general€abstract schedule - 'a' cuddalore and gurubarapalli … · 2019-12-13 · 507...
TRANSCRIPT
![Page 1: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/1.jpg)
Painting of kerb wall and de-silting of side drain in main roads and secondary roads
at SIPCOT Industrial Park, Thervoykandigai
Amount (Rs.)
Formation of road to Plot No.R-14 to R-22, Plot No.A-9/S and Line marking with stud
fixing at SIPCOT Industrial Complex, Gummidipoondi
Improvement and strengthening of existing roads (Balance roads) at SIPCOT
Industrial Complex, Cuddalore
(Rupees__________________________________________________________________________________only)
Description of work
GST 12% on Sub Total
SCHEDULE - 'A'
Name of work Formation of Roads, Improvement and strengthening of roads, street lights and other works in
SIPCOT Industrial Complexes / Growth Centre, Parks at Thervoykandigai, Gummidipoondi,
Cuddalore and Gurubarapalli
EMD: Rs.4,36,500/- Tender Date :19.12.2019
Providing of 12.5 m wide road to the plots A4 / 2A & B at SIPCOT Industrial Park,
Thervoykandigai
GST 12% on Sub Total
General Abstract
Sl.No.
II
III
I
GST 12% on Sub Total
IV
GRAND TOTAL
GST 12% on Sub Total
VForming internal road (Below tower line) at SIPCOT Industrial Park, Gurubarapalli
VI Providing Street light arragements to Gurubarapalli Krishnagiri District.
GST 12% on Sub Total
GST 12% on Sub Total
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 2: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/2.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
1
3300 Sqm
(Three
Thousand
Three
Hundred
Square meter
only)
Removal of light jungle and clearing away from the site
etc.complete as directed by the SIPCOT officers and as per
standards specification
1 Sqm
(One
Square
metre)
2
1220 Cum
(One
Thousand
Two Hundred
and Twenty
Cubic meter
only)
Forming Embankment using quarry dust having a CBR value
not less than 10% which has to be compacted properly and
form a stable embankment including cost, loading and
unloading and labour for proper setting out, shipping and
storing the top soil if necessary compacting the original
ground by vibratory roller to have a relative compaction of
required proctor density, spreading the materials uniformly
over the entire width of embankment etc. complete as
directed by SIPCOT Officers
1 Cum
(One
Cubic
metre)
I Formation of 12.5 m wide road to the plots A4 / 2A & B at SIPCOT
Industrial Park, Thervoykandigai
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 3: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/3.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
3
880 Cum
(Eight
Hundred and
Eighty Cubic
meter only)
Providing and Laying Wet Mix Macadam Base Course of
250mm compacted thickness in two layers of 125mm thick
or else as specified on the prepared sub base with graded
stone aggregates and Granular materials of quality size and
grading placed in layers as specified, including mixing in
base mix plant, spreading in uniform layer with motor grader
and compaction with vibrating rollers of 80 to 100 KN static
weight and fine dressing to required grade and cross slope
as shown in the drawing as per technical specification clause
408 of MORT & H.
1 Cum
(One
Cubic
metre)
4
3500 Sqm
(Three
Thousand
Five Hundred
Square meter
only)
Providing and applying Prime coat using Bitumen emulsion at
the rate of 6.00 kg per ten square metre over the WMM.
surface treated with primer preparatory to another
bituminous construction over it as per MoRT & H
Specification clause 502.
1 Sqm
(One
Square
metre)
5
3500 Sqm
(Three
Thousand
Five Hundred
Square meter
only)
Providing and applying Tack coat using Bitumen
emulsion at the rate of 2.50 kg per ten square metre over
the primed WMM surface treated with primer preparatory to
another bituminous construction over it as per MoRT & H
Specification clause 503.
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 4: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/4.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
6
270 Cum
(Two
Hundred and
Seventy
Cubic meter
only)
Providing and laying Hot Mix Dense Bituminous macadam
course of 75 mm thick (grade I)using course aggregate filler
and with 60/70 Gr Bitumen proportions as per mix
designcriteria specified the mixture is to be premixed in
central hot mix plant and spreading with selfpropelled
mechanical paver, consolidating with vibratory roller of 80 /
100 KN static weight as per standard specification clouse
507 of MORT & H.
1 Cum
(One
Cubic
metre)
7
3500 Sqm
(Three
Thousand
Five Hundred
Square meter
only)
Providing and laying tack coat using Bitumen Emulsion at the
rate of 2 kg per ten square metre over the DBM surface
preparatory to another bituminous construction over it as
per MoRT & H Specification clouse 503.
1 Sqm
(One
Square
metre)
8
150 Cum
(One Hundred
and Fifty
Cubic meter
only)
Providing and laying Bituminous concete of 40mm thick
(grade II) using course aggregate filler and with 60/70 Gr
bitumen proportions as per mix design criteria specified the
mixture is ti be premixed in central paver,consolidating with
vibratory roller of 80/100 KN static weight as per standard
specification clause 509 of MORT & H.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 5: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/5.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
9
90 Sqm
(Ninety
Square meter
only)
Providing and laying of hot applied thermoplastic compound
2.5mm thick including reflectorising glass beads @ 250 gms,
per sq.m. area thickness of 2.50mm is exclusive of surface
applied glass beads as per IRC :35. The finished surface to
be level, uniform and free from streaks and holes etc,
complete(as per MoRTH specification No.803)
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 6: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/6.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
10
98 Nos
(Ninety Eight
Numbers
only)
Providing and fixing reflective road studs of ‘category ‘B’
raised pavement markers made out of poly carbonate/ABS
moulded body and reflective panels(bi-convex reflectors)
with micro prismatic lens capable of providing total internal
reflection of the light entering the lens face with retro –
reflectance and chromaticity values confirming to ASTM
D4280. The reflective raised pavement markers shall also
confirm to the MORTH circular No. RW/NH.33023/10 97
–DO.III Dt:11.06.97 and the langth, height and width of the
body shall not be less than 100mm, 15mm and 90mm and
base of marker shall be flat within 1.3mm. The marker shall
support a load of 13635 kg tested in accordance with ASTM
D 4280. Lenses shall not be moulded of polycarbonate or
meth methyl methecrylate confirming to ASTM D 788. The
area of each retro- reflectory surface shall not be less than
13.00sq.cm. The slope or retro – reflectory surface shall be
35 + 5degree to base. Each reflector shall have a CIL not
less than values specified in table 2 of said MoRT&H circular
and two cylindrical polymer shanks of not less than 20mm
diameter and not less than 30mm length shall be provided
for better anchorage
1 No
(One
Number
)
TotalNo. of items in Schedule "A" - I - 10 (Ten items only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 7: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/7.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
1
6300 Sqm
(Six
Thousand
Three
Hundred
Square
metres only)
Clearing light jungles after setting out the alignment
including grubbing the root bush, wastage logs and other
debries as directed by SIPCOT Officer.
