general notes: specifications: locationsite plan site · general notes: all electrical works herein...

18
GENERAL NOTES: ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL BUILDING CODE, PROVISIONS OF THE LATEST APPROVED PHILIPPINE ELECTRICAL CODE, THE LAWS AND ORDINANCES OF THE LOCAL CODE ENFORCING AUTHORITIES AND REQUIREMENTS OF THE LOCAL ELECTRIC, TELEPHONE COMPANY AND BUILDING ADMINISTRATION REQUIREMENTS. 1. CONTRACTOR SHALL SECURE ALL WIRING PERMIT AND ALL FEES REQUIRED FOR THE WORKS AND FURNISH THE OWNER THE CERTIFICATE OF FINAL ELECTRICAL INSPECTION, 2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST, WIRE INSULATION AND LOAD TEST UPON COMPLETION OF WORKS, 3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITE CONDITION, SPECIFICATIONS & REVISIONS CHANGES, THE CONTRACTOR SHOULD IMMEDIATELY VERIFY & CONSULT TOWITH THE ELECTRICAL ENGINEER OF THE PNP ENGINEERING SERVICE (PNPES), 4. ALL LOCATION & MOUNTING HEIGHT ARE SUBJECT TO APPROVAL OF ELECTRICAL ENGINEER OF PNPES, 5. CONTRACTOR SHALL BE RESPONSIBLE IN THE PREPARATION OF AS-BUILT PLANS DULY SIGNED AND SEALED BY PROFESSIONAL ELECTRICAL ENGINEER, AND ELECTRONIC AUTOCAD FILES, 6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL BE APPROVED BY PNPES, REPRESENTATIVEENGINEER, 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF SHOP OR CONSTRUCTION DRAWING REQUIRED BY OWNERARCHITECHENGINEER, THIS INCLUDES DEVICES AND FIXTURES ELEVATION, 8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDE ALL COST NECESSARY TO COMPLETE THE SYSTEM AT NO COST TO OWNER, INCLUDING COST OF CORING SERVICE AND EXPENSES FOR THE RESTORATION OF ANY DAMAGE AFFECTED CIVIL ARCHITECTURAL FINISHES OR RELOCATION OF EXISTING FACILITIES ON BUILDING, 9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TO ACCESSIBLE PLACE OR WITH ACCESS PANELS, 10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTS TO BE INSTALLED OR PLACE WITHIN THE BUILDING, AND MAKE AN ADJUSTMENT WITH THE PNPES ENGINEER ARCHITECT CONSENT, 11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANY MATERIALS AND FITTINGS NOT SHOWN ON THIS PLANS BUT NEEDED TO COMPLETE THE SYSTEM AND OPERATION SHALL BE INCLUDED WITH THE CONTRACTOR'S SCOPE OF WORKS. 12. ALL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF LICENSE DULY REGISTERED ELECTRICAL ENGINEER OR REGISTERED MASTER ELECTRICIAN. 13. ADDITIONAL NOTES: · USE OF MICA SHALL BE LIMITED TO 150mm MAXIMUM · USE OF FLEXIBLE METALLIC CONDUTIT SHALL BE LIMITED TO 1m MAXIMUM · PROVIDE PROPER CONDUIT SUPPORT, G.I. WIRES AS SUPPORT SHALL NOT BE ALLOWED · PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT (RED OXIDE PRIMER) ON HANGERS AND SUPPORTS. SPECIFICATIONS: 1. POWER SUPPLY TO THE BUILDING SHALL BE 230V, THREE PHASE, 4-WIRES, 60HZ. 2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE FOR PURPOSE & LOCATION. 3. NORMAL AND EMERGENCY CIRCUIT SHALL NOT BE COMBINED IN ONE RACEWAY OR CONDUIT. 4. RECEPTACLES FOR GENERAL USE SHALL BE DUPLEX 20A, 250VAC, GROUND TYPE. 5. ALL WIRES SHOULD HAVE A MAXIMUM LOAD OF 80 OF WIRE AMPACITY. 6. LIGHT SWITCHES MINIMUM RATING SHALL BE 16A 230VAC. 7. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND SHALL HAVE THE "P.S." MARKS. 8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS: A. LIGHT SWITCHES - 1.37m above Floor finish B. CONVENIENCE OUTLET - 0.3m above Floor finish C. TELEPHONE OUTLET - 0.3m above Floor finish D. PANEL BOARD - 1.8m ABOVE FLOOR FINISH 9. CONDUIT EMBEDED WITHIN CONCRETE WALL SHALL HAVE A MINIMUM CEMENT PLASTERED OF 20mm THICK. 10. ALL CONDUIT PIPE ABOVE CEILING SHOULD HAVE INDEPENDENT HANGER SUPPORTS. 11. ALL LIGHTING FIXTURES SHOULD HAVE INDEPENDENT HANGER SUPPORTS. 12. ALL BOXES SHALL BE OCCUPIED ONLY OF 50 OF WIRE VOLUME. 13. VOLTAGE DROP SHALL BE LIMITED TO 2.5 FROM SOURCE TO PANEL BOARD AS P.E.C. REQUIREMENT OR ACCEPTABLE TO THE LABORATORY EQUIPMENT. 14. CIRCUIT BREAKERS SERVING MOTORS AND LIGHTING SHALL BE INDUSTRIAL AND COMMERCIAL BOLT-ON TYPE RESPECTIVELY WITH MINIMUM OF 10kAIC. 15. ALL WIRES AND CABLES SHALL BE BRAND NEW AND APPROVED TYPE. 16. ALL CIRCUITS SHALL BE 4-WIRES FOR 3Ø & 3-WIRES FOR 2Ø AND SHALL BE COLOR CODED AS FOLLOWS: LINE 1 - BLACK LINE 2 - RED LINE 3 - BLUE GROUND WIRE - GREENSTRIPE GREEN-YELLOWGRAY 17. PREFERRED DISTRIBUTION BOARDS MUST BE INDUSTRIAL TYPE, BOLT-ON WITH 18kAIC MINIMUM UNLESS OTHERWISE SPECIFIED. 18. USE SOLDERLESS CONNECTOR, MECHANICAL 1 PRESSURE TYPE COPPER LUGS FOR CONNECTION OF WIRES LARGER THAN 8mm². 19. USE FILLER COMPOUND, "SCOTCH FILL" OR APPROVED EQUAL AT SHARP EDGES TO PROVIDE SMOOTH SURFACE BEFORE TAPING WITH ELECTRICAL TAPE. LOCATIONSITE PLAN MDP1 MDP2 ATS MDB SERVICE ENTRANCE GUARD POST BPO BUILDING BFO BUILDING GATE 1 P E D E S T R I A N L A N E ENTRANCE EXIT TRANSFORMATION OVAL 3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT (DIRECTLY BURRIED) PROVIDE ALSO 1-3" DIA PVC CONDUIT FOR SERVICE ENTRANCE OF TELECOMMUNICATION SYSTEM 3-500mmsq THWNTHHN Cu WIRE 1-60mmsq THHNTHWN Cu WIRE with messanger (OVERHEAD)(app 15mts) 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia RSC CONDUIT (DIRECTLY BURRIED) 3-500mmsq THWNTHHN Cu WIRE 1-60mmsq THHNTHWN Cu WIRE with messanger(OVERHEAD)(app 25mts) (Existing concrete pole) To serve as guying system Additional: 3-38mmsq coated ACSR (app 40mts) Additional: 1-38mmsq coated ACSR (app 30mts) Existing concrete pole with transformers Provide New 45' Concrete pole THIS SITE Provide appropriate guying system 3-100kVA Distribution Transformer (Provide new concrete pole) Provide appropriate guying system Sab Sabc 1 DP3 ATS Sa LEGEND & SYMBOLS DP1 7W LED DOWNLIGHT LED EMERGENCY LIGHT 2-18W LED TUBE with LOUVER 1' x 4' CASING (SURFACED) PHOTOVOLTAIC SWITCH MOTION SENSOR SWITCH ONE GANG OF 1-SINGLE POLE SWITCH ONE GANG OF 2-SINGLE POLE SWITCHES ONE GANG OF 3-SINGLE POLE SWITCHES DUPLEX CONVENIENCE OUTLET WITH GROUND EXHAUST FAN (CEILING MOUNTED) CIRCUIT HOMERUN INDICATING PANEL DESIGNATION AUTOMATIC TRANSFER SWITCH DISTRIBUTION PANEL 1 DUPLEX RECEPTACLE WITH GROUND WEATHERPROOF WP MS F X PS 2-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED) 1-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED) 2-9W LED TUBE with 1' x 2' DUST PROOF CASING (RECESSED) 1-18 LED TUBE with WATER TIGHT CASING (SURFACED) DUPLEX RECEPTACLE WITH GROUND (FLOOR MOUNTED) AIR-CONDITIONING UNIT CB IN NEMA 3R ENCLOSURE MDP MAIN DISTRIBUTION PANEL 2-18 LED TUBE with WATER TIGHT CASING (SURFACED) TUNNELWALL LED LIGHTS, PHOTOSWITCH OPERATED PS THREE WAY SWITCH S3W PROVIDE ALSO TELECOMMUNICATION SYSTEM BOX E-1 SHEET NO. PROJECT TITLE: LOCATION: CAMP CRAME, QUEZON CITY PREPARED BY: POLICE CHIEF INSPECTOR CHIEF, PLANS & DESIGN SECTION FERDINAND S MAGALLANES ABELARDO C MATILLANO DEPUTY DIRECTOR, ENGINEERING SERVICE CHECKED BY: ACTING CHIEF, INFRASTRUCTURE DIVISION POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT MANUEL G FABROS CHIEF OF STAFF, ENGINEERING SERVICE APPROVED BY: RECOMMEND APPROVAL: SUBMITTED BY: POLICE SENIOR SUPERINTENDENT DIRECTOR, ENGINEERING SERVICE POLICE CHIEF SUPERINTENDENT HONORIO R AGNILA ANTONIO A TAYLAN, JR PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Upload: others

