ENGINE RM RECEPTS

2

20 1

3 360

20 1 SPARE

0 4

ENGINE RM RECEPTS

2

20 1

5 360

20 1

ENGINE RM RECEPT (NEAR A/C)180 6 1

BATTERY RM 20 1

7 180

30 2 SPARE

8

ENGINE RM RECEPT - NW

1

20 1

9 180

10

SPACE

11 --

20 1 SPARE

0 12

SPACE

13 --

20 1 SPARE

0 14

SPACE

15 --

20 1 SPARE

0 16

SPARE 20 1

17 0

20 1 SPARE

0 18

SPARE 20 1

19 0

20 1 SPARE

0 20

SPARE 20 1

21 0

20 1 SPARE

0 22

SPARE 20 1

23 0

20 1 SPARE

0 24

SPARE 20 1

25 0

40 2

AIR COMPRESSOR (ADDED 1998)

3720 26

SPARE 20 1

27 0

3720 28

SPACE

29 --

SPACE

-- 30

SPACE

31 --

SPACE

-- 32

TVSS 40 1

33 10

SPACE

-- 34

TVSS 40 1

35 10

SPACE

-- 36

TVSS 40 1

37 10

SPACE

-- 38

SPACE39 --

SPACE

-- 40

SPACE

41 --

SPACE

-- 42

9010 VA - 3PH TOTAL CONNECTED 4190 4270 550

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

1260

VA - GP RECEPTS X (**)

= 1260 VA

7750 VA - NON-CONTIN X 1.00 = 7750 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

12810

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

7 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

35.6 LARGEST PHASE CURRENT 11/15/2017 7:59

COMMENT:

VOLTS 120/208V PANEL

RPB

(EXISTING)

MAIN 100A MCB

PHASE 3PH, 4 WIRELOCATION CORRIDOR - FD3 BUS 100A

A.I.C. 10KA IC MIN FED FROM LPC VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

RAIL DOCK RECEPTS

1

20 1

1 180

20 1 RF SYSTEM

250 2

RAIL DOCK RECEPTS

1

20 1

3 180

20 1 BI PART DOOR HEATERS

1000 4

RAIL DOCK RECEPTS

1

20 1

5 180

20 1 BI PART DOOR HEATERS

1000 6

SPACE

7 --

20 1 BI PART DOOR HEATERS

1000 8

SPACE9 --

20 1 BI PART DOOR HEATERS

1000 10

SPARE 20 1

11 0

20 1 BI PART DOOR HEATERS

1000 12

DOCK OUTLETS

2

20 1

13 360

20 1 BI PART DOOR HEATERS

1000 14

DOCK OUTLETS

2

20 1

15 360

20 1 BI PART DOOR HEATERS

1000 16

DOCK OUTLETS

2

20 1

17 360

20 1 SPARE

0 18

DOCK OUTLETS

2

20 1

19 360

20 1 RAIL DOCK DOOR RECEPT

180 20 1

SPARE 20 1

21 0

20 1 RAIL DOCK OUTLET

180 22 1

SPARE 20 1

23 0

20 1 SPARE

0 24

RED/GRN DOCK LTS

1

20 1

25 500

20 1 SPARE

0 26

SPARE 20 1

27 0

20 1 SPARE

0 28

DOCK OUTLETS

2

20 1

29 360

20 1 DOCK SCALE RECEPT

180 30 1

DOCK OUTLETS

2

20 1

31 360

20 1 SPARE

0 32

SPARE 20 1

33 0

20 1 FIRE ALARM PANELS

250 34

SPARE 20 1

35 0

20 1 SPARE

0 36

DAIR, MAID COMPUTER OUTLET

1

20 1

37 180

20 1 SPARE

0 38

SPARE 50 2

39 0

20 1 SPARE

0 40

41 0

20 1 SPARE

0 42

11420 VA - 3PH TOTAL CONNECTED 4370 3970 3080

500VA - CONTINUOUS X 0.25 (*)

= 125 VA

3420

VA - GP RECEPTS X (**)

= 3420 VA

7500 VA - NON-CONTIN X 1.00 = 7500 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)13235

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)19 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

36.780236 LARGEST PHASE CURRENT 6/1/2017 9:38

COMMENT:

VOLTS 120/208V PANEL

RPC

(EXISTING)

MAIN 150A MCB

PHASE 3PH, 4 WIRELOCATION COLD DOCK AREA - SOUTH BUS 225A

A.I.C. 10KA IC MIN FED FROM LPD VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

FREEZER C5 RECEPTS

2

20 1

1 360

20 1

FREEZER C6 RECEPTS

360 2 2

FREEZER C5 RECEPTS

2

20 1

3 360

20 1

FREEZER C6 RECEPTS

360 4 2

FREEZER C5 RECEPTS

2

20 1

5 360

20 1

FREEZER C6 RECEPTS

360 6 2

FREEZER C5 RECEPTS

2

20 1

7 360

20 1

DOCK RECEPTS

360 8 2

FACP 20 1

9 250

20 1

DOCK RECEPTS

360 10 2

DOCK EVAP RECEPTS

1

20 1

11 360

20 1

HEATER RISER ROOM

500 12

DOCK RECEPTS

1

20 1

13 360

20 1

FREEZER C6 DOOR HEATER (MAN)

1000 14

DOCK RECEPTS

1

20 1

15 360

20 1

SPARE

0 16

DOCK RECEPTS

1

20 1

17 360

20 1

SPARE

0 18

DOCK DOOR RECEPT (SWITCHED)

1

20 1

19 180

20 1

DOCK DOOR RECEPT (SWITCHED)

180 20 1

DOCK DOOR RECEPTS

2

20 1

21 360

20 1

DOCK DOOR RECEPT

180 22 1

DOCK DOOR RECEPTS

2

20 1

23 360

20 1

DOCK DOOR RECEPT

180 24 1

DRAIN PIPE HEAT TRACE 20 1

25 1000

20 1

FREEZER C5 SOUTH FAN

500 26

DOOR HEATER C5 NORTH 20 1

27 1000

20 1

FREEZER C6 SOUTH FAN

500 28

RF RECEPT S DOCK

1

20 1

29 180

20 1

PHOTOCELL / CONTACTOR

150 30

DOCK EVAPS RECEPTS

2

20 1

31 360

20 1

FREEZER C5 DOOR FAN

500 32

DOCK EVAPS RECEPTS

2

20 1

33 360

20 1

FREEZER C5 DOOR FAN

500 34

SPARE 20 1

35 0

20 1

FREEZER C5 DOOR HEATER

1000 36

SPARE 30 3

37 0

20 1

FREEZER C5 DOOR HEATER

1000 38

39 0

20 1

RED/GRN DOCK LTS

250 40 1

41 0

20 1

RED/GRN DOCK LTS

250 42 1

15420 VA - 3PH TOTAL CONNECTED 6520 4840 4060

500VA - CONTINUOUS X 0.25 (*)

= 125 VA

6300

VA - GP RECEPTS X (**)

= 6300 VA

8620 VA - NON-CONTIN X 1.00 = 8620 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)19685

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

35 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

54.704869 LARGEST PHASE CURRENT 6/1/2017 9:38

COMMENT:

VOLTS 120/208V PANEL

LVP1

(EXISTING)

MAIN 50A MCB

PHASE 3PH, 4 WIRELOCATION

DRY DOCK (NEAR FD2)

BUS 60A

A.I.C. 10 KA IC MIN FED FROM HVP1 VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

LEVEL 02 RECEPTS - OFFICE (DAVE)

3

20 1

1 540

20 1 DOCK RECEPTS - NORTH1

360 2 2

LEVEL 02 RECEPTS - OFFICE (GLENN)

3

20 1

3 540

20 1 DOCK RECEPTS - NORTH2

360 4 2

LEVEL 02 RECEPTS - CSR / REGIONAL

8

20 1

5 1440

20 1 SPARE

540 6 3

LEVEL 02 RECEPTS - FINANCE

4

20 1

7 720

20 1 SPARE

900 8 5

LEVEL 02 RECEPTS - OFFICE (TOM)

3

20 1

9 540

20 1 SPARE

1260 10 7

LEVEL 02 RECEPTS - DSM

4

20 1

11 720

20 1 SPARE

0 12

FREEZER CONTROL BI PART 20 1

13 500

20 1 SPARE

0 14

CONDESATE PUMP RECEPT

4

20 1

15 720

20 1 SPARE

0 16

CONDESATE PUMP RECEPT

4

20 1

17 720

20 1 SPARE

0 18

SPACE

19 --

20 1 SPARE

0 20

SPACE

21 --

20 1 SPARE

0 22

SPACE

23 --

SPACE

-- 24

PANEL MAIN BREAKER 50 3

25 --

-- 26

27 --

SPACE

-- 28

29 --

-- 30

9860 VA - 3PH TOTAL CONNECTED 3020 3420 3420

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

9360

VA - GP RECEPTS X (**)

= 9360 VA

500 VA - NON-CONTIN X 1.00 = 500 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

10260

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

52 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

28.5 LARGEST PHASE CURRENT 11/15/2017 7:58

COMMENT:

VOLTS 120/208V PANEL

LVP3

(EXISTING)

MAIN 100A MCB

PHASE 3PH, 4 WIRELOCATION RAIL DOCK BUS 225A

A.I.C. 22 KAIC FED FROM

PNL LPB (VIA TRANSFORMER)

MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPARE 20 3

1 0

20 3 SPARE

0 2

3 0

0 4

5 0

0 6

SPARE 20 3

7 0

40 1 120V LINE POWER

0 8

9 0

30 1 SPARE

0 10

11 0

20 1 EAST WALL RECEPTS

900 12 5

DRAIN VALVE 20 1

13 250

30 3 SPARE

0 14

SPARE 20 1

15 0

0 16

SPARE 20 3

17 0

0 18

19 0

50 2 SPARE

0 20

21 0

0 22

SPACE

23 --

20 2 RECEPTACLE

1500 24

SPARE 30 3

25 0

1500 26

27 0

20 2 RECEPTACLE

1500 28

29 0

1500 30

SPARE 30 3

31 0

20 2 RECEPTACLE

1500 32

33 0

1500 34

35 0

20 2 RECEPTACLE

1500 36

MAIN BREAKER 100 3

37 --

1500 38

39 --

20 2 RECEPTACLE

1500 40

41 --

1500 42

16150 VA - 3PH TOTAL CONNECTED 4750 4500 6900

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

900VA - GP RECEPTS X (**)

= 900 VA

15250 VA - NON-CONTIN X 1.00 = 15250 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

20700

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

5 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)57.5 LARGEST PHASE CURRENT 11/15/2017 7:58

COMMENT:

VOLTS 120/208V PANEL

LVP2

(EXISTING)

MAIN 100A MCB

PHASE 3PH, 4 WIRELOCATION

DRY DOCK (NEAR STAIRS)

BUS 100A

A.I.C. 10 KA IC MIN FED FROM HVP2 VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPARE 30 2

