GENERAL SPECIFICATION FOR THE CIVIL
ENGINEERING AND BUILDING DESIGN AND CONSTRUCTION OF SECONDARY
SUBSTATIONS
SUB-03-017 Appendix 1 10/07/2018
_________________________________________________________________________________
© SP Power Systems Limited
APPENDIX 1: DRAWINGS
The guidance drawings listed below are typical layout and construction details deemed to satisfy SPEN’s functional civil and building requirements for Secondary Substations.
Constructors shall note that where provided such typical details may be generic and may not reflect exact on-site requirements on a project/site-specific basis.
Where applicable and considered appropriate by SPEN, additional typical deemed to satisfy construction detail drawings may be issued on a project-specific basis.
Variations or changes to the ‘deemed to satisfy guidance drawings’ shall be submitted to SPEN for audit and agreement prior to any work starting on-site.
Drawing No. Drawing Title Revision
SP2022244 Typical 11kV GRP Plinth (No Metering) 5
SP2103445 Typical 11kV GRP Plinth (With Metering) 5
SP2142493 Typical 11kV RMU GRP Plinth (With Metering) 5
SP3020357 Typical 11kV Brick Built Substation (Close Coupled Gear) 6
SP4000542 Typical Z Vent Louvered Ventilation Unit For Brick Built Substation 5
SP4000543 Typical Hardwood Doors for 11kV Substations 4
SP4000545 Typical 11kV Brick Built Substation (X or Y Type Separate Gear) 5
SP4008870 Typical 11kV Brick Built Substation (3 Panel Board With Metering) 6
SP4049060 Typical 11kV Brick Built Substation (D or G Type RMU With Metering)
10
SP4053389 Typical 11kV Brick Built Substation (Double Side by Side) 3
SP4058664 Typical 11kV Brick Built Substation (Double Square) 3
SP4102117 Typical 11kV GRP Plinth D Type RMU with MU Single Plinth 2
SP4105959 Typical 11kV Brick Built (LV Generation Substation 3
SP4132847 Typical 11kV GRP Plinth G or D Type RMU (indoor Kit) 2
11
15
79
8
21
52
15
3590 Ext.
665 798 798 665
31
60
In
t.
SIDE ELEVATION
REAR ELEVATION
FRONT ELEVATION
PLAN
35
90
E
xt.
floor slab
cable slots - below
to trench sides &
215mm Brickwork
SECTION B-B
SECTION A-A
Trench
Cable
Slot
68
5
2035 ==
AA
B
B
G.L.
F.F.L.
24
10
15
0
25
06
75
21
85
D
oo
r o
pe
nin
g
30
0 S
lo
t
82
5
22
53
85
38
5
75
Cable
Slot
Galvanised steel ventilators
Cable
Slot
to top, on Visqueen or similar
(anti-crack) fabric with 20mm cover
concrete reinforced with A142
Floor slab to be min. 150mm thk.
NOTE
It is essential that EnergyNetworks
personnel can access
& properly secure on egress
Facing brick to finish
DETAIL AT DOORWAY
suit door spec.
Threshold detail to
F.F.L.
1 course below G.L.
G.L.
40mm cover
1 sheet top, 1 sheet bottom,
2 sheets of A252 fabric -
to be reinforced with
Concrete floor over cable slots
min. 100mm bearing
cable slots
R.C. lintels over
over open trench area
to u/s to prevent movement)
plywood covers (with battens fitted
Provide 19mm thk. temporary
over cable slots
Reinforced floor slab
approved dpm, on sand blinding
DETAIL
SEE
metal lintel
Proprietary corrosion resistant
DETAIL
SEE
150mm thickness of rounded
sand filled, trench topped with
Cable trench & slots to be
50
15
0
(or similar approved)
with 2 layers of Visqueen
level and smooth, topped
10mm Thk. cured bed joint,
Scale 1:10
15
0
10
0
3690
3790 Slab o/a
36
90
10
0
37
90
S
la
b o
/a
ROOF SECTION
ROOF PLAN
FOUNDATION
PLAN OF BRICKWORK BELOW FLOOR SLAB
Concrete slab, reinforced with
min. A393 fabric with 40mm cover
to sides, top and bottom.
Laps to be min. 400mm
25
0
11
15
= =
C
L
778778
665665
18
00
21
5
910 909
21
5
21
5
FallFall
215
Cable
Slot
Cable
Slot
2260 B.O.
2035
2465
25mm Galvd. M.S. bar
A252 Fabric reinft.
900 X 900mm sheet
Haulage
eye (see
detail)
HAULGE EYE DETAIL Scale 1:20
C
L
13
0
10
0
30
0
18
0
12
5 C
ove
r
15
01
50
R
5
0
100 Cover
all doors at all times. Any
hardwood, metalwork or GRP
construction doors that may
shrink, warp, wind, distort,
corrode or bind will not be
acceptable
L.H. leaf to open first
SECTION
Min
.
Min
.
Min
.
(min. 150mm end bearing)
laps to be 400mm
20mm cover to bottom,
75mm cover to sides and
Roof reinft. min. A393 mesh with
ventilator openings
R.C. lintels over
(see detail)
For plant installation:
Weak mix concrete
or graded stone infill
with suitable polysulphide
Rake out and point
movement joint sealant
Drip
LINTOL TO VENT OPENING SCALE 1:20
Min. 2 No. 6mm dia. m.s. bars at 45mm centres
(shape code 21 bar length 1040mm 'A'=940mm)
1000 103
14
0
25mm Cover
to bars
D.P.C.
where graded stone infill is used
(top to be level with F.F.L.)
gravel chippings
Additional foundation and/or
ground improvement works
to constructors design
to suit site-specific conditions
60
0
600mm rad.
100mm I/D
cable duct
NOTES
cScale
A2Size
Status
Location
Drawn
Title
Drg. No.
CheckedDate Date
Rev.