Post on 08-Oct-2019

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

GENERAL NOTES:

ALL ELECTRICAL WORKS HEREIN SHALL BE DONE INACCORDANCE WITH THE NATIONAL BUILDING CODE,PROVISIONS OF THE LATEST APPROVED PHILIPPINEELECTRICAL CODE, THE LAWS AND ORDINANCES OF THELOCAL CODE ENFORCING AUTHORITIES AND REQUIREMENTSOF THE LOCAL ELECTRIC, TELEPHONE COMPANY ANDBUILDING ADMINISTRATION REQUIREMENTS.

1. CONTRACTOR SHALL SECURE ALL WIRING PERMIT ANDALL FEES REQUIRED FOR THE WORKS AND FURNISH THEOWNER THE CERTIFICATE OF FINAL ELECTRICALINSPECTION,

2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST,WIRE INSULATION AND LOAD TEST UPON COMPLETION OFWORKS,

3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITECONDITION, SPECIFICATIONS & REVISIONS CHANGES,THE CONTRACTOR SHOULD IMMEDIATELY VERIFY &CONSULT TOWITH THE ELECTRICAL ENGINEER OF THEPNP ENGINEERING SERVICE (PNPES),

4. ALL LOCATION & MOUNTING HEIGHT ARE SUBJECT TOAPPROVAL OF ELECTRICAL ENGINEER OF PNPES,

5. CONTRACTOR SHALL BE RESPONSIBLE IN THEPREPARATION OF AS-BUILT PLANS DULY SIGNED ANDSEALED BY PROFESSIONAL ELECTRICAL ENGINEER, ANDELECTRONIC AUTOCAD FILES,

6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL BEAPPROVED BY PNPES, REPRESENTATIVEENGINEER,

7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATIONOF SHOP OR CONSTRUCTION DRAWING REQUIRED BYOWNERARCHITECHENGINEER, THIS INCLUDES DEVICESAND FIXTURES ELEVATION,

8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDEALL COST NECESSARY TO COMPLETE THE SYSTEM AT NOCOST TO OWNER, INCLUDING COST OF CORING SERVICEAND EXPENSES FOR THE RESTORATION OF ANY DAMAGEAFFECTED CIVIL ARCHITECTURAL FINISHES ORRELOCATION OF EXISTING FACILITIES ON BUILDING,

9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TOACCESSIBLE PLACE OR WITH ACCESS PANELS,

10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTSTO BE INSTALLED OR PLACE WITHIN THE BUILDING, ANDMAKE AN ADJUSTMENT WITH THE PNPES ENGINEERARCHITECT CONSENT,

11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANYMATERIALS AND FITTINGS NOT SHOWN ON THIS PLANSBUT NEEDED TO COMPLETE THE SYSTEM AND OPERATIONSHALL BE INCLUDED WITH THE CONTRACTOR'S SCOPE OFWORKS.

12. ALL WORKS SHALL BE DONE UNDER THE DIRECTSUPERVISION OF LICENSE DULY REGISTERED ELECTRICALENGINEER OR REGISTERED MASTER ELECTRICIAN.

13. ADDITIONAL NOTES:

· USE OF MICA SHALL BE LIMITED TO 150mm MAXIMUM· USE OF FLEXIBLE METALLIC CONDUTIT SHALL BE

LIMITED TO 1m MAXIMUM· PROVIDE PROPER CONDUIT SUPPORT, G.I. WIRES AS

SUPPORT SHALL NOT BE ALLOWED· PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT

(RED OXIDE PRIMER) ON HANGERS AND SUPPORTS.

SPECIFICATIONS:

1. POWER SUPPLY TO THE BUILDING SHALL BE 230V, THREEPHASE, 4-WIRES, 60HZ.

2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVEDTYPE FOR PURPOSE & LOCATION.

3. NORMAL AND EMERGENCY CIRCUIT SHALL NOT BECOMBINED IN ONE RACEWAY OR CONDUIT.

4. RECEPTACLES FOR GENERAL USE SHALL BE DUPLEX 20A,250VAC, GROUND TYPE.

5. ALL WIRES SHOULD HAVE A MAXIMUM LOAD OF 80 OF WIREAMPACITY.

6. LIGHT SWITCHES MINIMUM RATING SHALL BE 16A 230VAC.

7. ALL MATERIALS TO BE USED SHALL BE BRAND NEW ANDSHALL HAVE THE "P.S." MARKS.

8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:

A. LIGHT SWITCHES - 1.37m above Floor finishB. CONVENIENCE OUTLET - 0.3m above Floor finishC. TELEPHONE OUTLET - 0.3m above Floor finishD. PANEL BOARD - 1.8m ABOVE FLOOR FINISH

9. CONDUIT EMBEDED WITHIN CONCRETE WALL SHALL HAVE AMINIMUM CEMENT PLASTERED OF 20mm THICK.

10. ALL CONDUIT PIPE ABOVE CEILING SHOULD HAVEINDEPENDENT HANGER SUPPORTS.

11. ALL LIGHTING FIXTURES SHOULD HAVE INDEPENDENTHANGER SUPPORTS.

12. ALL BOXES SHALL BE OCCUPIED ONLY OF 50 OF WIREVOLUME.

13. VOLTAGE DROP SHALL BE LIMITED TO 2.5 FROM SOURCE TOPANEL BOARD AS P.E.C. REQUIREMENT OR ACCEPTABLE TOTHE LABORATORY EQUIPMENT.