1 Sqm
(One
Square
metre)
2
6260 Cum
(Six thousand
and two
hundred and
sixty cubic
metres only)
Forming the embankment portion of road and hard shoulder
portions of road and hard shoulder portions with good
quulity of hard earth with a conveyance of 2 km belt around
SIPCOT area and filling in layers of not more than 15cm
thick well watereing, ramming and consolidation etc.
complete complting with standard specifications and as
directed by SIPCOT Officers.
1 Cum
(One
Cubic
metre)
II Formation of road to Plot No.R-14 to R-22, Plot No.A-9/S and Line marking
with stud fixing at SIPCOT Industrial Complex, Gummidipoondi
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 8: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/8.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
3
1150 Cum
(One
thousand and
one hundred
and fifty cubic
metres only)
Construction of Granular Sub - Base (GSB) to the required
compacted thickness (Drainage layer) by providing approved
coarse graded material conforming to Grading - V of Table
400 - 1 and satisfying the physical rquirement for material
for GSB as per Table 400 - 2 of MORTH Rv. - 5 including
screening, spreading in uniform layers with motor grader on
prepared surface, watering and premixing y mix in place
method with rotavator at OMC, and compacting with
Vibratory roller 80 to 100 KN static weight to achieve the
desireed density and fine dressing to rquired grade and cross
slope as directed by the SIPCOT officers etc., complete
inculding obtaining and transporting all materials from
approved quarry site to work site with all lift and lead by
mechanical transport, head load or any other mode of
transportation including cost and conveyance of all
materials, labour charges, hire charges and fuel charges for
loader, water tanker with sprinkler, motor graderr, vibratory
road rollers and all other equipments, tools and plants,
safety measures, testing required including as per the
standared specification as per clause 401 of MORTH Rev. - 5
and as directed by the SIPCOT Officers.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 9: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/9.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
4
1430 Cum
(One
thousand and
four hundred
and thirty
cubic metres
only)
Providing and Laying Spreading and compacting graded
stone aggreats to Wet Mix Macadam Base Course
of 150mm compacted thickness specification as specified on
the prepared sub base by providing approved coarse graded
material conforming to Table 400 - 13 and satisfying the
physical requirements for material for WMM as er Table 400 -
12 of MORTH Rec. - 5, including pre - mixing the aterials
with water at OMC in mechanical mix plant carriage of mixed
material by tipper to site laying in uniform layer with favours
in subbase / base course on well prepared surface and
compacting with vibratory roller to achieve the dsired
density including cost of material, labour charges, rental for
machinery, ful and all other incidental charges etc., complete
as per clause 406 of MORTH Rev. - 5 and as directed by
SIPCOT Officers.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 10: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/10.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
5
5300 Sqm
(Five
thousand
three
hundred
square
metres only)
Providing and laying single coat of low viscosity liquid
bituminous material to the absorbent WMM surface using
7.00 kg of bituminous emulsion primer having kinetic
viscosity of 30 - 60 centistokes at 60oC complying with IS
8887 for 10 sq.m. area including cost of bituminuous primer,
labour charges for preparing the surface to lay the
bituminous primer and applying required quantity of
bituminuous primer as prime coat by bituminous sprayer etc.
completer as per clause 502 of MORT & H specification and
as directed bySIPCOT Officers.
1 Sqm
(One
Square
metre)
6
9200 Sqm
(Nine
thousand two
hundred
square
metres only)
Providing and laying single coat of low viscosity liquid
bituminous material using 2.50 kg of liquid bituminous
emulsion complying with IS 8887 for 10 sq.m. area over the
WMM surface treated wih primer as tack coat, including cost
of bituminuous binder, labour charges for preparing the
surface to lay the bituminous binder for applying the
required quantity of bituminuous binder as tack coat by
bituminous sprayer etc. completer as per clause 503 of
MORT & H specification and as directed bySIPCOT Officers.
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 11: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/11.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
7
645 Cum
(Six hundred
and Fourty
five cubic
meter only)
Providing and laying 50 mm compacted thickness Dense
Bituminous Macadam using 0.24 cum of 26.50 - 13.20 mm
IRC size graded metal 0.25 cum of 13.20 - 2.36 mm IRC
graded metal and 0.23 cum of 2.36 mm and below IRC size
HBG metal with 53.20 kg of VG30 / VG40 bitument for
premixing for 10 sq.meter including cost and conveyance of
all materials to CMP site heating the bitumen and other
materials to CMP site heating temperature and mixing them
n required temperature in cntral hoti mix plant 20-30 tonnes
capacity, conveying the mix by tipper trucks to paver site,
spreading the mix in required temperature for uniform
thickness of 50mm with mechanical paver to the specified
grades and cross sections and compaction by bibratiry
Pneumatic Roller to the required density etc., including
labour charges for loading the bitumen in bitumen tank and
metal to feeder unit, lobour for attending to paver site etc.,
including hire, fuel charges for 20-30 tonnes capacity CMP
unit bitumen boiler, tipper trucks, paver finisher / 9 m paver
fininsher, vibratary / Pneumatic Roller, and all other tools &
plants required including fuel and all other incidental charges
etc., complete as per specification using CMP as per clause
505 MORTH Rec. V specification and as per directed SIPCOT
Officers.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 12: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/12.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
8
9200 Sqm
(Nine
thousand two
hundred
square
metres only)
Providing and laying single coat of low viscosity liquid
bituminous materials using 2.00 Kg of liquid bituminous
emulsion complying with ISS 8887 for 10 sqm. area over the
DBM surface as tack coat, including cost of Bituminuous
binder, labour charges for preparing the surface to lay the
bituminous primer for applying the required quantity of
bituminous binder as tack coat by bituminous sprayer etc.,
Complete as per clause 503 of MORT & H specification and
as directed by SIPCOT Officers.