DateApproved
Drawn
CheckedApproved
Rev. Date
SP PowerSystems LtdSystem Design, Drawing Office3 Prenton Way , Prenton , CH43 3ETTelephone 0151 6092491
ISSUED SP3020357
TYPICAL TRADITIONAL BUILDING DETAILS FOR11kV BRICKBUILT SUBSTATION
(CLOSE COUPLED GEAR)
1:50
TYPICAL
M.T. JAN.07 C.W. JAN.07 A.J.R. JAN.07
C.B.27/11/17
GRGR
GENERAL UPDATES TO REFLECT CHANGESTO CIVIL POLICY DOCUMENTS
GeneralThis drawing is to be read in conjunction with document SUB-03-017 GeneralSpecification for the Civil Engineering and Building Design and Construction ofSecondary Substations. It is the constructor's responsibility to confirm, beforeconstruction, that the details on this drawing are correct as per SUB-03-017.
This is a generic guidance drawing that is deemed suitable for construction. Howeverthe constructor should consider all site specific risk that will affect the design andoperation of the substation. Proposed substation details are to be submitted foracceptance before installation.
Details shown on this drawing are typical for this type of substation building but maynot be suitable for substations housing alternative equipment. The constructor shallsatisfy themselves that the appropriate details shown are correct depending on thetype of substation being constructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain the relevant cubcrushing strength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that provide the requiredminimum design safe ground bearing capacity. Minimum bearing capacity to be75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)A flat, level and smooth floor surface is essential for installation of plant. Tolerancesto finished level expressed as a maximum permissible deviation beneath a straightedge with feet placed anywhere on the floor shall not exceed 1mm in 1m or 3mm in3m. Floors to be cured, prepared & painted with 2 No. Coats of non-slip floor paint oncompletion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² mean compressivestrength and max 7% M.A. and durability designation F2 S2 (Ex Engineering BrickworkClass B) in English bond except for exposed faces.External facing brickwork to be H.D. category 1 min. 30N/mm² mean compressivestrength and max 12% M.A. and durability designation F1 S1 or better.Internal facing brickwork to fair faced smooth textured solid concrete bricks, sized tomatch external facing bricks and with a mean compressive strength of not less than20N/mm².Class iii mortar.
WallsWalls shall be 215mm English garden wall bond or Collar jointed stretcher bond.Leaves of collar jointed double stretcher walls to be tied together by means of type 1or type 2 stainless steel ties laid in every fourth course at 375mm centres and set back38mm from outer face, ties are to be staggered.
DoorsDetails of proposed doors shall be submitted to SPEN for comment, before workcommences.Proprietary GRP faced aluminium or steel security doors are the preferred option,unless stated otherwise.An alternative option for hardwood doors (see Drg SP4000543 for details) or GRPdoors is also available.
Cable Trench & SlotsOn completion of cabling, cable trench and slots to be filled with dry sand topped witha minimum 150mm depth of rounded gravel chippings (top to be level with FFL).
RoofStandard Concrete Roofs (Concrete 40N/mm² 28-Day Cube Strength)Wherever practicable, roofs should be cast in situ reinforced concrete constructionwith a soffit finish. Slip joints shall be incorporated at wall bearings, polysulphidesealed externally. Internal / External faces of concrete to be fair faced. All externalfaces to be cured, prepared, primed and finished with a two coat high performance(Aliphatic) polyurethane waterproofing system (flat roof grade) with glass fibre matreinforcement to initial coat, e.g.
1No. Coat of LPL bonding primer then2No. Coats of LPL Decothane.
Obtainable from Liquid Plastics Tel. 01772 259 781 or Equal System
All finishes are to be in accordance with the manufacturers recommendations.
Where permanent structural metal soffit shutters are used as part of a compositeroof system these shall be corrosion resistant and the Constructor's proposals forscreening or tagging for earthing purposes shall be expressly agreed with SPEN priorto construction.
VentilationVentilation shown is typical for a single 500kVA transformer substation.The typical ventilation indicated may not be adequate in certain supply conditionswhich might require additional or alternative ventilation arrangements.
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901Vent for Brickbuilt substation SP4000542
13
0
23
10
280
B.O
.
79
88
90
1003
215
40
50
36
20
21
5
215
1002
21
5
14
00
15
0
B.O
.
150
B.O.
75
MIN
. 2
50
82
5M
IN
. 2
41
0
3590
3160
112
345
75
3690
41
50
400
75
15
00
15
00
75
75
3590
MIN
. 2
50
215
21
5
40
50
215
21
52
31
0
457
215 215
280
14
00
21
52
15
MIN
. 1
00
MIN
. 1
00
MIN
. 1
50
1115798
38
53
85
B.O
.
1585 B.O.
*
*
150
150
100
125
R
5
0
100
1000
25 25 103
140
2525
25
180
100
300
50
75
NOTES
cScale
A1Size
Status
Location
Drawn
Drg. No.
CheckedDate Date
Rev.
DateApproved
Location
Title
SP PowerSystems LtdSystem Design, Drawing Office3 Prenton Way , Prenton , CH43 3ET
Drawn
Checked
Approved
Rev. Date
Telephone 0151 6092491
ISSUED SP40005451:50
TYPICAL
L.A. 12/4/06 M.T. 12/4/06 A.J.R. 12/4/06
TYPICAL TRADITIONAL BUILDING DETAILS FOR11kV BRICKBUILT SUBSTATION
(X OR Y TYPE SEPARATE SWITCHGEAR)
C.B.27/11/17
GRGR
GENERAL UPDATES TO REFLECT CHANGES TOCIVILS POLICY DOCUMENT
GeneralThis drawing is to be read in conjunction with document SUB-03-017 General Specification forthe Civil Engineering and Building Design and Construction of Secondary Substations. It is theconstructor's responsibility to confirm, before construction, that the details on this drawing arecorrect as per SUB-03-017.
This is a generic guidance drawing that is deemed suitable for construction. However theconstructor should consider all site specific risk that will affect the design and operation of thesubstation. Proposed substation details are to be submitted for acceptance before installation.