14. CIRCUIT BREAKERS SERVING MOTORS AND LIGHTING SHALLBE INDUSTRIAL AND COMMERCIAL BOLT-ON TYPERESPECTIVELY WITH MINIMUM OF 10kAIC.

15. ALL WIRES AND CABLES SHALL BE BRAND NEW ANDAPPROVED TYPE.

16. ALL CIRCUITS SHALL BE 4-WIRES FOR 3Ø & 3-WIRES FOR 2ØAND SHALL BE COLOR CODED AS FOLLOWS:

LINE 1 - BLACKLINE 2 - REDLINE 3 - BLUEGROUND WIRE - GREENSTRIPE

GREEN-YELLOWGRAY

17. PREFERRED DISTRIBUTION BOARDS MUST BE INDUSTRIALTYPE, BOLT-ON WITH 18kAIC MINIMUM UNLESS OTHERWISESPECIFIED.

18. USE SOLDERLESS CONNECTOR, MECHANICAL 1 PRESSURETYPE COPPER LUGS FOR CONNECTION OF WIRES LARGERTHAN 8mm².

19. USE FILLER COMPOUND, "SCOTCH FILL" OR APPROVED EQUALAT SHARP EDGES TO PROVIDE SMOOTH SURFACE BEFORETAPING WITH ELECTRICAL TAPE.

LOCATIONSITE PLAN

MDP1MDP2

ATS

MDB

SERVICE ENTRANCE

GUARD POST

BPO BUILDING BFO BUILDING

GATE 1

P E D E S T R I A N L A N E

ENTRANCE

EXIT

TRANSFORMATION OVAL

3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT (DIRECTLY BURRIED)PROVIDE ALSO 1-3" DIA PVC CONDUIT FOR SERVICEENTRANCE OF TELECOMMUNICATION SYSTEM

3-500mmsq THWNTHHN Cu WIRE1-60mmsq THHNTHWN Cu WIRE with messanger (OVERHEAD)(app 15mts)

3-250mmsq THWNTHHN Cu WIRE1-50mmsq THHNTHWN Cu WIRE

in 100mm dia RSC CONDUIT (DIRECTLY BURRIED)

3-500mmsq THWNTHHN Cu WIRE1-60mmsq THHNTHWN Cu WIREwith messanger(OVERHEAD)(app 25mts)

(Existing concrete pole)To serve as guying system Additional: 3-38mmsq

coated ACSR (app 40mts)

Additional: 1-38mmsq coated ACSR(app 30mts)

Existingconcrete polewithtransformers

Provide New 45' Concrete pole

THIS SITE

Provide appropriateguying system

3-100kVA DistributionTransformer

(Provide new concretepole)

Provide appropriateguying system

Sab

Sabc

1DP3

ATS

Sa

LEGEND & SYMBOLS

DP1

7W LED DOWNLIGHT

LED EMERGENCY LIGHT

2-18W LED TUBE with LOUVER 1' x 4' CASING (SURFACED)

PHOTOVOLTAIC SWITCH

MOTION SENSOR SWITCH

ONE GANG OF 1-SINGLE POLE SWITCH

ONE GANG OF 2-SINGLE POLE SWITCHES

ONE GANG OF 3-SINGLE POLE SWITCHES

DUPLEX CONVENIENCE OUTLET WITH GROUND

EXHAUST FAN (CEILING MOUNTED)

CIRCUIT HOMERUN INDICATING PANEL DESIGNATION

AUTOMATIC TRANSFER SWITCH

DISTRIBUTION PANEL 1DUPLEX RECEPTACLE WITH GROUND WEATHERPROOFWP

MS

F

X

PS

2-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED)

1-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED)

2-9W LED TUBE with 1' x 2' DUST PROOF CASING (RECESSED)

1-18 LED TUBE with WATER TIGHT CASING (SURFACED)

DUPLEX RECEPTACLE WITH GROUND (FLOOR MOUNTED)

AIR-CONDITIONING UNIT CB IN NEMA 3R ENCLOSURE

MDP MAIN DISTRIBUTION PANEL

2-18 LED TUBE with WATER TIGHT CASING (SURFACED)

TUNNELWALL LED LIGHTS, PHOTOSWITCH OPERATEDPS

THREE WAY SWITCHS3W

PROVIDE ALSO TELECOMMUNICATION SYSTEM BOX

E-1

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 2: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

54.00

P E D E S T R I A N L A N E

ENTRANCE

EXIT

2.00

6.006.00 6.00 6.00 6.006.006.006.006.00

1234

32.7

0

INFORMATION

STOR

AGE

RM

CABI

NET

CABI

NET

EXAMINATION RM - 2

OFFICE

SENIOR CITIZENS & PWD LOUNGE

TRANSACTION WINDOWS

STO

CLIENTS WAITING AREA

PWD CR

CRIME LAB DRUG TESTING

MUL

TI P

URPO

SE R

M

H A L L W A Y

LOBBY

DI & NBI CLEARANCELANDBANK

WASH AREA

RECEPTION AREA

EXIT

MALE CR

FEMALE CR

EXAM RM

CLIENTS LOUNGE CLIENTS LOUNGE

CLIENTS LOUNGE

RAMP UP

COUNTER TABLE COUNTER TABLE STORAGE

PIPE

CHAS

E

UP

6.00

6.00

6.00

24.0

0

NP SECTION

EXIT

INTERVIEW RM INTERVIEW RM

H A L L W A Y

1

2

34

UP

CHIEF

RAMP UP

ELECTRICAL RM

6.00

ENTR

ANCE

FRO

MTR

ANSF

ORM

ATIO

N

ENTEXIT

COM

PUTE

R TA

BLE

STORAGE

UP

FE

H A L L W A Y

CR

OVAL

TRANSACTION WINDOWS

STO

NBI STO

LANDBANK DI AND NBI

PANELINTERVIEW

LOCKER RM

DI STO

EXAMINATION RM - 1

CHIEF

SERVERCCTV RM

FEMALECR

WASH AREA

URINE COLLECTION

MALE FEMALE

MALECR

GFCI GFCI

8DP1

5DP2

6DP2

7DP2

17DP1

9DP1

10DP1

11DP1

12DP1

8DP2

13DP1

21DP1

15DP1

9DP2

10DP2

16DP1

18DP1

19DP1

20DP1

14DP1

MAIN ENTRY

RAMP UP

PORCH

CANOPY LINE

UP

1DP5

6DP5

7DP5

9DP4

3DP5

4DP5

8DP4

2DP5

10DP4

5DP5

11DP4

13DP4

14DP4

9DP510

DP5

21DP3

22DP3

23DP3

DP1 DP5MDP1DP2 MDP2

ATS

MDB

SERVICE ENTRANCE

With SEPARATE CONDUIT FOR TELECOM & FIRE PUMP

GROUND FLOOR PLANSCALE 1 : 100MTS

POWER LAYOUT

F F

F FF F

F

FF

F

FF

F

FF

GFCI GFCI

3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE

in 100mm dia PVC CONDUIT (DIRECTLY BURRIED)PROVIDE ALSO 1-3"DIA PVC CONDUIT FOR SERVICE

ENTRANCE OF TELECOMMUNICATION SYSTEM

E-2

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 3: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

