PC-II SCHEME

GOVERNMENT OF THE PUNJAB

MINES & MINERALS DEPARTMENT

ADP (2021 - 24)

POTENTIAL EVALUATION OF COAL, IRON

ORE, LIMESTONE AND OTHER INDUSTRIAL

MINERALS IN KOH-E-SULEMAN RANGE,

DISTRICT D.G.KHAN & RAJANPUR

AUGUST, 2021

Page 2: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 2 of 33

PC-II FORM

1. Name by which

survey / feasibility will

be identified

POTENTIAL EVALUATION OF COAL, IRON ORE, LIMESTONE

AND OTHER INDUSTRIAL MINERALS IN KOH-E-SULEMAN

RANGE, DISTRICT D.G.KHAN & RAJANPUR

2. Administrative

Authorities

responsible for: i) Sponsoring

ii) Execution

i) Mines and Minerals Department. Govt. of the Punjab Lahore.

ii) The Director General, Mines and Minerals, Punjab Lahore, through

Director, Resource Mapping (Division).

3. Details of Survey

i) General Description

and Justification

Introduction:

The scheme is initiated by the Mines & Minerals Department, Govt.

of the Punjab for prospecting and evaluating the potential of economic a.

Energy, b. Industrial, c. Metallic Minerals Resources in Districts, Dera

Ghazi Khan & Rajan Pur (herein after called scheme area). A brief

description of the existence of different minerals on the basis of past

geological studies, available information on the exploration, prospecting

and mining activities in the above Districts are discussed in the instant PC-

II to give an understanding of the importance and need for further

exploration & exploitation of these mineral resources in untapped areas. In

order to create investment opportunities and promote the potential of

mineral resources, a comprehensive scheme is initiated through Annual

Development Program (ADP 2021-24). Mainly, the Scope of Work

involved would be reconnaissance survey, geological mapping,

geophysical surveys, drilling and related exploration techniques including

adits, pitting, trenching, etc. using necessary machinery and equipment to

achieve the objective of the scheme.

(ii) Background

Description &

Justification:

According to the available past studies, information, geological

descriptions and mineral production from the scheme areas, it is believed

that these areas contained energy, industrial and metallic mineral

resources. Amongst, the main resources are Coal, Iron Ore, Gypsum,

Dolomite, Fuller earth, Bentonite, Silica Sand and limestone etc.

Exploration and mining activities of different minerals is going on by Pvt.

Page 3: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 3 of 33

and partially Public Sector through the licenses and leases granted by the

Mines & Minerals Department under Punjab Mining Concessions Rules

2002. A topo geological map of Suleman Range falling in Dera Ghazi

Khan & Rajan Pur areas are attached as "Annex-A". Adjoining to the

existing concessions (applied & granted), there are untapped areas which

can be explored to establish the existence of similar mineral deposits.

Therefore, through this ADP scheme, un-granted accessible areas in the

Suleman Range falling in Districts Dera Ghazi Khan and Rajan Pur are

proposed to be explored to evaluate the mineral potential so that these can

be put to open auction for investment and development of the mineral

resources to earn revenue for the Government and business/employment

opportunities in general.

Objective: The objective is to undertake exploration & exploitation of

the mineral resources in untapped far-flung remote hilly terrains and plains

of the scheme area, where the private sector is shy enough to come

forward for exploration risk. Continuity of the geological and stratigraphic

successions of the rocks evident that the mineralization may continue in

these similar adjoining areas of which the real economic potential is yet to

be established. On evaluation of the mineral resources, potential blocks

would be carved out and put to open auction under the Punjab Mining

Concession Rules, 2002. This will attract the investors giving a confidence

for further resource estimation, mine planning and production.

A brief introduction to the existing geological and mineral description

within Suleman Range is given below:-

Suleman Range:

This mountainous range is mainly exposed in the South West of

Punjab in Dera Ghazi Khan & Rajan Pur Districts, comprising sedimentary

sequence of rocks present throughout from where a number of minerals are

being commercially extracted through various concessions granted under

the Punjab Mining Concession Rules, 2002. However, the continuity of

different minerals in the areas other than granted under concessions are yet

to be explored.

Page 4: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 4 of 33

The available information on the basis of past geological works and

the concessions etc. granted in the scheme area is attached as “Annex-

B1”. An exercise by Punjab Economic Research Institute (PERI) has also

been under taken to support the background knowledge about the scheme

areas. According to PERI, the analysis of mineral reserves in Koh-e-

Suleman Range at District Dera Ghazi Khan & Rajanpur and list of the

publications, provided which is as such attached at Annexure-B2.

4)

a) Strategy to

handle and

carryout the

mineral

exploration work

program

There is a need to explore promising mineral bearing areas in a scientific

and systematic manner. Mines & Minerals Department as a part of its

mandate is striving hard to identify the mineral resources to structure the

mineral sector as a vibrant and potential sector to attract the domestic and

international investors. The present PC-II is a practical step towards the

achievement of this objective.

(i) Requirements of the Project and planning of the sponsoring

agency:

To handle and carryout the minerals prospecting/ exploration, a

systematic and geo-scientific approach is essential which needs an

adequate team of geologists, mineral exploration tools, machinery,

geological survey equipment, drilling rigs, mineral testing labs and

pitting/trenching digging instruments etc. Besides, transport/vehicles,

boarding, lodging and routine office commodities both at project sites and

headquarter office, Lahore are inevitable. Procurement of all these

logistics, require a substantial budget & time consumption and is not in

line with the policy of the government to involve spending of huge

amounts in billion rupees on the purchase and maintenance of such high

cost gadgets, human resource, machinery and equipments. The most cost

effective and efficient approach is to outsource the execution of above

mentioned exploration and prospecting activities through competitive

bidding process.

For prospecting and exploration of mineral resources, the technical

activities involved can be as under:

Reconnaissance Survey

Page 5: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 5 of 33

Geological Survey/Mapping

Geophysical Survey

Shallow confirmatory drilling

Pitting, trenching, adits

Assays (Lab testing)

Digitization/Geo-referencing of the entire data using remote sensing

images & GIS Analysis.