Details shown on this drawing are typical for this type of substation building but may not besuitable for substations housing alternative equipment. The constructor shall satisfythemselves that the appropriate details shown are correct depending on the type of substationbeing constructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain the relevant cub crushingstrength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that provide the required minimumdesign safe ground bearing capacity. Minimum bearing capacity to be 75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)Floors of substations housing indoor switchgear shall have a visqueen damp proof membraneinstalled where graded stone infill is used.A flat, level and smooth floor surface is essential for installation of plant. Tolerances to finishedlevel expressed as a maximum permissible deviation beneath a straight edge with feet placedanywhere on the floor shall not exceed 1mm in 1m or 3mm in 3m. Floors to be cured, prepared& painted with 2 No. Coats of non-slip floor paint on completion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² mean compressive strengthand max 7% M.A. and durability designation F2 S2 (Ex Engineering Brickwork Class B) in Englishbond except for exposed faces.External facing brickwork to be H.D. category 1 min. 30N/mm² mean compressive strength andmax 12% M.A. and durability designation F1 S1 or better.Internal facing brickwork to fair faced smooth textured solid concrete bricks, sized to matchexternal facing bricks and with a mean compressive strength of not less than 20N/mm².Class iii mortar.
WallsWalls shall be 215mm English garden wall bond or Collar jointed stretcher bond.Leaves of collar jointed double stretcher walls to be tied together by means of type 1 or type 2stainless steel ties laid in every fourth course at 375mm centres and set back 38mm from outerface, ties are to be staggered.
DoorsDetails of proposed doors shall be submitted to SPEN for comment, before work commences.Proprietary GRP faced aluminium or steel security doors are the preferred option, unless statedotherwise.An alternative option for hardwood doors (see Drg SP4000543 for details) or GRP doors is alsoavailable.
Cable Trench & Slots/RampOn completion of cabling, cable trench to be filled with dry sand and skimmed with minimum50mm depth of sand/cement screed over a visqueen membrane (top to be level with FFL).
RoofStandard Concrete Roofs (Concrete 40N/mm² 28-Day Cube Strength)Wherever practicable, roofs should be cast in situ reinforced concrete construction with asoffit finish. Slip joints shall be incorporated at wall bearings, polysulphide sealed externally.Internal / External faces of concrete to be fair faced. All external faces to be cured, prepared,primed and finished with a two coat high performance (Aliphatic) polyurethane waterproofingsystem (flat roof grade) with glass fibre mat reinforcement to initial coat, e.g.
1No. Coat of LPL bonding primer then2No. Coats of LPL Decothane.
Obtainable from Liquid Plastics Tel. 01772 259 781 or Equal System
All finishes are to be in accordance with the manufacturers recommendations.
Where permanent structural metal soffit shutters are used as part of a composite roof systemthese shall be corrosion resistant and the Constructor's proposals for screening or tagging forearthing purposes shall be expressly agreed with SPEN prior to construction.
VentilationVentilation shown is typical for a single 500kVA transformer substation.The typical ventilation indicated may not be adequate in certain supply conditions which mightrequire additional or alternative ventilation arrangements.
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901Vent for Brickbuilt substation SP4000542
150
910 X 2185 HIGH
440
267
267
215
215
2785
900
1050 500 500
150
3620
4378
379379
4378
1050 500 500
1135
2485
1750675
600
100
500 500
4578
4378
3620379
100
379
100
3028
4578
100
4378
1135
2270
215
100
1185
1340
665
1585 x 2485 HIGH
890
250
400
750
225
225
750
3620
379
379
3600
4050
614
1083
450
2185
1135
2485
665
1400
450
NOTES
cScale
A1Size
Status
Location
Drawn
Drg. No.
CheckedDate Date
Rev.
DateApproved
Location
Title
SP PowerSystems LtdSystem Design, Drawing Office3 Prenton Way , Prenton , CH43 3ET
Drawn
Checked
Approved
Rev. Date
Telephone 0151 6092491
ISSUED SP40088701:50
TYPICAL
M.T. DEC.06 C.W. DEC.06 A.J.R. DEC.06
TYPICAL TRADITIONAL BUILDING DETAILS FOR11kV BRICKBUILT SUBSTATION
(3 PANEL BOARD WITH METERING)
C.B.27/11/17
G.R.G.R.
GENERAL UPDATES TO REFLECT CHANGES TOCIVILS POLICY DOCUMENT
GeneralThis drawing is to be read in conjunction with document SUB-03-017 General Specification for the CivilEngineering and Building Design and Construction of Secondary Substations. It is the constructor'sresponsibility to confirm, before construction, that the details on this drawing are correct as perSUB-03-017.
This is a generic guidance drawing that is deemed suitable for construction. However the constructorshould consider all site specific risk that will affect the design and operation of the substation.Proposed substation details are to be submitted for acceptance before installation.
Details shown on this drawing are typical for this type of substation building but may not be suitablefor substations housing alternative equipment. The constructor shall satisfy themselves that theappropriate details shown are correct depending on the type of substation being constructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain the relevant cub crushingstrength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that provide the required minimum designsafe ground bearing capacity. Minimum bearing capacity to be 75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)Floors of substations housing indoor switchgear shall have a visqueen damp proof membrane installedwhere graded stone infill is used.A flat, level and smooth floor surface is essential for installation of plant. Tolerances to finished levelexpressed as a maximum permissible deviation beneath a straight edge with feet placed anywhere onthe floor shall not exceed 1mm in 1m or 3mm in 3m. Floors to be cured, prepared & painted with 2No. Coats of non-slip floor paint on completion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² mean compressive strength and max7% M.A. and durability designation F2 S2 (Ex Engineering Brickwork Class B) in English bond except forexposed faces.External facing brickwork to be H.D. category 1 min. 30N/mm² mean compressive strength and max12% M.A. and durability designation F1 S1 or better.Internal facing brickwork to fair faced smooth textured solid concrete bricks, sized to match externalfacing bricks and with a mean compressive strength of not less than 20N/mm².Class iii mortar.
WallsExternal walls to enclosures housing Indoor Equipment shall be cavity construction that provides, as aminimum, standard thermal insulation values in accordance with the table below. The internal leafshall be solid brickwork construction minimum 215mm overall thickness. Walls shall be fair-facedplumb and smooth to the interior.Leaves of walls to be tied together by means of type 1 or type 2 stainless steel ties laid in every fourthcourse at 375mm centres and set back 38mm from outer face, ties are to be staggered.
DoorsDetails of proposed doors shall be submitted to SPEN for comment, before work commences.Proprietary GRP faced aluminium or steel security doors are the preferred option, unless statedotherwise.An alternative option for hardwood doors (see Drg SP4000543 for details) or GRP doors is alsoavailable.
Cable Trench & Slots/RampOn completion of cabling, cable trench to be filled with dry sand and skimmed with minimum 50mmdepth of sand/cement screed over a visqueen membrane (top to be level with FFL).