CANOPY LINE

FEO

TRAN

SACT

ION

WIN

DOW

S

UP DN

STORAGE PIPE

CHAS

E

CONFERENCE RM

COUNTER TABLE

INFO

RMAT

ION

6.00

6.00

6.00

6.00

24.0

0

CLIE

NTS

LOUN

GE

54.00

6.00 6.00 6.00 6.006.006.006.006.00

MALE CR

FEMALE CR

PERIMETER LINE

ROOF LINE

PULL DOWN STAIR

6.00

FIRE EXIT

UP

6.00

UPDN

SOSI

A ST

AFF

CHIEF

CHIEF

SOSI

A TR

ANSA

CTIO

N W

INDO

WS

FEO

RECO

RDS

RM

FEO STAFF

MAL

E CR FEMALE CR

RECO

RDS

RM

FEO

STAF

F

F F F F

F FF F

F F F F

FF

7DP3

16DP3

6DP4

9DP3

8DP3

6DP3

10DP3

11DP3

12DP3

13DP3

14DP3

15DP3

17DP3

18DP3

5DP4

4DP4

6DP419

DP3

20DP3

7DP4

12DP5

11DP5

15DP4

13DP5

14DP5

15DP5

16DP5

16DP4

17DP4

20DP4

19DP5

17DP5

DP4

DP3

18DP5

19DP4

18DP4

SECOND FLOOR PLANSCALE

POWER LAYOUT

1 : 100MTS

12DP4

8DP5

F

F

F

F F F F F

F F F F F

F

E-3

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 4: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

UP DN

(COVERED ROOFDECK)

6.00

6.00

6.00

24.0

0

6.00

PERIMETER LINE

MULTI-PURPOSE AREA

54.00

6.00 6.00 6.00 6.006.006.006.006.00

DN6.00

FIRE EXIT

DN

DP6

ROOFDECK FLOOR PLANSCALE 1 : 100MTS

POWER LAYOUT

8DP6

7DP6

E-4

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 5: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

J

54.00

P E D E S T R I A N L A N E

ENTRANCE

EXIT

2.00

6.006.00 6.00 6.00 6.006.006.006.006.00

1234

32.7

0

INFORMATION

STOR

AGE

RM

CABI

NET

CABI

NET

EXAMINATION RM - 2

OFFICE

SENIOR CITIZENS & PWD LOUNGE

TRANSACTION WINDOWS

STO

CLIENTS WAITING AREA

PWD CR

CRIME LAB DRUG TESTING

MUL

TI P

URPO

SE R

M

H A L L W A Y

LOBBY

DI & NBI CLEARANCELANDBANK

WASH AREA

RECEPTION AREA

EXIT

MALE CR

FEMALE CR

EXAM RM

CLIENTS LOUNGE CLIENTS LOUNGE

CLIENTS LOUNGE

RAMP UP

COUNTER TABLE COUNTER TABLE

STORAGE

PIPE

CHAS

E

UP

6.00

6.00

6.00

24.0

0

NP SECTION

EXIT

INTERVIEW RM INTERVIEW RM

H A L L W A Y

1

2

34

UP

CHIEF

RAMP UP

ELECTRICAL RM

6.00

ENTR

ANCE

FRO

MTR

ANSF

ORM

ATIO

N

ENTEXIT

COM

PUTE

R TA

BLE

STORAGE

UP

FE

H A L L W A YCR

OVAL

TRANSACTION WINDOWS

STO

NBI STO

LANDBANK DI AND NBI

PANELINTERVIEW

LOCKER RM

DI STO

EXAMINATION RM - 1

CHIEF

SERVERCCTV RM

FEMALECR

WASH AREA

URINE COLLECTION

MALE FEMALE

MALE CR

2DP1

1DP2

5DP1

6DP1

4DP2

1DP1

3DP2

X

X

X

X

X

J

7DP1

3DP1

2DP2

Sa

a

Sab

a abb

PS

PS

PS

PS

PS

PS

MS

4DP1

Sab

ba a

MS

MS

Saba

b

a abb

a

Sab Sa

a a b a b

b a b a

a

MS

Sab

a

b

Sa

a

Sab

Sc

Sabc

a a b b c

Sa

a a

a

b b

c

PS

Sabc

a a b b c

d

d d dS3Wy

yyS3Wy

S3Wy

y

SabMS

c

cf

f

Sg

Sf

gg

Sh

Sk

h

Scd

k

Sji

j i d c

MS

Sxy

y

y

x

MS

MS

MSSa a

S

Sab S

Sabc

Sb

MSa

MSc

MSf

MSe

MSd

MS

MS

aa

cc

d

d

e e f

MSMS

Sabc

c

ab b

Sab

S

a

a a

b

bb

Sce

c

c e

e

e

e

c

c

SabScd

S

d db b

a c cS

S

Sd

b b

a

c

MAIN ENTRY

RAMP UP

PORCH

UP

CANOPY LINE

b b b

d d d

X

MS

X

MS

a a

b

S

X

MS

X

MS

X

GROUND FLOOR PLANSCALE 1 : 100MTS

LIGHTING LAYOUT21

DP4

SINAGE LIGHTING AT CANOPY

PS

E-5

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 6: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

CANOPY LINE

FEO

TRAN

SACT

ION

WIN

DOW

S

UP DN

STORAGE PIPE

CHAS

E

CONFERENCE RM

COUNTER TABLE

INFO

RMAT

ION

6.00

6.00

6.00

6.00

24.0

0

CLIE

NTS

LOUN

GE

54.00

6.00 6.00 6.00 6.006.006.006.006.00

MALE CR

FEMALE CR

PERIMETER LINE

ROOF LINE

PULL DOWN STAIR

6.00

FIRE EXIT

UP

DN

6.00

UPDN

SOSI

A ST

AFF

CHIEF

CHIEF

SOSI

A TR

ANSA

CTIO

N W

INDO

WS

FEO

RECO

RDS

RM

FEO STAFF

MAL

E CR FEMALE CR

RECO

RDS

RM

FEO

STAF

F

X

X

X

MS

Sxy

y

y

x

MS MSSa a

S

X

MS

Sa

X

MS

Sa

a

a

MS

Sa

a

a

b

Sb

Scde

cc

d

d

e

Sfg

Shi

Swx

wxw

Sjk

g g

hi

i h

j

k

j

k

ff

MS

Sabc

a

a

a

b

b

c

c

Sde

d

d

d

d

e

e

e

e a

SijkSfgh

f

f

f

g

g

h

h

i

j

j

j

k

k

k

k

Slm Sno

l

l

l

l

l

l

l l

m

m

m

m

m

m

m

m

n

n

n

n

n

n

n

n n o

o

o

o

o

o

o Sno

1DP3

2DP3

3DP3

4DP3

5DP3

1DP4

2DP4

3DP4

4.55

SECOND FLOOR PLANSCALE 1 : 100MTS

LIGHTING LAYOUT

PS

PS

Sb

a

b

n

n

n

n

n

n

oo

o

o

o

p

p

p

q

q

q

p

Spq

21DP4

PNP LOGO LIGHTINGS

PSONE STOP LIGHTINGS

E-6

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 7: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

UP DN

(COVERED ROOFDECK)

6.00

6.00

6.00

24.0

0

6.00

PERIMETER LINE

MULTI-PURPOSE AREA

54.00

6.00 6.00 6.00 6.006.006.006.006.00

DN6.00

FIRE EXIT

DN

X

X

X

MS

Sxy

y

y

x

MS MSSa a

S1

DP6

2DP6

a

a

a

a

a

b

b

b

b

b

SabScdSefSgh

3DP6

d

d

d

d

d

c

c

c

c

c

c d

4DP6

e f

e f

e f

f e

f e

f e

5DP6

6DP6

g h

h g

g h

h g

g h

h g

SijSkl

i

i

i

i

j

j

jk

k

k

l

l

l

ROOFDECK FLOOR PLANSCALE 1 : 100MTS

LIGHTING LAYOUT

PS

PS

MS

MS

E-7

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 8: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