The present organizational structure of the Directorate General of

Mines & Minerals, particularly, the mineral prospecting/ exploration

human resource is not well established and facilitated because huge

financial resources are involved. Therefore, such specialized nature of

exploration/prospecting projects are better to be out sourced. However, all

managerial, geological coordination, work plans, data handling and results

oriented completion of the ADP scheme would be taken up by the

available human resource of Resource Mapping Division attached with

this project. The project team (from the Resource Mapping Division,

RMD) will be deputed to monitor the scheme execution.

(ii) Work Plan Strategy

The most efficient and fast track route to undertake and complete

such projects, the Scope of Work (SOW) under this ADP scheme will be

executed through outsourcing by engagement of Consultant and having

relevant technical capability and machinery/equipment arrangements to

perform the Scope of Work. Procurement of these services would be

carried out as per provisions of the relevant rules (PPRA) and procedures

in vogue. For administrative and technical controls, a steering committee

would be notified by the Government to ensure the executional

management and achievement of the objective of the scheme. Following

members for the steering committee are proposed:-

(i) Secretary, MMD, Punjab, Chairman

(ii) Director General, M&M, Punjab Member

(iii) Director, (RMD)/Project Director Member

(iv) Deputy Secretary, (Technical) Member

(v) Director, Inst. of Geology (PU, LHR) Member

or his Rep. not less than BS-19

(vi) Rep./a senior geologist from GSP Member

not less than BS-18.

Page 6: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 6 of 33

b) Authorization of

Payments

(vii) Project Coordinator Member

(viii) Project Manager Member

Note: a) Chairman, DG M&M, Project Director, Project

Manager/Coordinator and Rep. of GSP will be the

mandatory members constituting the quorum of the steering

committee.

b) Chairman of the Steering Committee would have the

authority to opt. any additional expert as member of the

committee.

The TORs for the Steering Committee are as follows: -

Steering Committee will steer execution of the overall project

components including ongoing results interpretation, progress

reviews.

To evaluate and certify the executional activities of SOW.

Due diligence on any modification in the SOW without

compromising the overall objective of the scheme.

To approve the interim, draft and final reports etc. as required in

the agreements with the Consultant and Contractor.

Whereas, day to day handling, support management and

monitoring of executional works will be carried out by the Project

Manager, Project Coordinator and its associated team reporting to the

Project Director. The entire project activities will be well managed and

coordinated through the Project team. All the Project Team will be deputed

and arranged from amongst the officers of Resource Mapping Division

based at Hqr’s office, Lahore.

The payments to the Consultant are to be approved by the steering

committee as mentioned above. However, the routine monitoring,

logistics, transport, fuel, T.A/D.A and others/miscellaneous expenses will

be approved by the Project Director from the budgetary provisions

provided in the respective heads of the account.

5) Scope of Work In order to achieve the objective of the ADP scheme, the roles of

the execution agency, Consultant are very important to define at their

respective positions.

The information and record of the available exploration/

prospecting, mining, production etc. of the minerals under different

concessions shown on a consolidated GIS based map will be prepared by

Page 7: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 7 of 33

the Licensing and GIS Divisions of the Directorate General of Mines &

Minerals.

The Resource Mapping Division as per decisions of the Steering

Committee would be strategizing the work plans, monitoring the

execution, results orientation achievements, payments processing and

completion of the scheme.

Whereas, the Consultant will have their respective responsibilities

to execute the Scope of Work of the scheme which is summarily described

below:-

Scope of Work for the Consultant

To review the past literature, studies of the scheme areas,

geologically evidencing the presence of the economic minerals.

To review the information provided by the Client to interpret and

correlate the possibility of the existence of potential economic

mineral resources in the un-granted areas.

Under take the reconnaissance survey of the scheme area to

identify the potential sites to be included for exploration work.

To propose and present the promising un-granted areas where the

required Scope of Work for exploration/prospecting etc. is to be

carried out and shall get approval of the same from the Steering

Committee.

Under take the geological mapping at an appropriate scale using

GIS, remote sensing and related modern techniques/applications to

produce digitized geological maps and cross section of each

minerals of the identified areas.

To conduct in the scheme area appropriate geophysical surveys as

and if required to delineate the sub-surface existence of economic

mineral presence.

To identify the economic minerals zones and give locations of the

proposed drilling, pitting and trenching sites.

Identification and ensuring collection of representative samples of

each mineral from each site/location/interval for its appropriate

handling, preservation and transportation to the lab.

Preparation of digitized geo-chemical maps in accordance with the

lab analysis results and geological controls.

Prepare economically potential blocks of areas for energy,

industrial and metallic minerals.

Page 8: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 8 of 33

Ensure QA/QC measures and safety/environment standards

Facilitate the Client for accessibility to all types of data, both at

working sites and office etc.

Facilitate monitoring, supervision and inspections etc. to the

officers and staff of the Client as and when required during the

execution of the exploration/prospecting works in the scheme area.

Prepare and submit monthly/quarterly progress reports to the Client

as per schedule and program.

Prepare and submit reports as deliverables linked with the payment

schedule for the approval of the Steering Committee.

Prepare and submit draft final report on each economic mineral in a

particular area/block.

Prepare and submit final report on each economic mineral in a

particular area/block for approval of the Steering Committee.

6) TORs for the

Consultant

Detailed Terms of Reference for the Consultant, scope of work,

deliverables and Time lines is elaborated in the attached

Annex- C.

7) Implementation

period

PERIOD WORK ACTIVITY

One (1) month

One (1) month

Two (2) months

Advertisement/Processing for hiring of

Consultant.

Selection/Agreement and award of work to the

Consultant.

To review the past literature, studies of

the scheme areas, geologically evidencing

the presence of the economic minerals.

To review the information and record of

the exploration/prospecting, mining,

production etc. of the minerals under the

concessions.

To propose and present the promising

areas to carry out the required Scope of

Work for exploration/prospecting etc. and

get approval of the SOW from the

Steering Committee.

Twenty (20)

months

Execution, supervision, report writing etc. as

per Scope of Work of the Consultant.

Total: 24 months Completion of the whole scheme activities.