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 13: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/13.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
9
370 Cum
(Three
hundred and
seventy cubic
metres only)
Providing and laying 40mm compacted thickness bituminous
concrete using 0.13 cum of 19.0 - 9.5 mm graded IRC size
HBG metal 0.17 cum of 9.5-2.36mm IRC graded metal and
0.26 Cum. of 2.36 mm and below size graded metal with
50.30 of bitumen grade VG 30/VG40 confirming to IS 73 for
pre mixing for 10 Sq. meter and using materials as per table
500 - 17 and staifying the physical requirement for material
for course aggregates for BC as per table 500 - 16 of MORTH
REV-V including cost and conveyance of all materials to CMP
site , heating the bitumen andaggregates to required
temperature and mixing them in required temperature in
central hot mix plant 20-30 tonnes capacity, conveyin the
mix by tipper trucks to paver site spreading the mix in
required temperature for uniform thickness of 40mm with
mechanical paver to the specified grades and cross sections
and consolidation 80-100 kn vibratory/Pneumatic road roller
to the required density etc., includinglabour charges for
loading the bitumen in bitumen tank and metal to feeder
unit, labour for attending to paver site etc., including hire,
fuel charges for 20-30 tonnes capacity CMP unit bitumen
boiler, tipper trucks, paver finaisher/9 m paver finisher
/Vibratory/Pneumatice road roller , and all other tools and
plants requried, including fuel and all other incidental
charges etc., complete as per specification using CMPP as
per clause 507 OF MORTH REV. specification and as directed
by SIPCOT Officers.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 14: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/14.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
10
4280 Sqm
(Four
thousand and
wo hundred
and eighty
square
metres only)
Providing and laying of hot applied thermo plastic compound
2.5 mm thick including refletorising glass beads @ 250 gms
per Sq.m. area, thickness of 2.50 mm is exclusive of
surface applied glass beads as per IRC : 35. The finished
surface to be level, uniform and free from streaks and holes
etc., complete as per MORTH Specification No. 803 and as
directed by SIPCOT officers .
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 15: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/15.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
11
1700 Nos
(One
thousand ans
seven
hundred
Numbers
only)
Providing and fixing reflective Road studs of category 'B'
Raised pavement markers made out of poly carbonate / ABS
moulded body and reflective panels (bi-convex reflectors)
with micro prismatic lens capable of providing total internal
reflection of the light entering the lens face with retro-
reflectance and chromaticity values conforming to ASTM
D4280. The reflective raised pavement markers shall also
confirm to the MORTH circular No.RW / NH.
33023/10/97.DO.III dt. 11.06.97 and the length, height and
width of the body shall not be less than 100 mm, 15 mm and
90 mm and base of marker shall be flat within 1.3 mm. The
marker shall supplort a load of 13635 kg tested in
accordance with ASTM D4280. Lenses shall be moulded of
Polycarbonate or methyl methecrylate conforming to ASTM
D788. The area of each retro - reflectory surface shall not
be less than 13.0 sq.cm. The slope or retro - reflectory
surface shall be 35 + 5 degree to base. Each reflector shall
have a CIL not less than values specified in table 2 of said
MORT &H circular and two cylindrical Polymer Shanks of not
less than 20 mm diameter and not less than 30 mm length
shall be provided for better anchorage.
1 No
(Each)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 16: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/16.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
12
60 Rm (Sixty
running
metres only)
Supplying and laying of 300 mm dia. RCC non pressure spun
pipes with socket and spigot ends - NP 3 class as per IS
458/2003 manufactured with sulphate resistance cement
with 12 mm Hi- alumina lining with rubber rings including
labour charges for laying at proper levels and locations as
directed by Engineer in charge, transportation cost, jointing
materials, etc. complete as per standard specification and
as directed by SIPCOT Officers.
1 Rm
(One
running
metre)
13
1685 Cum
(One
thousand and
six hundred
and eighty
five cubic
metres only)
Earth work excavation for side drain work in all classes of
soils such as hard stiff clay, stiff black cotton soil, hard red
earth, shales, murram, gravel, stoney earth and earth mixed
with small size boulders etc. except hard rock requiring
blasting as per SS 20-B (HGS SS.20.B.) and depositing the
same to the road side as directed by Engineer in charge etc.
complete as per standard specification and as directed by
the SIPCOT officers.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 17: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/17.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
14
9 Cum (Nine
cubic metres
only)
Providing plain Cement Concrete 1:4:8 (One cement, Four
sand and eight aggregate) using 40mm size Hard broken
granite stone jelly for foundation, flooring bed, dummy
columns, mudmat below column footings, Grade beams etc.
laid in layers not exceeding 15cm thick including cost and
conveyance of all materials and labour to work site, mixing
of concrete, laying, compacting, curing with all leads for soft
potable water, hire and fuel charges for all tools and plants
including all other incidental charges such as bailing out
water for forming protective bunds, coffer dams and shoring,
strutting etc. complete complying with standard
specifications and as directed by "SIPCOT" officers. (in all
heights and all depths)
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 18: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/18.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
15
Supplying and erecting form work for steel centering for
sides and soffits including supports and strutting upto a
height of 3.90m in all floors for RCC slabs, beams TEE or
EL beams, lintels, stair case beams, side walls etc., with all
cross bracings using mild steel BG 10 sheets of size 90 cm x
60 cm stiffened with welded mild steel angles of size 25mm
x 25mm x 3mm laid over silver oak (country wood) joists of
size 10cm x 6.5cm spaced at about 90cm centre to centre
and supported by casurina props of 10 cm to 13cm dia
spaced at 75cm centre to centre etc., Complete complying
with standard specification and as directed by SIPCOT
Officers.
a
190 Sqm
(One hundred
and ninety
square
metres only)
For Vertical surfaces 1 Sqm
(One
square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 19: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/19.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
b
38 Sqm
(Thirty eight
square
metres only)
For Plane surfaces 1 Sqm
(One
square
metre)
16
58 Qtl (Fifty
eight quintal
only)
Supplying, Fabricating and placing in position steel
reinforcement grills using M.S. / R.T.S. rods of all sizes of
reinforcement for all Reinforced cement concrete works
including cost and conveyance of steel, binding wire,spacer
bars, cover blocks, labour charges for unbending of rods,
straighteing, cutting, fabricating, tying, lifting, placing in
position, overlaping to the required length whereever
necessary cover blocks and all other incidental charges etc.
complete complying with standard specifications and as
directed by "SIPCOT" officers. (The steel rods must be Fe
415 grade of any brand with ISI marking and necessary test
certicate to be produced before using it at site)
1 Qtl
(One
qunital
only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 20: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/20.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
17
55 Cum (Fifty
five cubic
metres only)
Providing Reinforced Cement Concrete M-25 Design mix
(One cement, One and a half sand and three jelly) using
Machine crushed 10 mm & 20mm size Hard Broken granite
ISS stone Jelly for all RCC including cost and conveyance of
all materials and labour to work site excluding cost of
centering, shuttering, strutting and cost of MS / RTS
Reinforcement grills placed in position but including machine
mixing of concrete, laying, vibrating with mechanical
vibrators, finishing, curing, etc., complete and as directed by
SIPCOT officers etc. complete complying with standard
specifications and as directed by "SIPCOT" officers.