RoofRoofs shall provide a minimum standard thermal insulation values as detailed in the table below.
Roof shall be proprietary precast pre-stressed beam and in situ concrete screed topping systems witha fair-faced soffit finish, sealed joints and with reinforcement to screed where applicable with waterproofing as shown in the Typical Detail above.
VentilationNominal trickle ventilation is to be provided to reduce the risk of condensation.
InsulationSubstations housing indoor switchgear require insulation. U values for wall and roof shall meet thosedetailed in the table below:
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901
SCOTLAND
REGION
ENGLAND & WALES
0.2
ROOF
0.25
U (W/m2k)WALLS
U (W/m2k)
0.27
0.35
cScale
A2Size
Status
Location
Drawn
Title
Drg. No.
CheckedDate Date
Rev.
DateApproved
Drawn
CheckedApproved
Rev. Date
SP PowerSystems LtdSystem Design, Drawing Office, Gateway House,Old Hall Road, Bromborough, CH62 3NX.Telephone 0141 614 7143.
ISSUED SP4049060
TYPICAL TRADITIONAL BUILDING DETAILS FOR11kV BRICKBUILT SUBSTATION
('D' OR 'G' TYPE RMU WITH METERING)
1:50
11kV SUBSTATIONS
MT OCT 08 C.O.B OCT 08 C.W OCT 08
C.B.27/11/17
G.R.G.R.
GENERAL UPDATES TO REFLECT CHANGES TOCIVILS POLICY DOCUMENT
GeneralThis drawing is to be read in conjunction with document SUB-03-017General Specification for the Civil Engineering and Building Design andConstruction of Secondary Substations. It is the constructor'sresponsibility to confirm, before construction, that the details on thisdrawing are correct as per SUB-03-017.
This is a generic guidance drawing that is deemed suitable forconstruction. However the constructor should consider all site specificrisk that will affect the design and operation of the substation. Proposedsubstation details are to be submitted for acceptance before installation.
Details shown on this drawing are typical for this type of substationbuilding but may not be suitable for substations housing alternativeequipment. The constructor shall satisfy themselves that the appropriatedetails shown are correct depending on the type of substation beingconstructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain therelevant cub crushing strength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that providethe required minimum design safe ground bearing capacity. Minimumbearing capacity to be 75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)Floors of substations housing indoor switchgear shall have a visqueendamp proof membrane installed where graded stone infill is used.A flat, level and smooth floor surface is essential for installation of plant.Tolerances to finished level expressed as a maximum permissibledeviation beneath a straight edge with feet placed anywhere on the floorshall not exceed 1mm in 1m or 3mm in 3m. Floors to be cured, prepared& painted with 2 No. Coats of non-slip floor paint on completion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² meancompressive strength and max 7% M.A. and durability designation F2 S2(Ex Engineering Brickwork Class B) in English bond except for exposedfaces.External facing brickwork to be H.D. category 1 min. 30N/mm² meancompressive strength and max 12% M.A. and durability designation F1 S1or better.Internal facing brickwork to fair faced smooth textured solid concretebricks, sized to match external facing bricks and with a mean compressivestrength of not less than 20N/mm².Class iii mortar.
WallsExternal walls to enclosures housing Indoor Equipment shall be cavityconstruction that provides, as a minimum, standard thermal insulationvalues in accordance with the table below. The internal leaf shall be solidbrickwork construction minimum 215mm overall thickness. Walls shall befair-faced plumb and smooth to the interior.Leaves of walls to be tied together by means of type 1 or type 2 stainlesssteel ties laid in every fourth course at 375mm centres and set back38mm from outer face, ties are to be staggered.
DoorsDetails of proposed doors shall be submitted to SPEN for comment,before work commences.Proprietary GRP faced aluminium or steel security doors are the preferredoption, unless stated otherwise.An alternative option for hardwood doors (see Drg SP4000543 for details)or GRP doors is also available.
Cable Trench & Slots/RampOn completion of cabling, cable trench to be filled with dry sand andskimmed with minimum 50mm depth of sand/cement screed over avisqueen membrane (top to be level with FFL).
RoofRoofs shall provide a minimum standard thermal insulation values asdetailed in the table below.
Roof shall be proprietary precast pre-stressed beam and in situ concretescreed topping systems with a fair-faced soffit finish, sealed joints andwith reinforcement to screed where applicable with water proofing shallbe that as shown in the Typical Detail above.
VentilationNominal trickle ventilation is to be provided to reduce the risk ofcondensation.
InsulationSubstations housing indoor switchgear require insulation. U values forwall and roof shall meet those detailed in the table below:
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901
SCOTLAND
REGION
ENGLAND & WALES
0.2
ROOF
0.25
U (W/m2k)WALLS
U (W/m2k)
0.27
0.35
cScale
A1Size
Status
Location
Drawn
Drg. No.
CheckedDate Date
Rev.
DateApproved
Location
Title
SP PowerSystems LtdSystem Design, Drawing Office3 Prenton Way , Prenton , CH43 3ET
Drawn
Checked
Approved
Rev. Date
Telephone 0151 6092491
ISSUED SP40533891:50
STANDARDS
M.T. JAN.09 A.J.R. JAN.09 C.W JAN.09
TYPICAL TRADITIONAL BUILDING DETAILS FOR11kV BRICK BUILT SUBSTATION
(DOUBLE SIDE BY SIDE)
C.B.27/11/17
G.R.G.R.
GENERAL UPDATES TO REFLECT CHANGES TOCIVILS POLICY DOCUMENT
NOTES
GeneralThis drawing is to be read in conjunction with document SUB-03-017 General Specification for theCivil Engineering and Building Design and Construction of Secondary Substations. It is theconstructor's responsibility to confirm, before construction, that the details on this drawing arecorrect as per SUB-03-017.
This is a generic guidance drawing that is deemed suitable for construction. However theconstructor should consider all site specific risk that will affect the design and operation of thesubstation. Proposed substation details are to be submitted for acceptance before installation.