54.00

P E D E S T R I A N L A N E

ENTRANCE

EXIT

2.00

6.006.00 6.00 6.00 6.006.006.006.006.00

1234

32.7

0

INFORMATION

STOR

AGE

RM

CABI

NET

CABI

NET

EXAMINATION RM - 2

OFFICE

SENIOR CITIZENS & PWD LOUNGE

TRANSACTION WINDOWS

STO

CLIENTS WAITING AREA

PWD CR

CRIME LAB DRUG TESTING

MUL

TI P

URPO

SE R

M

H A L L W A Y

LOBBY

DI & NBI CLEARANCELANDBANK

WASH AREA

RECEPTION AREA

EXIT

MALE CR

FEMALE CR

EXAM RM

CLIENTS LOUNGE CLIENTS LOUNGE

CLIENTS LOUNGE

RAMP UP

COUNTER TABLE COUNTER TABLE STORAGE

PIPE

CHAS

E

UP

6.00

6.00

6.00

24.0

0

NP SECTION

EXIT

INTERVIEW RM INTERVIEW RM

H A L L W A Y

1

2

34

UP

CHIEF

RAMP UP

ELECTRICAL RM

6.00

ENTR

ANCE

FRO

MTR

ANSF

ORM

ATIO

N

ENTEXIT

COM

PUTE

R TA

BLE

STORAGE

UP

FE

H A L L W A Y

CR

OVAL

TRANSACTION WINDOWS

STO

NBI STO

LANDBANK DI AND NBI

PANELINTERVIEW

LOCKER RM

DI STO

EXAMINATION RM - 1

CHIEF

SERVERCCTV RM

FEMALECR

WASH AREA

URINE COLLECTION

MALE FEMALE

MALECR

MAIN ENTRY

RAMP UP

PORCH

CANOPY LINE

UP

GROUND FLOOR PLANSCALE 1 : 100MTS

FIRE ALARM LAYOUT

SD

SD

SD

SD

SD

SD

SD SD SD

SD

SDSD SD SD

SD

SD

SD

SD

SD

SD SD

SD SD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD

SD

SD

HD

HD

M

M

M

B

B

B

FACP

M

Z101FACP

Z102FACP

Z103FACP

Z104FACP

Z105FACP

Z201FACP

Z202FACP

Z203FACP

Z204FACP

SD

SD

SD

SD

SD

SD

Z106FACP

Z205FACP

Z107FACP

22DP1

E-8

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 9: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

CANOPY LINE

FEO

TRAN

SACT

ION

WIN

DOW

S

UP DN

STORAGE PIPE

CHAS

E

CONFERENCE RM

COUNTER TABLE

INFO

RMAT

ION

6.00

6.00

6.00

6.00

24.0

0

CLIE

NTS

LOUN

GE

54.00

6.00 6.00 6.00 6.006.006.006.006.00

MALE CR

FEMALE CR

PERIMETER LINE

ROOF LINE

PULL DOWN STAIR

6.00

FIRE EXIT

UP

DN

6.00

UPDN

SOSI

A ST

AFF

CHIEF

CHIEF

SOSI

A TR

ANSA

CTIO

N W

INDO

WS

FEO

RECO

RDS

RM

FEO STAFF

MAL

E CR FEMALE CR

RECO

RDS

RM

FEO

STAF

F

SECOND FLOOR PLANSCALE 1 : 100MTS

FIRE ALARM LAYOUT

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD SD

SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

M

M

B

B

Z301FACP

Z302FACP

Z402FACP Z401

FACP

Z403FACP

E-9

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 10: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

UP DN

(COVERED ROOFDECK)

6.00

6.00

6.00

24.0

0

6.00

PERIMETER LINE

MULTI-PURPOSE AREA

54.00

6.00 6.00 6.00 6.006.006.006.006.00

DN6.00

FIRE EXIT

DN

ROOFDECK FLOOR PLANSCALE 1 : 100MTS

FIRE ALARM LAYOUT

SMOKE DETECTOR SD

M

B

FACP

FIRE MANUAL SWITCH

FIRE ALARM BELL

FIRE ALARM CONTROL PANEL

HEAT DETECTOR HD

Z106FACP CIRCUIT HOME RUN & DESIGNATION

SD

SD

HD

HD

HD HD

SD

M

B

Z501FACP

Z502FACP

HD HD

HD HD

LEGEND

E-10

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 11: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

1 L.O. (Multi-purpose & Exam Rm 2) 11 11 230 1.10 4.78 4.78 4.78 15, 50, 2, 18 2-3.5+1-2.0 20

3 L.O. (CL Drug Testing & PWD Lounge) 20 20 230 2.00 8.70 8.70 8.70 15, 50, 2, 18 2-3.5+1-2.0 20

5 L.0. (Main Entrance, Client's Waiting Area & Electrical Rm) 15 15 230 1.50 6.52 6.52 6.52 15, 50, 2, 18 2-3.5+1-2.0 20

7 L.0. (Landbank & DI-NBI T. Windows and M & F C.R.) 18 18 230 1.80 7.83 7.83 7.83 15, 50, 2, 18 2-3.5+1-2.0 20

9 Receptacle (NP Office and Interview Rooms) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

11 Receptacle (NP Office and Interview Rooms) 11 11 230 1.98 8.61 8.61 8.61 20, 50, 2, 18 2-3.5+1-2.0 20

13 Receptacle (T. Windows and Sr Citizen's & PWD Lounge) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20

15 Receptacle (CL Drug TestingEnt. InformationWaiting Areas) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

17 Receptacle (Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

19 Receptacle (DI & NBI Teller & Stock Rooms) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20

21 Receptacle (CL Examination Room and Main Entry) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

23 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

Sub-total 64 53 117 18.94 49.48 58.00 57.22 82.35

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

2 L.O. (NP Section Reception Area, Interview Rm & Hallway) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20

4 L.O. (CL Drug TestingEnt. InformationWaiting Areas) 19 19 230 1.90 8.26 8.26 8.26 15, 50, 2, 18 2-3.5+1-2.0 20

6 L.0. (DI & NBI & Landbank C. Table, Hallway & Server Room) 15 15 230 1.50 6.52 6.52 6.52 15, 50, 2, 18 2-3.5+1-2.0 20

8 Receptacle (Multi-purpose and NP Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

10 Receptacle (NP Interview Rooms) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

12 Receptacle (NP Interview Rooms) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

14 Receptacle (CL Drug Testing) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

16 Receptacle (Landbank Couter Tables) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

18 Receptacle (Landban, DI and NBI Transaction Windows) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

20 Receptacle (DI & NBI Counter Tables) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

22 S P A R E (Fire Alarm Control Panel) 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

24 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

Sub-total 51 44 95 19.02 52.96 51.22 61.22 82.70

SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 1

COMPUTATION OF SERVICE EQUIPMENT: DP1

Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of

Largest motor

CONDUCTOR: Number Size

Type Icb (Main Over Current Protective Device)= Iw + Largest motor

DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,

CENTER MAIN

TOTAL CURRENT, (It) = 57.22 + 61.22 = 118.44 Line: 3

38 mm sq

THWN

Copper

Icb (Main OCPD) = 100.67 + 0.00 = 100.67 BREAKERS: Number PoleAT, AF, kAIC

DEMAND FACTOR, (df) = 0.85 Grounding:

1

8 mm sq

THWN

Copper

Main 1 3125, 150, 25

25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 7 215, 50, 18

WIRE AMPACITY, (Iw) = 100.67 + 0.00 = 100.67 Branches 14 220, 50, 18

Branches 3 230, 50, 18

125AT

3 - 50 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE

in 50 mm Ø PVC PIPE

1 3 G

15AT 15AT

15AT 15AT

20AT

20AT

20AT

GROUNDING LUGSFOR EVERY CIRCUIT

15AT

PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD (16MMØ X 3000MM)

1 - 8 MM ² THHNTHWN COPPER WIREin 20 MM Ø PVC PIPE

2

15AT

20AT

15AT

30AT

30AT 30AT

20AT

20AT 20AT

20AT 20AT

20AT 20AT

20AT 20AT

20AT

E-11

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 12: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

1 L.O. (Examination Room 1 and NP Storage Room) 10 10 230 1.00 4.35 4.35 4.35 15, 50, 2, 18 2-3.5+1-2.0 20

3 L.O. (Client's Lounge, NP Section and Interview Rooms) 22 22 230 2.20 9.57 9.57 9.57 15, 50, 2, 18 2-3.5+1-2.0 20

5 Receptacle (NP Examination Room 2) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

7 Receptacle (NP Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

9 Receptacle (Waiting Area) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

11 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

Sub-total 32 19 51 9.62 24.09 26.78 32.78 41.83

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

2 L.O. (Client's Area, CL Drug Testing & Hallway) 14 14 230 1.40 6.09 6.09 6.09 15, 50, 2, 18 2-3.5+1-2.0 20

4 L.O. (Female & Male C.R., Storage Room and Hallway) 10 10 230 1.00 4.35 4.35 4.35 15, 50, 2, 18 2-3.5+1-2.0 20

6 Receptacle (NP Examination Room 2) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

8 Receptacle (NP Office & Locker Rm, Hallway & Lounge) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

10 Receptacle (Client's Waiting Area & Electrical Room) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

12 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25

Sub-total 24 19 43 8.82 20.61 29.30 26.78 38.35

COMPUTATION OF SERVICE EQUIPMENT: DP2

Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of

Largest motor

CONDUCTOR: Number Size

Type Icb (Main Over Current Protective Device)= Iw + Largest motor

DISTRIBUTION PANEL 1: 12 BRANCHES, 100AF,

CENTER MAIN

TOTAL CURRENT, (It) = 32.78 + 26.78 = 59.56 Line: 3

22 mm sq

THWN

Copper

Icb (Main OCPD) = 50.63 + 0.00 = 50.63 BREAKERS: Number PoleAT, AF, kAIC

DEMAND FACTOR, (df) = 0.85 Grounding:

1

8 mm sq

THWN

Copper

Main 1 360, 100, 18

25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 4 215, 50, 18

WIRE AMPACITY, (Iw) = 50.63 + 0.00 = 50.63 Branches 8 220, 50, 18

Branches 0 230, 50, 18

SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 2

60AT

3 - 22 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE

in 40 mm Ø PVC PIPE

1 3 G

15AT 15AT

15AT 15AT

20AT 20AT

GROUNDING LUGSFOR EVERY CIRCUIT

PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD (16MMØ X 3000MM)

1 - 8 MM ² THHNTHWN COPPER WIREin 20 MM Ø PVC PIPE

2

20AT

20AT 20AT

20AT

20AT 20AT

E-12

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 13: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

L O A D OCPDNO. & SIZE of

WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF,

POLE, kAICWIRE mm²EMT mmØ

2 L.O. (SOCIA Area & CR) 18 18 230 1.80 7.83 7.83 7.83 15, 50, 2, 18 2-3.5+1-2.0 20

4 L.O. (Client's Lounge) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20

6 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

8 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

10 Receptacle (FEO Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

12 Receptacle (SOCIA Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

14 Receptacle (FEO Transaction Windows) 5 5 230 0.90 3.91 3.91 3.91 20, 50, 2, 18 2-3.5+1-2.0 20

16 Receptacle (SOCIA Transaction Windows) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20

18 Receptacle (FEO Transaction Windows) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20

20 Receptacle (Counter Table) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

22 1 TR (Server Room) 1 230 2.07 9.00 9.00 9.00 20, 50, 2, 18 2-5.5+1-3.525

24 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 35 38 1 73 15.41 43.78 43.57 46.65 67.00

L O A D OCPDNO. & SIZE of

WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF,

POLE, kAICWIRE mm²EMT mmØ

1 L.O. (FEO Area) 19 19 230 1.90 8.26 8.26 8.26 15, 50, 2, 18 2-3.5+1-2.0 20

3 L.O. (FEO & SOCIA Transaction Windows) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20

5 L.O. (Client's Lounge & CR) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20

7 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

9 Receptacle (FEO Staff) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20

11 Receptacle (FEO Staff) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20

13 Receptacle (FEO Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

15 Receptacle (FEO Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

17 Receptacle (SOCIA Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

19 Receptacle (SOCIA Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20

21 SERVER ROOM 1 230 10.00 43.48 43.48 43.48 50, 50, 2, 18 25

23 1 TR (Server Room) 1 230 2.07 9.00 9.00 9.00 20, 50, 2, 18 2-5.5+1-3.525

Sub-total 52 28 2 80 22.31 75.13 41.09 77.78 97.00

COMPUTATION OF SERVICE EQUIPMENT: DP3

Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of

Largest motor

CONDUCTOR: Number Size

Type Icb (Main Over Current Protective Device)= Iw + Largest motor

DISTRIBUTION PANEL 1: 24 BRANCHES, 150AF,

CENTER MAIN

TOTAL CURRENT, (It) = 77.78 + 46.65 = 124.43 Line: 3

50 mm sq

THWN

Copper

Icb (Main OCPD) = 108.02 + 9.00 = 117.02 BREAKERS: Number PoleAT, AF, kAIC

DEMAND FACTOR, (df) = 0.85 Grounding:

1

8 mm sq

THWN

Copper

Main 1 3125, 150, 25

25 OF LARGEST MOTOR = 0.25 x 9.00 = 2.25 CONDUIT: 1 50 mm Ø PVC Branches 5 215, 50, 18

WIRE AMPACITY, (Iw) = 105.77 + 2.25 = 108.02 Branches 17 220, 50, 18

Branches 1 230, 50, 18

Branches 1 250, 50, 18

125AT

3 - 50 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE

in 50 mm Ø PVC PIPE

1 3 G

15AT 15AT

15AT 15AT

20AT

20AT

20AT

GROUNDING LUGSFOR EVERY CIRCUIT

15AT

2

15AT

20AT

20AT

20AT

20AT 30AT

20AT

20AT 20AT

20AT 20AT

20AT 20AT

20AT 20AT

50AT

SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 3

E-13

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 14: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

L O A D OCPDNO. & SIZE of

WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF,

POLE, kAICWIRE mm²EMT mmØ

2 L.O. (SOCIA Area & CR) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20

4 Receptacle (Client's Lounge) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20

6 Receptacle (Counter Table) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20

8 2.5TR (GF Exam Room 2) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525

10 2.5TR (GF Exam Room 1) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525

12 2.5TR (GF Waiting Area) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525

14 1.5TR (GF EntryHallway) 1 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525

16 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 9.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