1 Cum
(One
cubic
metre)
18
9 Sqm (Nine
square
metres only)
Painting two coats of black and white bands alternatively
each coat separately using black and white enamel paints of
approved quality including cost and conveyance of paint,
painting articles and utencils, labour charges etc., complete
complying with standard specification and as directed by
SIPCOT officers.
1 Sqm
(One
square
metre)
TotalNo. of items in Schedule "A" - I - 18 (Eighteen items only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 21: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/21.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
1
6100 Sqm
(Six thousand
and One
Hundred
Square
metres only)
Clearing Light jungle after setting out the alignment
including grubbing the root bush, waste logs and other
debries as directed by the Engineer in charge for clearing
and including all other incidental charges, etc. complete as
per standard specification.
1 Sqm
(One
Square
metre
only)
IIIImprovement and strengthening of existing roads (Balance roads) at SIPCOT Industrial Complex,
Cuddalore
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 22: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/22.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
2
2550 Cum
(Two
thousand and
five hundred
and fifty
Cubic meters
only)
Construction of Granular Sub - Base (GSB) to the required
compacted thickness (Drainage layer) by providing approved
Coarse graded material conforming to Grading- V of Table
400 - 1 and satisfying the physical requirement for material
for GSB as per Table 400 - 2 of MORTH Rev.-5 including
screening, spreading in uniform layers with motor grader on
prepared surface, watering and premixing by mix in place
method with rotavator at OMC, and compacting with
Vibratory roller 80 to 100 KN static weight to achieve the
desired density and fine dressing to required grade and
cross slope as directed by the SIPCOT officers etc.,
complete including obtaining and transporting all materials
from approved quarry site to work site with all lift and lead
by mechanical transport, head load or any other mode of
transporation including cost and conveyance of all materials,
labour charges,hire charges and fuel charges for loader,
water tanker with sprinkler,motor grader, vibratory road
rollers and all other equipments, tools and plants, safety
measures, testing required including all other incidental
charges, etc., complete as per the standard specification as
per clause 401 of MORTH Rev.-5 and as directed by the
SIPCOT officers.
1 Cum
(One
Cubic
metre
only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 23: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/23.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
3
1065 Cum
(One
thousand and
sixty five
Cubic meters
only)
Providing and laying, spreading and compacting graded
stone aggreates to Wet Mix Macadam Base Course of
250mm compacted thickness specification in two layers of
125mm thick each or else as specified on the prepared sub
base by providing approved Coarse graded material
conforming to Table 400 - 13 and satisfying the physical
requirement for material for WMM as per Table 400 - 12 of
MORTH Rev.-5, including pre-mixing the materials with
water at OMC in mechanical mix plant carriage of mixed
matrerial by tipper to site laying in uniform layers with
favours in subbase/ base course on well prepared surface
and compacting with vibratory roller to achieve the desired
density including cost of material, labour charges, rental for
machinery, fuel and all other incidental charges etc.,
complete as per clause 406 of MORTH Rev.-5 and as
directed by SIPCOT Officers.
1 Cum
(One
Cubic
metre
only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 24: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/24.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
4
4300 Sqm
(Four
thousand
three
hundred
square
metres only)
Providing and laying single coat of low viscosity liquid
bituminous material to the absorbent WMM surface using
7.00kg of bituminous emulsion primer having Kinetic
viscosity of 30-60 centistokes at 60oC complying with IS
8887 for 10 sq.m. area including cost of bituminous primer,
labour charges for preparing the surface to lay the
bituminous primer and applying required quantity of
bituminuous primer as prime coat by bituminous sprayer etc.
Complete as per clause 502 of MORT & H specification and
as directed by SIPCOT Officers.
1 Sqm
(One
Square
metre)
5
13000 Sqm
(Thirteen
Thousand
Square
metres only)
Providing and laying single coat of low viscosity liquid
bituminous material using 2.50 Kg of liquid bituminous
emulsion complying with ISS 8887 for 10 sqm. area over the
WMM surface treated with primer as tack coat, including cost
of Bituminuous binder, labour charges for preparing the
surface to lay the bituminous binder for applying the
required quantity of bituminous binder as tack coat by
bituminous sprayer etc., Complete as per clause 503 of
MORT & H specification and as directed by SIPCOT Officers.
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 25: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/25.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
6
660 Cum
(Six hundred
and sixty
Cubic metres
only)
Providing and laying 50mm compacted thickness dense
bituminous macadam using 0.35 cum of 26.5 -13.2mm IRC
size graded metal 0.21 cum of 13.20 - 2.36mm IRC graded
metal and 0.14 cum of 2.36mm and below IRC size HBG
metal with 0.010 cum. of stone dust as filling materilas and
49.50 kg of bitumen grade 60/70 for premixing for 10
Sq.meter includin cost and conveyance of all materials to
CMP site including cost and conveyance of bitumen and
other materilas to CMP site heating the bitumen and
aggregates to required temperature and mixing them in
required temperature in central hoti mix plant 20-30 tonnes
capacity, conveying the mix by tipper trucks to paver site,
spreading the mix in required temperature for uniform
thickness of 50mm with mechanical paver to the specified
grades and cross sections and compaction by 8-10 tonnes
power roller to the required density etc., including labour
charges for loading the bitumen in bitumen tank and metal
to feeder unit, labour for attending to paver site etc.,
including hire,fuel charges for 20-30 tonnes capacity CMP
unit bitumen boiler, tipper ttrucks, paver finisher, vibrating
roller rolling, and all other incidentakl charegs etc., complete
asper standard specification and as per specification of
MORTH V.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 26: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/26.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
7
13900 Sqm
(Thrirteen
thousand nine
hundred
square
metres only)
Providing and laying single coat of low viscosity liquid
bituminous materials using 2.00 Kg of liquid bituminous
emulsion complying with ISS 8887 for 10 sqm. area over the
DBM surface as tack coat, including cost of Bituminuous
binder, labour charges for preparing the surface to lay the
bituminous primer for applying the required quantity of
bituminous binder as tack coat by bituminous sprayer etc.,
Complete as per clause 503 of MORT & H specification and
as directed by SIPCOT Officers.
