TRANSCRIPT

  • 7/31/2019 Generation Tariff

    1/31

  • 7/31/2019 Generation Tariff

    2/31

    Agenda

    Overview of Regulatory SetupOverview of Regulatory Setup

    Determination of Regulated TariffDetermination of Regulated Tariff

    Tariff setting Through CompetitiveTariff setting Through Competitive

    Bidding processBidding process

    2

    Short Term Trading of PowerShort Term Trading of Power Key RegulationsKey Regulations

    Commercial IssuesCommercial Issues

  • 7/31/2019 Generation Tariff

    3/31

    Capacity charges consists ofCapacity charges consists of

    ReturnReturn on equity (ROE)on equity (ROE)

    Interest on LoanInterest on Loan

    DepreciationDepreciation

    O&M CostO&M Cost

    Generation TariffGeneration Tariff

    3

    Interest on WorkingInterest on Working CapitalCapital

    Cost of Secondary fuelCost of Secondary fuel

    Compensatory allowanceCompensatory allowance

    Energy Charges consists ofEnergy Charges consists of

    Reimbursement of cost of primaryReimbursement of cost of primary

    fuel at normative Heat Ratefuel at normative Heat Rate

  • 7/31/2019 Generation Tariff

    4/31

    Tariff NormsTariff Norms20092009--1414

    4

  • 7/31/2019 Generation Tariff

    5/31

    Norms for

    Annual Capacity Charges Recovery

    5

  • 7/31/2019 Generation Tariff

    6/31

    Return on EquityReturn on Equity

    BasicBasic RateRate ofof ReturnReturn willwill bebe 1515..55%% forfor existingexisting stationsstations

    ForFor newnew projectsprojects itit cancan bebe 1616%% subjectsubject toto completioncompletion ofof CoDCoDfromfrom investmentinvestment approvalapproval asas followsfollows::

    200200//210210//250250//300300//330330 MWMW -- 3333 monthsmonths atat 44 mthsmths intervalinterval

    500500//600600//660660 MWMW -- 4444 monthsmonths atat 66 mthsmths intervalinterval

    660660//800800 MWMW -- 5252 monthsmonths atat 66 mthsmths intervalinterval

    GasGas StationsStations >>100100MWMW -- 3030 mthmth atat 44 mthsmths intervalinterval

    6

    x ens onx ens on ro ec sro ec s -- mon smon s essess

    HydroHydro ProjectsProjects asas perper TECTEC

    PrePre TaxTax ReturnReturn toto incentiviseincentivise investmentinvestment inin sectorsector

    DebtDebt:: EquityEquity forfor newnew projectsprojects toto 7070::3030 oror actualactual whicheverwhichever isishigherhigher

    Actual equity in excess ofActual equity in excess of 3030% will be treated as normative loan% will be treated as normative loan

  • 7/31/2019 Generation Tariff

    7/31

    RepaymentRepayment equalequal toto depreciationdepreciation irrespectiveirrespective ofof actualactualrepaymentrepayment

    ToTo bebe chargedcharged fromfrom 11stst yearyear ofof CoDCoD irrespectiveirrespective ofofmoratoriummoratorium

    ActualActual WtWt.. AvAv .. RateRate ofof interestinterest atat thethe be inninbe innin ofof

    Interest on LoanInterest on Loan

    7

    eacheach yearyear

    GeneratorGenerator toto attemptattempt rere--financingfinancing forfor benefitbenefit NetNetBenefitBenefit ofof refinancingrefinancing toto bebe sharedshared inin thethe ratioratio ofof 11(gen)(gen)::22 (beneficiaries)(beneficiaries)

    RefinancingRefinancing costcost isis toto bebe borneborne byby thethe beneficiariesbeneficiaries

  • 7/31/2019 Generation Tariff

    8/31

  • 7/31/2019 Generation Tariff

    9/31

  • 7/31/2019 Generation Tariff

    10/31

  • 7/31/2019 Generation Tariff

    11/31

    Secondary Fuel Oil in Annual Fixed Cost.Secondary Fuel Oil in Annual Fixed Cost.

    NormativeNormative SecondarySecondary FuelFuel OilOil consumptionconsumption

    uptoupto TargetTarget AvailabilityAvailability levellevel

    LandedLanded costcost ofof oiloil basedbased onon actualactual ofof thethe

    11

    threethree monthsmonths..

    SecondarySecondary FuelFuel OilOil expensesexpenses willwill bebe subjectsubjecttoto annualannual adjustmentadjustment onon annualannual basisbasis basedbasedonon thethe weightedweighted averageaverage landedlanded costcost ofof oiloil

  • 7/31/2019 Generation Tariff

    12/31

  • 7/31/2019 Generation Tariff

    13/31

    Capital CostCapital Cost

    CapitalCapital costcost forfor tarifftariff basebase toto includeinclude

    ForFor existingexisting stationsstations capitalcapital costcost admittedadmitted upup toto

    3131..33..20092009..

    For new stations onFor new stations on actual cash expenditureactual cash expenditure

    13

    not include commitments & liabilities for which nonot include commitments & liabilities for which nopayment has been made)payment has been made)

    InitialInitial SparesSpares -- CoalCoal:: 22..55%%,, GasGas:: 44..00%%,, HydroHydro::

    11..55%%

    PlusPlus EstimatedEstimated CapitalCapital ExpenditureExpenditure onon cashcash basisbasis

    forfor thethe respectiverespective yearsyears ofof thethe tarifftariff periodperiod 20092009--1414

  • 7/31/2019 Generation Tariff

    14/31

    Capital CostCapital Cost

    TruingTruing upup exerciseexercise basedbased onon actualactual CAPEXCAPEX uptoupto

    3131..0303..20142014 toto bebe donedone inin 20142014--1515 GeneratorsGenerators permittedpermitted additionallyadditionally oneone moremore timetime duringduring

    20092009 --1414 priorprior toto 20132013--1414 forfor truingtruing upup

    DifferenceDifference betweenbetween tarifftariff allowedallowed andand revisedrevised afterafter TruingTruing--upup

    14

    ofof respectiverespective yearyear

    CapitalCapital CostCost prudenceprudence checkcheck ww..rr..tt benchmarkbenchmark normsnorms asas &&whenwhen publishedpublished..

    EstimatedEstimated CapitalCapital ExpenditureExpenditure forfor thethe respectiverespective yearsyears ofof

    thethe tarifftariff periodperiod 20092009 --1414 toto includeinclude AdditionalAdditional CapitalCapital ExpensesExpenses uptoupto CutCut OffOff DateDate

    ExpenditureExpenditure allowedallowed asas perper 20092009--1414 RegulationRegulation beyondbeyondCutCut OffOff DateDate

  • 7/31/2019 Generation Tariff

    15/31

    Cut Off DateCut Off Date

    DateDate byby whichwhich allall worksworks withinwithin thethe originaloriginal

    scopescope ofof workwork areare requiredrequired toto bebe completedcompleted..meansmeans 3131stst MarchMarch of of thethe yearyear closingclosing afteraftertwotwo years years of of the the yearyear of of commercialcommercialoperationoperation of of thethe project,project, andand inin casecase thethe

    15

    operationoperation inin thethe lastlast quarterquarter of of aa year,year, thethecutcut--offoff datedate shallshall bebe 3131stst MarchMarch of of thethe yearyearclosingclosing afterafter threethree yearsyears of of thethe yearyear of ofcommercialcommercial operationoperation..

    COD of StationCOD of Station Cut off DateCut off Date

    1.4.2012 to 31.12.20121.4.2012 to 31.12.2012 31.3.201531.3.2015

    1.1.2013 to 31.03.20131.1.2013 to 31.03.2013 31.3.201631.3.2016

  • 7/31/2019 Generation Tariff

    16/31

  • 7/31/2019 Generation Tariff

    17/31

  • 7/31/2019 Generation Tariff

    18/31

    60.0

    80.0

    100.0

    120.0

    140.0

    NUALFIXEDC

    HARGE

    INCENTIVE DISINCENTIVE

    108108..88%%

    117117..66%%

    91.2%91.2%

    60.0

    80.0

    100.0

    120.0

    140.0

    NUALFIXEDC

    HARGE

    INCENTIVE DISINCENTIVE

    108.8%108.8%

    1010 yrs oldyrs old

    70708585

  • 7/31/2019 Generation Tariff

    19/31

    FixedFixed ChargesCharges (inclusive(inclusive ofof incentive)incentive) payablepayable onon calendarcalendar

    monthmonth basisbasisForFor stationsstations >> 1010 yearsyears

    == (AFC(AFC xx NDMNDM // NDY)NDY) xx (PAFM(PAFM // NAPAF)NAPAF)

    ==

    Recovery of Fixed ChargeRecovery of Fixed Charge Thermal StationsThermal Stations

    == (AFC(AFC xx NDMNDM // NDY)NDY) xx 00..55 ((11..00 ++ PAFMPAFM // NAPAF)NAPAF)

    EvenEven ifif plantplant availabilityavailability forfor aa particularparticular monthmonth isis nil,nil, stationstation willwill

    recoverrecover 5050%% ofof fixedfixed chargecharge

    ProvidedProvided InIn casecase thethe plantplant availabilityavailability factorfactor achievedachieved duringduring

    aa yearyear

  • 7/31/2019 Generation Tariff

    20/31

    Norms for

    Energy Charges Recovery

    20

  • 7/31/2019 Generation Tariff

    21/31

    Operating NormsOperating NormsHeatHeat RateRate Existing StationsExisting Stations

    ExistingExisting 200200//210210//250250 MWMW 25002500

    500 MW Sub critical Units (for TDBFP 40 Kcal less)500 MW Sub critical Units (for TDBFP 40 Kcal less) 24252425

    Kcal/kWh

    BTPSBTPS 28252825

    TTPSTTPS 29502950

    TandaTanda 28252825

    Anta, Dadri, KawasAnta, Dadri, Kawas 2075 /30102075 /3010

    Faridabad, KayamkulamFaridabad, Kayamkulam 2000/29002000/2900

    AuriyaAuriya 2100/30452100/3045

    GandharGandhar 2040/29602040/296021

  • 7/31/2019 Generation Tariff

    22/31

    AuxiliaryAuxiliary PowerPower ConsumptionConsumption

    Without cooling towerWithout cooling tower With cooling towerWith cooling tower

    200 MW200 MW 8.58.5 9.09.0

    22

    .. ..

    500 (MDBFP)500 (MDBFP) 8.58.5 9.09.0

  • 7/31/2019 Generation Tariff

    23/31

    ECEC coveringcovering primaryprimary fuelfuel costcost shallshall bebe payablepayable forfor totaltotal exex--busbus energyenergyscheduledscheduled toto bebe suppliedsupplied toto thethe beneficiarybeneficiary duringduring thethe calendarcalendar month,month,atat thethe specifiedspecified energyenergy chargecharge raterate..

    EnergyEnergy chargecharge raterate ((ECECRR)) inin RsRs.. perper kWhkWh onon exex--powerpower plantplant basisbasis::

    Computation of Energy ChargeComputation of Energy Charge -- ThermalThermal

    ECRECR isis arrivedarrived atat afterafter reducingreducing GHRGHR byby heatheat fromfrom 11 mlml secondarysecondary fuelfuel

    VCR = Energy charge rate, in Rupees per kWh sent out.

    GHR = Gross station heat rate, in kcal per kWh.

    SFC = Specific fuel oil consumption, in ml/kWh CVSF = Calorific value of secondary fuel, in kCal/ml

    LPPF = Landed price of primary fuel, in Rupees per kg,

    CVPF = Gross calorific value of primary fuel, in kCal per kg,

  • 7/31/2019 Generation Tariff

    24/31

  • 7/31/2019 Generation Tariff

    25/31

    Heat RateHeat Rate Existing StationsExisting Stations

    ExistingExisting 200200//210210//250250 MWMW 25002500 No changeNo change

    500 MW Sub critical Units (for TDBFP 40 Kcal500 MW Sub critical Units (for TDBFP 40 Kcal

    less)less)

    24252425 Less by 25Less by 25

    BTPSBTPS 28252825 Less by 60Less by 60

    TTPSTTPS 29502950 Less by 25Less by 25

    TandaTanda 28252825 Less b 25Less b 25

    Kcal/kWh

    Anta, Dadri, KawasAnta, Dadri, Kawas 2075 /30102075 /3010 SameSame

    Faridabad, KayamkulamFaridabad, Kayamkulam 2000/29002000/2900 SameSame

    AuriyaAuriya 2100/30452100/3045 SameSame

    GandharGandhar 2040/29602040/2960 Increase by 40Increase by 40

    25

    TheThe CommissionCommission maymay onon itsits ownown reviserevise thethe normsnorms ofof StationStation

    HeatHeat RateRate inin respectrespect ofof anyany ofof thethe generatinggenerating stationsstations forfor whichwhich

    relaxedrelaxed normsnorms havehave beenbeen providedprovided

  • 7/31/2019 Generation Tariff

    26/31

    Heat Rate - New Stations

    Pressure Rating (Kg/cm2) 150 170 170 247 247

    SHT/RHT (0C) 535/535 537/537 537/565 537/565 565/593

    New coal based stations after 1.4.2009 6.5% margin over design HeatRate

    New gas based stations after 1.4.2009 5% margin over design Heat Rate

    New liquid fuel based stations after

    1.4.2009

    7.1% margin over design Heat

    Rate

    Type of BFP Electrical Turbine Turbine Turbine Turbine

    Max Turbine Cycle Heat rate(kCal/kWh)

    1955 1950 1935 1900 1850

    Min.Boiler Efficiency

    Sub-Bituminous Indian Coal 0.85 0.85 0.85 0.85 0.85Bituminous Imported Coal 0.89 0.89 0.89 0.89 0.89

    Max Design Unit Heat rate(kCal/kWh)

    Sub-Bituminous Indian Coal 2300 2294 2276 2235 2176

    Bituminous Imported Coal 2197 2191 2174 2135 207926

  • 7/31/2019 Generation Tariff

    27/31

    Sample TariffSample Tariff

    a cu a ona cu a on

    27

  • 7/31/2019 Generation Tariff

    28/31

    Sample Tariff CalculationSample Tariff Calculation

    Station Details & AssumptionsStation Details & Assumptions

    Coal Station (Coal Station (11XX 500500 MW)MW)

    Ant. Completed Cost:Ant. Completed Cost: Rs.Rs. 25002500 CrsCrs

    Debt: Equity:Debt: Equity: 7070:: 3030 Loan Repayment: DepreciationLoan Repayment: Depreciation

    WtgWtg. Avg. Rate of. Avg. Rate of InttIntt.:.: 99%%

    TATA:: 8585%%

    28

  • 7/31/2019 Generation Tariff

    29/31

    Sample Tariff Calculation ..contd.

    YEAR 1 2 3 4 5 6 7 8 9 10

    ROE 176 176 176 176 176 176 176 176 176 176

    DEPRECIATION 125 125 125 125 125 125 125 125 125 125

    INTEREST ONLOAN 152 141 129 118 107 95 84 73 62 50

    OILCONSUMPTION 11 11 11 11 11 11 11 11 11 11

    IWC 20 20 20 20 20 20 20 20 20 20

    CAPACITYCHARGE 549 542 534 527 520 514 507 501 496 490

    29

  • 7/31/2019 Generation Tariff

    30/31

  • 7/31/2019 Generation Tariff

    31/31

    Frequency Linked UI Rate

    600

    700

    800

    900

    1000

    0

    100

    200

    300

    400

    500

    50.2 50.1 50 49.9 49.8 49.7 49.6 49.5 49.4 49.3 49.2 49.1 49 48.9