Details shown on this drawing are typical for this type of substation building but may not besuitable for substations housing alternative equipment. The constructor shall satisfy themselvesthat the appropriate details shown are correct depending on the type of substation beingconstructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain the relevant cub crushingstrength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that provide the required minimumdesign safe ground bearing capacity. Minimum bearing capacity to be 75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)Floors of substations housing indoor switchgear shall have a visqueen damp proof membraneinstalled where graded stone infill is used.A flat, level and smooth floor surface is essential for installation of plant. Tolerances to finished levelexpressed as a maximum permissible deviation beneath a straight edge with feet placed anywhereon the floor shall not exceed 1mm in 1m or 3mm in 3m. Floors to be cured, prepared & paintedwith 2 No. Coats of non-slip floor paint on completion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² mean compressive strength andmax 7% M.A. and durability designation F2 S2 (Ex Engineering Brickwork Class B) in English bondexcept for exposed faces.External facing brickwork to be H.D. category 1 min. 30N/mm² mean compressive strength and max12% M.A. and durability designation F1 S1 or better.Internal facing brickwork to fair faced smooth textured solid concrete bricks, sized to matchexternal facing bricks and with a mean compressive strength of not less than 20N/mm².Class iii mortar.
WallsWalls shall be 215mm English garden wall bond or Collar jointed stretcher bond.Leaves of collar jointed double stretcher walls to be tied together by means of type 1 or type 2stainless steel ties laid in every fourth course at 375mm centres and set back 38mm from outerface, ties are to be staggered.
SHS windposts shall be installed on the front and rear wall panels.
DoorsDetails of proposed doors shall be submitted to SPEN for comment, before work commences.Proprietary GRP faced aluminium or steel security doors are the preferred option, unless statedotherwise.An alternative option for hardwood doors (see Drg SP4000543 for details) or GRP doors is alsoavailable.
Cable Trench & Slots/RampOn completion of cabling, cable trench to be filled with dry sand and skimmed with minimum 50mmdepth of sand/cement screed over a visqueen membrane (top to be level with FFL).
RoofStandard Concrete Roofs (Concrete 40N/mm² 28-Day Cube Strength)Wherever practicable, roofs should be cast in situ reinforced concrete construction with a soffitfinish. Slip joints shall be incorporated at wall bearings, polysulphide sealed externally. Internal /External faces of concrete to be fair faced. All external faces to be cured, prepared, primed andfinished with a two coat high performance (Aliphatic) polyurethane waterproofing system (flat roofgrade) with glass fibre mat reinforcement to initial coat, e.g.
1No. Coat of LPL bonding primer then2No. Coats of LPL Decothane.
Obtainable from Liquid Plastics Tel. 01772 259 781 or Equal System
All finishes are to be in accordance with the manufacturers recommendations.
Where permanent structural metal soffit shutters are used as part of a composite roof system theseshall be corrosion resistant and the Constructor's proposals for screening or tagging for earthingpurposes shall be expressly agreed with SPEN prior to construction.
VentilationVentilation shown is typical for a double 500kVA transformer substation.Ventilation unit opening sizes for 1000kVA transformers shall be a minimum 1002 x 450mm. Thetypical ventilation indicated may not be adequate in certain supply conditions which might requireadditional or alternative ventilation arrangements.
SteelworkAll steelwork is to be hot dipped galvanised in accordance with the specification and shall providefixings for earthing.
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901Vent for Brickbuilt substation SP4000542
cScale
A1Size
Status
Location
Drawn
Drg. No.
CheckedDate Date
Rev.
DateApproved
Location
Title
SP PowerSystems LtdSystem Design, Drawing Office3 Prenton Way , Prenton , CH43 3ET
Drawn
Checked
Approved
Rev. Date
Telephone 0151 6092491
ISSUED SP4058664AS SHOWN
STANDARDS
M.T. MARCH 09 C.W. MARCH 09 A.J.R. MARCH 09
TYPICAL TRADITIONAL BUILDING DETAILS FOR11kV BRICK BUILT SUBSTATION
(DOUBLE SQUARE TYPE)
C.B.27/11/17
G.R.G.R.
GENERAL UPDATES TO REFLECT DETAILS TOCIVILS POLICY DOCUMENT
NOTES
GeneralThis drawing is to be read in conjunction with document SUB-03-017 General Specification for theCivil Engineering and Building Design and Construction of Secondary Substations. It is theconstructor's responsibility to confirm, before construction, that the details on this drawing arecorrect as per SUB-03-017.
This is a generic guidance drawing that is deemed suitable for construction. However theconstructor should consider all site specific risk that will affect the design and operation of thesubstation. Proposed substation details are to be submitted for acceptance before installation.
Details shown on this drawing are typical for this type of substation building but may not besuitable for substations housing alternative equipment. The constructor shall satisfy themselvesthat the appropriate details shown are correct depending on the type of substation beingconstructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain the relevant cub crushingstrength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that provide the required minimumdesign safe ground bearing capacity. Minimum bearing capacity to be 75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)Floors of substations housing indoor switchgear shall have a visqueen damp proof membraneinstalled where graded stone infill is used.A flat, level and smooth floor surface is essential for installation of plant. Tolerances to finishedlevel expressed as a maximum permissible deviation beneath a straight edge with feet placedanywhere on the floor shall not exceed 1mm in 1m or 3mm in 3m. Floors to be cured, prepared &painted with 2 No. Coats of non-slip floor paint on completion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² mean compressive strength andmax 7% M.A. and durability designation F2 S2 (Ex Engineering Brickwork Class B) in English bondexcept for exposed faces.External facing brickwork to be H.D. category 1 min. 30N/mm² mean compressive strength andmax 12% M.A. and durability designation F1 S1 or better.Internal facing brickwork to fair faced smooth textured solid concrete bricks, sized to matchexternal facing bricks and with a mean compressive strength of not less than 20N/mm².Class iii mortar.
WallsWalls shall be 215mm English garden wall bond or Collar jointed stretcher bond.Leaves of collar jointed double stretcher walls to be tied together by means of type 1 or type 2stainless steel ties laid in every fourth course at 375mm centres and set back 38mm from outerface, ties are to be staggered.
SHS windposts shall be installed on the front and rear wall panels.
DoorsDetails of proposed doors shall be submitted to SPEN for comment, before work commences.Proprietary GRP faced aluminium or steel security doors are the preferred option, unless statedotherwise.An alternative option for hardwood doors (see Drg SP4000543 for details) or GRP doors is alsoavailable.