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 27: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/27.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
8
560 Cum
(Five hundred
and sixty
cubic metres
only)
Providing and laying 40mm compacted thick Bituminous
Concrete (BC) using 0.13 cum of 19.00 - 9.50mm graded
metal, 0.17 cum of 9.50 - 2.36mm IRC graded metal and
0.26 Cum. of 2.36 mm and below IRC graded metal with
50.30Kgs. of bitumen of grade VG-30/ VG-40 coforming to
IS:73 for premixing per 10sq.m. and using material as per
Table 500 - 17 (BC) and satisfying the physical
requirement for material for coarse aggregate for BC as per
Table 500 - 16 of MORTH Rev.-5 including cost and
conveyance of all materials to CMP site, heating the bitumen
and aggregates to the required temperature and mixing
them in required temperature in Central Hot Mix Plant 20-30
tonnes capacity, conveying the mix by tipper trucks to paver
site, spreading the mix in required temperature for uniform
thickness of 40mm with mechanical paver to the specified
grades and cross sections and consolidated by 80-100KN
vibratory/pneumatic road roller to the required density etc.,
including labour charges for loading bitumen into bitumen
tank and metal to feeder unit, labour for attending to paver
site etc., including hire charges and fuel charges for 20 - 30
tonnes CMP with bitumen boiler, tipper trucks, paver
finisher/ 9 m paver finsher, vibratory / pneumatic road
rollers and all other tools and plant required including fuel
and all other incidental charges, etc., complete as per
specification using CMP as per clause 507 of MORTH Rev-5
specification and as directed by SIPCOT Officers.
1 Cum
(One
Cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 28: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/28.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
9
710 Sqm
(Seven
hundred and
ten Square
metres only)
Providing and laying of hot applied thermo plastic compound
2.5 mm thick including refletorising glass beads @ 250 gms
per Sq.m. area, thickness of 2.50 mm is exclusive of
surface applied glass beads as per IRC : 35. The finished
surface to be level, uniform and free from streaks and holes
etc., complete as per MORTH Specification No. 803 and as
directed by SIPCOT officers .
1 Sqm
(One
Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 29: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/29.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
10
500 Nos
(Five hundred
Numbers
only)
Providing and fixing reflective Road studs of category 'B'
Raised pavement markers made out of poly carbonate / ABS
moulded body and reflective panels (bi-convex reflectors)
with micro prismatic lens capable of providing total internal
reflection of the light entering the lens face with retro-
reflectance and chromaticity values conforming to ASTM
D4280. The reflective raised pavement markers shall also
confirm to the MORTH circular No.RW / NH.
33023/10/97.DO.III dt. 11.06.97 and the length, height and
width of the body shall not be less than 100 mm, 15 mm and
90 mm and base of marker shall be flat within 1.3 mm. The
marker shall supplort a load of 13635 kg tested in
accordance with ASTM D4280. Lenses shall be moulded of
Polycarbonate or methyl methecrylate conforming to ASTM
D788. The area of each retro - reflectory surface shall not
be less than 13.0 sq.cm. The slope or retro - reflectory
surface shall be 35 + 5 degree to base. Each reflector shall
have a CIL not less than values specified in table 2 of said
MORT &H circular and two cylindrical Polymer Shanks of not
less than 20 mm diameter and not less than 30 mm length
shall be provided for better anchorage.
1 No
(Each)
TotalNo. of items in Schedule "A" - II - 10 (Ten items only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 30: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/30.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
1
13500 Sqm
(Thirteen
Thousand
Five Hundred
Square meter
only)
Painting two coats of black and white bands alternatively
each coat separtely using black and white enamel paints of
approved quality including cost and conveyance of paint,
painting articles and utencils labour charges etc., Complete
complying with standard specification and as dircted by
SIPCOT Officers.
1 Sqm
(One
Square
metre
only)
2
1163 Cum
(One
Thousand
One Hundred
and Sixty
Three Cubic
meter only)
Desilting of Existing RCC Drain
1 Cum
(One
Cubic
metre
only)
IV Painting of kerb wall and de-silting of side drain in main roads and
secondary roads at SIPCOT Industrial Park, Thervoykandigai
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 31: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/31.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
3
1163 Cum
(One
Thousand
One Hundred
and Sixty
Three Cubic
meter only)
Disposal of the Desilted Earth to a distance of 10 Km from
the site including loading charges as instructed by the
SIPCOT Officers.
1 Cum
(One
Cubic
metre
only)
TotalNo. of items in Schedule "A" - IV - 3 (Three items only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 32: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/32.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
1 16500 Sqm
(Sixteen
thousand and
five hundred
square
metres only)
Clearing and grubbing road land including uprooting wild
vegetation, grass, bushes, shrubs, saplings and trees of girth
upto 300mm, removal of stumps of such trees cut earlier
and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, upto a lead of
1km including removal and disposal of top organic soild not
exceeding 150mm in thickness as per Technical Specification
Clause 201.
1 Sqm
(Square
metre)
2 750 Cum
(Seven
hundred and
fifty cubic
metres only)
Quarrying, Wedging and Chiseling the hard rock measured in
solid and removing them away from site where blasting is
prohibiteed etc., complete as per standard specification and
as directed by SIPCOT Officers.
1 Cum
(One
cubic
metre)
3 7187 Cum
(Seven
thousand and
one hundred
and eighty
seven cubic
metres only)
Earth work excavation in all types of soils for the
construction of roadway embankment to the required line,
grade, slope and level including stacking reusable materials
and disposal of unwanted excavated material and all lift as
per Technical Specification clause 301 of MORT&H
specifications complete and as directed by SIPCOT Officers
FOR CUTTING
1 Cum
(One
cubic
metre)
V Forming Internal road (Below tower line) at SIP, Gurubarapalli
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 33: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/33.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
4 7187 Cum
(Seven
thousand and
one hundred
and eighty
seven cubic
metres only)
Filling Utilising the cutting earth for the construction of
roadway embankment to the required line, grade, slope and
level using Vibratory roller water sprinkler etc., including
stacking reusable materials and disposal of unwanted
excavated material with a lead of 1 Kms. and all lift as per
Technical Specification clause 301 of MORT&H specifications
complete and as directed by SIPCOT Officers. - For
Compaction.
1 Cum
(One
cubic
metre)
5 8276 Cum
(Eight
thousand and
two hundred
and seventy
six cubic
metres only)
Formation of Embankment with approved selected material
from borrow areas to the required line, grade and level,
compacted to 95% of modified proctor MDD using Vibratory
roller and as per technical specifications/Clause 305 of
MORT&H specifications etc., complete including all leads and
lifts and labour as per the technical specification etc
complete and as directed by the SIPCOT Officers - FOR
FILLING
1 Cum
(One
cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 34: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/34.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
6 2650 Cum
(Two
thousand and
six hundred
and fifty cubic
metres only)
Granular Sub-base with Graded Material (Table:- 400-1)
Plant Mix Method: Construction of granular sub-base 200mm
thick by providing close graded Material, mixing in a
mechanical mix plant at OMC, carriage of mixed Material to
work site, spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory power roller
to achieve the desired density, complete as per clause 111,
112, 401 & 900 of MORTH Vth Revision etc.,complete - for
grading- V Material
1 Cum
(One
cubic
metre)
7 2100 Cum
(Two
thousand and
one hundred
cubic metres
only)
Wet Mix Macadam (Table 400-13): Providing, laying,
spreading and compacting graded stone aggregate to wet
mix macadam specification 250mm thick including premixing
the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform
layers with paver in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density, as per clause 111, 112, 406 &
900 of MORTH Vth Revision etc.,complete as directed by the
SIPCOT Officers.