Page 9: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 9 of 33

8) Manpower

requirement and

execution plan

To handle the supervisory and monitoring activities on day to day basis by

the Client, services of the requisite technical officers would be avail from

the Resource Mapping Division and essential supporting staff would be

availed from the existing strength of the DGMM office.

Operational Mechanisms:-

The areas under study in this ADP scheme, consist of vast hilly terrains

and plains. Therefore, the office of the Deputy Director, Mines &

Minerals, Dera Ghazi Khan would be used as the project office. The

Deputy Manager (Mineral Data Geo-chemistry), RM Division, Mines &

Minerals headquarter office would be notified as Project Manager.

However, the expenses and requirements for monitoring, inspections of the

field activities, travelling, camping/boarding-lodging, rental 4×4 vehicle(s)

etc. will be met from the cost of the scheme. Since, the Steering

Committee Members from different tiers of the Mines & Minerals

Department would be based at Lahore, therefore, the office of the Director

Resource Mapping Division of DGMM office Lahore would be

coordinating the implementation of the SOW to update the Government

and the high ups from time to time.

9) Vehicles/Transport

Requirements

For monitoring of the field works and project coordination activities on

day to day basis by the project related officers and staff etc., the vehicles

from the existing offices would be preferably utilized. However, the POL

charges will be drawn from the cost of the scheme as there is always

shortage of POL routine budgets. However, in case of non-availability the

vehicles, the same may also be availed on rental basis with the approval of

the Project Director. All project related staff will draw TA/DA from the

cost of the scheme. This alternate arrangement is inevitable because most

of the times Government vehicles are not adequately available due to other

official duties, therefore, the Project activities requiring it's own

monitoring to follow the objective, quality and time lines, physical

monitoring should not be suffered.

10) Year wise estimated

cost

Keeping in view the budget provisions of the current year and forecasting

the expenditures in the years 2022-23 and 2023-24, the year wise

Page 10: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 10 of 33

estimated costs are as follows:-

FISCAL YEAR

ESTIMATED COST

(Rs. in Millions)

2021-22

2022-23

2023-24

TOTAL COST

25.00

125.00

30.00

180.00

Summary of the breakup of cost estimates are given at Annex-D.

Consultant's man months and breakup of it's work and services along with

unit costs where existed is given at Annex-E. Activity wise details are

given at Annex-F. Deliverables and timelines are given at Annex-G.

11) Financial Plan Source of funding includes domestic source. No foreign component is

included in the cost. Main expenditures, incurred under the scheme would

be met out of the allocated budget. Entire allocated amount shall be

utilized under the sub heads of revenue and as provided under the law.

Following would be the main expenditure centers:-

Major amount (Rs.174.20 million) is proposed to be incurred for

the payments to others for services to be rendered. (Services i.e.,

Consultancy, Geo-Physical & Geological Surveys, Pitting,

Trenching & Drilling, Lab Testing/Assays, report writing.

Rented vehicles where required by the Officers/Staff of the

Executing Agency and for the far flung hilly terrains where routine

transport/vehicle may not be useful).

A minor amount of Rs.5.80 million is proposed to be incurred on

advertisement (in case), Purchase of IT Equipment (Two Laptops,

One Color Printer and One Scanner), POL, TA/DA and others

expenses for the effective and close monitoring of the project

activities by the executing agency and to achieve the objective of

the ADP scheme.

12) Expected outcomes

of the survey study

and details of the

Project likely to be

submitted after the

survey.

Exploration/prospecting of the scheme areas would result in evaluating

the economic potential and probable mineral resources in the Dera

Ghazi Khan& Rajan Pur Districts. Economically viable blocks will be

carved out over the areas where the mineral prospects are evaluated and

would be offered to the intending investors through competitive

bidding process for the grant of mining leases under the Punjab Mining

Page 11: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 11 of 33

Concession Rules, 2002. Through this bidding process, a handsome

revenue may be generated for the Government Exchequer along with

regular receipt of royalty on the produced and dispatched minerals. On

the other hand numerous employment opportunities in the far flung

neglected areas of South Punjab creating economic activity of

production of mineral resources will be created to feed and meet the

domestic mineral based industries. There are also bright prospects of

the export of raw minerals, ores and valuable mineral products through

the CPEC road/route adjoining to the South Punjab. Hence, the scheme

would be a contribution to develop the mineral wealth in the South

Punjab and an overall growth of GDP.

Page 12: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 12 of 33

ANNEXURE-A

TOPO GEOLOGICAL MAP OF DERA GHAZI KHAN AREA SHOWING

THE EXISTENCE AND EXPOSURE OF SULEMAN RANGE

Page 13: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 13 of 33

ANNEXURE-B1

AVAILABLE INFORMATION ABOUT THE MINERAL RESOURCES IN

DERA GHAZI KHAN & RAJAN PUR AREAS

In the South Western part of the Punjab Province, a sedimentary sequence of

Suleman Range is exposed in Dera Ghazi Khan& Rajan Pur Districts, from where certain

industrial minerals are being commercially extracted. The potential of coal and iron ore in

this Range is yet to be established; besides other important industrial minerals like gypsum,

dolomite, limestone, Fuller earth, silica sand, fireclay, barite etc.

1. Coal: Previous work undertaken by the Geological Survey of Pakistan (GPS)

indicates presence of coal / carbonaceous shales in the Domanda Formation and Drazinda

Formation of Eocene age, in DG Khan district. Indication of coal has also been reported from

the Chiterwata Formation, of Oligocene age, in the same district of DG Khan. Coal seam in a

mine near Rakhi Munh Hills was studied by the Geological Survey of Pakistan and a coal

seam of 0.33 to 0.41 meters thick was touched. Similarly another coal seam of 0.2 to 0.3

meters thick has also been reported in the same Domanda Formation near the localities of

Kahhan BMP Post, Zain BMP post and Mahoi Nallah areas. Presence of coal seam having

thickness of 0.76 meter has also been reported by GSP in the Chiterwata Formation of

Oligocene age near the Khador, BMP post. However presence of carbonaceous shales are

also reported in the Drazinda Shales of Eocene age near village Haftgarh.