Cable Trench & Slots/RampOn completion of cabling, cable trench to be filled with dry sand and skimmed with minimum50mm depth of sand/cement screed over a visqueen membrane (top to be level with FFL).
RoofStandard Concrete Roofs (Concrete 40N/mm² 28-Day Cube Strength)Wherever practicable, roofs should be cast in situ reinforced concrete construction with a soffitfinish. Slip joints shall be incorporated at wall bearings, polysulphide sealed externally. Internal /External faces of concrete to be fair faced. All external faces to be cured, prepared, primed andfinished with a two coat high performance (Aliphatic) polyurethane waterproofing system (flatroof grade) with glass fibre mat reinforcement to initial coat, e.g.
1No. Coat of LPL bonding primer then2No. Coats of LPL Decothane.
Obtainable from Liquid Plastics Tel. 01772 259 781 or Equal System
All finishes are to be in accordance with the manufacturers recommendations.
Where permanent structural metal soffit shutters are used as part of a composite roof systemthese shall be corrosion resistant and the Constructor's proposals for screening or tagging forearthing purposes shall be expressly agreed with SPEN prior to construction.
VentilationVentilation shown is typical for a double 500kVA transformer substation.The typical ventilation indicated may not be adequate in certain supply conditions which mightrequire additional or alternative ventilation arrangements.
SteelworkAll steelwork is to be hot dipped galvanised in accordance with the specification and shall providefixings for earthing.
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901Vent for Brickbuilt substation SP4000542
Blinding Concrete
50mm
G.L.
Switchgear Leg
(Typical)
RLK-L-10100
M10x100 Sleeve Anchor Rawplug
Top flange and support to be drilled
on site to take fixing for switchgear
Packer
RMU STEEL SUPPORT DETAIL
Scale 1:20
REAR ELEVATIONFRONT ELEVATION
SECTION A-A
to top, on Visqueen or similar
(anti-crack) fabric with 20mm cover
concrete reinforced with A142
Floor slab to be min. 150mm thk.
NOTE
It is essential that EnergyNetworks
personnel can access
& properly secure on egress
Facing brick to finish
DETAIL AT DOORWAY
suit door spec.
Threshold detail to
F.F.L.
1 course below G.L.
G.L.
approved dpm, on sand blinding
metal lintel
Proprietary corrosion resistant
50
15
0
(or similar approved)
with 2 layers of Visqueen
level and smooth, topped
10mm Thk. cured bed joint,
Scale 1:10
15
0
10
0
5490 Conc.Roof
10
0
ROOF SECTION
ROOF PLAN
FOUNDATION SECTION
PLAN OF BRICKWORK BELOW FLOOR SLAB
Concrete slab, reinforced with
min. A252 fabric with 40mm cover
to sides, top and bottom.
Laps to be min. 400mm
FallFall
all doors at all times. Any
hardwood, metalwork or GRP
construction doors that may
shrink, warp, wind, distort,
corrode or bind will not be
acceptable
L.H. leaf to open first
Min
.
Min
.
Min
.
(min. 150mm end bearing)
laps to be 400mm
20mm cover to bottom,
with 75mm cover to sides and
Roof reinft. min. A393 mesh
D.Tp. Type 1 graded
stone (class 'A') infill,
75mm to dust, or
weak-mix mass concrete infill
with suitable polysulphide
Rake out and point
movement joint sealant
Drip
where graded stone infill is used
Additional foundation and/or
ground improvement works
to constructors design to
suit site-specific conditions
brickwork below D.P.C.
215mm Engineering
F.F.L.
G.L.
conduits (1 on 2)
vitreous clay
plain ended
3No. 150mm i/d
250
F.F.L.
A
B
G.L.
D.P.C.
SECTION B-B
910
1892
12
50
46
0
Galvanised
steel ventilators
F.F.L.
G.L.
21
85
24
10
150
67
5
82
5
250
225
conduits
vitreous clay
plain ended
3No. 150mm i/d
See doorway detail
R.C. lintels over
ventilator openings
(see vent detail drg.)
5490 Found. slab
5390 Brickwork
conduit (600 rad.)
vitreous clay
plain ended
1No. 150mm i/d
Double doors
(see doors detail drg.)
customer design
Sw.room to
cu
sto
me
r d
esig
n
Sw
.ro
om
to
552
89
0
1340
A
215
4960
215
B
42
35
46
65
1003 4405721115 2260
5390
A
(or similar approved)
with 2 layers of Visqueen
PLAN
Cable slot
767 910
1677
46
01
46
5
Cable slot
450 5221851
800
347
65
05
40
25
0
14
78
915
32
3
1230
880
800
450
10
80
65
0
68
0
250
11
03
22
93
129
307
PLANT LAYOUT
45
0
450
'G' Type
Sw.gear
Unit T/X
Sw.gear
(1000kVA)
(Schneider)
Consumer
unit
Socket
Thermostatic
controlled heater
Unswitched
spur box
for B.S.U.
Ba
tte
ry
pa
ne
l
Electrical installation to comply with
SPEN document SUB-03-029
450
Light
switch
150
45
0
45
0
75
conduit (600 rad.)
vitreous clay
plain ended
2No. 150mm i/d
Socket
See RMU Steel Support Detail
cScale
A2Size
Status
Location
Drawn
Title
Drg. No.
CheckedDate Date
Rev.
DateApproved
Drawn
CheckedApproved
Rev. Date
SP PowerSystems LtdSystem Design, Drawing Office, Gateway House,Old Hall Road, Bromborough, CH62 3NX.Telephone 0141 614 7143.
ISSUED SP4105959
TYPICAL TRADITIONAL BUILDING DETAIL FOR11kV BRICK BUILT SUBSTATION
(LV GENERATION)
1:50
11kV SUBSTATIONS
M.T. SEPT. 13 S.H. OCT.13 A.J.R. OCT.13
C.B.27/11/17
G.R.G.R.
TO SWITCHGEAR ARRANGEMENT
GENERAL UPDATES TO REFLECT CHANGES TOCIVIL POLICY DOCUMENTS AND AMENDMENTS
NOTES
GeneralThis drawing is to be read in conjunction with document SUB-03-017 General Specificationfor the Civil Engineering and Building Design and Construction of Secondary Substations. Itis the constructor's responsibility to confirm, before construction, that the details on thisdrawing are correct as per SUB-03-017.