1 Cum
(One
cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 35: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/35.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
8 8400 Sqm
(Eight
thousand and
four hundred
square
metres only)
Providing and applying primer coat with bitumen emulsion
(SS-I type) on prepared surface of granular Base including
clearing of road surface and spraying primer at the rate of
7.0 kg/ 10sqm using mechanical means as per clause 111,
112, 502 & 900 of MORTH Vth Revision - over WMM/ WBM
as directed by SIPCOT Officers.
1 Sqm
(Square
metre)
9 8400 Sqm
(Eight
thousand and
four hundred
square
metres only)
Providing and applying tack coat with bitumen emulsion (RS-
I type) using emulsion pressure distributor at the rate of
2.50 kg per 10 sqm on the prepared bituminous/granular
surface cleaned with mechanical broom as per clause 111,
112, 503, 900 of MORTH Vth Revision - over granular
surfaces treated with primer
1 Sqm
(Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 36: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/36.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
10 630 Cum (Six
hundred and
thirty cubic
metres only)
Dense Graded Bituminous Macadam (Table - 500-10):
Providing and laying dense bituminous macadam 75mm
thick with Hot Mix Plant using crushed aggregates of
specified grading, premixed with bituminous binder
(Viscosity Grade 40) at percentage specified by JMF by
weight of total mix of mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher to the
required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MoRTH specification clause No.111, 112,
501, 505 & 900 Grading II as directed by SIPCOT Officers.
1 Cum
(One
cubic
metre)
11 8400 Sqm
(Eight
thousand and
four hundred
square
metres only)
Providing and applying tack coat with bitumen emulsion (RS-
I type) using emulsion pressure distributor at the rate of 2kg
per 10 sqm on the prepared bituminous/granular surface
cleaned with mechanical broom as per clause 111, 112, 503,
900 of MORHT Vth revision - over Granular Surfaces trated
with primer as directed by SIPCOT Officers.
1 Sqm
(Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 37: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/37.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
12 333 Cum
(Three
hundred and
thirty three
cubic metres
only)
Bituminous Concrete (Table 500-17): Providing and laying
bituminous concrete 40mm thick with hot mix plant using
crushed aggregates of specified grading, premixed with
bituminous binder (Viscosity Grade-40) at percentage
specified by JMF of mix and filler, transporting the hot mix to
work site, laying with a hydrostatic paver finisher to the
required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MORTH specification clause No. 111, 112,
501, 507 & 900 of MORTH vth Revision complete in all
respects - Grading II as directed by SIPCOT Officers.
1 Cum
(One
cubic
metre)
13 1190 Cum
(One
thousand and
one hundred
and ninety
cubic metres
only)
Providing and laying of Carted Earth including cost and
conveyance of the same to worksite with an average lead of
5 Kms. including stacking the same to departmental gauge
for premeasurement including all labour charges for laying,
spreading etc., complete and as directed by the SIPCOT
Officers. for making up of low berms.
1 Cum
(One
cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 38: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/38.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
14 386 Sqm
(Three
hundred and
eighty six
square
metres only)
Providing and laying of hot applied Thermoplastic compound
2.5mm thick including reflectorising glass beads @ 250gms
per Sqm area, thickness of 2.5mm is exclusive of surface
applied glass beads as per IRC:35. The finished surface to
be level, uniform and free from streaks and holes etc.,
complete as directed by SIPCOT Officers.
1 Sqm
(Square
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 39: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/39.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
15 320 Nos
(Three
hundred and
twenty
Numbers
only)
Providing and fixing reflective road studs of category 'A'
Raised pavement markers made out of polycarbonate/
methyl methecrylate/ ABS moulded body confirming to
ASTM D 788 and reflective panels with microprismatic lens
capable of providing total internal reflection of the light
entering the lens face with retro-reflectance and
chromaticity values conforming to ASTM D4280. The
Reflective raised pavement markers shall also confirm to the
MORTH circular No RW/NH.33023/10/97 DO.III dt 11.06.97.
The height, width and length shall not be less than 15mm,
90mm and 100mm and with minimum reflective area of 13
sq.cm. on each side and the slope to the base shall be 35+/-
5 decree. Each reflector shall have a CIL not less than values
specified in Table 2 of said MORTH circular. The strength of
detachment of the integrated cylindrical shanks, (of diameter
not less than 19+/-2mm and height not leass than 30+/-
2mm) from the body is to be minimum value of 500 Kgf.
Fixing will be by drilling holed on the road for the shanks to
go inside, without nails and using epoxy resin based
adhesive as per manufacturer's recommendation and
complete as directed by the engineer. The marker shall
support a load of 13635 Kg tested in accordance with ASTM
D4280 and confirming to IRC 35-2015 guidelines and
MORT&H specification 804 etc., complete as directed by
SIPCOT Officers.
1 Nos
(Each)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 40: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/40.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
16 120 Nos (One
hundred and
twenty
Numbers
only)
Supply and installation of Delineators (road way indicators,
hazard markers and object markers) 80-100 cm high above
ground level, painted at alternatively black and white in 15
cm wide strips, fitted with 80 x 100 mm rectangular or 75
mm dia Circular reflectorised panels at the top, buried or
pressed into the ground and confirming to IRC -79 etc.,
complete as directed by SIPCOT Officers.
1 Nos
(Each)
17 290 Cum
(Two hundred
and ninety
cubic metres
only)
Earth work excavation in all classes of soil except hard rock
requiring blasting and depositing on bank as per SS20B with
all leads and lifts and all other incidenal charges such as
baling out water shoring shrutting, walling & forming
protective bunds wherever necessary etc., complete as per
relevant standard specification and as directed by SIPCOT
Officeers (For CULVERT)
1 Cum
(One
cubic
metre)
18 23 Cum
(Twenty three
cubic metres
only)
Supplying and filling with M-sand including cost and
conveyance of sand and labour for filling, leveling, watering
and tamping for foundation
1 Cum
(One
cubic
metre)
19 22 Cum
(Twenty two
cubic metres
only)
Plain Cement Concrete 1 : 4 : 8 (One cement, four sand and
eight aggregates) using 40 mm HBGS stone jelly excluding
cost of mixing charges, laying and curing of concrete etc.,
complete with standard specification and as directed by
SIPCOT Officers. (For Base Course of Culvert)
1 Cum
(One
cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 41: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/41.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
20 Supplying and erecting steel centering for sides and soffits
including supports and shuttering to the required height for
RCC items using MS sheets or suitable size 25 mm x 25mm
x 3 mm of boarding, laid over silver oak joints of size 10 cm
x 6.50 cm spaced at 90 cm c/c and supported by casurina
props of 10cm to 13cm dia spaced at 75cm c/c complying
with standard specifications etc., complete and as directed
by SIPCOT Officers.
a 454 Sqm
(Four
hundred and
fifty four
square
metres only)
Vertical surface 1 Sqm
(One
square
metre)
b 54 Sqm (Fifty
four square
metres only)
Plain surface 1 Sqm
(One
square
metre)21 145 Qtl (One
hundred and
forty five
quintals only)
Supply, fabricating and placing in position of HSD steel rods
for reinforcement including the cost of steel and binding wire
etc., complete and as directed by SIPCOT Officers.
