geophysical survey assessment report · 2017. 1. 16. · approximately 25 km east of the matachewan...
TRANSCRIPT
![Page 1: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/1.jpg)
INSIGHT
INSIGHT EXPLORATION INC PAGE 1 11/07/2010
Geophysical Survey Assessment Report
Tuned Gradient / Insight Section DCIP Surveys
On the
Burt Twp. Property
Matachewan, Ontario on behalf of
Insight Exploration Inc.
403833
Oakville, Ontario
June 2010 Prepared by:
Blake McLaughlin David J.W. Dawson
IIINNNSSSIIIGGGHHHTTT GGGEEEOOOPPPHHHYYYSSSIIICCCSSS IIINNNCCC... 95 WALBY DR., OAKVILLE, ONTARIO, CANADA, L6L-4C8
905 465 2996
![Page 2: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/2.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 2 11/07/2010
TABLE OF CONTENTS
TABLE OF CONTENTS.............................................................................................................................................2
INTRODUCTION ........................................................................................................................................................3
GENERAL INFORMATION.............................................................................................................................................3
SURVEY GRID: PROPERTY LOCATION...........................................................................................................4
PROPERTY LOCATION..................................................................................................................................................4 GRID INFORMATION.....................................................................................................................................................6
CLAIM STANDING ....................................................................................................................................................7
SURVEY PARAMETERS..........................................................................................................................................8
SPECIFICATIONS...........................................................................................................................................................8 INSTRUMENTATION......................................................................................................................................................8 IP PARAMETERS...........................................................................................................................................................8 RECORDED PARAMETERS............................................................................................................................................8
SURVEY EXECUTION..............................................................................................................................................9
GENERALITIES .............................................................................................................................................................9 SURVEY COVERAGE ....................................................................................................................................................9
DATA PROCESSING AND PRESENTATION ...................................................................................................10
QUALITY CONTROL...................................................................................................................................................10 DATA REDUCTION .....................................................................................................................................................11 DIGITAL......................................................................................................................................................................11
MAPS............................................................................................................................................................................12
ANALYSIS OF DATA...............................................................................................................................................14
CULTURAL SOURCE EFFECTS....................................................................................................................................14
INTERPRETATION OF RESULTS.......................................................................................................................15
BACKGROUND ...........................................................................................................................................................15 KNOWN PREVIOUS WORK.........................................................................................................................................15
SUMMARY INTERPRETATION..........................................................................................................................17
COMMENTS...............................................................................................................................................................19
APPENDIX A : INSTRUMENT SPECIFICATIONS..........................................................................................20
![Page 3: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/3.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 3 11/07/2010
INTRODUCTION
In June of 2010 Insight Geophysics Inc. was contracted by Insight Exploration Inc. to conduct geophysical surveys on the Burt Township property, located near Matachewan, Ontario. The principle survey objective was to further define the potential presence of gold bearing structures below the known Gowganda Sediment package mapped at surface. This potential contact had been defined by an Insight Geophysics Inc. survey (reference 42A01SW2022.pdf OGS file). The June 2010 survey was designed to extend the information package to the east and west in anticipation of future drilling.
General Information
Project Name: Burt Township Property Survey Type: Time Domain Induced Polarization / Resistivity
Tuned Gradient / Insight Sectional Dates: May 29th to June 9th, 2010 Client: Insight Exploration Inc.
95 Walby Dr., Oakville, Ontario, Canada, L6L-4C8 Client Representatives: Mr. John Moses
![Page 4: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/4.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 4 11/07/2010
SURVEY GRID: PROPERTY LOCATION
Property Location
Province: Ontario
Townships: Burt Township
General Location: North of regional Highway 66. Approximately 25 km east of the Matachewan
Figure 1: Approximate grid location for Burt Twp. Property in relation with the City of Kirkland Lake
![Page 5: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/5.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 5 11/07/2010
Figure 2: Property and grid location, Burt Township.
![Page 6: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/6.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 6 11/07/2010
Grid Information
Established: Prior to and during survey
Total New Line cutting: 18.7 km
Co-ordinate System: referenced to local picketed survey grid. Metric lines and stations
Datum: NAD 83
Spheroid: WGS84
Line Direction: 0° TN
Line Separation: 100 m
Station Interval: picketed @ 25 m
Access: Grid was accessed by 4x4 vehicles
Figure 3: Grid detail, Burt Township.
![Page 7: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/7.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 7 11/07/2010
CLAIM STANDING
POntario MIN'S TRY OF NORn''''RN DEVIOLOPMIONT • ... ,N., .. " N D FOAE6TRV
HOME I "" NES ANO ""HE"AeS I HO"THE"" DEVElOP"'E"' I HEWS I SITE >'<AP I CO"TACT US
M;II;IIU Cia;", ( Wel~ Repol1s I M"jll Me." 16i!Qs. 1
LARDER LAKE MilljllU DMsioll _ 40' 833 _ INSIGHT EXPLORA l ION INC.
![Page 8: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/8.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 8 11/07/2010
SURVEY PARAMETERS
Specifications
IP Survey
Survey Type: Time Domain Induced Polarization / Resistivity
Array Types: Insight Section Array and Gradient Array
AB (Tx dipole spacing): Multiple AB injections (200m to 3000m)
MN (Rx dipole spacing): 25 meters Gradient, 25 meters Insight Section
Sampling Interval: 25 meters
Instrumentation
IP Receiver: Iris Elrec Pro
IP Transmitter: Walcer MKIV – 10kW
IP Parameters
Transmitted Waveform: Square wave @ 0.0625 Hz (4 second Square Wave) 50% duty cycle
Receiver Sampling: Semi-Logarithmic windows (20 windows)
Window Width Window Width M Delay 160
1 80 11 160 2 80 12 160 3 80 13 160 4 80 14 160 5 80 15 320 6 80 16 320 7 80 17 320 8 80 18 320 9 160 19 320 10 160 20 320 TOTAL 3680ms
Recorded Parameters
IP measured parameter: Chargeability in mV/V
Resistivity measured Parameters: Primary Voltage in mV and Transmitted Current in mA.
![Page 9: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/9.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 9 11/07/2010
SURVEY EXECUTION
Generalities
Survey Dates: May 28th to June 9th, 2010
Survey Days 13 days
Weather Days: 0 days
Mob Days: 2 days
Personnel: Geophysical Operators Marty Kratochvil, Marmora On. Geophysical Field Personnel Rob Comfort, Montreal, PQ A.J. Saul, Matachewan, On Dylan Ryan, New Liskeard, On
Survey Coverage
The follow tables contain the line extents of the survey coverage. They do not include repeated readings in the total distance calculations. Approximately 10% of the data was repeated in the field at the time of collection for quality control purposes.
Survey Line Min
cover Max
cover # of
levels meters Grad 11400E 1050S 750N 1800
11300E 1000S 775N 1775 Grad 11300E 775N 1000N 275
11400E 750N 1000N 250 11500E 1200S 1000N 2200 11400E 1200S 1000S 200 11300E 1200S 1000S 200
Grad 11400E 1000N 1600N 600 IS 11400E 200S 800N IS 11400E 200S 800N 21 IS 11400E 200S 800N 8 IS 11400E 1200S 200S
Grad 11400E 1600S 1200S 400 IS 11400E 1200S 200S 16 IS 11400E 1200S 200S 13
Grad 13200E 1200S 400S 800 Grad 13100E 600S 1400N 2000
13200E 0N 1000N 1000 13000E 0N 1000N 1000 12900E 0N 1000N 1000
Grad 13100E 1400S 600S 800 13000E 1200S 400S 800 12900E 1200S 400S 800
![Page 10: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/10.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 10 11/07/2010
DATA PROCESSING AND PRESENTATION
Quality Control
The Insight Section Array utilizes a distributed array of 40 channels. Special attention is taken to ensure best possible contact resistance (k-Ohm) prior to acquisition. Approximately 10% of the data was repeated and saved in the field for quality control purposes. When logistically possible, Insight Sections to be stitched were overlapped by a minimum of one, typically two dipoles. Survey design allows for minimal levelling for stitched sections due to non-common injection locations.
Particular care is taken in reviewing the individual time decays of the chargeability.
Figure 4: Screen capture of InDecay for detailed time decay study
![Page 11: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/11.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 11 11/07/2010
Data Reduction
Apparent resistivity and total chargeability are calculated within the Elrec-Pro receiver. All receiver data is stored in the final data.csv file including all geometry points, primary voltages and voltage decays for further quality control and data reduction as required.
Once the data has been quality reviewed and low quality readings rejected, a depth estimate calculation is made for the remaining data. The depth estimate is based on a uniform half space and does not account for resistivity changes actually encountered at surface or at depth. Changes in half space penetration resulting from the geometry of the receiver dipoles positions relative to transmitter dipoles positions are estimated.
Depending on the surface conditions encountered on the property, the data will also be corrected for topographic and surface effects. Surface effects resulting from transmitter placements are adjusted in the final data.
The final reduced field data can then be inverted using the UBD-2D inversion program. Final inversions are an optional product to the client.
Digital
Processing of the IP data was handled with two software packages:
Prosys software from Iris, was used to dump the instrument and edit out spurious readings. It produces a binary and an ASCI text export.
*.bin Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported using Prosys software available on Iris website at the following link: http://www.iris-instruments.com/Support/Download/Download_geophy.html *.txt ASCI CSV export of binary dump files. Oasis Montaj from Geosoft, was used to compile and QC the data in a Data base
format. It produces a data base and a *.xyz format export as a final digital product. All map products were generated with the mapping portion of this package.
Burt.gdb Oasis database file.
![Page 12: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/12.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 12 11/07/2010
MAPS
~ +
~ +
&:vlv I 10000
To&aI C~.lIbill1y
'. 01 I] II 1.0 1.3 I t t. h ta .1 n, 10";!
Insight Exploration Inc BurtPropli!rty
Burt Township, Onbrio Tuned Gradient Survey - Total Chargeability
~~~----~~----~~----~------~------~--~.~
" rr
![Page 13: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/13.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 13 11/07/2010
"""" ",.,.
+ APpl'll~iltlvity
.a7 UI11 riot..' 1.,. l Ull
InSIght Exploration Inc Burt Pro,pt! rty
8urt Town1-hlp, Qlrtia rlO f UMe! Gradl. "1 S.UIU Y • App<II, . nl FtHlml1y
.a $«Clll:lhrlil():melnIP i!:t..:P'to . tt.nIIo::ltItIY
On OMX: PN f'I"oceHII'qCf> C-102 ...,...2(110
rtHIIIXIIl -~',~
![Page 14: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/14.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 14 11/07/2010
ANALYSIS OF DATA
Cultural Source Effects
The survey property was isolated from man-made construction and development. As such, external cultural effects do not affect the survey results.
![Page 15: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/15.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 15 11/07/2010
INTERPRETATION OF RESULTS
Background
Known Previous Work
The area’s overburden blanket and Cobalt Group sedimentary cover has hampered exploration locally (D. Anderson, Winteroad, pers. comm. August, 2002). The extent of exploration on the property known to the authors is as follows:
• Billiton, Airborne Geophysical Survey and Drill program, 1983-1987 A magnetic and VLF airborne survey was performed, followed up with 8 reverse circulation holes (total 365m) and two diamond drill holes (total 230m). The airborne survey revealed a strong magnetic anomaly just north of the current property. The RC holes revealed a deep overburden valley along the Englehart River, having greater than 130m of till covering the Proterozic cover. This overburden valley is located just west of the property.
• Chevron, Mapping, Sampling and Soil Geochemistry, 1986-1988 Geological mapping, surface sampling, and a soil geochemistry survey where conducted. Two diamond drill holes (K86-1, 198m) (K86-2, 200m) where also drilled, with no reported assays.
• WMC International Limited, Geophysical Exploration Program, 1993 – 1994 VES, Magnetic, Gravity, and Dipole-Dipole IP/Resistivity surveys where conducted. The geophysical methods applied were used to determine the depth of Huronian cover rocks, and possible extension of the Kirkland Lake Main Break and Cadillac-Larder Lake Break. The IP survey produced several Chargeability anomalies, which where tested in the subsequent drill program.
• WMC International Limited, Drilling Program, 1994 Five diamond drill holes (KLW-94-01 to KLW-94-05), totalling 1,273 m, were drilled. Every hole intersected Archean rocks between 30m and 330m vertical depth. The IP anomalies, which holes 94-01 and 94-02 were targeted on, were unresolved. Assays did not exceed 66ppb Au
• WMC International Limited, Drilling Program, 1996 Diamond drill hole KLW94-05 was deepened by 210m to a final depth of 608m. The hole originally drilled to test for an extension of the Cadillac-Larder Break, intersected strongly sheared Temiskaming conglomerate with strong ankerite, sericite and fuchsite alteration. Disseminated pyrite (1%) evident throughout, with assays returning values no greater than 113ppb Au.
• OGS, Operation Treasure Hunt Airborne GEOTEM Survey, 2000 GEOTEM Airborne Magnetic and Electromagnetic Survey
• Quantec Geophysical Field Schools, August 2000 and August 2001. Various survey methods, covering lines 105E, 123E, 125E, 127E.
• Winteroad Resources Inc., Drilling Program, Winter of 2003 Two diamond drill holes were drilled and assayed, the details are unknown to author at the time of writing this report.
![Page 16: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/16.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 16 11/07/2010
• The author used the following for reference: Report of the 1994 Drilling Program on the Kirkland Lake West Project, Rex Brommecker Kirkland Lake West Project, Report on Geophysical Exploration, 1993-1994, Rex Brommecker Report on the 1996 Drilling Program on the Kirkland Lake West Property, Clement J. Baker OGS Compilation of Kirkland Lake Area, Misc. Release – Data 58, Aug. 2000 (ISBN 9-7-7794-0072-0)
• Summer 2003: Insight Geophysics Inc. contract C-8. DCIP surveys in the area of L104E through L116E with three Insight Sections.
• Summer 2005: Insight Geophysics contract C32
• Summer 2009: Insight Geophysics contract C-85
![Page 17: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/17.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 17 11/07/2010
SUMMARY INTERPRETATION
The Insight Section L114+00E outlines the general accepted geology of a typical cross section of the LLCB and the associated surrounding geology. Gowganda Sediments [low energy sub aqueous] cover the Northern portion of the section to depths up to 200m then give way to the underlying Timiskaming Sediment sub unit. Line 114+00E is slightly complicated by an obliquely cutting magnetic [diabase?] dyke.
It is postulated that the nature of the LLCB in the region of Section 114+00E is complicated by an interference pattern of various geologic fabrics [splay] and this complication may in fact make this region interesting to focus on for Au mineralization.
Figure 5: Insight Section L114+00E: Treasure Hunt 2vd Airmag / plan Tuned Gradient apparent resistivity / adjusted apparent resistivity in vertical section with summary interpretation
![Page 18: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/18.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 18 11/07/2010
Figure 6: Insight Section L114+00E: Treasure Hunt 2vd Airmag / plan Tuned Gradient chargeability / adjusted chargeability in vertical section with summary interpretation
![Page 19: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/19.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 19 11/07/2010
COMMENTS
Insight Geophysics would like to thank Insight Exploration Inc. for their assistance in completing this successful project.
Respectfully Submitted
David J.W. Dawson Chief Geophysicist Insight Geophysics Inc.
![Page 20: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/20.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 20 11/07/2010
APPENDIX A : INSTRUMENT SPECIFICATIONS
ELREC PRO Ten channel IP receiver
Terraplus is pleased to announce the ELREC PRO, its new ten channel IP receiver, featuring 20 chargeability windows and a graphic LCD display.
The following improvements have been introduced in this new receiver with respect to the previous ELREC 10 unit :
HARDWARE FEATURES:
The size has been reduced by 4 cm in height: 31x 21x 21 cm
The power consumption has been reduced by a ratio of three, which means that with less battery it is possible to have a longer autonomy.
As a result, the new system is 2.5 kg lighter than the ELREC 10, with a weight of 5.5 kg only.
The data (21 000 readings max.) are stored in flash memories not requiring any lithium battery for safeguard.
The new system is compatible with the existing SWITCH Plus boxes for automatic switching of electrodes according to preset sequences. In such a case, the receiver is used as a single channel unit ; with SWITCH Pro boxes (to be developed next), the full ten channel capability of the ELREC PRO will be usable for a higher acquisition speed.
![Page 21: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/21.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 21 11/07/2010
SOFTWARE FEATURES:
Each new reading is stored as a specific unit file, making easier the grouping of readings corresponding to a given profile, specially for the last (edge) points of a line obtained with a smaller number of dipoles than the main part of the profile.
The data format is compatible with the PROSYS software, which means that the operator can easily visualize the numerical values of the data, automatically sort them according to the standard deviation of the chargeability measurement, merge two files stored under different names, introduce the elevation of each electrode, etc.
The ELECTRE II software can be used to define and upload preset sequences of measurements according to any type of electrode array.
![Page 22: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/22.jpg)
INSIGHT GEOPHYSICS INC.
INSIGHT EXPLORATION INC PAGE 22 11/07/2010
Walcer Model MKIV 10
Voltage Input 125V line to neutral 400 Hz / 3 phase Powered by MG12, MG6 and MG12A
Output 100 - 3200V in 10 steps 0.05 - 20 Amps Tested to 10.5 kVA
Switching 1 sec., 2 sec., 4 sec., 8 sec.
Metering LED for line voltage and output current
Size 63cm. x 54cm. x 25cm.
Weight 44 kg
![Page 23: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/23.jpg)
E S T I M A T E D
D E P T H
(m)
o
o o ~ ,
o o
'" o o '?
o o 'f
o o "?
o o "I
o o ";-
o o "?
12005 11005
+
+ +
+ +
+ + 12005 11005
10005 9005 8005 7005
+ + +
+ + + + 10005 9005 8005 7005
Line 114+00E - Apparent Resistivity
6005 5005 4005 3005 2005 1005 o 100N 200N 300N 400N
+ +
+ + + + 6005 5005 4005 3005 2005 1005 o 100N 200N 300N 400N
500N 600N
+ +
+ 500N 600N
700N
+
+ 700N
800N
+
+
+
+ 800N
o
, ~
o o
,:" o o
iN o o
J,. o o
in o o
&, o o
.:.., o o
60 o o
1306
100 IOiijiijOI
3805 ••
o Scale 15000
100
(meters)
200
Apparent Resistivity Ohm-m
5045 6294 9454 14302 17710 • Insight Exploration Inc
Burt Property Burt Township, Ontario
300
21921
Insight Section 11400E - Apparent Resistivity
4 Second Time Domain IP Elrec Pro - Walcer 10kW
Data: MK Processing:DD C-102 June 2010
Insight Geophysics Inc
![Page 24: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/24.jpg)
E S T I M A T E D
D E P T H
(m)
o
o o ~ ,
o o
'" o o '?
o o 'f
o o "?
o o "I
o o ";-
o o "?
12005
+ ,3.0
+. 31
+
u
+
+
+
+ 12005
3.5
34
4.1
4 7
5 2
58
57
, j §i
Line 114+00E - Total Chargeability
11005 10005
+ 6.1 4.7
5.1
!U 44
52
B.a+- 4.5
5.3
46 2.7
60 2 9
55 30
+ 4 .7 30 3 2
6 0 57
4 9 35
9005 8005
2 7 24 2,1 24
2.2 &+ 2"t-26
31 2 8
2 4
26
23 2 5 2.1
25 25
2 7 27 2.8
22
25
7005 6005 5005 4005 3005
2.7 2.4 2.0 2 7
2.' 2 4 2.2 2.8 2A 2.2 . 2A 3.1
22 2.1 2.2 2A 2.6 25 2.8 2.6 1.9 3.9
21 2.3 2.3 2 9 . 2.3 3.2 35 2 0 2 2 5 27 29 2 7 4 " 2.2 .6 . 2.5 . 2.7 . .l!
2 4
2005 1005
29 25 --h 2.5
2.7 2.3 29 3.1 B 27 3.0 3.7
2 9 2.5 3.0 3.2 28 29 3.2
2.0 3.6 3. 1 2.5 3.2 34 29 30 3.3 3.9 3 0
4.2 2.1 3.7 3.1 2.7 3.2
2.3 3~ 3 2.8 3.5
3 .1 3 .0
35 -p1
2 8
2A 2A 2~ 2.5 3.0 2.7 2 l.L .3 27 +26 2 6 4S
2.6 1"2 2.5 2.7 . 3.2 2.5 2fB
(19
+
+
+ 11005
4 9
5 49
51
5 52
52 6.5
66 55
5 3 8 5
4 2
4.5
46
37 38
37
42 45
43
44 nt-48
46 '9 Ii 47 50
-".Bi Hu
+
+
+ 10005
48
+
+ 9005
31 2 9
3 1 2 g
3 2 29 34
3.2
-p2 31
38 3D 38
34 34
34 33
3.8....L~6 1 u 3.6
4.3 35
44
38 38
45 37
45
39
+
+ 8005
2.5 2.5 2 9 28 2.5 2.8 2.6 2.8 33 . 2.9
2.6 2 9 3 0 . 3.1 3.2 2 9 2.7 . 35 3.1
2 7 2 7
+ 31
3 1
2~ 0 3 4
32
3.0 3.2 35 3.2 3A 3.1
34 +36 3.3
30+33
3.5 3.8 3.8 39
36 3.8 3A 3.3
3.8 3.8 32 5.3 4.6 6.2 39 5.2 5.1 4 .7 5.0 5.0 47 3 1 + 3.6 3.5
3B1-38 + 4 .7 4 .7 4 .7 49 4 .2 4 .2
4A 4.2 4 .3 4 .3 4 .7
3.6 3A
3.7 3.6
3 ~7
+
+
37
43 4 .2 4 .5
4 .5 4 .6
4 .3 4 .5 + 4.5 4 .6
5.7 3.8 5.6 5.0 Q 4 .2 5.7
4 .7-f-48 5.8 39 + 5.8 5.3 +
4 .2 5.7
5.0 5.1 49 5.2 4 .3 5.0 5.3
+ 5.1 5A 5.1 5A 4 .5 5.2 5.B 4 .9 5.0
4 .8 4 .7 5.3 5.1 4 .5 4 .2
45 4 .0 4.8 4 .0
43 5.0 5.0
5.8 5.3 5.8 1 R::l 6 . ~' ~c-'6 I 5.2 5.B 5.6 53
4:3 4.2 42 4.3 42.L4A
f'1 .5 4.6 49 4 .7 5.0
51 5.0
+ 4 .8 5.2 5.5 ¥ 5.8 5.5 5.7 m-
6.6 6.3 + + 4 .8 5.2
+ +
:~ 5A 5A 5A . 5.5 5A 5A 6.1 4 .5
6.0 4 .5
+
:; fj 7.2
~3
+
5.3 5.5 5.7 5.6
4 .7 ~ 4.8 ~\ :~
+
59 5.8 54 5.3
5.9 5.8 54 5A
+ 7005 6005 5005 4005 3005 2005 1005
o
o
100N
2 8 36 3 8
37 34 35
34 38 43
46 51
53 54
4.6 4.7 49 59
4 s-f-5 0
GA 55 52
50 5.7 5.6 52
52
72 6.9 6.9 6 .6 6.1 8 .4
200N
54 81
+ 1.5 7 2 6 .2 6 .9
~ 6A 7.3 7.5 6A 72 6 .5
6.<1 17j7 6Hi ~7
+
6.5 74 6.6
7.0 7.8 70 8.6 7.8 7.1
300N
953 A
3.0
37
4 0
400N
+ 39
45
+n 46
45 48
48 51
37
41
43 44
45 46
500N 600N
86
82
67
53 45 63
-1-;A .1 -to , 54 B 2
46 ' .1 7 0 57 48 8.3
48
" 71 58 51 64
+ +47 4.8-p 0
5.1 4 .6 0 " 4 1
4 .5 5.2 49 4.9 49 .4 54
4 .6 5.2 5.2 54
50 55
80 5 9
5 B
+ ." 54
64 U
5 4
51
56
73 64
71
+
a 7S 64
5 72 65
"+
+ til 7
6.9 7.6 S" l 73
82
63
74
19
700N
+ 42
58
48
Gen ,
50
54
9 3 6.0
71
9 B 6 2
1.2 8.9
6.8 6.9 7.0 1 1
8.0 1.5 7.0 1_9
800N
+
5 5 t 58
+
8 1
+
62 70
73
, 77 ,
t" 6.9 79 7.8 2f3 6.4 76 6.7
2 8 + + 1.7 8 5+ 7.6 11 7 .~
, 7.5 91
'flO 18 +
"
92 6.9 7.8 7.5 1.5 7 2 .
75
81 87 8.1 1 :;S 17 gJ :# 0
( {l .p dofltl3~ 1 4 6 .8 10.1
5 .1 10.1 14 ~ 411HJ3 .47 j \~1l1 13M~~~ : : B2 94+,8 83 84 75 : : :
) 84 87 88 1~5~~~.r---88(1111 .684 & 84859891
7.1 7.6 7 2 1.0 93 1.1
7.8 7 1 7 2 8 .9 9A 1.3
+ +
,3 95 87
4 97 89 111(0f 7 Il2 8.7
+ + 100N 200N 300N 400N
+ + + 500N 600N 700N
84
iff" 88
~ +
+ 800N
o
, ~
o o
,:" o o
iN o o
J,. o o
in o o
&, o o
.:.., o o
60 o o
1.5
•
100 IOiijiijOI
2.3 3.0
I I
a Scale 15000
100
(meters)
200
Total Chargeability mVIV
300
3.6 4.0 4.5 4.9 5.4 5.8 6.3 6.9 7.4
I I I I I I I I
Insight Exploration Inc Burt Property
Burt Township, Ontario
8.2
I
Insight Section 11400E - Total Chargeability
4 Second Time Domain IP Elrec Pro - Walcer 10kW
Data: MK Processing:DD C-102 June 2010
Insight Geophysics Inc
![Page 25: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/25.jpg)
Z a a "'
Z a a a
Z a a "'
a
(j) a a "'
(j) a a a
(j) a a "'
10500E
+
+
+
+
+
+
+
10500E
11000E
+
+
+
+
+
+
+
11000E
65
15524
11500E
13692
34970
44~ 26062
4kw
481 2
6837
10640
21732
24~
27l&L 18819
+
23964 317
31060 22178 25'r~=~
20281 25580 2 89
27209 11730 265 9
18556 23104 20293
16488 20369 20252 +
24924 23547 24217
18013 19976 21793
18903 23130 13 9 ~
22955 ~ 1 23
24712 20139 15 1
996 5
20319 11
~ 191 22 21973 ::;5744
214~9 72 423
27 21 4
13385 1 1 tl1 u--~=--=",,:
~21 19
~ 5633
4690
4231
5499
4783
4717
Z 679
700
~72 431
423~ 4639~ 4951 41
5343 6
5585 7097
574
0lD 1
6 68
W
5159
5314
37
3 2
8673
:!~ 474
sm 27 ~8274
10 1!J Sao 69 127
;JJ44 \~ 11119
25281 13 39I7
246 39276 33 36
~2 ~ 10242 11847 12254
10599
10050
6216
10033
12673
15730
15447
14072
+
11500E
12000E 12500E
+ +
+ +
+ +
+ +
+ +
+ +
+ +
12000E 12500E
13000E
+
:J 25 53
27082
19997
29177
25684
23189
35967
28302
23866
14778
42570
36644
'" a a Z
a a
J9862 ~
9965
3257
25206 26671 7144 1 870
18829
24 139 22309 8
26511
96
19385 31544 46184 258 5
22319 33450 2
~3 2
ru--2"S25
~3 20993
;1 :: 18
22581
18585
4 9
3095
2005
3259
17 27829 30387 28117
'" a a Z
il'''~/ T .... Z 8
~~: ~
+
13000E
... ~( 9'. , ... 397
'" a a en
1927 ••
200 !Ojiiijii
5954 I
o Scale 1: 1 0000
200
(meters)
400
Apparent Resistivity Ohm-m
10097 12837 15428 18196 • I I I
21581
I
I nsight Exploration Inc Burt Property
Burt Township, Ontario
600
26395
I
Tuned Gradient Survey - Apparent Resistivity
4 Second Time Domain IP Elrec Pro - Huntec MklV
Data OAlOC:PN Processing:CP C-102 June 2010
Insight Geophysics Inc.
![Page 26: Geophysical Survey Assessment Report · 2017. 1. 16. · Approximately 25 km east of the Matachewan ... Raw binary dump files from Elric Pro, one file per day. Can be viewed and exported](https://reader036.vdocument.in/reader036/viewer/2022071506/6127539217122617eb3fc865/html5/thumbnails/26.jpg)
Z a a "'
Z a a a
Z a a "'
a
(j) a a "'
(j) a a a
(j) a a "'
10500E
+
+
+
+
+
+
+
11000E
+
+
+
+
+
+
+
10 .9
10.7
10 .7
10 .8
10.5
91
9 1
94
9 7
8.4
69
64
6 4
64
75
7 0
35
4 9
4 5
4 1
4 6
4 0
4 3
4 5
6 1
11500E
+
10.2 10.2
11 .3 1(13
9.3
11. 1
3
10.3
10.2
9 7
9.6
10.4
98
10.3
'+' 10.3
99
10.7 110
110 10
-~/ '7
96 9 6
9 3 8$
8.7 8.9
72
6.4 6. 9
6.6 6.8
6.9 6.5
7.4 6.4
6.8 6.9
7.0 7.0
1:4 6.6 69
57 6.4 6.6
1
~4
6.1 _ 6.3 59
57
56
44
6
62
6
62
63
_ 5 .5
5.8 5.4
5.3 5. 1
5.2 5.0
5.1 5.1
5 4
5 5
49
5 5
69
67 71 7.4 7.3
6.9 6.9 6.1
6.8 6.7 7.1
6~1 __ 6c.7'---_ 6 5
51
38
5.0
5 8
5.2
5 1
5 6
57
+
12000E 12500E
+ +
+ +
+ +
+ +
+ +
+ +
+ +
13000E
+
55
62
6.7
67
62
6 1
5.3 / 6t -d 6.7
7,1 7,0
7 .4 6. 8
76
7 5
68
7 1
7.0
73
58
82
7$
7 1
67
47
41
38
7.3 6.6 5.8
1.9 6.4 6.2
5.8 6.6 7.0
6. 7 7 .3 7.0
7.1 7. 5 69
7.3 6 9 7.0
7. 9 6. 5 6.8
'¥ 6.2 6.6
6 CV--'C2 _~5 8
o 55
4 5
3 6
56
5.3
44
36
57
52
5 1
51
2~2 o .~ ~3~
5.2 ts ~ 5.9 5.3
~ 4 .8
-0.3 ·0
05 0 9
e 49
3.7 5.4
11
08
1 9
0.3
OS
-0.5
~1~3 _ "':'J",8 -0.1 -0.5
33
35
2
+
'" a a Z
a a a Z
'" a a Z
a
'" a a en
a a a en
'" a a en
(j) ~ a a a a a a N~ __ ~~~~ ________ ~~~~ ________ ~~~~ ________ ~~~ _________ ~~~ _________ ~~~ _____ ~en
10500E 11000E 11500E 12000E 12500E 13000E
200 !Ojiiijii
o Scale 1: 1 0000
200
(meters)
Total Char!leability mVrv
400 600
1.0 4.8 5.3 5.6 6.0 6.3 6.7 7.0 7.5 8.0 8.8 9.5 10.2
1= 1 1 1 1 1 1 1 1 1 I C I
Insight Exploration Inc Burt Property
Burt Township, Ontario Tuned Gradient Survey - Total Chargeability
4 Second Time Domain IP Elrec Pro - Huntec MklV
Data QAlQC:PN Processing:CP C-102 June 2010
Insight Geophysics Inc.