generator transformer & unit auxiliary transformer installation 070903

Upload: bewid

Post on 02-Jun-2018

246 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    1/18

    Content

    Compilation Reference.......................................................... 1

    General Introduction and Characteristics............................. 1

    Construction Organization and Schedule........................... 4

    Preparation...........................................................................4

    Installation Process and Implementation Procedure.......... 6

    Qualit control................................................................... 1!

    Safe"Ci#ilized Construction.............................................. 16

    Compilation Reference

    0

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    2/18

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    3/18

    Item Specification Unit QTY Wt.

    n=d1 Hd1+; O)5)

    E.3 and O,phase to$er PC 4

    >.3 to$er $ith >.3 ushing7 PC *

    ain Control o0$ith 2e7 PC 1

    ?erminal o0 $ith e7 PC 1

    Control o0 of ?ap,change PC 1

    PumpJith Oil flo$ing Rela 7 PC *

    ain Conser#ator PC 1

    Pressure Relief 3al#e and Ruer PC +

    Gas Rela 'rip,proof cap PC 1

    'ehumidifier

    PC 1

    Jinding ?emperature Controller

    'ispla and atcher

    PC 1

    Signal ?hermometer Indicator and

    'ispla

    PC +

    E.3 ushing PC *

    O,Phase ushing K tie,in PC 1

    &arthing ushing 5ccessories PC 1

    Radiators Set 1?C7 are

    correct and tightM $hether taps are cleaned.

    f Jhether has sludging= $ater drop= metal chip= etc.

    'uring chec2ing of acti#e part and accessories installation= minimize the time

    acti#e part e0posed to air. ?ime shall e calculated from unscre$ing of co#er olt

    or opening #al#e for e0hausting till tan2 #acuumized. 5ir relati#e humidit shall e

    referred to control the e0pose time. anufacturer stipulates that $hen relati#e

    humidit8!;= e0pose deniedM $hen at 6!;,8!;= e0pose time shall e less than

    1+ hoursM $hen 6!;= e0pose time shall not e0ceed 16 hours.

    !.+.8 Installation of ain 5ccessories

    a. Installation of 5scending ?o$er

    Chec2 C? efore installation. ount ascending to$er as per series numer on

    products. a2e sure the C? nameplate face outside of oil tan2 and place air loc2 at

    highest part of ascending to$er. Jhen tightening olts of flange= ma2e sure that

    gas2et is placed in right position in ad#ance= and then scre$ olts graduall and

    e#enl.

    . Installation of E3 ushing

    10

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    12/18

    5ssign person speciall monitoring the stand of E3 ushing from horizontal status.

    &rection is to e carried out rigger cooperating $ith electrical installer $ith hoo2

    and manual hoist as detailed in Plate 1. Place olster e.g. ruer plate or timer

    oard under ottom end of ushing. Protect ushing at $here ma contact chain or

    rigging $ith ruer plate. Prior to mounting ushing to transformer= clean carefull

    the central hole and ushing end that immersed in oil. o#e ushing slo$l to

    ao#e of ascending to$er= regulate position of Phase 5 and C= and let fall ushing

    slo$l into ascending to$er. 'o not hit ushing on ascending flange. Rigger and

    crane operator shall cooperate closel. Open hand hole co#er on ascending to$er=

    and $ire E3 lead to ushing panel.

    Plate 1 ushing &rection

    c. Installation of >3 ushing

    17. Chec2 and confirm that no scratch on ushing surface= especiall no scratch=

    crac2 and fla2e off on porcelain sealing surface of flange. Clean ushing surface.

    +7 ?ie the s2irt of porcelain $ith nlon rope= lift slo$l to ao#e of installation hole

    of transformer= and let fall it #erticall and slo$l into transformer. 'o not hit

    porcelain on oil tan2 case.

    *7 Scre$ olts on flange graduall and e#enl.

    47 Jhen $iring ushing and lead= ma2e sure that no olt or other article drop into

    oil tan2.

    d. Installation of Cooler

    11

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    13/18

    17. Installation of Rac2= Cooler and )an

    Chec2 and clean if thereDs an foreign matters inside of cooler. )lush it $ith

    satisfactor transformer oil if necessar= and then carr out lea2 test again. air

    pressure -.1+ pa for +-min= no lea2age shall e found.7 Chec2 and confirm that

    motor and impeller of fan shall e securel installed= and smooth and no loc2 in

    rotation. %o distortion of impeller and no contact $ith air duct.

    5fter installation of rac2= lift and mo#e cooler slo$l to a#oid collision. )asten it on

    rac2= appl flange olts $ithout tighten. Position cooler #erticall and ma2e it $ell,

    distriuted. )asten cross piece= and then tighten flange olts.

    +7. Pipe Connection= Pump and Oil flo$ Rela Installation

    Clean oil pipe efore installationM pump shall e insulated efore installationM

    e$are of the impeller direction $hen installing oil flo$ rela. Regulate impeller to

    right position tightening nut.

    e. Chec2 of On,load ?ap Changer

    Chec2 contactor of on,load tap changer O>?C7 as re@uired in manufacturerDs

    instruction and confirm the correctness of positionM chec2 operation mechanism

    and confirm the correctness of position

    f. Installation of Pressure Relief 3al#e

    a2e sure flange connecting pressure relief #al#e on oil tan2 is le#el and no slag

    on it. Place o,ring $ith adhesi#e to pre#ent it from displacing $hen tightening.

    )asten olt at re@uired moment manufacturer. )ace oil outlet on of

    pressure relief #al#e to a open space.

    g. Installation of Capsule,tpe 3acuum Conser#ator

    17. Inside of conser#ator shall e clean. %o scratches are found on capsule. ount

    a #al#e and pressure gauge on flange of capsule to test air tightness. 5ppl a 82Pa

    pressure on capsule and close #al#e. Pressure shall not reduce $ithin -.! hour.

    +7. )i0 rac2 and mount conser#ator on it tightl.

    *7. Connect to gas rela pipe and install gas rela after filling oil under #acuum.

    47. )it e0haust pipe= oiling pipe= and oil discharging pipe. Install matching stop

    #al#es at the ottom of these pipes. 'uring pipe fitting= ma2e sure that seal ring

    has een place on the interface.

    !7. ?ear off seal on co#er of reather efore installation. ?ighten olt after seal ring

    12

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    14/18

    placed. Oil shall e filled in cup till +,*cm ao#e aluminum chec2 tue to 2eep oil

    tightness.

    h. Installation of Gas Rela

    17. Chec2 $hether outer appearance of rela if sound.

    +7. Install rela et$een t$o connection pipes in accordance $ith direction mar2ed

    on housing of rela= i.e. red arro$head direct to conser#ator.

    *7. Install e0haust pipe of ascending to$ers= concentrate all gas ma e0ist in

    ascending to$er in connection pipe of rela.

    47. Pipe directl connected to rela shall ha#e a proper gradient $ithin -N !N.

    !.+.< Oil )ill under 3acuum

    5fter installation of transformer= chec2 and confirm that no tools and materials left

    inside of transformer oil tan2. Close co#er of transformer= and fill oil under #acuum.

    5fter installation of all accessories= open #al#e connecting gas chamer and oil

    chamer at t$o sides of oil conser#ator. a2e sure e@ual pressure inside of

    capsule to a#oid damage. 5fter confirmation of all parts connecting of od of

    transformer can ear #acuum operation manufacturer $ho shall confirm it in

    ad#ance. Parts unale to ear #acuum shall e isolated from #acuation7= open all

    #al#es connecting transformer od and start #acuation including od. 'uring

    #acuation of oil tan2= chec2 tightness at all times. Stop #acuum pump if necessar

    for con#enience of listen to lea2ing sound.

    13

    Plate 2 illing Oil fom Bottom "al,e

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    15/18

    a. Connect #acuometer to proper #al#e on oil tan2.

    . Connect #acuum pump to #al#e on the top of tan2 or to conse#ator.

    c. )illing Oil and 5dding under 3acuum

    17

    Generator ?ransformer

    If acti#e part chec2 and remounting are unale to e finished in one da= satisfied

    transformer oil shall e filled into transformer. Resume remounting after draining

    oil. Jhen remounting complete= carr out #acuumizing and oil filling under #acuum.

    Oil in on,load tap changer has een drained. Connected oil tan2 $ith on,load tap

    changer chamer $ith H pipe to ma2e oth of them e #acuumized. Connect oil

    pipe of on,load tap changer to ma2e it e filled $ith oil under #acuum together $ith

    transformer.

    Connect #acuumizing pipe= and turn on #acuum pump. 3acuumize till 1**Pa

    1torr7= and 2eep it for < hours= during $hen= fill oil #isa ottom #al#e at oil tan2

    Plate +7 $ith oil flo$ less than !t"h and stop filling till oil le#el is 1--mm from co#er

    of oil tan2. ean$hile= fill satisfactor transformer oil to chamer of on,load tap

    changerM 2eep it under #acuum for < hours. Release #acuum= and dismantle

    #acuum pipe and e#acuation e@uipment.

    Install supplementar oil pipe at filling #al#e of conser#ator. add oil #isa top of oil

    tan2 to pre#ent air from entering #acuumized oil tan2 of transformer.7

    5dd oil to proper le#el according amient temperature $hen oil is filled.

    +7

    Hnit 5u0iliar ?ransformer

    3acuumize transformer till +1.*2Pa 16-rorr7 as re@uired manufacturer. Eold the

    status for -.!,1 hour. )ill oil #isa ottom #al#e at rate not igger than !t"h= and stop

    filling and release #acuum till oil le#el reaching at $here 1--mm from top of oil

    tan2. Open all #al#es connecting od to accessories= and add oil till proper le#el

    as per temperature at that time.

    !.+.11 Eot Oiling Plate *7

    14

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    16/18

    5fter filling oil under #acuum to transformer od= hot oiling shall e carried out in

    follo$ing procedures as re@uired manufacturer(

    17 ?ransformer connects to oil filter #isa upper and lo$er filter #al#e to form a

    closed circulation. Oil direction is from filter to top of transformer= and from ottom

    of transformer ac2 to filter.

    +7 Eeat the oil to e transferred from filter to transformer to !-,6-.

    *7 eep oil circulating till total oil @uantit through transformer e0ceeding + times of

    oil tan2 capacit= $hile time of circulation shall not less than 4< hours as re@uired.

    47 5fter the $hole oil filling process= sample transformer oil for test again.

    !.+.18 O#erall ?ightness Chec2 and Placement

    )ill dr air or nitrogen #isa reather at oil conser#ator to chec2 the o#erall

    tightness. 5ppl -.-*Pa pressure to oil co#er for +4 hours and no lea2age shall

    e found. 5fter filling oil and efore appl #oltage= place G? for 4< hours and E3

    unit au0iliar transformer for +4 hours= during $hen release all gas #isa air #ent.

    !.+.1+ Grounding

    17

    Jire grounding olt 1+ of on,load tap changer cainet and tap to transformer

    housing or oil tan2.

    +7

    15

    Plate 3 ot Oiling

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    17/18

    Jire ascending to$er #isa grounding olt to transformer housing or oil tan2.

    *7

    Connect E3 neutral point ushing #isa steel cored aluminum strand >G,*--"+!

    and grounding post insulator FS+,1+6" to grounding grid.

    Ground plate shall e $elded to ottom of oil tan2 of transformer. 5fter cleaning

    interface= scre$ do$n nut to ma2e the copper,cored cale contact closel to

    grounding plate.

    Qualit! Control

    6.1 5cti#e part chec2 shall meet re@uirements in !.+.6M

    6.+ ushing is installed in right position. %o scratch= crac2 and spall on seal interfaceof porcelain ushing flangeM

    6.* Insulation oil test shall e in compliance $ith I&C6--6M

    6.4 O#erall installation chec2 of transformer shall e in accordance $ith re@uirements

    of manufacturer.

    Safe"Ci#ilized Construction

    8.1 ?o e in strict stipulations as sho$n in &lectric Po$er Construction Safet CodesM

    8.+ ?o e in strict oedience to construction safet protection specifications herein

    in#ol#edM

    8.* 5fter unpac2ing of the e@uipment= $ithout an hesitation= remo#e and dispose all

    the deris out ofconstruction area in order to 2eep the galler to e in smooth

    access and no an inLuries the nails

    8.4 Jhile performing $elding acti#ities= anti,shoc2= e0plosion,proof and metal splashes

    etc shall e carried,out=as for the shell of the electric $elding machine= it shall e

    $ell grounded.

    8.! On the site= all the tools and de#ices shall e 2ept in satisfactor storage and

    custodian= the temporar po$er suppl shall e in good conditions $hile

    o#erlapping= as $ell= rain$ater,proof= lea2age,resistance methods and actions

    shall e implemented. %o an aritrar dismantle those installed and assemled

    16

  • 8/10/2019 Generator Transformer & Unit Auxiliary Transformer Installation 070903

    18/18

    scaffoldings and amoo,centered structures= prior to completion of each

    construction se@uence or regular shift termination= ta2e care to chec2 those

    electric,dri#en tools and grounding cale rolls to e shut,do$n or not.

    8.6 In those energized areas= all the acti#ities and operations shall e presented $ith

    applicale oImplementation PermitsT= if necessar to utilize flame= flame,

    centered o Implementation PermitsT shalle issued.

    8.8 'uring installation= oil filter and oil tan2 shall e grounded securel.

    17