This is a generic guidance drawing that is deemed suitable for construction. However theconstructor should consider all site specific risk that will affect the design and operation ofthe substation. Proposed substation details are to be submitted for acceptance beforeinstallation.
Details shown on this drawing are typical for this type of substation building but may not besuitable for substations housing alternative equipment. The constructor shall satisfythemselves that the appropriate details shown are correct depending on the type ofsubstation being constructed.
ConcreteGeneralThe concrete shall be in accordance with the specification and attain the relevant cubcrushing strength at 28 days.
Foundations (Concrete 40N/mm² 28-Day Cube Strength)Foundations are to be set on undisturbed inorganic strata that provide the requiredminimum design safe ground bearing capacity. Minimum bearing capacity to be 75kN/m².
Floor (Concrete 40N/mm² 28-Day Cube Strength)A flat, level and smooth floor surface is essential for installation of plant. Tolerances tofinished level expressed as a maximum permissible deviation beneath a straight edge withfeet placed anywhere on the floor shall not exceed 1mm in 1m or 3mm in 3m. Floors to becured, prepared & painted with 2 No. Coats of non-slip floor paint on completion.
BrickworkGeneralAll brickwork below D.P.C. to be H.D. category 1 min. 75N/mm² mean compressive strengthand max 7% M.A. and durability designation F2 S2 (Ex Engineering Brickwork Class B) inEnglish bond except for exposed faces.External facing brickwork to be H.D. category 1 min. 30N/mm² mean compressive strengthand max 12% M.A. and durability designation F1 S1 or better.Internal facing brickwork to fair faced smooth textured solid concrete bricks, sized to matchexternal facing bricks and with a mean compressive strength of not less than 20N/mm².Class iii mortar.
WallsWalls shall be 215mm English garden wall bond or Collar jointed stretcher bond.Leaves of collar jointed double stretcher walls to be tied together by means of type 1 ortype 2 stainless steel ties laid in every fourth course at 375mm centres and set back 38mmfrom outer face, ties are to be staggered.
DoorsDetails of proposed doors shall be submitted to SPEN for comment, before workcommences.Proprietary GRP faced aluminium or steel security doors are the preferred option, unlessstated otherwise.An alternative option for hardwood doors (see Drg SP4000543 for details) or GRP doors isalso available.
Cable Trench & SlotsOn completion of cabling, cable trench and slots to be filled with dry sand topped with aminimum 150mm depth of rounded gravel chippings (top to be level with FFL).
RoofStandard Concrete Roofs (Concrete 40N/mm² 28-Day Cube Strength)Wherever practicable, roofs should be cast in situ reinforced concrete construction with asoffit finish. Slip joints shall be incorporated at wall bearings, polysulphide sealed externally.Internal / External faces of concrete to be fair faced. All external faces to be cured,prepared, primed and finished with a two coat high performance (Aliphatic) polyurethanewaterproofing system (flat roof grade) with glass fibre mat reinforcement to initial coat, e.g.
1No. Coat of LPL bonding primer then2No. Coats of LPL Decothane.
Obtainable from Liquid Plastics Tel. 01772 259 781 or Equal System
All finishes are to be in accordance with the manufacturers recommendations.
Where permanent structural metal soffit shutters are used as part of a composite roofsystem these shall be corrosion resistant and the Constructor's proposals for screening ortagging for earthing purposes shall be expressly agreed with SPEN prior to construction.
VentilationVentilation shown is typical for a single 500kVA transformer substation.Ventilation unit opening sizes for 1000kVA transformers shall be a minimum 1002 x 450mm.The typical ventilation indicated may not be adequate in certain supply conditions whichmight require additional or alternative ventilation arrangements.
Related Typical Deemed to Satisfy DrawingsHardwood Doors SP4000543Meter Cupboards SP4078901Vent for Brickbuilt substation SP4000542
'X' 'Y'
2486 (CABLE TRENCH)
'Y' 'X'
!
PLANT LAYOUT PLAN
FRONT ELEVATION
SECTION C - C
METRE OR GREATER FROM BOUNDARY
ERECTED AT A DISTANCE OF ONE
ENCLOSURE ONLY SUITABLE WHEN
WARNING/INFORMATION NOTICESDANGER SIGN, CONTACT NUMBERAND SF6 EQUIPMENT WITHIN
TYPICAL HOLDING DOWN DETAIL SECTION
ANTI VERMIN MESHFITTED INTERNALLY WITH S.S.
REAR ELEVATION
BOTTOM (AT FRONT) OF UNIT.EACH TO BE 150 x 100mm Min.
LOUVER
GROUND LEVEL
S.W. GEAR SECTION E - E
ABOVE FINISHEDSLAB TO BE 150mm
FOR DIAGRAMATIC
TOP OF FOUNDATION
PURPOSES ONLY
S.W. GEAR SHOWN
OF PLINTH
SIDE ELEVATION
ISOMETRIC VIEW
DOOR HEIGHT
ROOF TO BE FITTED WITH MANUFACTURERSEXPLOSION RELIEF MECHANISM
FABRICA142 REINFORCEMENT
PLINTH PLAN
SECTION A - A
25mm PERIMETER CHAMFER
ADDITIONAL FOUNDATION AND/ORGROUND IMPROVEMENT WORKSTO CONSTRUCTOR'S DESIGNTO SUIT SITE-SPECIFIC CONDITIONS
100
2486
50mm COVER TO
C
BCABLE TRENCH
C910
1923
1013
235 235
500
CHAMFERS25mm
CABLE TRENCH
CABL
E SL
OT
CABL
E SL
OT
CONDUITS
PLAIN ENDED3No. 150mm I/D
VITREOUS CLAY
CABLE ENTRY
CABL
E SL
OT
CABL
E SL
OT
ENTRYCABLE
225
450 67
5EQUI-SPACED, 50mmCOVER TO BOTTOM & SIDES
3 No T10 BARS 2800 LONG
A
A B
SECTION B - B
LOUVER
LOUVERLOUVER
E
E
PANEL
BATTERY PANEL- FOR 'G' TYPE
METER
RCD SOCKET
6 WAY
SPUR BOX
THERMOSTATICCONTROLLED HEATER
'G' TYPE
LIGHT SWITCH
SOCKET
SOCKET
UNSWITCHEDSPUR BOXFOR B.S.U.