Following is the summary of coal occurrences in D.G. Khan& Rajan Pur.

COAL OCCURRENCES IN THE D.G.KHAN & RAJAN PUR DISTRICTS

Sr.

No.

Location Coordinates Sheet

No.

Seam Thickness

&

Trend

Associated Rock

formation

Remarks

Latitudes

“DD”

Longitude

“DD”

1. RakhiMunh

Mine (3km

from

D.G.Khan-

Fort Munro

Road)

29º57’55” N 70º7’12” 39 k/1 0.33 to 0.41 m

Trend N20W/55

SE

Coal bed in 41.6m

below Pirkhoh

Limestone in

Domada formation

of Eocene age.

Eastern limb of Fort

Munro Anticline

At the

depth of 37

meters.

Production

of 100 ton

was made

from the

mine.

Page 14: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 14 of 33

2. Kahhan

BMP post

area

29º49’06”N

29º45”10”N

29º44”56”N

70º03’07”

70º02’40”

70º02’38”

39 k/1 (i) 0.30 m

Trend

N15w/575E

(ii) Thin

Carbonaceous

Mudstone

layer

(iii) Thin coaly

zone 2.5m

-do- —

3. Mahori

Area

30º32’51”N 70º31’13” 39J/10 0.3m Domada formation

ZindaPir

4. Zain BMP.

Post Area

(Chowkiwal

Bhart Road)

30º34’52” 70º30’17” 39J/6 0.2-0.3 m

Trend N 10 W/

43 SE

-do- —

5. Haft Garh

D.G.Khan –

Taunsa

Road

30º25’00”N 70º31’14” 39J/11 60cm layer of

coal flakes in

Papery Shales

Middle Part of

Drazinda Formation

6. Khandor

BMP

Approachab

le from

SakhiSerwa

r

30º13’55” 70º12’47” 39J/4 0.67m

Trend NS/40E

Chitterwatta

Formation Of

Oligocene Age

The Geological Survey of Pakistan had therefore recommended further exploration activities

in the Suleman Range under the above said significant results.

2. Iron Ore

Economic deposits of iron ore with sedimentary nature have been reported in the

RakhiMunh Hills, district D.G. Khan. Iron ore deposits of Rakhi Munh are relatively

of low grade and found along the linear belt near Fort Manroo which is stretching

along north south direction having length of about 25 km, district DG Khan. The ore

body mainly consists of limonite, siderite and chemosite etc.

RAKHIMUNH, DG KHAN IRON ORE DEPOSITS

These deposits are located two kilometers west of RakhiMunh Hills, which is about 53

kilometers west of D.G. Khan. These deposits are of Eocene-Oligocene age.

The iron occurs as banded iron ore and is exposed in the foothills of the Rakhi Munh

area. The overlying beds are ferruginous shales. The Rakhi Munh iron ore deposits

Page 15: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 15 of 33

constitute a single sedimentary iron ore bed commonly called Rakhi MunhIron Ore

Bed which marks the unconformable boundary between the Eocene and Oligocene

strata dipping at 600 to 700 and almost vertical at places. The iron ore bed is traceable

persistently, with varying thickness and grade, for a stretch of 25 kms from Choti Nai

area in the south to Shadan Nala Valley in the north. Thickness of the bed varies from

30 to 65 cms. On the northern and southern extremes and upto 1.85 meters in the

middle part forming a lenticular pattern.

The constituent minerals include limonite, goethite and siderite. Average grade is 32-

34% Fe2O3. Estimated resources are 268.3 million tons.

CHEMICAL COMPOSITION

Iron (Fe) 37.5 %

Silica (SiO2) 13.9 %

Alumina (Al2O) 07.4 %

Calcium & Magnesium

Oxides (CaO + MgO)

06.6 %

Manganese (Mn) 01.8

3. Fuller Earth.

Fuller earth is a non-plastic clay or clay like material, usually high in magnesia that

has adequate decolorizing and purifying properties. It can be used as

decolorizing/bleaching agent. It is mainly used in oil industry and in foundries. The

districts of D.G. Khan& Rajan Pur in the Punjab Province is the prominent area

where extensive deposits have been known to occur. It is formed along the flood

plains of ancient river channels. The Paleocene Eocene Rocks which had been

deposited with coal in Punjab contained Fuller earth in the adjoining areas. With

activation of this clay, it may be used for purification of vegetable oil and ghee

industry. It is also being used in making insecticide. It is also an excellent binding

agent for different minerals in foundries and steel industries. An exploration study can

be carried out to quantify the potential and continuity of Fuller earth deposits in the

Suleman Range, South Punjab.

Page 16: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 16 of 33

4. Gypsum

Gypsum, known to mankind since its earliest days, is the most common calcium

sulphate mineral (Ca2SO4.2H2O). Its composition ranges upto 75% calcium sulfate

and 21% water. It is mainly used as a raw material for Cement, some fertilizer and

plaster of Paris etc. Extensive work is required for evaluation of its proved deposits

and determining the process of its value addition. The Suleman Range have been

bestowed with the extensive deposits of Gypsum in the province of Punjab.

In view of the above, it will be appropriate to undertake reconnaissance, Geophysical

exploration if necessary and prospection activities for these minerals under the instant

scheme corresponding to the Suleman Range falling in Districts Dera Ghazi khan&

Rajan Pur.

5. Limestone

The term limestone includes those rocks which contain more than 50% mineral calcite

(Ca CO3) and dolomite (Ca Mg CO3)2. Limestone deposits are extensively formed on

continental shelves as detrital, biogenic or chemical precipitates.

Limestone is extensively used as concrete aggregates and gravel after crushing. It is

also the basic raw material for Portland cements. Limestone is also used as the fluxing

agent, soil conditioner, source of lime, chemical raw material and as dimension stone.

Variegated, in exhaustible deposits of limestone are found in Suleman Range, most of

which are being used in different projects. Detailed study for evaluation and value

addition products is required.