1 Qtl
(One
quintal)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 42: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/42.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
22 145 Cum
(One hundred
and forty five
cubic metre
only)
Reinforced cement concrete 1:1.5:3 ( one cement, one and
half sand and three aggregates) using 20mm HBGS stone
jelly excluding coat of reinforcement , centering, shuttering,
strutting, but including cost of mixing concrete, placing,
vibrating, with mechanical vibrator, finishing, curing etc.,
complete with standard specification and as directed by
SIPCOT Officers (For Culvert)
1 Cum
(One
cubic
metre)
23 10 Sqm (Ten
square
metres only)
Painting Two coats of Enamel paint over one coat priming
coat including cost of materials and labour charges etc.,
complete as directed by SIPCOT Officers
1 Sqm
(One
square
metre)24 1930 Cum
(One
thousand and
nine hundred
and hirty
cubic metres
only)
Earth work excavation and depositing on bank with initial
lead 10m and lift of 2m in hard stiff clay block bottom hard
red earth mixed with small size boulders for foundation
except hard rock requiring blasting etc., complete with
standard specification and as directed by SIPCOT Offciers
(For Drain).
1 Cum
(One
cubic
metre)
25 215 Cum
(Two hundred
and fifteen
cubic metres
only)
Plain Cement Concrete 1:4:8 (one cement, Four sand and
eight aggregates) using 20mm HBGS stone jelly excluding
cost of mixing charges, laying and curing of concrete etc.,
complete with standard specification and as directed by
SIPCOT Officers. (For Base Course of Drain).
1 Cum
(One
cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 43: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/43.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
26 3822 Sqm
(Three
thousand and
eight hundred
and twenty
two square
metres only)
Supplying and erecting steel centering for sides and soffits
including supports and shuttering to the required height for
RCC items using MS sheets or suitable size 25 mm x 25mm
x 3 mm of boarding, laid over silver oak joints of size 10 cm
x 6.50 cm spaced at 90 cm c/c and supported by casurina
props of 10cm to 13cm dia spaced at 75 cm c/c complying
with standard specifications etc., complete and as directed
by SIPCOT Officers.
1 Sqm
(One
square
metre)
27 625 Cum (Six
hundred and
twenty five
cubic metres
only)
Plain Cement Concrete 1:1.5:3 (One cement, One and half
sand and three aggregates) using 20mm HBGS stone jelly
including cost of all materials mixing concrete, vibrating with
mechanical vibrator, finishing, curing etc., complete with
standard specification and as directed by SIPCOT Officers.
(For Drain side walls)
1 Cum
(One
cubic
metre)
28 RCC kerb wall 0.75m (0.45 m above GL and 0.30 m below
GL) with a width of 0.20 m vertical side and 0.15m bottom
etc., complete and as directed by SIPCOT Officers.
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 44: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/44.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
a 1120 Rm
(One
thousand and
one hundred
and twenty
running
metres only)
Both sides 1 Rm
(One
running
metre)
29 730 Sqm
(Seven
hundred and
thirty square
metres only)
Painting two coats of enamal paint at over one coat of
priming coat including cost of materials and labour charges
etc., complete as directed by SIPCOT Officers.
1 Sqm
(Square
metre)
TotalNo. of items in Schedule "A" - VI - 29 (Twenty nine items only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 45: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/45.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
1 Supply, delivery and erection of 10 metre height Hot Dip
Galvanized Octogonal Poles with 150 mm bottom A/F & 70
mm top A/F made up of 3 mm thick HT sheet along with
base plate of size 240 x 240 x 16 mm along with 1000 mm
long Double/Single arm braket made up of 40 NB GI Pipe,
Backeite sheet connectors for fixing of street light fittings
including 4 Nos of M20 mm dia. MS " J "bolts of size 750
mm long top - EN8 grade foundation bolts along with
Template for the above poles & Terminals suitable for the
same etc., complete.
40 Nos (Forty
Numbers
only)
For Single Collar Poles 1 No
(Each)
VI Providing Street light arragements to Gurubarapalli Krishnagiri District.
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 46: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/46.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
2 Supply, installation, testing and commissioning of following
capacity of LED street / Flood lights. Housing made of Die -
Casting aluminum with silver / Grey Powder Coated, Diffuser
should be clear Heat Resistant toughened glass and IK08
with IP 66 Protection, system efficacy should be > 100 Lm /
W, System Having 5 KV Surge, Operating voltage range of
120 V - 270 V AC and frequency 50 Hz, Power factor 0.95,
THD < 10%, LED Chip should be High power and Each LED
should be > 2 watts, Each LED with Individual lens, LED Life
50000 Burning Hours as per L70, CCT Range 5000K - 6000
K, CRI >70 and make of LED CREE / OSRAM / NICHIA and
Driver should be potted type constant current LED Driver
with 4 KV Inbuilt surge, Driver Efficiency > 85%, Driver
having High voltage, short circuit protection and Driver
should be with BIS certified with R number. The fixture shall
be conforming to Latest Indian standards or International
standards. LEDs comply to the Photo biological safety
standards as per IEC62471 and RoHs. The fixtures shall be
outdoor type. LM79 report from NABL Accredited Lab and
LM80 Report from LED chip manufacture to be submitted
etc. complete and as directed by SIPCOT Officers.
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 47: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/47.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
40 Nos (Forty
Numbers
only)
90 W LED fiitings 1 No
(Each)
3Providing foundation arrange ments to the street light poles
as per the following provisions
a 55 Cum (Fifty
five cubic
metres only)
Earth work excavation and depositing on bank with initial
lead and lift in all soils except hard rock requiring blasting
etc., complete as per SS 20 B standard specifications and as
directed by SIPCOT Officers.
1 Cum
(One
cubic
metre)
b 5 Cum (Five
cubic metres
only)
Providing PCC 1:4:8 (One cement, Four sand and Eight
aggregates) including cost of cement and using 40mm HBG -
ISS Stone jelly and cost of mixing charges, laying and curing
of concrete etc., complete and as directed by SIPCOT
Officers.