1 0

100 3P PANEL MAIN

-- 2

3 0

-- 4

LEVEL 02 RECEPTS - TRAINING / SALES

4

20 1

5 720

-- 6

LEVEL 02 RECEPTS - TRAINING / SALES

5

20 1

7 900

20 1 SPARE

0 8

LEVEL 02 RECEPT - DF 20 1

9 480

20 1 SPARE

0 10

LEVEL 02 COFFEE BAR

1

20 1

11 180

20 1 SPARE

0 12

LEVEL 02 COFFEE BAR

1

20 1

13 180

20 1 SPARE

0 14

SPARE 20 1

15 0

20 1 SPARE

0 16

SPARE 20 1

17 0

20 1 SPARE

0 18

LEVEL 02 RECEPTS - FUTURE (RM 229)

8

20 1

19 1440

20 1 DOCK RECEPTS

360 20 2

SPARE 20 1

21 0

20 1 DOCK RECEPTS

360 22 2

LEVEL 02 FLOOR RECEPTS - TRAINING

6

20 1

23 1080

20 1 DOCK RECEPTS

360 24 2

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

6060 VA - 3PH TOTAL CONNECTED 2880 840 2340

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

5580

VA - GP RECEPTS X (**)

= 5580 VA

480 VA - NON-CONTIN X 1.00 = 480 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

8640

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

31 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)24.0 LARGEST PHASE CURRENT 11/15/2017 7:58

COMMENT:

VOLTS 120/208V PANEL

RPE

(EXISTING)

MAIN 100A MCB

PHASE 3PH, 4 WIRELOCATION CHARGING/BATTERY RM BUS 100A

A.I.C. 10KA IC MIN FED FROM LPF VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

RECEPTS

3

20 1

1 540

20 1 WATER FILTER RECEPT

180 2 1

RECEPTS

2

20 1

3 360

20 1 WATER HEATER

1600 4

RECEPTS

2

20 1

5 360

20 1 GENERATOR BATTERY CHARGER

100 6

SPARE 30 3

7 0

20 1 EF-10

1180 8

9 0

20 1 SPARE

0 10

11 0

20 1 SPARE

0 12

SPARE 20 1

13 0

20 1 SPARE

0 14

SPARE 20 1

15 0

20 1 SPARE

0 16

SPARE 20 1

17 0

20 1 SPARE

0 18

IRRIGATION CONTROLLER 20 1

19 100

20 1 SPARE

0 20

AMMONIA DUMP 20 1

21 500

20 1 SPARE

0 22

SPARE 20 1

23 0

20 1 SPARE

0 24

SPARE 20 1

25 0

20 3

recepts and lights for USDA room or spare

360 26

SPARE 20 1

27 0

360 28

NH3 DUMP TANK ALARM 20 1

29 100

360 30

SPACE

31 --

SPACE

-- 32

SPACE

33 --

SPACE

-- 34

SPACE

35 --

SPACE

-- 36

SPACE

37 --

SPACE

-- 38

SPACE39 --

SPACE

-- 40

SPACE

41 --

SPACE

-- 42

6100 VA - 3PH TOTAL CONNECTED 2360 2820 920

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

1440

VA - GP RECEPTS X (**)

= 1440 VA

4660 VA - NON-CONTIN X 1.00 = 4660 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

8460

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

8 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

23.5 LARGEST PHASE CURRENT 6/1/2017 9:39

COMMENT:

PROJECT NAME: PROJECT NUMBER: 17002

VOLTS 120/208V PANEL

RPB1

(EXISTING) MAIN 150A MCB

PHASE 3PH, 4 WIRE LOCATION DRY DOCK (NEAR FD1) BUS 150A

A.I.C. 10KA IC MIN FED FROM LPB VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

LEVEL 02 RECEPTS - CONF RM 5 20 1 1 900

20 1 DOCK RECEPT

360 2 2

LEVEL 02 RECEPTS - FILE 3 20 1 3 540

20 1 DOCK RECEPT

360 4 2

HIGH ROOFTOP GFCI RECEPTS 7 20 1 5 1260

20 1 DOCK RECEPT

360 6 2

LEVEL 02 RECEPTS - OFFICE (RYAN) 6 20 1 7 1080

20 1 DOCK RECEPT

360 8 2

LEVEL 02 RECEPTS - COPY 5 20 1 9 900

20 1 DOCK RECEPT

360 10 2

SPARE 1 11 0

20 1 DOCK RECEPT

360 12 2

EXHAUST FAN (EF-3) 20 1 13 100

20 1 DOCK RECEPT

360 14 2

2 20 15 360

20 1 DOCK RECEPT

360 16 2

30 17 0

20 2 2POLE DOCK RECEPT

1000 18

19 0

1000 20

SPARE 40 3 21 0

20 1 OUTSIDE RECEPTS

540 22 3

23 0

20 2 2POLE DOCK RECEPT

1000 24

25 0

1000 26

IDF NORTH CABINET RECEPT 1 20 1 27 180

20 1 DOCK RECEPT

180 28 1

LEVEL 02 FLOOR RECEPTS - CONF RM 4 20 1 29 720

50 2 2POLE DOCK RECEPT

2000 30

SPARE 20 1 31 0

2000 32

DOCK RECEPTACLE 30 3 33 1250

SPACE

-- 34

35 1250

SPACE

-- 36

37 1250

SPACE

-- 38

SPACE 39 --

SPACE

-- 40

SPACE 41 --

SPACE

-- 42

21390 VA - 3PH TOTAL CONNECTED 8410 5030 7950

0 VA - CONTINUOUS X 0.25 (*) = 0 VA

9540 VA - GP RECEPTS X (**) = 9540 VA

11850 VA - NON-CONTIN X 1.00 = 11850 VA

(* INCLUDES LIGHTING & LARGEST MOTOR) 25230 FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE) 53 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA) 70.1 LARGEST PHASE CURRENT 11/15/2017 7:59

COMMENT:

VOLTS 120/208V PANEL

RPD

(EXISTING)

MAIN 150A MCB

PHASE 3PH, 4 WIRELOCATION LEVEL 02 - UTILITY ROOM BUS 225A

A.I.C. 10KA IC MIN FED FROM SWBD "TE" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

EXHAUST FANS (EF-4 & 5) 20 1

1 200

20 1 LEVEL 02 RECEPTS - PROCUREMENT

1080 2 6

SPARE 20 1

3 0

540 4 3

SPARE 20 1

5 0

20 1

LEVEL 02 RECEPTS - OFFICE (ED)

540 6 3

SPARE 20 1

7 0

20 1 SPARE

0 8

SPARE 20 1

9 0

20 1 SPARE

0 10

SPARE 20 1

11 0

20 1 SPARE

0 12

LEVEL 02 HVAC (DSO-1 / DSI-1) 40 2

13 2880

30 2

LEVEL 02 HVAC (HP-8)

(NEW BREAKER)

2316 14

15 2880

2316 16

SPARE 20 1

17 0

SPARE

0 18

4 PLEX FIRE RISER

2

20 1

19 360

20 1 SPARE

0 20

SPARE 20 1

21 0

20 1 SPARE

0 22

EXTERIOR SIGN 20 1

23 500

20 1 SPARE

0 24

LEVEL 02 RECEPTS - COMPUTER RM

1

20 1

25 180

20 1 SPARE

0 26

LEVEL 02 RECEPTS - PROCUREMENT

4

20 1

27 720

20 1 SPARE

0 28

SPARE 20 1

29 0

20 1 SPARE

0 30

SPARE 20 1

31 0

20 1 SPARE

0 32

SPARE 20 1

33 0

20 1 SPARE

0 34

SPARE 20 1

35 0

20 1 SPARE

0 36

SPARE 20 1

37 0

20 1 SPARE

0 38

IDF ROOM RECEPTS

2

20 1

39 360

SPACE

-- 40

IDF ROOM RECEPTS

2

20 1

41 360

SPACE

-- 42

15232 VA - 3PH TOTAL CONNECTED 7016 6816 1400

0VA - CONTINUOUS X 0.25 (*)

= 0 VA

4140

VA - GP RECEPTS X (**)

= 4140 VA

11092 VA - NON-CONTIN X 1.00 = 11092 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)21048

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)23 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

58 LARGEST PHASE CURRENT 11/15/2017 8:00

COMMENT:

VOLTS 120/240V PANEL

LVP4

(EXISTING)

MAIN 70A MCB

PHASE 3PH, 4 WIRELOCATION ACCESS CORRIDOR BUS 100A

A.I.C. 22 KAIC FED FROM

SWBD TE (VIA TRANSFORMER)

MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

PANEL RECEPTACLE

1

20 1

1 180

20 1 EXIT SIGN

100 2

SPARE 20 1

3 0

20 1 NORTH RECEPTACLE

180 4 1

SPACE ** HIGH LEG **

5 0

SPACE ** HIGH LEG **

-- 6

SPARE 50 3

7 0

20 1 ROOF RECEPT

180 8 1

9 0

20 1 ROOF RECEPT

180 10 1

11 0

20 1 SPACE ** HIGH LEG **

-- 12

820 VA - 3PH TOTAL CONNECTED 460 360 0

0VA - CONTINUOUS X 0.25 (*)

= 0 VA

720VA - GP RECEPTS X (**)

= 720 VA

100 VA - NON-CONTIN X 1.00 = 100 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

1380

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

4 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)3.8 LARGEST PHASE CURRENT 6/1/2017 9:39

COMMENT:

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

208V

PANEL

SCHEDULES

E151

EXISTING 208V PANEL RPA SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 208V PANEL RPA2 SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

(ADDED UPS LOAD)

EXISTING 208V PANEL RPAA SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 208V PANEL RPE SCHEDULE

(REFERENCE ONLY; NO CHANGES)

EXISTING 208V PANEL RPD SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTNG 208V PANEL RPB SCHEDULE

(REFERENCE ONLY; NO CHANGES)

EXISTING 208V PANEL RPC SCHEDULE

(REFERENCE ONLY; NO CHANGES)

EXISTING 208V PANEL RPB1 SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 208V PANEL LVP1 SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 208V PANEL LVP2 SCHEDULE

(REVISED CIRCUITS TO REFLECT AS-BUILT CONDITIONS)

EXISTING 208V PANEL LVP3 SCHEDULE

(REFERENCE ONLY; NO CHANGES)

EXISTING 240V PANEL LVP4 SCHEDULE

(REFERENCE ONLY; NO CHANGES)

4

4

4

4

444

AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 17: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

EXHAUST FAN (EF-6)

(1.1 FLA PER NEC)

1/2

MCP

480VAC POWER

FROM PANEL HVP3

CKT 31,33,35

H1 H2 H3 H4

X1 X2 X3

CPT

480-120VAC

FUSE FUSE

FUSE

EXHAUST FAN MOTOR CONTROL SCHEMATIC

M EOL

EOL

H

RUNNING

R

M

EOL

H

OVERLOAD

A

30.5mm, 2-POS (Ma-Ma), METAL

KNOB, MAINTAIN TYPE 4 RATING

30.5mm, PUSH-TO-TEST

PILOT LIGHT, LED

FULL-VOLTAGE LAMP,

PLASTIC LENS, METAL

BEZEL, MAINTAIN TYPE 4

RATING (TYPICAL)