SPUR BOXFOR HEATER
UNITCONSUMER
FOR HEATER
PROTECTIONPANEL
F.F.L.
G.L.
G.L.
G.L. G.L.G.L.
F.F.L.
LOUVERS TO BE PROVIDEDTOP (AT REAR) AND
F.F.L.G.L.
1501013
500
1923300
235235
FABRICA142 REINFORCEMENT
50mm BLINDING CONCRETE
THE REQUIRED INTERNAL FIXINGS FOR MANUFACTURERS ARE TO INCLUDE
DESIGN (SEE PLANT LAYOUT PLAN)
FABRIC
METALWORK FRAME BUILT FLOOR TO CEILING IN A BOX SECTION TO SUPPORT LOAD
REINFORCEMENT
(SCALE 1:5)
EQUI-SPACED,
BOTTOM & SIDES
3 No T10 BARS
(SEE PLANT LAYOUT PLAN)
2800 LONG
CURRENT BUILDING REGULATION STANDARDS 'U' VALUES OF ROOF AND WALLS TO BE TO
25
CHAMFER25mm
C
SECTION D -D
CABLE TRENCH
CABLE SLOT
G.L.F.F.L.
ABUS
DD
850
650CONDUITS
PLAIN ENDED3No. 150mm I/D
SECTION X-X (SCALE 1:5)
VITREOUS CLAY (450mm RADIUS)1No. 100mm DIA
CLAY CONDUIT
650
F.F.L.
1260
(INT
.)
600 (INT.)
1585(Min.) DOUBLE DOORS ==
PANELMETER
DOOR
2235
(Min
.)
F.F.L.F.F.L.
R450
SW. GEAR
REFER TO DRG. SP4090884FOR CABLE DUCT DETAILSIN METER CUPBOARD
MANUFACTURERS TO PROVIDE THE FINISH/COLOUR OF GRP UNIT TOREQUIRED GRP UNIT DESIGN
75
CUSTOMERS REQUIREMENTS
F.F.L.
50
DIMENSION TO SUIT GRP DESIGN (300mm Min.)
25
100
Y
G.L.
2500
(Min
.)
2235
(Min
.)
100
LOCK
910450
150
F.F.L.
C
25
CEILINGLIGHT
L
CEILINGLIGHT
CLA142
300 (Min.)
300
(Min
.)
100
150
CL
50100
825
2235
(Min
.)
775
825
675
GRP ENCAPSULATED WOOD VERTICAL BATTENS
L
PLINTH EXTERNAL DIMS. TO SUIT GRP UNIT DESIGN
3900 (Min. INTERNAL)
2900
(Min
. INT
ERNA
L)
PLIN
TH E
XTER
NAL
DIM
S. T
O SU
IT G
RP U
NIT
DESI
GN
BE SINGLE SKIN GRP/PLYWOOD/GRP WITHINTERNAL DIVISION WALL MAY ALTERNATIVELY
TO REAR
REQUIREMENTS ETC. IN THE GRP DESIGN. HEATERS/LIGHTS/SOCKETS ETC. CAN BEAND MANUFACTURERS ARE TO INCLUDE THE FIXING, REINFORCEMENT, 'U' VALUEALL ITEMS SHOWN BLUE ARE TO BE FITTED ON THE INTERNAL WALLS OF THE GRP
FIXED TO 18mm WEATHERPROOF PLYWOOD. BATTERY/METER PANELS TO HAVE A
CHANNEL NUT
1000
BACKING PLATE
CHANNELSKIN (INNER)
SKIN (OUTER)
SECTION Y-Y
WALL MOUNTED ITEMS IN THE GRP
(MAX 100kg)
(MAX 30kg)
CONSTRUCTION DETAILSSTANDARD GRP UNIT
(SCALE 1:5)
150
(SAFETY, SECURITY ETC.)
825
50
BUILDING REGULATION STANDARDS 'U' VALUES OF WALLS TO BE AS CURRENT
REQUIREMENT UP TO 100KG
TOP METALANGLE SUPPORT
ANGLE SUPPORTBOTTOM METAL
(BACKING PLATE)
SKIN (OUTER)
(BACKING PLATE)
x
CHANNEL
x
Y
Y
Y
STRUT
STRUT
STRUT
WEATHER BAR ATGALVANISED STEEL
BASE OF DOORS
1000
DOUBLE DOORS TO MEET
SKIN (INNER)
WITH F.F.L.)(TOP TO BE LEVEL SAND/CEMENT SCREEDAREAS FILLED WITH
(TOP TO BE LEVEL WITH F.F.L.) SAND/CEMENT SCREEDAREAS FILLED WITH
Rev Date Drawn Reviewed Approved Description of Change
1 17/12/2015 M.T. S.H. G.W. -
2 27/11/2017 CB GR GR GENERAL UPDATES TO REFLECT CHANGES TO CIVILS POLICY DOCUMENT
Size:
Drawn Rev'd App'd
Project:
Drg. No.: Rev:
All rights reserved. Total or partial reproduction of this drawing without authorisation of the proprietor is prohibited.
Scale:
Drg. Title:
Sheet:
Next:
Location:
Drawing State:
Approval Status:
43 5 6 7 8 9 1021 11 12
43 5 6 7 8 9 1021 11 12
C
B
A
D
E
F
G
H
C
B
A
D
E
F
G
H
A2
Voltage:GUIDANCE DRAWING 11kV
TYPICAL TRADITIONAL BUILDING DETAILS FOR
11kV GRP PLINTH 'D' OR 'G' TYPE RMU
(INDOOR KIT)
1:50CB GR GR SP4132847
Approved
For Issue
2
THIS DRAWING TO BE READ IN CONJUCTION WITH
SUB-03-017 'GENERAL SPECIFICATION FOR THE
CIVIL ENGINEERING AND BUILDING DESIGN AND
CONSTRUCTION OF SECONDARY SUBSTATIONS'
NOTES
THIS DRAWING IS FOR GUIDANCE ONLY.
PROPOSED SUBSTATION DETAILS ARE TO BE
SUBMITTED FOR ACCEPTANCE BEFORE
INSTALLATION.