1 Cum
(One
cubic
metre)
c 34 Cum
(Thirty four
cubic metre
only)
Reinforced cement concrete 1:1.5:3 ( one cement, one and
half sand and three aggregates ) using 20mm BGGS stone
jelly excluding coat of reinforcement , centering, shuttering ,
strutting, but including cost of mixing concrete, placing,
vibrating, with mechanical vibrator, finishing, curing etc.,
complete with standard specification and as directed by
SIPCOT officers.
1 Cum
(One
cubic
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 48: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/48.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
d 150 Sqm
(One hundred
and fifty
square
metres only)
Supplying and erecting steel centering for sides and soffits
including supports and shuttering to the required height for
RCC items using MS Sheets or suitable size 25mm x 25mm
x3mm of boarding ,laid over silver oak joists of size 10cm x
6.5cm spaced at 90 cm c/c and supported by casurina props
of 10cm to 13cm dia spaced at 75cm c/c complying with
standard specifications etc., complete and as directed by
SIPCOT Officers.
1 Sqm
(One
square
metre)
e 15 Qtl
(Fifteen
qunital only)
Supplying, fabricating and placing in position of HSD steel
rods for reinforcement including the cost of steel and binding
wire etc., complete and as directed by SIPCOT Officers.
1 Qtl
(One
qunital)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 49: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/49.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
4 2 Nos (Two
Numbers
only)
Fabrication, supply, installation, of out -door street lighting
service pillar box of size 900 mm x 900 mm x 300 mm made
by 16 SWG sheet steel metal fitted with required size of
wooden plank board, 1 No. 100 Amps main switch, 3 Nos. of
100A fuse unit, suitable copper bus bars for neutral line,
etc., complete. The pillar box fabricated with front double
door arrangements with locking facility painted with one coat
of primer and 2 coats of aluminium finish. The pillar to be
erected with suitable angle iron frame pedestal with concrete
grouting etc. complete including cost and conveyance of all
materials and labour including pedestal concrete and angle
iron frame pedestal etc., complete and as directed by
SIPCOT Officers.
1 No
(Each)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 50: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/50.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
5 2 Nos (Two
Numbers
only)
Fabrication, supply and installation of TNEB Power distribution pillar
box outdoor type of size 1250 mm x 900 mm x 300 mm made out of
16 SWG MS sheet steel with lockable door, with 1 No. 100 A TPN
rewirable fuse switch and 32 A 4 way fuse DB with 12 Nos. 63A
porcelain fuse cut-outs with 1No. copper earth link and neutral link
and 1 No. of 63 A TP Contactor with 230 V Coil and 1 No. of 24
Hours Timer of L & T make or equivalent with its contorl wiring,
power interconnection with 7/16 copper wire from main switch to
contactor and contactor to fuse DB etc., complete. The pillar painted
with one coat of red-oxide and 2 coats of aluminium finish as required
by TNEB etc., The pillar to be installed in angle iron frame pedestal
with concrete grouting etc. including cost and conveyance of all
materials and labour including pedestal concrete and angle iron
frame pedestal etc. complete and as directed by SIPCOT Officials.
1 No
(Each)
6 Supply , laying and jointing of following size of PVC armoured LTUG
Aluminium cable with ISI mark in a trench to be excavated at a depth
of 0.75 m, and routing the cable into the 90 mm dia. HDPE Pipes
laid completely and refilling the earth to make good and as per
standard specification. (Excluding the cost of HDPE Pipes and laying
the same into trenches will be extra)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 51: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/51.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
a 180 Rm (One
hundred and
eighty
running
metres only)
3 1/2 Core x 50 Sq.mm. PVC Armoured LT UG Aluminium Cable 1 Rm
(One
running
metre)
b 1700 Rm
(One
thousand and
seven
hundred
running
metre only)
4 Core x 16 Sq.mm. PVC Armoured LT UG Aluminium Cable 1 Rm
(One
running
metre)
7 430 Rm (Four
hundred and
thirty running
metres only)
Supply, laying, jointing and testing of 2 core x 1.50 sq.mm
PVC insulated SC unsheathed Cu.cable conductor cable of
1100 V grade with necessary jointing materials etc.,
complete including cost and conveyance of cable and labour
charges for laying the cable etc. complete complying with
appropriate specification / standards and as directed by
SIPCOT Officers etc. complete (PWD SED item No. 64)
1 Rm
(One
running
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 52: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/52.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
8 4 Nos (Four
Numbers
only)
Earthing as per the ISI specification with an earth electrode
of 2.10 m class "B" GI Pipe of dia. Not less than 40 mm ,
with copper earth plate of size 125 mm x 50 mm x 6 mm,
with necessary funneling arrangements and masonry work ,
38 mm RCC Cover slab for brick masonry etc., complete as
per PWD SED item No. 233 and as directed by SIPCOT
Officers.
1 No
(Each)
9 40 Nos
(Fourty
Numbers
only)
Coil earth to street light poles with 8 SWG GI wire of 11.50
mtrs. Of length in which 10 mtrs of total length compressed
in to a coil of one metre length connected suitable with
hexagonal earth bolt of size 8 mm x 25 mm welded on the
pole at one end with a coil position fixed on the earth etc.,
complete as per standard specification (PWD SED Item No.
78 ) and as directed by SIPCOT Officers.
1 No
(Each)
10 1700 Rm
(One
thousand and
seven
hundred
running
metre only)
Supply, delivery and laying of 90 mm dia HDPE Pipes
including cost and laying charges into trenches etc.,
complete as directed by SIPCOT Officers.
1 Rm
(One
running
metre)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE
![Page 53: General€Abstract SCHEDULE - 'A' Cuddalore and Gurubarapalli … · 2019-12-13 · 507 of MORT & H. 1 Cum (One Cubic metre) 7 3500 Sqm (Three Thousand Five Hundred Square meter only)](https://reader033.vdocument.in/reader033/viewer/2022041910/5e67435cee8da93175055e21/html5/thumbnails/53.jpg)
Sl.
No
Quantity Description of work TNBP
No.
Rate both in
figures and in
words
(Rs.)
Unit Amount
(Rs.)
1 2 3 4 5 6 7
11 90 Rm
(Ninety
running
metres only)
Supply, delivery and laying of 50 mm OD - 4 Kg/cm2 PVC Rigid
Pipes including cost and laying charges into Pole pillars for
connecting cable into Poles etc., complete as directed by SIPCOT
Officers.
1 Rm
(One
running
metre)
TotalNo. of items in Schedule "A" - VI - 11 (Eleven items only)
CONTRACTOR
No. of Corrections ...............
No. of over writtings ...............
CE