18 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

20 1.5TR (2F SOCIA STAFF) 1 1 230 2.16 9.40 5.48 9.40 20, 50, 2, 18 2-5.5+1-3.525

22 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

24 S P A R E 230 3.00 17.00 13.04 13.04 30, 50, 2, 18 25

Sub-total 16 15 7 38 35.28 87.68 98.50 110.63 153.38

L O A D OCPDNO. & SIZE of

WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF,

POLE, kAICWIRE mm²EMT mmØ

1 L.O. (Client's Lounge) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20

3 L.O. (FEO & SOCIA Transaction Windows) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20

5 Receptacle (Client's Lounge at Column) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

7 Receptacle (InfoClient's Lounge) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20

9 3TR (Interview Rooms) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525

11 4TR (Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

13 3TR (Client's Testing Area) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525

15 1.5TR (2nd Floor FEO Staff) 1 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525

17 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

19 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

21 S P A R E (Sinage Lightings) 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 2-3.5+1-2.0 20

23 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 29 8 6 43 33.71 91.58 101.46 100.07 146.56

COMPUTATION OF SERVICE EQUIPMENT: DP4

Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of

Largest motor

CONDUCTOR: Number Size

Type Icb (Main Over Current Protective Device)= Iw + Largest motor

DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,

CENTER MAIN

TOTAL CURRENT, (It) = 100.07 + 110.63 = 210.70 Line: 3

100 mm

sq

THWN

Copper

Icb (Main OCPD) =

183.95 + 19.40 = 203.35 BREAKERS: Number PoleAT, AF, kAIC

DEMAND FACTOR, (df) =

0.85

Grounding:

1

14 mm sq

THWN

Copper

Main 1 3200, 250, 25

25 OF LARGEST MOTOR = 0.25 x 19.40 = 4.85 CONDUIT: 1 65 mm Ø PVC Branches 3 215, 50, 18

WIRE AMPACITY, (Iw) = 179.10 + 4.85 = 183.95 Branches 8 220, 50, 18

Branches 8 230, 50, 18

Branches 5 240, 50, 18

200AT

3 - 100 mm² THHN/THWN CU WIRE1 - 14 mm² THHN/THWN CU WIRE

in 65 mm Ø PVC PIPE

1 3 G

15AT 15AT

15AT

GROUNDING LUGSFOR EVERY CIRCUIT

2

20AT

30AT

30AT 30AT

20AT

20AT

SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 4

20AT

30AT

30AT

40AT

40AT

40AT

40AT

40AT

20AT

20AT

30AT

30AT

30AT

20AT

20AT

E-14

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 15: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

1 1.5 TR (Multi-purpose Room) 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525

3 3 TR (NP Section) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

5 3 TR (Exam Room 1) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

7 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

9 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

11 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

13 2.5 TR (C, FEOConference Room) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

15 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

17 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

19 3 TR (C,SOCIA & Staff) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

21 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

23 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 10 46.11 131.64 131.64 137.69 200.49

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

2 3 TR (Exam Room 2) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

4 3 TR (NP Section Intreview Rooms) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

6 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

8 3 TR (Waiting Areas) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

10 1.5 TR (CL Exam Room) 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525

12 3 TR (FEO Staff) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525

14 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

16 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

18 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525

20 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

22 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

24 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 9 44.65 125.29 135.29 127.69 194.13

250AT

3 - 125 mm² THHN/THWN CU WIRE1 - 22 mm² THHN/THWN CU WIRE

in 65 mm Ø PVC PIPE

1 3 G

GROUNDING LUGSFOR EVERY CIRCUIT

2

30AT

30AT 30AT

20AT

40AT

SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 5

30AT

30AT

30AT

30AT

30AT

40AT

40AT

40AT

40AT

40AT

40AT

40AT

40AT

COMPUTATION OF SERVICE EQUIPMENT: DP5

Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of

Largest motor

CONDUCTOR: Number Size

Type Icb (Main Over Current Protective Device)= Iw + Largest motor

DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,

CENTER MAIN

TOTAL CURRENT, (It) = 137.69 + 127.89 = 265.58 Line: 3

125 mm

sq

THWN

Copper

Icb (Main OCPD) =

230.59 + 19.40 = 249.99 BREAKERS: Number PoleAT, AF, kAIC

DEMAND FACTOR, (df) =

0.85

Grounding:

1

22 mm sq

THWN

Copper

Main 1 3250, 250, 25

25 OF LARGEST MOTOR = 0.25 x 19.40 = 4.85 CONDUIT: 1 65 mm Ø PVC Branches 0 215, 50, 18

WIRE AMPACITY, (Iw) = 225.74 + 4.85 = 230.59 Branches 2 220, 50, 18

Branches 13 230, 50, 18

Branches 9 240, 50, 18

30AT

30AT

30AT

30AT

20AT

30AT

PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD (16MMØ X 3000MM)

1 - 22 MM ² THHNTHWN COPPER WIREin 25 MM Ø PVC PIPE

E-15

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 16: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

1 L.O. (Female & Male C.R., Storage Room and Hallway) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20

3 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20

5 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20

7 Receptacle (Multi-purpose Hall) 9 9 230 1.62 7.04 7.04 7.04 20, 50, 2, 18 2-3.5+1-2.0 20

9 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

11 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 37 9 46 11.32 30.96 30.96 36.52 49.22

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION LO COSPONEMA

3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,

kAICWIRE mm²PVC mmØ

2 L.O. (Multi-purpose Hall) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20

4 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20

6 L.O. (Multi-purpose Hall) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20

8 Receptacle (Multi-purpose Hall) 9 9 230 1.62 7.04 7.04 7.04 20, 50, 2, 18 2-3.5+1-2.0 20

10 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

12 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25

Sub-total 41 9 50 11.72 30.96 32.70 38.26 50.96

COMPUTATION OF SERVICE EQUIPMENT: DP6

Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of

Largest motor

CONDUCTOR: Number Size

Type Icb (Main Over Current Protective Device)= Iw + Largest motor

DISTRIBUTION PANEL 1: 12 BRANCHES, 150AF,

CENTER MAIN

TOTAL CURRENT, (It) = 36.52 + 38.26 = 74.78 Line: 3

38 mm sq

THWN

Copper

Icb (Main OCPD) = 63.56 + 0.00 = 63.56 BREAKERS: Number PoleAT, AF, kAIC

DEMAND FACTOR, (df) = 0.85 Grounding:

1

8 mm sq

THWN

Copper

Main 1 3100, 150, 18

25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 6 215, 50, 18

WIRE AMPACITY, (Iw) = 63.56 + 0.00 = 63.56 Branches 2 220, 50, 18

Branches 4 230, 50, 18

SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 6

100AT

3 - 38 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE

in 40 mm Ø PVC PIPE

1 3 G

15AT 15AT

15AT 15AT

30AT 30AT

GROUNDING LUGSFOR EVERY CIRCUIT

2

20AT

30AT 30AT

20AT

15AT 15AT

E-16

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 17: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

CKT

NO.

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION Volts kVA Amps LOAD CURRENTL1 L2 L3

AT, AF, POLE,kAIC

WIRE mm²PVC mmØ

1 DISTRIBUTION PANEL 1 230 37.96 165.04 102.44 109.22 118.44 125, 150, 3, 25 3-50+1-8 50

2 DISTRIBUTION PANEL 3 230 37.72 164.00 118.91 84.66 124.43 125, 150, 3, 25 3-50+1-8 50

3 DISTRIBUTION PANEL 5 230 90.76 394.61 256.93 266.93 265.58 250, 250, 3, 25 3-125+1-4 65

4 S P A R E 230 3.60 27.11 15.65 15.65 15.65 40, 50, 3, 18 32

T O T A L 170.04 750.76 493.93 476.46 524.10

CKT

NO.