RESET

JUMPER

NEMA SIZE 0 CONTACTOR

ON OFF

(XO)

ETM

SWITCHED 120VAC CONTROL

POWER TO CONTACTOR

CONTROL PANEL

BATTERY

CHARGER 1

C1

CONTACTOR CONTROL PANEL SCHEMATIC

H N

BATTERY

CHARGER 2

C2

BATTERY

CHARGER 3

C3

BATTERY

CHARGER 4

C4

BATTERY

CHARGER 5

C5

BATTERY

CHARGER 6

C6

BATTERY

CHARGER 7

C7

BATTERY

CHARGER 8

C8

SWITCHED 120VAC SWITCH POWER

FROM EXHAUST FAN MOTOR STARTER

FUSE

C1

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 1,3,5

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C2

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 2,4,6

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C3

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 7,9,11

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C4

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 8,10,12

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C5

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 13,15,17

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C6

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 14,16,18

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C7

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 19,21,23

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

C8

A-PH

B-PH

C-PH

480V

AC

P

OW

ER

F

RO

M

480V

P

AN

EL H

VP

3

CK

T 20,22,24

SW

IT

CH

ED

480V

AC

PO

WE

R T

O B

AT

TE

RY

CH

AR

GE

R R

EC

EP

TA

CLE

DEFINITE PURPOSE CONTACTOR

WITH 30A CONTACTS

PR

OO

F-O

F-F

LO

W

CR

1

PROOF-OF-FLOW

CR

1

FLOW SWITCH

PROOF-OF-FLOW

(PER MECH PLANS)

PROOF-OF-FLOW

CR1

PROOF-OF-FLOW SIGNAL

TO CONTACTOR

CABINET

4

SHORT CIRCUIT CALCULATION

Fault

Point

Panel/Transformer Description

Source

(Fault

Point)

I (Source

Current)

(amps)

Conduit

Type Cable Type

Wire/Bus Size "C" Value

EL-L

(Volts)

L

(Length)

(FT)

XFMR KVA XFMR %Z f M ISCA

F0 SES

43,490 43,490

F1 MDP F0

43,490

NM 600V 8

SET(S) OF

500 26706 480 19 -- -- 0.014 0.99

42,891

F2 SWBB F1

42,891

NM 600V 2

SET(S) OF

500 26706 480 35 -- -- 0.101 0.91

38,942

F3 480V PANEL HPV1 F2

38,942

NM 600V 1

SET(S) OF

1 7493 480 192 -- -- 3.605 0.22

8,456

F4 208V PANEL LVP1 XFMR PRIMARY F3

8,456

M 600V 1

SET(S) OF

12 617 480 7 -- -- 0.346 0.74

6,282

F5 208V PANEL LVP1 XFMR SECONDARY F4

6,282

-- --

SET(S) OF

208 -- 15 2 6.963 0.13 789

F6 480V PANEL HPV2 F2

38,942

NM 600V 1

SET(S) OF

1 7493 480 78 -- -- 1.463 0.41

15,813

F7 208V PANEL LVP2 XFMR PRIMARY F6

15,813

M 600V 1

SET(S) OF

8 1557 480 7 -- -- 0.257 0.80

12,584

F8 208V PANEL LVP2 XFMR SECONDARY F7

12,584

-- --

SET(S) OF

208 -- 30 2 6.975 0.13

1,578

F9 480V PANEL LPB F2

38,942

NM 600V 1

SET(S) OF

1 7493 480 236 -- -- 4.429 0.18

7,173

F10 208V PANEL RPB1 XFMR PRIMARY F9

7,173

M 600V 1

SET(S) OF

4 3806 480 5 -- -- 0.034 0.97

6,937

F11 208V PANEL RPB1 XFMR SECONDARY F10

6,937

-- --

SET(S) OF

208 -- 30 5.2 9.997 0.09 631

F12 208V PANEL LVP3 XFMR PRI DISCO F9

7,173

NM 600V 1

SET(S) OF

6 2430 480 250 -- -- 2.663 0.27

1,958

F13 208V PANEL LVP3 XFMR SECONDARY F12

1,958

-- --

SET(S) OF

208 -- 45 4.5 1.628 0.38 745

F14 208V PANEL RPD XFMR PRI DISCO F2

38,942

M 600V 1

SET(S) OF

4 3806 480 180 -- -- 6.646 0.13

5,093

F15 208V PANEL RPD XFMR SECONDARY F14

5,093

-- --

SET(S) OF

208 -- 45 6.3 5.928 0.14 735

F16 208V PANEL LVP4 XFMR PRI DISCO F2

38,942

M 600V 1

SET(S) OF

2/0 10755 480 310 -- -- 4.050 0.20

7,711

F17 208V PANEL LVP4 XFMR SECONDARY F16

7,711

-- --

SET(S) OF

208 -- 30 2 4.274 0.19

1,462

F18 480V PANEL HVP3 F2

38,942

M 600V 2

SET(S) OF

3/0 12844 480 595 -- -- 3.255 0.24

9,153

F19 480V PANEL LPC F2

38,942

NM 600V 1

SET(S) OF

4/0 16673 480 160 -- -- 1.352 0.43

16,557

F20 208V PANEL RPB XFMR PRIMARY F19

16,557

M 600V 1

SET(S) OF

6 2425 480 10 -- -- 0.246 0.80

13,284

F21 208V PANEL RPB XFMR SECONDARY F20

13,284

-- --

SET(S) OF

208 -- 30 2 7.363 0.12

1,589

F22 480V PANEL LPCA F19

16,557

M 600V 1

SET(S) OF

6 2425 480 7 -- -- 0.172 0.85

14,122

F23 480V PANEL LPD F2

38,942

M 600V 1

SET(S) OF

4/0 15082 480 228 -- -- 2.124 0.32

12,465

F24 208V PANEL RPC XFMR PRIMARY F23

12,465

M 600V 1

SET(S) OF

4 3806 480 10 -- -- 0.118 0.89

11,147

F25 208V PANEL RPC XFMR SECONDARY F24

11,147

-- --

SET(S) OF

208 -- 45 2 4.119 0.20

2,178

F26 SWBA1/SWBA2 F1

42,891

NM 600V 2

SET(S) OF

500 26706 480 35 -- -- 0.101 0.91

38,942

F27 480V PANEL LPA2 F26

38,942

M 600V 1

SET(S) OF

3/0 12844 480 35 -- -- 0.383 0.72

28,160

F28 208V PANEL RPA2 XFMR PRIMARY F27

28,160

M 600V 1

SET(S) OF

2 5907 480 10 -- -- 0.172 0.85

24,027

F29 208V PANEL RPA2 XFMR SECONDARY F28

24,027

-- --

SET(S) OF

208 -- 75 5.19 13.823 0.07

1,621

F30 480V PANEL LPA F26

38,942

M 600V 1

SET(S) OF

3/0 12844 480 37 -- -- 0.405 0.71

27,721

F31 208V PANEL RPA XFMR PRIMARY F30

27,721

M 600V 1

SET(S) OF

2 5907 480 5 -- -- 0.085 0.92

25,557

F32 208V PANEL RPA XFMR SECONDARY F31

25,557

-- --

SET(S) OF

208 -- 75 3.6 10.199 0.09

2,282

F33

F34 480V PANEL LPE F26

38,942

M 600V 1

SET(S) OF

4/0 15082 480 228 -- -- 2.124 0.32

12,465

F35 480V PANEL LPF F26

38,942

M 600V 1

SET(S) OF

500 22185 480 120 -- -- 0.760 0.57

22,125

F36 208V PANEL RPE XFMR PRIMARY F35

22,125

M 600V 1

SET(S) OF

6 2425 480 8 -- -- 0.263 0.79

17,513

F37 208V PANEL RPE XFMR SECONDARY F36

17,513

-- --

SET(S) OF

208 -- 30 2 9.706 0.09

1,636

F38 TRANSFER SWITCH F35

22,125

M 600V 1

SET(S) OF

6 2425 480 70 -- -- 2.305 0.30

6,695

F39 208V PANEL EM XFMR PRI DISCO F38

6,695

M 600V 1

SET(S) OF

10 981 480 10 -- -- 0.246 0.80

5,372

F40 FUSE PANEL EM XFMR SECONDARY F39

5,372

-- --

SET(S) OF

208 -- 9 2.5 12.407 0.07 401

F41 480V PANEL EM F38

6,695

M 600V 1

SET(S) OF

6 2425 480 5 -- -- 0.050 0.95

6,378

F42 MCCA F26

38,942

NM 600V 1

SET(S) OF

500 26706 480 18 -- -- 0.095 0.91

35,573

F43 MCCB F1

42,891

NM 600V 2

SET(S) OF

500 26706 480 30 -- -- 0.087 0.92

39,461

F44 MCCC F1

42,891

NM 600V 2

SET(S) OF

500 26706 480 23 -- -- 0.067 0.94

40,212

F45 MCCD F1

42,891

M 600V 2

SET(S) OF

350 19704 480 30 -- -- 0.118 0.89

38,371

F46 FIRE PUMP CONTROLLER F0

43,490

NM 600V 2

SET(S) OF

3/0 13923 480 300 -- -- 1.691 0.37

16,163

F47 208V PANEL UPS1 F29

1,621

M 600V 1

SET(S) OF

1 7293 208 170 -- -- 0.315 0.76

1,233

F48 BATTERY CONTACTOR PANEL F18

9,153

M 600V 1

SET(S) OF

10 981 480 5 -- -- 0.168 0.86

7,834

VOLTS 120/208V PANEL

UPS1

MAINS: 125A MIB / 110A MIS / 110A MBP

PHASE 3PH, 4 WIRELOCATION LEVEL 02 - COMP/TELCO RM BUS 225A

A.I.C. 10KA IC MIN FED FROM LPA2 VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

NORTH IDF PDU 20 2

1 1250

20 2 EAST IDF PDU

1250 2

3 1250

1250 4

SOUTH IDF PDU 20 2

5 1250

20 2 MDF PDU - 2

1250 6

7 1250

1250 8

SPACE

9 --

20 1 RECEPT - TELCO

360 10 2

SPACE

11 --

20 1 RECEPT - ACCESS CONTROL

360 12

MDF PDU - 1 20 2

13 1250

20 2 MDF PDU - 3

1250 14

15 1250

1250 16

SPACE

17 --

20 2 MDF PDU - 4

1250 18

SPACE

19 --

1250 20

SPACE

21 --

SPACE

-- 22

SPACE

23 --

SPACE

-- 24

SPACE

25 --

SPACE

-- 26

SPACE

27 --

SPACE

-- 28

SPACE

29 --

SPACE

-- 30

SPACE

31 --

SPACE

-- 32

SPACE

33 --

SPACE

-- 34

SPACE

35 --

SPACE

-- 36

18220 VA - 3PH TOTAL CONNECTED 8750 5360 4110

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

360

VA - GP RECEPTS X (**)

= 360 VA

17860 VA - NON-CONTIN X 1.00 = 17860 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

26250

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

2 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

73 LARGEST PHASE CURRENT 11/15/2017 8:16

COMMENT:

MIB

208VAC, 3-PHASE

POWER FROM PANEL

RPA2 CKT 18,20,22

MBP MBOUPS

120/208V LOADS (REFER TO

208V PANEL UPS1

SCHEDULE

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

NE

W P

HO

EN

IX

A

Z. F

AC

IL

IT

Y R

EM

OD

EL

PERMIT SET

# Date Revision

17002

ZEW

CEE

MAR 13, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

3-13-17

1 4-27-17 2ND CITY

SUBMITTAL

2 6-1-17 3RD CITY

SUBMITTAL

3 7-12-17 RAIL DOCK

BATTERY

CHARGING

4 11-15-17 3000A SES

CONTROL

SCHEMATICS

E160

OVERSIZED CPT TO

SIMULTANEOUSLY CLOSE ALL

DEFINITE PURPOSE CONTACTORS

ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 18: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

A. CONTRACTOR SHALL OBTAIN NECESSARY PERMITS AND INSPECTIONS REQUIRED BY THE GOVERNING

AUTHORITIES.

B. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ADOPTED (OR CURRENT WHERE NONE HAVE

BEEN ADOPTED) BUILDING CODES: 2012 IBC, 2012 IECC, 2012 IRC, 2012 IFC, 2012 IMC, 2012 IPMC, 2012 IPC,

2012 IFGC, 2011 NEC, ALL APPLICABLE LOCAL CODES, ORDINANCES AND AMENDMENTS.

C. ALL WORK SHALL BE DONE IN A NEAT, WORKMANLIKE, FINISHED AND SAFE MANNER UNDER COMPETENT

SUPERVISION.

D. ALL MATERIALS SHALL BE NEW AND OF THE BEST QUALITY, MANUFACTURED IN ACCORDANCE WITH

NEMA, ANSI, U.L. OR OTHER APPLICABLE STANDARDS. THE USE OF MANUFACTURER'S NAMES, MODELS

AND NUMBERS IS INTENDED TO ESTABLISH STYLE, QUALITY, APPEARANCE, USEFULNESS AND BID PRICE.

PROPOSED SUBSTITUTIONS SHALL BE SUBMITTED IN WRITING AND REVIEWED BY THE ENGINEER PRIOR

TO MATERIAL PROCUREMENT.

E. ALL ELECTRICAL EQUIPMENT SHALL BE CAPABLE OF OPERATING SUCCESSFULLY AT FULL-RATED LOAD,

WITHOUT FAILURE, AT AN AMBIENT AIR TEMPERATURE OF 0°F TO 120°F AND AN ELEVATION OF 1,200 FEET

(ABOVE SEA LEVEL). WHERE THESE CRITERIA CANNOT BE MET, ANCILLARY EQUIPMENT AND/OR SPECIAL

DERATING FACTORS AS APPROVED BY THE ENGINEER SHALL BE UTILIZED.

F. PROTECT ALL ELECTRICAL MATERIAL AND EQUIPMENT INSTALLED UNDER THIS CONTRACT AGAINST

DAMAGE BY OTHER TRADES, WEATHER CONDITIONS OR ANY OTHER CAUSES. EQUIPMENT FOUND

DAMAGED OR IN OTHER THAN NEW CONDITION WILL BE REJECTED AS DEFECTIVE.

G. LEAVE THE SITE CLEAN. REMOVE ALL DEBRIS, EMPTY CARTONS, TOOLS, CONDUIT, WIRE SCRAPS AND

ALL MISCELLANEOUS SPARE EQUIPMENT AND MATERIALS USED IN THE WORK DURING CONSTRUCTION.

ALL COMPONENTS SHALL BE FREE OF DUST, GRIT AND FOREIGN MATERIALS BEFORE FINAL

ACCEPTANCE OF WORK.

H. THESE CONSTRUCTION DRAWINGS ARE SUBJECT TO THE INTERPRETATION OF THE DESIGN ENGINEER.

ALL QUESTIONS REGARDING THESE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE

ENGINEER. ANYONE WHO TAKES UPON THEMSELF THE INTERPRETATION OF THESE CONSTRUCTION

DOCUMENTS OR MAKES REVISIONS TO THE SAME WITHOUT CONFERRING WITH THE DESIGN ENGINEER

SHALL BE RESPONSIBLE FOR THE CONSEQUENCES THEREOF.

I. REFER TO OTHER PLANS FOR EXACT LOCATION OF EQUIPMENT AND ARCHITECTURAL FEATURES.

J. ALL WIRING SHALL BE COPPER UNLESS OTHERWISE NOTED. INSULATION SHALL BE TYPE XHHW OR

THWN. NONMETALIC-SHEATHED CABLE WILL NOT BE PERMITTED.

K. ALL WIRING DEVICES AND ELECTRICAL EQUIPMENT SHALL BE COMMERCIAL GRADE.

L. VERIFY EXACT LOCATION, MOUNTING HEIGHT AND ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT

PROVIDED BY OTHERS PRIOR TO ROUGH-IN. PROVIDE ALL ASSOCIATED EQUIPMENT FOR PROPER

OPERATION AND FINAL CONNECTIONS TO EQUIPMENT PER OWNER.

M. PROVIDE GROUND WIRE IN ALL RACEWAYS SIZED PER NEC ARTICLE 250. INSTALL 250-LB PULL CORD IN

ALL EMPTY CONDUITS INSTALLED AS PART OF THIS PROJECT.

N. ALL UNDERGROUND CONDUIT TO BE SCHEDULE 40 PVC. MINIMUM DEPTH SHALL BE 24", MINIMUM SIZE

3/4". ALL EXPOSED CONDUIT SHALL BE TYPE GRS OR IMC, MINIMUM SIZE 3/4".

O. CONDUIT SHALL BE BURIED A MINIMUM OF 24-INCHES BELOW FINISHED GRADE TO TOP OF CONDUIT(S).

WHERE CONDUIT STUBS UP OUT OF THE EARTH TO ELECTRICAL EQUIPMENT, THE CONDUIT SWEEP AND

CONDUIT LEAVING THE EARTH MUST BE PVC COATED GRS CONDUIT OR RIGID STEEL CONDUIT WRAPPED

WITH 20-MIL RUBBER TAPE HALF-LAPPED TO A THICKNESS OF 40-MILS.

P. ALL CIRCUIT CONDUCTORS, #6 AWG OR SMALLER, SHALL BE "THHN/THWN-2" OR "XHHW" STRANDED

COPPER. ALL OTHER CONDUCTORS SHALL BE "XHHW" STRANDED COPPER. MINIMUM CONDUCTOR SIZE

SHALL BE #12 AWG WITH #12 AWG GROUND FOR POWER CIRCUITS.

GENERAL NOTES

ELECTRICAL ABBREVIATIONS

A, AMP AMP(S), AMPERE(S)

AC ALTERNATING CURRENT MC MANUFACTURER CABLE

AIC AMPS INTERRUPTING CAPACITY MCC MOTOR CONTROL CENTER

AFF ABOVE FINISHED FLOOR MCP MOTOR CIRCUIT PROTECTOR

AFG ABOVE FINISHED GRADE MECH MECHANICAL

AICAMPS INTERRUPTING CAPACITY, SYMM. MFR(S) MANUFACTURER(S)

AL ALUMINUM MH MANHOLE

ARCH

ARCHITECT(URAL)

MIC MICROPHONE

ASYM ASYMMETRICAL MIN MINIMUM

ATS AUTOMATIC TRANSFER SWITCH MISC MISCELLANEOUS

AUTO AUTOMATIC MLO MAIN LUG ONLY

AUX AUXILIARY MOV MOTOR OPERATED VALVE

AWG AMERICAN WIRE GAUGE MPC MINI-POWER CENTER

BC BARE COPPER MPR MOTOR PROTECTION RELAY

BLDG BUILDINGMV, mV MEDIUM VOLTAGE, MILLIVOLT

BOT BOTTOM MVMC MEDIUM VOLTAGE MOTOR CONTROL

CCONDUCTOR, CONDUIT

N.C. NORMALLY CLOSED

CB CIRCUIT BREAKER N.O. NORMALLY OPEN

CKT CIRCUIT N/A NOT APPLICABLE

CLG CEILINGNEUT, N

NEUTRAL

CMU CONCRETE MASONRY UNIT NF NON-FUSED

CNTL CONTROL NG NATURAL GAS

CONC CONCRETE NIC NOT IN CONTRACT

CPT CONTROL POWER TRANSFORMER No. NUMBER

CSI COMMUNICATION SYSTEM INSTALLER NOM NOMINAL

CT CURRENT TRANSFORMER NP NAMEPLATE

Cu COPPER NTS NOT TO SCALE

CV CONTROL VALVE OD OUTSIDE DIAMETER

DB DIRECT BURIAL OH OVERHEAD

DCDIRECT CURRENT, DATA CABLE

OIT OPERATOR INTERFACE TERMINAL

DET DETAIL OL OVERLOAD

DIAG DIAGRAM OWS OPERATOR WORKSTATION

DISC DISCONNECT PBPUSHBUTTON, PULLBOX

DIST DISTRIBUTION PKG'D PACKAGED

DWG DRAWING PMM POWER MONITORING MODULE

(E), (N)

EXISTING / NEW PNL PANEL

EA EACH PP POWER PANEL

EDB ELECTRICAL DUCTBANK PR PAIR

ELECELECTRIC, ELECTRICAL

PRI PRIMARY

ELP EXTRA LONG POND PT POTENTIAL TRANSFORMER

EMH ELECTRICAL MANHOLE PVC POLYVINYL CHLORIDE

ENCLENCLOSURE, ENCLOSED

PWR POWER

EP EXPLOSION PROOF RCPT RECEPTACLE

EPB ELECTRICAL PULLBOX PVC POLYVINYL CHLORIDE

EQUIP EQUIPMENT PW POTABLE WATER

FFUSE, FUSED

PWR POWER

FDR FEEDER RCPT RECEPTACLE

FL FLUORESCENT REF REFERENCE

FLA FULL LOAD AMPS REQ'D REQUIRED

FO FIBER OPTIC REQ'TS REQUIREMENTS

FVNR FULL VOLTAGE NON-REVERSING RMS ROOT MEAN SQUARE

FVR FULL VOLTAGE REVERSING RTU REMOTE TERMINAL UNIT

GDR GROUNDING RESISTOR RVNS REDUCED VOLTAGE NON-REVERSING

GEC GROUNDING ELECTRODE CONDUCTOR RVSS REDUCED VOLTAGE SOFT STARTER

GF GROUND FAULT SA SURGE ARRESTOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER SCR SILICON CONTROLLED RECTIFIER

GFP GROUND FAULT PROTECTION SD SMOKE DETECTOR

GND GROUND SEC SECONDARY

GRS GALVANIZED RIGID STEEL SES SERVICE ENTRANCE SECTION

H, HIHIGH SPEC SPECIFICATION

HMI HUMAN MACHINE INTERFACE SPC SPARE CONDUIT

HP HORSEPOWER SPD SURGE PROTECTION DEVICE

HTR HEATER SSI SECURITY SYSTEM INSTALLER

HTU HEAT TRACE UNIT SSS SOLID-STATE SOFT STARTER

HZ

HERTZ (CYCLES PER SECOND)

ST SHORT TIME

ICOM INTERCOM SWBD SWITCHBOARD

ID INSIDE DIAMETER SWGR SWITCHGEAR

INSTINSTANTANEOUS, INSTRUMENT

SYMM SYMMETRICAL

INTLK INTERLOCK SYS SYSTEM

IPB INSTRUMENT PULLBOX TELCO TELEPHONE COMPANY

JB JUNCTION BOX TEMP TEMPERATURE

KCMIL 1000 CIRCULAR MILS TSP TWISTED SHIELDED PAIR

kV KILOVOLT TST TWISTED SHIELDED TRIAD

kVA KILOVOLT-AMPERE TTB TELEPHONE TERMINAL BOARD

Kvar KILOVOLT-AMPERE REACTIVE TYP TYPICAL

KW KILOWATT UG U/G UNDERGROUND

KWH KILOWATT-HOUR UPS UNINTERRUPTIBLE POWER SUPPLY

LLONG, LENGTH

V VOLT

LAN LOCAL AREA NETWORK VA VOLT-AMPERE

LCP LOCAL CONTROL PANEL VAR VOLT-AMPERE REACTIVE

LCS LOCAL CONTROL STATION VC VACUUM CONTACTOR

LFMC LIQUIDTIGHT FLEXIBLE METAL CONDUT VD VOLTAGE DROP

LT LONG TIME WWATT, WIRE, WIDE

LTG LIGHTING WAN WIDE AREA NETWORK

LV LOW VOLTAGE WP WEATHERPROOF

mA MILLIAMPERE WPWIU WEATHERPROOF WHILE-IN-USE

MAG MAGNETIC XMTR TRANSMITTER

MBJ MAIN BONDING JUMPER Z IMPEDANCE

ELECTRICAL PLAN SYMBOLS

IDENTIFICATION SYMBOLS

XX

#

#

#X

INDICATES KEY NOTE # REFERENCED,

(APPLICABLE ONLY TO SHEET WITH NOTE

IS FOUND)

INDICATES BILL OF MATERIAL #

REFERENCED, (MAY BE APPLICABLE

ACROSS ALL PROJECT SHEETS)

INDICATES BRIEF INSTRUMENT

REFERENCE

INDICATES MISCELLANEOUS REFERENCE

NUMBER OR LETTER (DESCRIBED

FURTHER WITHIN PLANSET WHERE

APPLICABLE)

CXXXX

CONDUIT IDENTIFICATION

(#### = CONDUIT NUMBER,

REFER TO CONDUIT SCHEDULE)

RACEWAYS AND LINETYPES

GROUNDING SYSTEM CONDUCTOR

EXPOSED CONDUIT

UTILITY CONDUIT DUCTBANK

CONDUIT TURNED DOWN

CONDUIT STUBUP

EXISTING CONCEALED CONDUIT

CONDUIT RUN CONCEALED IN

CEILING, FLOOR, OR IN WALLS

GGG

XXXX

XXXX

EXISTING EXPOSED CONDUIT

UNDERGROUND CONDUIT

DUCTBANK

EXISTING UNDERGROUND CONDUIT

DUCTBANK

EXISTING UTILITY CONDUIT

DUCTBANK

OHEOHE

OHEOHE

CHAIN LINK FENCE

EXISTING CHAIN LINK FENCE

UTILITY OVERHEAD ELECTRIC

EXISTING UTILITY OVERHEAD

ELECTRIC

GROUNDING

GROUND SYSTEM CONNECTION

GGG

G

LIGHTNING ROD

GROUND ROD AND WELL

GROUND ROD WITHOUT WELL

RECEPTACLES

SWITCH AND SIMPLEX RECEPTACLE

SIMPLEX RECEPTACLE

DUPLEX RECEPTACLE

DUPLEX RECEPTACLE WITH SPLIT WIRE

QUADRAPLEX RECEPTACLE

RECESSED FLOOR DUPLEX RECEPTACLE

RECESSED FLOOR QUADRAPLEX RECEPTACLE

SPECIALTY PURPOSE RECEPTACLE

480V RECEPTACLE

WELDING OR APPLIANCE RECEPTACLE

#

x

S

#

x

#

x

#

x

#

x

#

x

#

x

#

x

#

x

#

x

WHERE,

# = CIRCUIT DESIGNATION

x = DEVICE TYPE DESIGNATION, WHERE

GF = GROUND FAULT CIRCUIT INTERRUPTER

WP = WEATHERPROOF

WPWIU = WP WHILE-IN-USE

SWITCHES

SINGLE POLE SWITCH

SINGLE POLE SWITCH WITH MODIFIER

WHERE,

# = CIRCUIT DESIGNATION

x1 = DESIGNATION OF DEVICE SWITCHED (I.E. a, b, c, etc.)

x2 = SWITCH SUBSCRIPT MODIFIER, WHERE

2 = GROUND FAULT CIRCUIT INTERRUPTER

3 = WEATHERPROOF

4 = WP WHILE-IN-USE

K = KEY OPERATED

M = HORSEPOWER RATED MANUAL STARTER

MC = MOMENTARY CONTACT, THREE POSITION

MO = SWITCH WITH MOTION SENSOR

MS = MANUAL (MOTOR) STARTER OR SWITCH

TC/P = TIME CLOCK / PROGRAMMABLE

R = RHEOSTAT (DIMMER OR SPEED CONTROL)

F = FLUSH MOUNTED

WP = WEATHERPROOF

HOMERUN

MISCELLANEOUS

xx UNDERGROUND BOX

xx = BOX TYPE/DESIGNATION (I.E. EMH, EPB, IPB)

SAFETY SWITCH

xx = DISCONNECT TYPE (I.E. F, NF, CB)

#A = CURRENT RATING OF SWITCH

xx

#A

COMBINATION MOTOR STARTER

LOCAL/PUSHBUTTON CONTROL STATION

IDENTIFICATION SYMBOLS

a

b

c

d

e

f

LOW VOLTAGE CIRCUIT BREAKER

a = BREAKER DESIGNATION

b = AMPS & TRIP SETTING

(AT - AMP TRIP)

(AC - CONTINUOUS RATING)

c = FRAME SIZE (MFR TO

DETERMINE FRAME SIZE UNLESS

INDICATED)

d = BREAKER TYPE

MCP - MOTOR CIRCUIT

PROTECTOR

SS - SOLID-STATE

TM - THERMAL MAGNETIC

e = NUMBER OF POLES

f = WITHSTAND RATING

LOW VOLTAGE DISCONNECT SWITCH

a = DISCONNECT DESIGNATION

b = AMPS RATING

c = NUMBER OF POLES

d = ENCLOSURE RATING (IF

MOUNTED IN SEPARATE ENCL) (I.E.

NEMA 1, 12, 3R, 4X, 7)

e = WITHSTAND RATING

a

b

c

d

f

a

b

FUSE

a = AMPS RATING

b = FUSE TYPE

MOTOR STARTER

a = STARTER SIZE

b = STARTER TYPE (NEMA/IEC)

a

b

OVERLOAD RELAY

a = OVERLOAD TYPE (I.E. OL, EOL)

a

M <UTILITY>

POWER

METER

UTILITY

METER

HP

MOTOR

HP = HORSEPOWER RATING

ONE LINE DIAGRAM

SYMBOLS

DESCRIPTION

120V, 2'x4' FLUORESCENT LUMINAIRE, GRID/LAY-IN MOUNT,

SPECIFICATION GRADE T8 TROFFER, FLAT WHITE STEEL DOOR,

UNIVERSAL VOLTAGE, ELECTRONIC START BALLAST.

** IN KITCHEN, PROVIDE WITH A125INV LENS, G2 GASKET (INVERTED

LENS WITH FRAME).

LUMINAIRE SCHEDULE

SYMBOL LAMP(S) FIXTURE MANUFACTURER

METALUX (2GC8-232A-UNV-EB81 + FRAME/LENS OPTIONS

IN KITCHEN)

(2) 32W T8

FLUORESCENT

LAMPS

120V, 2'x4' FLUORESCENT LUMINAIRE, GRID/LAY-IN MOUNT,

SPECIFICATION GRADE T8 TROFFER, FLAT WHITE STEEL DOOR,

UNIVERSAL VOLTAGE, ELECTRONIC START BALLAST. INCLUDE

EMERGENCY BATTERY PACK.

** PROVIDE WITH A125INV LENS, G2 GASKET (INVERTED LENS WITH

FRAME).

METALUX (2GC8-232A-UNV-EB81 + BATTERY PACK +

FRAME/LENS OPTIONS)

x1 #

x1 #

x2

A

B

BP

(2) 2W

AC LED

LAMPS

OS OCCUPANCY SENSOR

SP SWITCHPACK / POWER SUPPLY

SURE-LITES (APX6-R)120V, AC ONLY LED, ALL-PRO EXIT, RED.

EXIT

(2) 32W T8

FLUORESCENT

LAMPS

(3) 32W T8

FLUORESCENT

LAMPS

METALUX (2GC8-332A-UNV-EB81 + FRAME/LENS OPTIONS IN

KITCHEN)

C

120V, 2'x4' FLUORESCENT LUMINAIRE, GRID/LAY-IN MOUNT,

SPECIFICATION GRADE T8 TROFFER, FLAT WHITE STEEL DOOR,

UNIVERSAL VOLTAGE, ELECTRONIC START BALLAST.

** IN KITCHEN, PROVIDE WITH A125INV LENS, G2 GASKET (INVERTED

LENS WITH FRAME).

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PH

OE

NIX

, A

Z. K

IT

CH

EN

B

UIL

D-O

UT

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PERMIT SET

# Date Revision

17002

ZEW

CEE

AUG 21, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

10-17-17

1 10-17-17 2ND CITY

SUBMITTAL

ELECTRICAL

COVER

SHEET

E100

ELECTRICAL SHEET INDEX

E100 ELECTRICAL COVER SHEET

E101 ELECTRICAL BUILDING PLAN

E102 LEVEL 02 - ELECTRICAL KITCHEN PLAN

E103 SINGLE LINE DIAGRAM

E104 PANEL SCHEDULES

1

AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 19: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

1

1

3

3

4

4

B4

B

5

5

7

7

6

6

8

8

9

9

10

10

11

11 12 13 14 15 16 17 18 19 20 21 22

23

23

23.2

23.2

24

24

25

25

26

26

26.6 27

27

29

29

30

30

31

31

32

3222.8 23.6" 26.2 26.9 28 30.6 31.4

B1

B7

B8

B9

C

D1

E

F

G

H

I

J

K1

L1

F-01

C2 C1

C3C3

RB

RC RD

RE

C1

C1

C1

C2 C2

C2 C2

C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1 C2 C2

C1

C1

P5

P5

P5

P5

P5

P5

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P3

P5

P5

P5

P5

P5

P5

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P5

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

FA FB FC FD FE FF

C3 C3C3

C2C2 C2 C2

C2 C2

C2 C2

C1

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C2 C2

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C4

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C2 C2 C2 C3

C4

C1

C4

C4

C2 C2 C2 C3C1

C4

C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C2 C2 C2 C3C1 C4

C4

C4

RARF

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2 C1

C2

C3

C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

C2 C1 C1

DR

C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3

DQDPDNDMDLDKDJDHDGDFDDDCDBDA DEC4C1C1C2C2

C2C2C2

C2C2C2C2C1C1C2C2C2C2C2C2C2C2C2

P4

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C4C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2C2C2C2C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2C2

C2C2C2

C2C2C2C1C1C2C2C2

C1C1C2C2

C1C1C2C2

C1C1C2C2

C1C1C2C2

C1C1C2C2

C2

C2

C2

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C1C1

C2C2C2C2C2C2

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

C2C2C2C2C2C2

C1C1

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C4

C3 C3 C3 C3 C3C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3 C3

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

C2

P5

P5

PIR

C1C1

PIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIRPIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

PIR

C3C3

C3C3

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

P4

C2

C2

C2

C2

C2

C2

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C3

C2

P3

P4

P4

C1

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PH

OE

NIX

, A

Z. K

IT

CH

EN

B

UIL

D-O

UT

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PERMIT SET

# Date Revision

17002

ZEW

CEE

AUG 21, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

10-17-17

1 10-17-17 2ND CITY

SUBMITTAL

ELECTRICAL

BUILDING

PLAN

E101

N

0 2 1

SCALE 1/16" = 1'

1

GENERAL NOTES KEY NOTES

1

2

EXISTING 480V PANEL "LPCA" (LEVEL 01)

EXISTING 480V PANEL "HVP2" (LEVEL 01) AND 208V PANEL "LVP2" (LEVEL 01)

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEET E102 FOR LEVEL 02 KITCHEN POWER AND LIGHTING PLANS.

E. REFER TO SHEET E103 FOR SINGLE LINE DIAGRAM.

F. REFER TO SHEET E104 FOR PANEL SCHEDULES.

LEVEL 01 EXISTING

ELECTRICAL EQUIPMENT

INDICATED ON THIS SHEET

REFER TO SHEET E102 FOR

LEVEL 02 KITCHEN REMODEL

LIGHTING AND POWER PLANS

1

2

AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 20: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

Utility

Cabinet

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PH

OE

NIX

, A

Z. K

IT

CH

EN

B

UIL

D-O

UT

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PERMIT SET

# Date Revision

17002

ZEW

CEE

AUG 21, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

10-17-17

1 10-17-17 2ND CITY

SUBMITTAL

LEVEL 02 -

KITCHEN

ELECTRICAL

PLAN

E102

N

0 2 1

SCALE 1/4" = 1'

1

PROCUREMENT

STORAGE

TEST

KITCHEN

MENS WOMENS JAN.

TRAINING

SALES MTG.

LVP2-12

GFCI

KEY NOTES

GENERAL NOTES

A. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWINGS TO ENGINEER AND OWNER.

B. REFER TO SHEET E100 FOR ADDITIONAL GENERAL NOTES.

C. REFER TO SHEET E100 FOR LUMINAIRE SCHEDULE.

D. REFER TO SHEET E103 FOR SINGLE LINE DIAGRAM.

E. REFER TO SHEET E104 FOR PANEL SCHEDULES.

F. REFER TO SHEET E101 FOR PANEL LOCATIONS THAT MAY BE REFERRED TO ON THIS

SHEET BUT NOT INDICATED.

G. FURNISH AND INSTALL CONDUITS, FITTINGS, PULL BOXES, ETC. AS REQUIRED FOR

LIGHTING AND RECEPTACLE BRANCH CIRCUIT NUMBERS INDICATED. USE #12 AWG

CONDUCTORS WITH #12 AWG GROUND FOR 20A AND 15A CIRCUITS. USE #10 AWG

CONDUCTORS WITH #10 AWG GROUND FOR 30A CIRCUITS. DO NOT EXCEED SIX

CURRENT CARRYING CONDUCTORS PER CONDUIT.

H. CONDUITS SHALL BE CONCEALED WHERE POSSIBLE.

I. LIGHT SWITCHES SHALL BE FLUSH MOUNTED AT 42" ABOVE FINISHED FLOOR.

J. RECEPTACLES SHALL BE MOUNTED FLUSH MOUNTED AT 18" ABOVE FINISHED FLOOR.

1ROOF MOUNTED HP-9. INSTALL 600VAC, 30A FUSED DISCONNECT SWITCH.

DISCONNECT SWITCH ENCLOSURE SHALL HAVE TYPE 3R RATING. INSTALL FUSES

SIZED PER HVAC MFR RECOMMENDATIONS. INSTALL 3-#10, #10 GND, 1"C. CIRCUIT TO

PANEL HPV2-12,14,16.

F

30A

1

3ROOF MOUNTED EXHAUST FAN (EF-K1 / EXH-1). REFER TO POWER LINE DIAGRAM ON

THIS SHEET FOR CONDUIT AND CONDUCTOR REQUIREMENTS. REFER TO

MECHANICAL PLANS FOR ADDITIONAL INFORMATION.

4ROOF MOUNTED EXHAUST FAN (EF-K2 / EXH-2). REFER TO POWER LINE DIAGRAM ON

THIS SHEET FOR CONDUIT AND CONDUCTOR REQUIREMENTS. REFER TO

MECHANICAL PLANS FOR ADDITIONAL INFORMATION.

LOBBY

HALL

LVP2-15

LV

P2-15 HP-9

2MOUNTED ON ROOF NEXT TO AIR CONDITIONING UNIT.

SHADED AREA REPRESENTS

LEVEL 02 AREA BEING

REMODELED ABOVE

EXISTING BUILDING FOOTPRINT

2

LVP2-10

GFCI

RPD-15

GFCI

PROCUREMENT

STORAGE

KITCHEN

MEN

WOMEN

JAN.

TRAINING

SALES MTG.

44

MO

B

LPC-28BP

45

A

LPCA-28

47

A

LPCA-28

47

B

LPC-32BP

47

A

LPCA-28

47

43

MO

45

MO

42

MO

46

MO

A

LP

CA

-28

42

LOBBY

HALL

A

LPCA-28

47

C

LPCA-28

45

A

LPCA-28

47

LP

C-3

2

EX

IT

A

LP

CA

-28

46

A

LPCA-28

43

A

LPCA-28

44

LP

C-3

2

EX

IT

LEVEL 02 KITCHEN

AND STORAGE

AREAS REMODEL

INDICATED

ON THIS SHEET

LIGHTING AND RECEPTACLES IN

PROCUREMENT, RESTROOMS,

JANITOR CLOSET, LOBBY, HALL

AND TRAINING AREAS PROVIDED

UNDER SEPARATE PERMIT

HOOD

5ROOF MOUNTED EVAPORATIVE COOLER / MAKEUP AIR UNIT (BLOWER AND

SOLENOID)(MAU-K3 / SUP-1). REFER TO POWER LINE DIAGRAM ON THIS SHEET FOR

CONDUIT AND CONDUCTOR REQUIREMENTS. REFER TO MECHANICAL PLANS FOR

ADDITIONAL INFORMATION.

MAU-K3

6HOOD SYSTEM CONTROL PANEL. REFER TO POWER LINE DIAGRAM ON THIS SHEET

FOR ADDITIONAL WIRING REQUIREMENTS. REFER TO MECHANICAL PLANS FOR

ADDITIONAL INFORMATION.

7INSTALL 240V, 30A, 2P, TYPE 1 DISCONNECT SWITCH FOR CONVEYOR OVEN. CIRCUIT

TO PANEL RPD-20,22.

8SNAP SWITCH FOR HOOD LIGHTS AND FAN(S).

CONTROL

POWER

(RPD-38)

EF-K1 / EXH-1

POWER

RPD-31,33,35

EF-K2 / EXH-2

POWER

RPD-37,39,41

MAU-K3 / SUP-1

POWER

RPD-32,34,36

HOOD SYSTEM CONTROL PANEL

VFD VFD VFD

1.5 1 1.5

S

2-#12, #12 GND, 3/4"C 3-#12, #12 GND, 3/4"C 3-#12, #12 GND, 3/4"C 5-#12, #12 GND, 3/4"C

6-#12, #12 GND, 3/4"C5-#12, #12 GND, 3/4"C

TO HOOD

LIGHTS

8

7

8

2-#12, #12 GND, 3/4"C

6

6

6

5

3

4

RPD-7

GFCI

RPD-5

GFCI

RPD-3

GFCI

EXHAUST FAN

EF-K1

(EXH-1)

EXHAUST FAN

EF-K2

(EXH-2)

EXHAUST FAN

MAU-K3

(SUP-1)

MAKEUP AIR UNIT

REFER TO M604 FOR

ADDITIONAL SIGNAL

REQUIREMENTS

HOOD SYSTEM POWER LINE DIAGRAM

KITCHEN POWER PLAN

KITCHEN LIGHTING PLAN

C

LP

CA

-28

42

9INSTALL 120V, 20A SNAP SWITCH NEXT TO WATER HEATER TO SERVE AS

DISCONNECTING MEANS.

9

WH-2

(RPD-1)

10

(TYP 9)

10EXISTING LUMINAIRE PROVIDED UNDER SEPARATE PERMIT.

11HOOD LIGHT - PACKAGED WITH HOOD (REFER TO MECHANICAL PLANS FOR

ADDITIONAL INFORMATION)

11

(TYP)

LVP2-8

GFCI

1

12INSTALL 240V, 30A, 2P, TYPE 1 DISCONNECT SWITCH FOR ICE MAKER. CIRCUIT TO

PANEL RPD-8,10.

12

1

1

1

13

1

13INSTALL 240V, 30A, 2P, TYPE 4 DISCONNECT SWITCH FOR DISH WASHER. CIRCUIT

TO PANEL RPD-11.

1 10

1 10

1 10

1

1

AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
ts$
Rectangle
ts$
Typewritten Text
B
ts$
Oval
ts$
Oval
ts$
Text Box
Additional LED Lighting. LPC-18
ts$
Line
ts$
Line
ts$
Typewritten Text
LPC-28
ts$
Typewritten Text
45
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 21: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

T-3

45KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPD"

100A

3P

45KVA

480V

208V

3PH

EXISTING

208V PANEL

"LVP3"

60A

3P

15KVA

480V

208V

3PH

EXISTING

208V PANEL

"LVP1"

EXISTING

480V PANEL

"HVP1"

15KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPB1"

EXISTING

480V PANEL

"LPB"

XFMR-T2

30KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPB"

EXISTING

480V PANEL

"LPC"

EXISTING

480V PANEL

"LPCA"

(E) 480V, 3∅, 4W, 3000A

SERVICE FROM SRP

(SCA = 43,490A)

N

G

(E) SES

M

(E) SRP METER #

SPD

(E) GROUNDING

SYSTEM

1200A

3P

800A

3P

800A

3P

800A

3P

800A

3P

800A

3P

TO FIRE PUMP

(407HP)

MCCD

(CB-5)

SWBB MCCC SWBA MCCB

EXISTING

480V PANEL

"EM"

(E

) S

TA

ND

BY

G

EN

ER

AT

OR

FROM SES

(E) SWBD "SWBB"

M

100A

3P

100A

3P

100A

3P

100A

3P

100A

3P

400A

3P

M M M M M

MLO

400A

3P

200A

3P

200A

3P

SPACE

(E) SWBD "TE"

EXISTING

480V PANEL

"LPE"

EXISTING

480V PANEL

"LPD"

EXISTING

208V PANEL

"RPC"

RPA2-XFMR

75KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPA2"

EXISTING

480V PANEL

"LPA2"

FROM SES

(E) SWBD "SWBA1"

200A

3P

200A

3P

200A

3P

(E) SWBD "SWBA2"

SPACE SPACE

400A

3P

MCCA

400A

3P

45KVA

480V

208V

3PH

30KVA

480V

208V

3PH

EXISTING

208V PANEL

"LVP2"

EXISTING

480V PANEL

"HVP2"

EXISTING

480V PANEL

"LPF"

T-4

30KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPE"

SPARE

F3

F4

F0

F2 F5

F6

F1

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

NOTE: ALL EQUIPMENT INDICATED

ON THIS SHEET IS EXISTING.

MODIFICATIONS TO PANELBOARDS

HAVE BEEN INDICATED HEREIN.

SPACE SPACE

T-4

9KVA

480V

208V

3PH

EXISTING

FUSE PANEL

"EM"

30A

3P

10A

3P

T-4

30KVA

480V

240V

3PH

EXISTING

240V PANEL

"LVP4"

60A

3P

50A

100A

3P

EXISTING TRANSFER

SWITCH

75KVA

480V

208V

3PH

EXISTING

208V PANEL

"RPA"

EXISTING

480V PANEL

"LPA"

EXISTING

208V PANEL

"RPAA"

EXISTING

480V PANEL

"HPV3"

REFER TO PANEL

SCHEDULE FOR

MODIFICATIONS

F7

F8

F9

EXISTING #8

CONDUCTORS

EXISTING #2

CONDUCTORS

EXISTING #1

CONDUCTORS

EXISTING #1

CONDUCTORS

100A

EXISTING #2/0

CONDUCTORS

EXISTING #3/0

CONDUCTORS

EXISTING #6

CONDUCTORS

SHORT CIRCUIT CALCULATION

Fault

Point

Panel/Transformer Description

Source

(Fault

Point)

I (Source

Current)

(amps)

Conduit

Type Cable Type

Wire/Bus Size "C" Value

EL-L

(Volts)

L

(Length)

(FT)

XFMR KVA XFMR %Z f M ISCA

F0 SES

43,490 43,490

F1 SWBB F0

43,490

NM 600V 2

SET(S) OF

500 26706 480 35 -- -- 0.103 0.91

39,435

F2 480V PANEL HPV2 F1

39,435

NM 600V 1

SET(S) OF

1 7493 480 86 -- -- 1.635 0.38

14,967

F3 208V PANEL LVP2 XFMR PRIMARY F2

14,967

M 600V 1

SET(S) OF

8 1557 480 10 -- -- 0.347 0.74

11,113

F4 208V PANEL LVP2 XFMR SECONDARY F3

11,113

-- --

SET(S) OF

208 -- 30 4.5 13.858 0.07 748

F5 480V PANEL LPC F1

39,435

NM 600V 1

SET(S) OF

3/0 13923 480 160 -- -- 1.639 0.38

14,940

F6 480V PANEL LPCA F5

14,940

M 600V 1

SET(S) OF

6 2425 480 10 -- -- 0.222 0.82

12,223

F7 RPD XFMR DISCO F1

39,435

M 600V 1

SET(S) OF

1 7293 480 188 -- -- 3.668 0.21

8,448

F8 208V PANEL RPD XFMR PRIMARY F7

8,448

M 600V 1

SET(S) OF

1 7293 480 10 -- -- 0.042 0.96

8,109

F9 208V PANEL RPD XFMR SECONDARY F8

8,109

-- --

SET(S) OF

208 -- 45 4.5 6.741 0.13

1,047

1

1

1

1

1

1

1

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PH

OE

NIX

, A

Z. K

IT

CH

EN

B

UIL

D-O

UT

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PERMIT SET

# Date Revision

17002

ZEW

CEE

AUG 21, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

10-17-17

1 10-17-17 2ND CITY

SUBMITTAL

SINGLE

LINE

DIAGRAM

E103

1

1

AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18
Page 22: GENERAL NOTES - SITE PLAN - teciftp.us Under Construction/PFG Phx... · ct current transformer np nameplate cu copper nts not to scale cv control valve od outside diameter ... duplex

VOLTS 120/208V PANEL

RPD

(EXISTING)

MAIN 150A MCB

PHASE 3PH, 4 WIRELOCATION LEVEL 02 - UTILITY ROOM BUS 225A

A.I.C. 10KA IC MIN FED FROM SWBD "TE" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

WATER HEATER (WH-2)

(CONNECT TO EXISTING

BREAKER)

20 1

1 240

30 2

LEVEL 02 HVAC (HP-8)

2316 2

GRIDDLE

(CONNECT TO EXISTING

BREAKER)

20 1

3 120

2316 4

LEVEL 02 FREEZER

(CONNECT TO EXISTING

BREAKER)

20 1

5 1164

20 1

HVAC (HP-8) RECEPT

180 6 1

LEVEL 02 REGRIG

(CONNECT TO EXISTING

BREAKER)

20 1

7 1404

20 2

ICE MAKER

(NEW BREAKER)

1620 8

SPARE 20 1

9 0

1620 10

LEVEL 02 DISH WASHER

(CONNECT TO EXISTING

BREAKER)

20 1

11 1920

20 1 SPARE

0 12

HVAC (HP-5) RECEPT

1

20 2

13 180

20 3

HVAC (HP-1 / 2) RECEPT

180 14 1

HVAC (HP-6, HP-7 & HP-9)

RECEPTS

(ADDED LOAD)

3 15 540

HVAC (HP-3) RECEPT

180 16 1

EXHAUST FANS (EF-3, 4 & 5) 20 1

17 300

HVAC (HP-4) RECEPT

180 18 1

4 PLEX FIRE RISER

2

20 1

19 360

20 2

CONVEYOR OVEN

(NEW BREAKER)

180 20

LEVEL 02 RECEPTS - TELEPHONE

1

20 1

21 180

180 22

LEVEL 02 RECEPTS - FINANCE

4

20 1

23 720

20 1 SPARE

0 24

LEVEL 02 RECEPTS - COMPUTER RM

1

20 1

25 180

20 1 SPARE

0 26

LEVEL 02 RECEPTS - COMPUTER RM

1

20 1

27 180

20 1 SPARE

0 28

SPARE 20 1

29 0

20 1 SPARE

0 30

KITCHEN EXHAUST FAN (EF-K1)

(NEW BREAKER)

15 3

31 828

15 3

KITCHEN MAU FAN (MAU-K3)

(NEW BREAKER)

828 32

33 828

828 34

35 828

828 36

KITCHEN EXHAUST FAN (EF-K2)

(NEW BREAKER)

15 3

37 576

15 1

HOOD SYS CONTROL PANEL

(NEW BREAKER)

250 38

39 576

40 2

LEVEL 02 HVAC (DSO-1 / DSI-1)

2880 40

41 576

2880 42

29146 VA - 3PH TOTAL CONNECTED 9142 10428 9576

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

3060

VA - GP RECEPTS X (**)

= 3060 VA

26086 VA - NON-CONTIN X 1.00 = 26086 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

31284

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

17 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

87 LARGEST PHASE CURRENT 10/16/2017 8:03

COMMENT:

EXISTING 208V PANEL RPD SCHEDULE

EXISTING 480V PANEL LPCA SCHEDULE

EXISTING 480V PANEL HVP2 SCHEDULE

VOLTS 277/480V PANEL

LPCA

(EXISTING)

MAIN MLO

PHASE 3PH, 4 WIRELOCATION MAINT ROOM BUS 225A

A.I.C. 14KA IC MIN FED FROM LPC MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

LEVEL 02 HVAC (HP-4) 15 3

1 3019

15 3

FREEZER DOOR - (FD3)

368 2 1

3 3019

506 4 1

5 3019

506 6 1

LEVEL 02 HVAC (HP-5) 15 3

7 2853

15 3

FREEZER DOOR - (FD4)

506 8

9 2853

506 10

11 2853

506 12

SPARE 15 3

13 0

15 3

FREEZER DOOR - (FD5)

506 14

15 0

506 16

17 0

506 18

SPARE 15 3

19 0

15 3

FREEZER DOOR - BACK (SE DOCK)

506 20

21 0

506 22

23 0

506 24

SPACE

25 --

15 3

LEVEL 02 LTS - MID

2560 26 1

27 --

LEVEL 02 LTS - SOUTH

(REDUCED LOAD)

3040 28 1

29 --

LEVEL 02 LTS - NORTH

2480 30 1

SPACE

31 --

SPACE

0 32

33 --

0 34

35 --

0 36

SPACE

37 --

SPACE

-- 38

SPACE

39 --

SPACE

-- 40

SPACE

41 --

SPACE

-- 42

31631 VA - 3PH TOTAL CONNECTED 10318 10936 10376

9460

VA - CONTINUOUS X 0.25 (*)

= 2365 VA

22171 VA - NON-CONTIN X 1.00 = 22171 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

35174FEEDER TOTAL (VA) (***)

0

TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

42

LARGEST PHASE CURRENT

10/16/2017 8:04

COMMENT:

VOLTS 277/480V PANEL

HVP2

(EXISTING)

MAIN 100A MCB

PHASE 3PH, 4 WIRELOCATION

COLD DOCK (NEAR STAIRS)

BUS 100A

A.I.C. 35KA IC MIN FED FROM SWBD "TE" MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

PANEL MAIN BREAKER 100 3

1 --

SPACE

-- 2

3 --

20 2 SPARE

0 4

5 --

0 6

SPARE 20 1

7 0

20 1

DRY WH LTS (ROWS DQ/DR)

1440 8 1

SPARE 20 1

9 0

20 1 SPARE

0 10 1

FREEZER DOOR

1

15 3

11 1000

20 3

LEVEL 02 HVAC (HP-9)

(CONNECT TO EXISTING

SPARE BREAKER)

3435 12

1 13 1000

3435 14

1 15 1000

3435 16

SPARE 20 3

17 0

40 3 PANEL LVP2 TRANSFORMER

4440 18

19 0

4440 20

21 0

4440 22

SPARE 20 3

23 0

15 3

LEVEL 02 HVAC (HP-7)

2853 24

25 0

2853 26

27 0

2853 28

SPACE

29 --

SPACE

-- 30

36624 VA - 3PH TOTAL CONNECTED 13168 11728 11728

4440

VA - CONTINUOUS X 0.25 (*)

= 1110 VA

32184 VA - NON-CONTIN X 1.00 = 32184 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

40614

FEEDER TOTAL (VA) (***)

0 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

49 LARGEST PHASE CURRENT 10/16/2017 8:03

COMMENT:

480V, 3PH LOAD CALCULATIONS

LOAD DESCRIPTION KVA H.P. AMPS

FIRE PUMP -- 250 302.0

SWITCHBOARD (SWBA)

727.8

480V PANEL LPA2 66.0 -- 79.4

480V PANEL LPA 55.6 -- 66.9

480V PANEL LPE ** EXISTING - NO CHANGES ** 18.0 -- 21.7

480V PANEL LPF ** EXISTING - NO CHANGES ** 217.3 -- 261.4

MOTOR CONTROL CENTER (MCCA) ** EXISTING - NO CHANGES **

298.5

FREEZER FAN D2-A -- 2 3.4

FREEZER FAN D2-A -- 2 3.4

FREEZER FAN D2-B -- 2 3.4

FREEZER FAN D2-B -- 2 3.4

FREEZER FAN D3-A -- 2 3.4

FREEZER FAN D3-A -- 2 3.4

FREEZER FAN D3-B -- 2 3.4

FREEZER FAN D3-B -- 2 3.4

FREEZER FAN D4-A -- 2 3.4

FREEZER FAN D4-A -- 2 3.4

FREEZER FAN D4-B -- 2 3.4

FREEZER FAN D4-B -- 2 3.4

FREEZER FAN D5-A -- 2 3.4

FREEZER FAN D5-A -- 2 3.4

FREEZER FAN D5-B -- 2 3.4

FREEZER FAN D5-B -- 2 3.4

FREEZER FAN D6-A -- 2 3.4

FREEZER FAN D6-A -- 2 3.4

FREEZER FAN D6-B -- 2 3.4

FREEZER FAN D6-B -- 2 3.4

FREEZER FAN D1-C -- 2 3.4

FREEZER FAN D1-B -- 1 1.8

FREEZER FAN D1-A -- 1 1.8

UNDER FLR VENT FAN -- 2 3.4

EF-2 VENT FAN -- 1 1.8

MAINTENANCE ROOM EXHAUST FAN -- 0.5 1.0

GLYCOL PUMP 1 -- 1.5 2.6

GLYCOL PUMP 2 -- 1.5 2.6

PURGE PUMP -- 3 4.8

AMMONIA PUMP 1 -- 3 4.8

WATER JACKET PUMP 1 -- 3 4.8

WATER JACKET PUMP 2 (BACKUP)

-- 3 0.0

AMMONIA PUMP -- 5 7.6

AMMONIA PUMP -- 5 7.6

CONDENSOR PUMP -- 5 7.6

CONDENSOR PUMP -- 5 7.6

DOCK HOLDING COND FAN (AC-1)

-- 1 1.8

DOCK HOLDING COND FAN (AC-2)

-- 1 1.8

DOCK HOLDING COND FAN (AC-3)

-- 1 1.8

DOCK HOLDING COND FAN (AC-4)

-- 1 1.8

DOCK HOLDING COND FAN (AC-5)

-- 1 1.8

DOCK HOLDING COND FAN (AC-6)

-- 1 1.8

BLAST FREEZER (B-1) (7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER (B-1) (7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER (B-2) (7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER (B-2) (7.5 HP) <REMOVED>

-- 0 0.0

ROOF CONDENSOR FAN -- 10 14.0

ROOF CONDENSOR FAN -- 10 14.0

AMMONIA PUMP -- 3 4.8

ROOF CONDENSOR HEATER 18 -- 21.7

ROOF CONDENSOR HEATER 18 -- 21.7

BLAST FREEZER #3 (2 X 7.5 HP) <REMOVED>

-- 0 0.0

BLAST FREEZER #4 (2 X 7.5 HP) <REMOVED>

-- 0 0.0

FREEZER EVAPORATOR #1 -- 7.5 11.0

FREEZER EVAPORATOR #2 -- 7.5 11.0

FREEZER EVAPORATOR #3 -- 7.5 11.0

FREEZER EVAPORATOR #4 -- 7.5 11.0

FREEZER EVAPORATOR #5 -- 7.5 11.0

DOCK EVAPORATOR #1 -- 3 4.8

DOCK EVAPORATOR #2 -- 3 4.8

DOCK EVAPORATOR #3 -- 3 4.8

FREEZER EVAPORATOR #6 -- 7.5 11.0

SWITCHBOARD (SWBB)

580.6

480V PANEL LPC 109.2 -- 131.4

480V PANEL LPD 37.4 -- 45.0

480V PANEL HVP3 197.9 -- 238.0

208V PANEL LVP4 TRANSFORMER 1.5 -- 1.8

SWITCHBOARD (TE)

164.5

480V PANEL HVP1 19.5 -- 23.4

480V PANEL HVP2 36.6 -- 44.1

480V PANEL LPB 50.6 -- 60.9

208V PANEL RPD TRANSFORMER 30.0 -- 36.1

MOTOR CONTROL CENTER (MCCB) ** EXISTING - NO CHANGES **

0.0

CP-3B (STANDBY)

-- 100 0.0

CP-4B (STANDBY)

-- 100 0.0

CP-3 (STANDBY)

-- 150 0.0

CP-4 (STANDBY)

-- 150 0.0

MOTOR CONTROL CENTER (MCCC) ** EXISTING - NO CHANGES **

608.0

CP-1B (DUTY)

-- 100 124.0

CP-2B (DUTY)

-- 100 124.0

CP-1 (DUTY)

-- 150 180.0

CP-2 (DUTY)

-- 150 180.0

MOTOR CONTROL CENTER (MCCD) ** EXISTING - NO CHANGES **

0.0

CP-5 (STANDBY)

-- 407 0.0

SURGE PROTECTION DEVICE 0 -- 0.0

SUBTOTAL = 2252.4

+25% OF CONTINUOUS LIGHTING LOADS = 45.2

+25% OF LARGEST MOTOR (407HP) =

75.5

MINIMUM SERVICE SIZE = 2373.1

EXISTING SERVICE SIZE = 3000A

EXISTING 208V PANEL LVP2 SCHEDULE

VOLTS 120/208V PANEL

LVP2

(EXISTING)

MAIN 50A MCB

PHASE 3PH, 4 WIRELOCATION

COLD DOCK (NEAR STAIRS)

BUS 60A

A.I.C. 10 KA IC MIN FED FROM HVP2 VIA TRANSFORMER MOUNTING SURFACE

LOAD

DESCRIPTION

VA LOAD

LOAD

DESCRIPTION

LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG

SPARE 30 2

1 0

100 3P PANEL MAIN

480 2

3 0

900 4

LEVEL 02 RECEPTS - TRAINING / SALES

8

20 1

5 1440

0 6

LEVEL 02 RECEPTS - TRAINING / SALES

8

20 1

7 1260

20 1

LEVEL 02 RECEPT - DF

(RE-PURPOSED BREAKER)

180 8

1

LEVEL 02 RECEPTS - PROCUREMENT

4

20 1

9 720

20 1

LEVEL 02 RECEPT

(RE-PURPOSED BREAKER)

180 10

1

LEVEL 02 RECEPTS - OFFICE (ED)

3

20 1

11 540

20 1

LEVEL 02 RECEPT

(RE-PURPOSED BREAKER)

180 12

1

LEVEL 02 RECEPTS - PROCUREMENT

6

20 1

13 1080

20 1 SPARE

0 14

STORAGE ROOM RECEPTS

(RE-PURPOSED BREAKER)

2

20 1

15 360

20 1 SPARE

0 16

LEVEL 02 RECEPTS - DSM

4

20 1

17 720

20 1 SPARE

0 18

LEVEL 02 RECEPTS - FUTURE (RM 229)

8

20 1

19 1440

20 1 SPARE

0 20

SPARE 20 1

21 0

20 1 SPARE

0 22

SPARE 20 1

23 0

20 1 SPARE

0 24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

9480 VA - 3PH TOTAL CONNECTED 4440 2160 2880

0

VA - CONTINUOUS X 0.25 (*)

= 0 VA

8280

VA - GP RECEPTS X (**)

= 8280 VA

1200 VA - NON-CONTIN X 1.00 = 1200 VA

(* INCLUDES LIGHTING & LARGEST MOTOR)

13320

FEEDER TOTAL (VA) (***)

(** 100% OF FIRST 10KW + 50% OF BALANCE)

46 TOTAL RECEPTACLES

(*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA)

37.0 LARGEST PHASE CURRENT 10/16/2017 8:03

COMMENT:

1

DATE:

DRAWN BY:

CHECKED BY:

CEE PROJECT #:

Original drawings remain the property

of the Engineer and as such the

Engineer retains total ownership and

control. The design represented by

these drawings is sold to the client for

a one time use, unless otherwise

agreed upon in writing by the Engineer.

© Controlled Energy Engineers LLC 2017

654321

E

D

C

B

A

CONTROLLED ENERGY

ENGINEERS, LLC

2451 W BIRCHWOOD AVE, #104

MESA, AZ 85202

PHONE: 480.621.5933

Know what's below.before you dig.Call

1-800-782-5348

THIS DRAWING IS A COMPILATION BASED ON INFORMATION FROM, BUT NOT

LIMITED TO, DRAWINGS FROM PREVIOUS PROJECTS:

THIS DRAWING MUST BE FIELD VERIFIED BEFORE USE

DRAWING NOT TO SCALE UNLESS SCALE BAR IS PRESENT

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PH

OE

NIX

, A

Z. K

IT

CH

EN

B

UIL

D-O

UT

# Date Revision

2/2/2017 3:58:55 P

M

455 S

OU

TH

75T

H A

VE

.

PH

OE

NIX

, A

Z 85043

PE

RF

OR

MA

NC

E F

OO

D G

RO

UP

PERMIT SET

# Date Revision

17002

ZEW

CEE

AUG 21, 2017

,

S

WILSTERMAN

E

n

r

e

ig

e

R

s

t

D

g

O

a

A

e

i

S

t

Z

I

R

e

A

n

N

d

.

U

ZANE E.

P

d

e

I

r

T

R

E

C

s

s

o

f

e

li

n

F

I

o

T

AC

a

E

l

A

.

.

)

e

.

ir

cal

c

t

E

(

O

i

N

g

e

r

e

n

39548

EXPIRES 09-30-2018

10-17-17

1 10-17-17 2ND CITY

SUBMITTAL

PANEL

SCHEDULES

E104

1

1

1

AutoCAD SHX Text
E
AutoCAD SHX Text
Y
AutoCAD SHX Text
G
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
O
AutoCAD SHX Text
C
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
L
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
E
ts$
Text Box
TECI - Electrical As-Built Drawings 2/7/18