6. Silica Sand/Glass Sand.

Quartz Sand, free of impurities, is used as silica sand or glass sand. Areas falling in the

D.G. Khan& Rajan Pur Districts comprise of different qualities of Silica Sand. Coarse

grained silica sand is used as abrasive material and in the manufacture of glass and

some chemicals. It is also used in re-factory and metallurgical applications. The

foundry requirements are met with molding sand (rounded grains) found in various

parts of the Punjab Province, particularly in the Suleman Range. Locally produced

glass/Silica Sand is used for making sheet glass and bottles. Extensive work is required

to determine its potential deposits.

7. Any Other Mineral.

Any other economic minerals are included in this PC-II as is to be explored during

execution of the Scope of Work.

Page 17: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 17 of 33

ANNEXURE-B2

ANALYSIS OF MINERAL RESERVES IN KOH-E-SULEMAN AT

DISTRICTS D. G. KHAN AND RAJANPUR BY PERI, P&D BOARD,

GOVERNMENT OF THE PUNJAB

(Source: Policy Paper Unveiling the Mineral Reserves in Punjab: A case of Attock, D.G.Khan, and Rajanpur by Punjab

Economic Research Institute, PERI 2020-02)

This part provides content analysis, based on previous studies to confirm the existence

of coal, barite, iron ore, gypsum, fuller earth, and limestone in the Koh-e-Suleman at Districts

of D. G. Khan and Rajanpur. The results of the content analysis and available literature

provided evidence of the existence of the above mentioned potential mineral deposits in the

Districts of D. G. Khan and Rajanpur as depicted in table 4. However, the available literature

does not support the existence of Barite in the region of the Southern Punjab.

To support the content analysis, a more thematic approach is used to provide the

arguments in favor of the existence of potential mineral deposits in these regions. (Shah,

2018) studied and explicated the strategies for mineral sector development in Pakistan. In this

exploratory study, several secondary sources like the GSP and the Small and Medium

Development Authority (SMEDA) were reviewed.

The study explicitly suggested the existence of gypsum in several areas of the Punjab.

It was added that gypsum reserves can be found in the regions of D. G. Khan, Mianwali,

Rohri, Kohat, Sibi, and Quetta. This study also discussed the existence of other potential

minerals like coal and iron ore, yet, it remained silent on the exact placement of minerals near

the Districts of D. G. Khan and Rajanpur.

Similarly, Alyani and Malkani (2018) conducted a study that highlighted the existence

of iron ore and limestone in the districts of D. G. Khan and Rajanpur and provided the

preliminary status of the formations. Furthermore, it confirmed the existence of limestone,

mudstone, sandstone, red muds at Fort Munro, and Rakhi Gaj while shale, rubbly limestone,

gypsum, and others at Sakhi Sarwar in the D. G. Khan. Additionally, it claimed the presence

of economic mineral commodities including fuller earth and other cement raw materials in

these formations.

Page 18: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 18 of 33

According to a study by Mahmood et al. (2017), minerals in varied geographical

formations were found in the Southern Punjab and the Northern Punjab. In this study, several

prospecting tools like lithology, structure, paleobiogeography, revised stratigraphy, geo-

dynamics/ tectonics, geological history, and paleontology were used to observe the presence

of minerals in these areas. Several coal formations including fireclay, iron ore (Rakhi Munh),

silica sand, shale, fuller earth, limestone, gypsum (2 billion tons in the Rajanpur and 9 billion

tons in the D. G. Khan), and cement raw materials were found in the Districts of D. G. Khan

and Rajanpur alongside celestite deposits, heavy mineral placer deposits, and bentonite in the

Suleman fold belt.

Similarly, in another study conducted by Malkani et al. (2016), several geographic

formations were observed to ensure and update the status of minerals in Pakistan. For this

study, several field visits were conducted to make new discoveries along with the

consultation with the previous work done. Furthermore, preliminary prospecting tools were

used to determine the existence of these minerals in these regions. The results suggested the

presence of fuller earth, iron ore, fire clay, silica sand, and cement raw material (Shale,

gypsum, and limestone) in the areas of Rajanpur and D. G. Khan.

In another study by Malkani and Shah (2014), the formation of Chamalang coal fields

was discussed. Additionally, preliminary prospecting techniques like stratigraphy and general

geology techniques were used to ensure the existence of several minerals in these formations.

The study suggested that the presence of coal, limestone, gypsum, sandstone, marl, and shale

in Chamalang coal fields (Middle Indus Suleman range).

Gondal, Ahsan, and Javid (2008) also studied Sakhi Sarwar and Rajanpur aggregates

by using geotechnical and petro-graphical techniques. The results of the study confirmed the

presence of limestone, sandstone, and gypsum at Sakhi Sarwar, Girdu, Pitok Nullah, Zungi

Nullah, Khalgari, and Kaha Nullahs in the Southern Punjab.

Hassan, Bhatti, Bhutta, and Abbas (2001) argued that several mineral resources like

gypsum, fuller’s earth, barite, iron ore, coal, and limestone etc. can be found in several

regions and formations of D. G. Khan. This report highlights the existence of these mineral

deposits in the areas like Zinda Pir, Safed Koh, Taunsa, Vidor, Rakhi Munh, Rodho, Sanghar,

Dalana, Rakhi Gaj, Baghal Chur, Dagar, Nangar Nai, and Fort Munro etc.

Page 19: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 19 of 33

According to findings, several gypsum reserves were identified along with the

potential reserves. Moreover, samples from the Dungan formation and the Ghazij shale

provided evidence of the existence of limestone and coal in the region as well. It was also

submitted that with the average dip depth of 50 feet in eastern and western flanks of Zinda Pir

and in Rakhi Munh, the gypsum reserve estimates can make up to 27, 12, and 27 million tons

respectively. Finally, the authors recommended an open-pit technique for mining. Even

though this study is quite comprehensive, however, it was conducted in 1970 while using

obsolete methods. This feasibility report and reserve estimation figures are questionable due

to the use of outdated approaches and a long-time lag.

In another study by Shah (2002), lithostratigraphic units of the Sulaiman and Kirthar

were identified along with the existence of potential minerals. This study classified these

regions in different formations which were classified as per the era, period, epoch, and age of

the formation. This study identified the presence of celestite, limestone (of various colors, and

type), claystone, siltstone, sandstone, shales, coal, marl, and gypsum in these formations. So,

to have a better idea about the reserve estimates in the region, it would be imperative to

conduct such a study, while using the latest technology available in the region.

LIST OF PUBLICATIONS

Sr.

No.

Authors Name of Publication

1 Shah (2018) Strategy for Mineral Sector Development in Pakistan

2 Alyani and Malkani (2018) Lithostratigraphy, Economic and Vertebrate Significance of Fort

Munro Anticlinorium, Dera Ghazi Khan (D. G. Khan) Rajanpur

Districts of Punjab and Dera Bugti And Barkhan Districts of

Balochistan, Pakistan

3 Mahmood et al. (2017) Mineral Resources of North and South Punjab, Pakistan

4 Malkani et al. (2016) Mineral Resources of Pakistan-An Update

5 Malkani and Shah (2014) Chamalang Coal Resources and Their Depositional Environments,

Balochistan, Pakistan

6 Gondal et al. (2008) Evaluation of Shaki Sarwar And Rajan Pur Aggregates for

Construction in Southern Punjab Province, Pakistan

7 Hussain (2003) Mineral Sector: Vision and Strategy

8 Hassan et al. (2001) Geology and Mineral Resource of D. G. Khan and Rajanpur Areas,

Eastern Sulaiman Range, Punjab, Pakistan

9 Shah (2002) Lithostratigraphic Units of the Sulaiman and Kirthar Provinces,

Lower Indus Basin, Pakistan

10 Hussain and Mustafa (1970) Gypsum Deposits of Dera Ghazi Khan District, Punjab Province.

Page 20: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 20 of 33

Annexure-C

TERMS OF REFERENCE (TORs) FOR THE CONSULTANT

REGARDING PROJECT, TITLED AS:-

POTENTIAL EVALUATION OF COAL, IRON ORE, LIMESTONE

AND OTHER INDUSTRIAL MINERALS IN KOH-E-SULEMAN

RANGE, DISTRICT D.G.KHAN & RAJANPUR

1) BACKGROUND AND OBJECTIVE

Mines & Minerals Department, Govt. of the Punjab has one of the mandates to explore and

evaluate the mineral resources of the province. It has recently, undertook detailed exploration

program for coal in the Salt Range/Trans Indus Range and Iron ore in Chiniot - Rajoa and adjoining

areas at International Standards through renowned International Consulting and Consultant firms.

Suleman Range falling in Districts Dera Ghazi Khan& Rajan Pur have a variety of Industrial,

metallic and energy minerals including Gypsum, Dolomite, Fuller Earth, Silica Sand, Limestone, Iron

ore and Coal, besides other minerals of economic potential. Different minerals and areas are already

granted to the private and public sector entities for exploration and mining, but the pace of

development of these important mineral commodities is not according to the real potential of the

minerals. There are areas which are still untapped and the private sector is shy enough to invest in it.

As a result of that, the mineral production growth is very slow.

As part of the mandate of the Mines & Minerals Department, Government of the Punjab is

desirous to evaluate the hidden mineral potential of those areas which have not so far been granted

under the mineral concessions so that after determination of these mineral bearing areas, they may be

presented for grant of concessions through competitive bidding process and bring investment and

economic opportunities in the remote and far flung areas of districts Dera Ghazi Khan& Rajan Pur

for its prosperity and mineral sector contribution towards the overall economic growth.

A detailed background of the mineral deposits information based on the past regional

geological studies and the Mines & Minerals activities through concessions is described at

Annexure-B1 & B2.

In order to meet the vision of the Government, Directorate General, of Mines & Minerals

Punjab (hereinafter called as the “Client”) has planned to undertake a Mineral Resource Potential

Evaluation of industrial, metallic and energy minerals in Dera Ghazi Khan& Rajan Pur Areas (herein

Page 21: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 21 of 33

after called as Scheme Area) through an Annual Development Program (ADP Scheme-2021-2023).

For this purpose, the services of a "Consultant cum Contractor Firm" (here in after called the

Consultant cum Contractor) are to be hired.

2) OBJECTIVE OF THE CONSULTANCY

The objective of the Consultancy is to explore Energy, Industrial and Metallic Minerals and to

identify the economic potential mineral bearing areas in host formations of the scheme area as

per Scope of Work.

3) SCOPE, DUTIES AND RESPONSIBILITIES OF THE CONSULTANT

The Scope of work (SOW) for the Consultant would include but not limited to the following: -

General Terms

The Consultant shall exercise all reasonable care to protect the interests of the Client;

ensure timely supervision, execution and control of the works. In addition the

Consultant would also be responsible to avoid occurrences of disorders of prospecting

and exploration activities during the execution of the scope of works; guarantee a

timely implementation and efficient use of financial resources.

The Consultant shall also maintain a continuous presence of its relevant experts and

staff on the sites of works for smooth execution of the project activities. The

Consultant will complete the job and submission of the reports etc. within a period of

two years from the date of award of Contractor.

Technical Terms

The Consultant would be responsible to execute the Services & Works

following the Scope of Work indicated in this PC-II, ADP scheme and details given

below:-

i) Availing and getting at its own cost and expenses of the relevant past geological

reports/studies/maps, data etc. reported/indicated by different private/public

sector organizations on the occurrence, deposition and presence of the minerals

Page 22: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 22 of 33

in the areas under study of Districts Dera Ghazi Khan & Rajan Pur (referred to

as the Past Literature) for review and evaluation of the Client.

ii) The Exploration/Mineral Potential Evaluation Program should include but not

limited to the following:

o The preliminary reconnaissance survey of Suleman Range areas fall in Districts

DG.Khan and Rajan Pur.

o The details of site surveys required (geological, geophysical surveys etc. and as may

be others).

o Submission of detailed geological and geophysical maps showing the probable

location of the promising mineral sites of the project area.

o The proposed Pitting / trenching / adits and sampling program (as may be required)

along with location maps and coordinates, prepared and submitted to the Client.

o The proposed drilling program, borehole locations with coordinates shown on the

maps submitted to the Client and after approval, drilling will be executed.

o Requirement of the types of sample analysis for different minerals and areas.