L O A D OCPDNO. & SIZEof WIRE &CONDUIT

DESCRIPTION Volts kVA Amps LOAD CURRENTL1 L2 L3

AT, AF, POLE,kAIC

WIRE mm²PVC mmØ

1 DISTRIBUTION PANEL 2 230 18.44 80.17 44.70 56.08 59.56 60, 100, 3, 25 3-22+1-8 40

2 DISTRIBUTION PANEL 4 230 68.99 299.96 179.26 199.96 210.70 200, 250, 3, 25 3-100+1-14 65

3 DISTRIBUTION PANEL 6 230 23.04 100.17 61.92 63.66 74.78 100, 150, 3, 18 3-38+1-8 40

4 S P A R E 230 3.60 27.11 15.65 15.65 15.65 30, 50, 3, 18 32

T O T A L 114.07 507.41 301.53 335.35 360.69

COMPUTATIONS OF LOADS: MAIN DISTRIBUTION PANEL 1& GENERATOR with ATS

Iw (Main Service Entrance Conductor)= (Highest Line Load x Demand Factor) + 25 of the Full Load Current of Largest motor

Iw (Wire ampacity) = 445.49 + 4.85 = 450.34USE: 6 - 250 mm² THHN/THWN + 2 - 50 mm² THHN/THWN Copper Wire in 2-100 mm Ø RSC

PIPE

Icb (Main Over Current Protective Device)= Iw + Full Load Current of Largest motor

Icb (Main OCPD) = 450.34 + 19.40 = 469.74USE: 500 AT CB Main CB, 42kAIC, 4 Branches Main Distribution Panel, Bolt-on individual CB, 3 Pole,

240V, 60Hz with Grounding LugsGenerator Rating:

Generator Rating (kVA) = Total kVALoad*1.25= 284.1 x 1.250 = 355.14

USE: 1-350 KVA GENERATOR SET, 3 PHASE, SILENT TYPE and 800AT Automatic Transfer Switch

COMPUTATIONS OF LOADS: MAIN DISTRIBUTION PANEL 2& TRANSFORMER with Main Disconnecting Means

Iw (Main Service Entrance Conductor)= ((Highest Line Load230) x (1.732) x Demand Factor)) + 25 of the Current of Largest motor

Iw (Wire ampacity) = 305.85 + 4.85 = 310.70USE: 3 - 250 mm² THHN/THWN + 1 - 50 mm² THHN/THWN Copper Wire in 1-100 mm Ø RSC

PIPE

Icb (Main Over Current Protection Device)= Iw + Current of Largest motor

Icb (Main OCPD) = 310.70 + 19.40 = 330.10USE: 350 AT CB Main, 42kAIC, 4 Branches Main Distribution Panel, Bolt-on individual CB, 3 Pole,

240V, 60Hz with Grounding LugsTransformer Rating, MDB and Main Service Entrance Conductor:

Total Load (kVA) = kVA MDP1+kVAMDP2*div.f* demand f1.732= 181.1 1.732 = 104.57

USE: 3-100 KVA DISTRIBUTION TRANSFORMERMain Disconnecting Means 700 AT CB9 - 250 mm2 THHNTHWN + 3-50 mm2 THHNTHWN Copper Wire in 3-100 mm dia RSC

SCHEDULE OF LOADS MAIN DISTRIBUTION PANEL 1 SCHEDULE OF LOADS MAIN DISTRIBUTION PANEL 2

E-17

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING

Page 18: GENERAL NOTES: SPECIFICATIONS: LOCATIONSITE PLAN SITE · general notes: all electrical works herein shall be done in accordance with the national building code, provisions of the

RISER DIAGRAM

M

MCB800AT

in NEMA 3REnclosures

DP6100AT

KWHR METERCT RATED

SERVICE ENTRANCE3PHASE, 4-WIRE, 240V, 60HZ

3-250mmsq THWNTHHN Cu WIRE1-50mmsq THHNTHWN Cu WIRE

in 100mm dia RSC CONDUIT

GF LINE

2nd F LINE

3rd F LINE

3-50mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIRE

in 50mm dia PVC CONDUIT

3-38mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIREin 40mm dia PVC CONDUIT

3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia RSC CONDUIT

ATS800AT

DP4200AT

MDP2350AT

EXTERIOR OF THEBUILDING

EXTERIOR OF THEBUILDING

3 SETS: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT

3-100mmsq THWNTHHN Cu WIRE1-14mmsq THHNTHWN Cu WIRE

in 65mm dia PVC CONDUIT

DP3125AT

DP1125AT

MDP1500AT

DP5250AT

2 SETS: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT

3-50mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIREin 50mm dia PVC CONDUIT

3-22mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIREin 40mm dia PVC CONDUIT

3-125mmsq THWNTHHN Cu WIRE1-22mmsq THHNTHWN Cu WIREin 65mm dia PVC CONDUIT

DP260AT

PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD

(16MM DIA x 3000MM)

1 - 60 MMSQ THHNTHWN COPPER WIREin 32 MM DIA PVC PIPE

PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD

(16MM DIA x 3000MM)

SEE SCHEDULE OF LOADS & COMPUTATIONSFOR SIZE OF GROUNDING ELECTRODE CONDUCTOR

DRIP LOOPat least 1500

3-100mmØ RIGID STEELCONDUIT EMBEDED ON

CONCRETE POLE

58" Ø EYEBOLT

GALVANIZED

KWHR METERCT RATED in

NEMA 3RENCLOSURES

SERVICE DROP LINE3-500mm² THWN Cu Wire1-60mm² THWN Cu Wire

USE SOLDERLESSCONNECTORS CURRENT TRANFORMER

ENCLOSED, CTR: 5:800

20 mm Ø RSC with clamps6-3.5mm² THHN Cu Wire

SERVICE ENTRANCE POLE3700mm High for residential property and driveways5500mm High for public streets, alleys, roads, parking areassubject to truck traffic

800AT MAIN DISCONNECTING MEANSIN NEMA 3R ENCLOSURES

SEE DETAIL OF MDB

PROVIDE GROUNDING RODCONNECTOR

PROVIDE GROUNDINGELECTRODE ROD

COPPER CLAD STEEL ROD(16MM DIA x 3000MM)

NGL

DETAIL OF SERVICE ENTRANCE EQUIPMENT & GROUNDINGNOT DRAWN TO SCALE

1.50

2.50

0.55

1.00

N. G. L.

0.40

0.35

0.80

TOP

1.50

RIGID STEELCONDUITRIGID STEEL BARSSTIRRUPS

NOTE:COORDINATE TO THE STRUCTURALENGINEER THE SIZE OF STEEL BARS

9 STEEL BARS5 x 4 PCS

3 SETS SERVICEENTRANCE CAP

58" EYEBOLT

3-100MM Ø RIGID STEELCONDUIT EMBEDDED ON

CONCRETE POLE

SERVICE POLE DETAILNOT DRAWN TO SCALE

3 SETS: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT

E-18

SHEET NO.PROJECT TITLE:

LOCATION: CAMP CRAME, QUEZON CITY

PREPARED BY:

POLICE CHIEF INSPECTOR

CHIEF, PLANS & DESIGN SECTION

FERDINAND S MAGALLANESABELARDO C MATILLANO

DEPUTY DIRECTOR, ENGINEERING SERVICE

CHECKED BY:

ACTING CHIEF, INFRASTRUCTURE DIVISION

POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT

MANUEL G FABROS

CHIEF OF STAFF, ENGINEERING SERVICE

APPROVED BY:RECOMMEND APPROVAL:

SUBMITTED BY:

POLICE SENIOR SUPERINTENDENT

DIRECTOR, ENGINEERING SERVICE

POLICE CHIEF SUPERINTENDENT

HONORIO R AGNILA

ANTONIO A TAYLAN, JR

PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING