Page 1: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Geomorphic Principles Applied to Reclamation at Navajo Mine

BHP Billiton Navajo Mine Mine Design Group May 20, 2014

Page 2: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Contents

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 2

• History of New Mexico Coal

• Regional Topography

• New Mexico Coal Geomorphic History

• Navajo Mine Operation

• Navajo Mine Geomorphic Reclamation

– Design Objectives

– Past

– Present

– Future

• Acknowledgements

Page 3: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Overview • The San Juan and Navajo coal mines are

located near Farmington, New Mexico and supply two different local coal fired power plants.

• San Juan: – Underground longwall operation – 100% owned by BHP Billiton – Annual production of 6-8 million tons to

San Juan Generating Station – Current Contract through 2017

• Navajo: – Open-cut dragline operation with coal

supplied by railroad to the Four Corners Power Plant

– Annual production of 7-9 million tons through December 2013

– Annual Production post June 2013 approximately 6 million tons

Asset location map

New Mexico

Albuquerque

San Juan Mine

Navajo Mine

New Mexico Coal: Overview

Farmington Office

Slide 3 C. Brandt, Production Planner, Mine Design Group, May 2014

Page 4: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

SHIPROCK

UTE MOUNTAIN UTE INDIAN RESERVATION

SAN JUAN RIVER

LA PLATA RIVER

ANIMAS RIVER

COLORADO NEW MEXICO

AZ

NAVAJO INDIAN

RESERVATION

NAVAJO LEASE BOUNDARY

New Mexico Coal • La Plata Mine • San Juan Mine • Navajo Mine • Farmington Office

SAN JUAN MINE

BHP Billiton New Mexico Coal

NAVAJO MINE PERMIT AREA

FOUR CORNERS POWER PLANT

SAN JUAN GENERATING STATION

FARMINGTON

Slide 4

LA PLATA MINE

C. Brandt, Production Planner, Mine Design Group, May 2014

Page 5: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Regional Topography

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 5

San Juan Mine Drainages

Navajo Mine Hosteen Area Drainages

La Plata Mine Drainages

Page 6: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

New Mexico Coal’s Geomorphic History – La Plata Mine

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 6

Buckeye and Elk Point (Panel 5 Highwall) •Deepest final pit at La Plata Mine

•210 feet deep

Page 7: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

New Mexico Coal’s Geomorphic History – San Juan Mine

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 7

Page 8: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Navajo Mine Overview

• Operations began in 1963 • Approximately 6 million tons of annual

production • Delivered quality of

‒ 8,700 BTU/lb

‒ 23% Ash

‒ Sulfur < 1% • Sole supplier to Four Corners Power

Plant (FCPP) • Owned by the Navajo Transitional

Energy Company, LLC (NTEC) • Operated by BHP Billiton through

December 2016 • Current coal sales contract through 2016 • Newly approved coal sales contract

between NTEC and FCPP from 2016 to 2031

• Significant resources available for future growth

Slide 8 C. Brandt, Production Planner, Mine Design Group, May 2014

Page 9: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Navajo Mine – Earthmoving Operations

Slide 9 C. Brandt, Production Planner, Mine Design Group, May 2014

Page 10: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Navajo Mine Geomorphic Design Objectives

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 10

Permit Standards • Ensured slopes in design meet permit standards • Overall slope percentages and acres comparable to the pre-mining area

Land Form • Utilized current spoils topography to increase diversification of design land forms • Improved slopes in particular areas to enhance sustainability • Defined ridges and valleys while honoring the major drainage routes • Applied geomorphic principles where practicable

Improvement In Erosion Control Structures For Sustainability • Designed down-drains for a 100 year 6 hour storm event • Reduced the need for terraces and down-drains in final reclamation

Page 11: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Navajo Mine Past Geomorphic Reclamation

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 11

Chinde Main Channel and Chinde Branch 2 Geomorphic Reclamation

Page 12: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Navajo Mine Present Geomorphic Reclamation

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 12

Tributary Channel

Page 13: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Challenges

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 13

FSC revision design challenges include:

• Working towards an overall balanced design surface while maintaining the material balance in the specific pit areas

• Reducing down drains along final pit tie-in areas

• Tying into previously reclaimed areas and drainages

• Managing the final pit reclaimed channel drainage grades

• Integrating geomorphic principles into an area where this type of reclamation was not previously planned

Page 14: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Area 2 Post-Mining Topography

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 14

Triangulation using Vulcan of the Area 3 Post-mining topography. Note the final dragline pits and spoil peaks.

Page 15: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Area 2 FSC – Hosteen/Yazzie Pits

Slide 15

Previous FSC Revised FSC

C. Brandt, Production Planner, Mine Design Group, May 2014

10’ Contours 5’ Contours

Page 16: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Area 2 FSC – Barber Pits

Slide 16

Previous FSC Revised FSC

C. Brandt, Production Planner, Mine Design Group, May 2014

10’ Contours 5’ Contours

Page 17: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Predicted Sediment Yields

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 17

Area 2 Predicted Sediment Yields Previous Design New Design Pre-mine=31,293 tons Pre-mine=31,845 tons Post-mine=18,926 tons Post-mine=19,491 tons Decrease in sediment yield of 12,367 tons

Decrease in sediment yield of 12,354 tons

Page 18: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Drainage Density Comparisons

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 18

Chinde Drainage Density Pre-mine drainage density Chinde Arroyo – 1.4 miles/sq. mile for entire drainage area and 2.8 miles/sq. mile for area

disturbed by mining Previous Drainage Density Design – 4.7 miles/sq. mile Revised Drainage Density Design – 4.6 miles/sq. mile Hosteen Drainage Density Pre-mine drainage density Hosteen Arroyo – 3.18 miles/sq. mile for entire drainage area and 2.8 miles/sq. mile for area

disturbed by mining Previous Drainage Density Design Hosteen Arroyo – 6.1 miles/sq. mile Revised Drainage Density Design Hosteen Arroyo – 5.2 miles/sq. mile Barber Drainage Density Pre-mine drainage density Barber Arroyo – 1.75 miles/sq. mile for entire drainage area and 1.46 miles/sq. mile for area

disturbed by mining Previous Drainage Density Design Barber Arroyo – 6.7 miles/sq. mile Revised Drainage Density Design Barber Arroyo – 5.3 miles/sq. mile South Barber Drainage Density Pre-mine drainage density South Barber Arroyo – 5.93 miles/sq. mile for entire drainage area Previous Drainage Density Design South Barber Arroyo – Barber and South Barber were previously combined Revised Drainage Density Design South Barber Arroyo – 5.6 miles/sq. mile

Page 19: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Channel Grades

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 19

Chinde

Previous FSC – 0.76% slope

Revised FSC – 0.91% slope

Hosteen

Previous FSC – 1.43% slope

Revised FSC – 0.80% slope

Barber

Previous FSC – previous drainage combined into South Barber Channel

Revised FSC – 0.41% slope

South Barber

Previous FSC – 0.91% slope

Revised FSC – combined with Barber Channel

Page 20: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

FSC Slope Distribution by Area

Percent

Area 2 AOC PRE Variance 0-2.9% 26.9% 34.9% -8.0% 3-5.9% 28.3% 27.6% 0.7% 6-8.9% 20.4% 14.3% 6.1% 9-11.9% 11.6% 8.4% 3.2% 12-14.9% 6.6% 5.1% 1.5% 15-19.9% 4.1% 4.3% -0.2% > 20.0% 2.2% 5.5% -3.3% Total 100% 100%

Acres

Area 2 AOC PRE Variance 0-2.9% 1,579 2,047 (467.6) 3-5.9% 1,660 1,622 38.5 6-8.9% 1,198 838 360.0 9-11.9% 679 493 186.0 12-14.9% 387 297 89.5 15-19.9% 240 251 (11.3) > 20.0% 126 321 (195.2) Total 5,870 5,870

Previous FSC Slope Distribution by Area

Revised FSC Slope Distribution by Area Percent

Area 2 AOC PRE Variance 0-2.9% 28.8% 34.9% -6.1% 3-5.9% 31.4% 27.6% 3.8% 6-8.9% 18.9% 14.3% 4.6% 9-11.9% 10.0% 8.4% 1.6% 12-14.9% 5.5% 5.1% 0.4% 15-19.9% 3.5% 4.3% -0.8% > 20.0% 1.9% 5.5% -3.5% Total 100% 100%

Acres

Area 2 AOC PRE Variance 0-2.9% 1,690 2,047 (356.9) 3-5.9% 1,846 1,622 223.7 6-8.9% 1,110 838 271.6 9-11.9% 587 493 93.9 12-14.9% 321 297 23.2 15-19.9% 204 251 (47.6) > 20.0% 113 321 (208.4) Total 5,870 5,870

Slide 20 C. Brandt, Production Planner, Mine Design Group, May 2014

Page 21: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Previous FSC Slope Histogram

26.9% 28.3%

20.4%

11.6%

6.6%

4.1% 2.2%

34.9%

27.6%

14.3%

8.4%

5.1% 4.3% 5.5%

0%

5%

10%

15%

20%

25%

30%

35%

40%

0-2.9% 3-5.9% 6-8.9% 9-11.9% 12-14.9% 15-19.9% > 20.0%

Dis

trib

utio

n

Slope Range (% Slope)

Figure 12.3-2 Area 2 Slope Histogram

FSC Pre-mine

Slide 21 C. Brandt, Production Planner, Mine Design Group, May 2014

Page 22: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Revised FSC Slope Histogram

28.8%

31.4%

18.9%

10.0%

5.5% 3.5%

1.9%

34.9%

27.6%

14.3%

8.4%

5.1% 4.3% 5.5%

0%

5%

10%

15%

20%

25%

30%

35%

40%

0-2.9% 3-5.9% 6-8.9% 9-11.9% 12-14.9% 15-19.9% > 20.0%

Dis

trib

utio

n

Slope Range (% Slope)

Figure 12.3-2 Area 2 Slope Histogram

FSC Pre-mine

Slide 22 C. Brandt, Production Planner, Mine Design Group, May 2014

Page 23: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Benefits

Slide 23

FSC revision design benefits include:

Achieved overall material balance

‒ North pit areas balance

‒ South pit areas balance

Increased reclamation productivity

Overall land form diversity has been improved

Removed terraces in certain areas

Changed land form slopes in areas of concern from convex to concave

Removed a total of 4 down drains from final reclamation

Applied geomorphic principles to increase diversity and sustainability

Overall decrease in the modeled sediment yield

C. Brandt, Production Planner, Mine Design Group, May 2014

Page 24: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Acknowledgements

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 24

Tim Ramsey, Superintendant of Compliance and Reclamation, BHP Billiton, Farmington, NM 87402

Leonard Raymond, Civil P.E., BHP Billiton, Farmington, NM 87402

Brent Musslewhite, Manager Environmental Execution, BHP Billiton, Farmington, NM 87402

Steve Perkins, Superintendent Permitting & Technical Services, BHP Billiton, Farmington, NM 87402

Daphne Place-Hoskie, Superintendent of Haulage, BHP Billiton, Farmington, NM 87402

Ron Van Valkenburg, Contractor

GEOMAT, Contractor, Farmington, NM 87402

Page 25: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON

Bibliography – Need to Update

C. Brandt, Production Planner, Mine Design Group, May 2014 Slide 25

Slide 6: Place-Hoskie, Daphne (2009). Geomorphic Reclamation at BHP Billiton’s New Mexico Coal-Successes, Challenges & Future (Slides 11 and 12). Retrieved from internal network.

Slide 7: Place-Hoskie, Daphne (2009). Geomorphic Reclamation at BHP Billiton’s New Mexico Coal-Successes, Challenges & Future (Slide 4). Retrieved from internal network.

Slide 5: Place-Hoskie, Daphne (2009). Geomorphic Reclamation at BHP Billiton’s New Mexico Coal-Successes, Challenges & Future (Slides 14 and 18). Retrieved from internal network.

Slide 11: Place-Hoskie, Daphne (2009). Geomorphic Reclamation at BHP Billiton’s New Mexico Coal-Successes, Challenges & Future (Slide 15). Retrieved from internal network.

Carlson Software (2012). Carlson Natural Regrade Program. Maysville, KY.

Page 26: Geomorphic Principles Applied to Reclamation at Navajo Mine · BHP Billiton New Mexico Coal . NAVAJO MINE PERMIT AREA . FOUR CORNERS POWER PLANT . SAN JUAN GENERATING STATION . FARMINGTON