o Any value added work to be proposed by the Consultant to meet the objective of the

ADP scheme, submitted to the Client.

iii) Submission to the Client, the details/list/ references of the past literature

consulted by the Consultant.

iv) Preparation and submission to the Client an inception report as an outcome of

the review of the past literature and recommendations for the

prospecting/exploration program in the identified/promising areas of Punjab

with justification.

v) Participate in the meetings, record minutes and follow up the implementation

of the instructions issued by the Client from time to time during performance /

execution of the Scope of Work

vi) Undertake reconnaissance/geological surveys of the promising areas for

proposing prospection and exploration program of Minerals throughout the

project area.

vii) Present the proposed exploration program before the Steering Committee with

the help of necessary descriptions, maps, illustrations, diagrams and analysis

reports etc. The formation of the Steering Committee would be notified by the

competent authority.

viii) Preparation of final program including the recommendations of the Steering

Committee for its approval.

ix) Framing of the SOW in a clear sequential manner including QA/QC measures.

Page 23: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 23 of 33

x) Specify the equipment, tools, machinery, drilling rigs etc. required for the

execution of the SOW.

xi) Preparation of a comprehensive monitoring program for the supervision of the

execution of the SOW mentioning the human resource, transport and other

logistics including (boarding / lodging etc.)

xii) Preparation of a Comprehensive periodic, interim, midterm, draft final and

final report etc. of the respective areas and minerals elaborated by necessary

analytical comments with a view to attract the domestic and foreign investors

including the industrial and commercial aspects.

xiii) The Consultant will also give training exposure to the nominated staff/officers

of the Clients department on ongoing all executional works at sites.

xiv) The Consultant will provide the Client, 20 both hard and soft copies for all

documentary reports, Maps, Assays, Lithologs, Geophysical data etc.

Financial Terms

i) The Consultant will claim payment on the basis of "part work done" part

payment.

ii) 10% of each bill submitted by the Consultant will be retained and paid at the

time of final payment.

iii) The settlement of final bill will be made upon the acceptance of Final Report.

iv) The Client will make the payment to the Consultant in Pak Rupees subject to

deduction of all types of Government taxes.

v) Expenditures incurred on mobilization of all kinds of machinery, equipment

and instruments etc. for the job will be borne by the Consultant itself.

vi) The skilled/unskilled personnel's deployed by the Consultant will be paid by

the Consultant itself.

4) ARBITRATION

In case the Consultant is aggrieved by any decision of the Client it can approach, the

Secretary, Mines & Minerals Department, Government of the Punjab, who will act as sole

arbitrator.

5) ROLE OF CLIENT AGENCY

Client agency will monitor all the project activities running in field and lab as well.

Client will evaluate the proposals; reports presented by the Consultant and process the

Page 24: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 24 of 33

approvals of deliverables after thorough deliberations and directions from the steering

committee.

6) TIME DURATION FOR PROPOSED CONSULTANCY

Subject ADP Scheme is formulated for twenty four (24) months and Consultant work

is spanned over the period of twenty two (22) months including all desk studies, field surveys

and sample collections, lab testing and final report submission.

Detailed man month is provided in Annexure-E for further explanation.

7) INDICATIVE MINERALS/AREAS OF STUDIES

The SOW to be executed by the Consultant in Districts Dera Ghazi Khan & Rajan Pur

may include but not limited to the following minerals and areas. These areas are just

indicative on the basis of existing information with the Client, therefore, other areas

containing potential economic minerals will also be considered included in the Scope of

Work and Project area.

The Consultant would be responsible and expected to identify additional promising

areas as per his own studies/evaluation. Selection of areas for exploration program would

therefore, be finalized by the steering committee of the scheme.

(A) COAL

a. Suleman Range

Rakhi Munh (D.G.Khan - Fort Munro Road, Wadoor Nala to Quetta Road).

Kahhan BMP area (Tibbi Lundan to Chhachar Nala).

Mahoi area (Barthi Road to Zinda Pir Nala).

Zain BMP area (Chowkiwal Bharthi Road).

Haft Garh, D.G.Khan – Taunsa Road.

Khandor BMP Approachable from Sakhi Sarwar.

(B) IRON ORE

A comprehensive geological study and drilling in the Rakhi Mounh Hills (Wadoor

Nala to Quetta Road) to substantiate the worth and potential of iron ore deposits is required.

Page 25: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 25 of 33

(C). INDUSTRIAL MINERALS

The Industrial Minerals in Suleman Range and their possibility may include; Gypsum,

Fireclay, Laterite, Bentonite, Barite, Flourite, Bauxite, Silica Sand, Limestone, Commercial

Marble, Dolomite, Fuller Earth and Iron ore etc. The indicate areas can be Wadoor Nala to

Quetta Road, Tibbi Lundan to Chhachar Nala, Barthi Road to Zinda Pir Nala, Chowkiwal

Bhart Road, D.G.Khan – Taunsa Road and Sakhi Sarwar.

8) CHANGE IN SCOPE OF WORK.

For any change in the Scope of Work of the Consultant and the corresponding revision

of the costs, the matter will be referred to the "Steering Committee" of the scheme. Steering

Committee would have the power to include/exclude and examine the changes for

improvement in the scope of work along with revision of cost if any and prepare final

recommendations to proceed further for approval by the competent forum. The Steering

Committee will be notified by the Secretary, Mines & Minerals Department, Government of

the Punjab, Lahore.

9) ARRANGEMENT OF THE CORE TEAM

Core team of the Consultant would comprise of the following experts.

Sr.

No.

Position Qualification Expertise

1. Team Leader: Ph.D. or M.Phil

in Geology/Earth

Sciences.

Having at least fifteen (15) years of relevant

experience and expertise in execution,

supervision or Consultant obligations for

geological, geophysical and drilling works

including exposed, un-exposed, minerals

and reporting.

2. Senior Geologist

(Exploration): M.Sc. Geology or

equivalent degree

Having at least ten (10) years of relevant

experience and expertise in execution,

supervision or Consultant obligations for

geological, drilling works including

exposed, un-exposed, minerals and

reporting.

3. Geophysicist: M.Sc. Geo-

Physics or

Geology degree

with

specialization in

Geo-Physics

Having at least ten (10) years of relevant

experience and expertise in applications of

geophysical surveys, data interpretation and

reporting.

Page 26: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 26 of 33

4. Geologist(Drilling/Loggi

ng/trenching/pitting/Adi

ts)

M.Sc. Geology or

equivalent degree

Having at least five (05) years of

drilling/logging /trenching/pitting/Adits

execution and supervision experience and

expertise.

5. Geologist (Mineralogy –

Petrology/Economic

Geology):

M.Sc. geology

with

specialization in

mineralogy

Petrology or

Economic

Geology.

Having at least five (05) years of relevant

experience and expertise in mineralogy /

petrography/mineral sampling analytical

works / economic geology.

6. Geologist

(GIS/Computer):

Masters or

equivalent degree

in Geology with

expertise in GIS or

Computer Geology

Applications

Having at least five (05) years of relevant

experience and expertise in GIS or computer

geology applications

Additional technical personal and support staff required to efficiently manage, monitor and

supervise of the execution of the SOW would also be hired / arranged by the Consultant.

10) DELIVERABLES

The Consultant would be responsible to submit the following deliverables to the Client:-

(i) Certificate of Mobilization of the resources of the Consultant

The Consultant will submit a certificate of mobilization of its resources reporting and

elaborating deployment of its required man power, machinery and equipment necessary office

setups, transport arrangement etc. as per approved proposal of the Consultant for the

satisfaction/certification of the Client.

(ii) Inception Report

The Inception Report should include a complete understanding of the objectives of the

scheme based on Past Literature review and preliminary reconnaissance survey of the scheme

area along with work plan strategy and schedules along with comprehensive monitoring plan

to execute and supervise the SOW for the approval of Steering Committee.

(iii) Submission of Geological and Geophysical Reports and Drilling Plan

This report will describe the detailed stratigraphic succession in the scheme area along with

geological map, geophysical data map and drilling plan along with location of boreholes and

probable depths. Based on the geological and geophysical interpretation, the economic

mineral deposits/horizons will be described in detail.

Page 27: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 27 of 33

(iv) Submissions of Interim/Periodic Drilling Data and Assays Reports

These reports will have to be submitted on quarterly basis, presenting the progress made in

the drilling of boreholes, lithological logs, geophysical logs (where applicable) samples

analysis/lab results, interpretation and further recommendations after evaluation of the entire

work of each periodic period progress.

(v) Draft Final Report

This draft final report should include the Comprehensive Reports for different areas and

minerals elaborated by necessary analytical comments by carving out mineral bearing

blocks/zones economically viable for grant of mineral concessions keeping in view the

industrial and commercial aspects for the perusal and approval of the Steering Committee.

(vi) Final Report

This final report should include the Comprehensive Reports for different areas and minerals

elaborated by necessary analytical comments by carving out mineral bearing blocks/zones

economically viable (in acres) for grant of mineral concessions keeping in view the industrial

and commercial aspects for the perusal and approval of the Steering Committee.

(vii) Professional Liability of the Consultant cum Contract as per Punjab Procurement

Rules, 2014

Professional liability of the Consultant will lie in form of its professional's man months

including all office and field services and also in form of services availed in field and

laboratory as well. All liabilities will be paid in the light of Punjab Procurement Rules, 2014.

11) PAYMENT SCHEDULE FOR CONSULTANT

The Consultant will be paid according to the "Part Work Done Part Payment principle".

Percentage payment will be linked with the quantum of work and time involved in a particular

deliverable as mentioned above. The payments will be approved by the "Steering Committee" on the

receipts of the deliverables and satisfaction of the Steering Committee.

Whereas, the payment schedule and details will be further elaborated in the agreement to be

executed between the Consultant and the Client in the light of directions of Steering Committee.

Page 28: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 28 of 33

Annexure-D

SUMMARY OF THE COST ESTIMATES OF POTENTIAL

EVALUATION OF COAL, IRON ORE, LIMESTONE AND OTHER

INDUSTRIAL MINERALS IN KOH-E-SULEMAN RANGE,

DISTRICT D.G.KHAN & RAJANPUR

OBJECT

CODE PARTICULARS

PERIOD OF UTILIZATION

Rs in million

A03919

Payments to others for service

rendered.

2021-22

(FY)

2022-23

(FY)

2023-24

(FY)

Total

(Rs)

(i) Consultant Services,

(ii) Costs/services to be rendered from

others to monitor the project

(Monitoring and Logistics)

21.00

1.30

119.00

3.10

29.20

0.60

169.20

5.00

Sub Total 22.30 122.10 29.80 174.20

A03907 Advertisement 0.10 0.10 0.00 0.20

A03901 Stationery 0.25 0.25 0.00 0.50

A03805 TA/DA 0.60 1.30 0.10 2.00

A03807 POL Charges 0.40 1.00 0.10 1.50

A03970 Others 0.25 0.25 0.00 0.50

A09203 IT Equipment 1.10 0.00 0.00 1.10

GRAND TOTAL (A) 25.00 125.00 30.00 180.00

Page 29: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 29 of 33

Annexure-E

POTENTIAL EVALUATION OF COAL, IRON ORE, LIMESTONE AND

OTHER INDUSTRIAL MINERALS IN KOH-E-SULEMAN RANGE,

DISTRICT D.G.KHAN & RAJANPUR

(A) Breakup of the Man Months Input/Payment to the Core Team of the

Consultant

Sr.

No.

Consultant’s core team and

Management/Admin Duration (months)

Rate/month

(PKR in

million)

Cost (PKR

in million)

1 Core Team

Literature review

and Exploration

program

Execution of the

Consultant(s)

works

Total

(4+5) Total Cost

(3× 6 × 7)

1 2 3 4 5 6 7 8

Members Nos. 2 18 20 0.8 16

I Team Leader 1

II Senior

Geologist(Exploration)

1 1 17 18 0.4 7.2

III Geo-physicist

1 1 6 7 0.4 2.8

IV

Geologist

(Sampling/Drilling

/Logging)

2 - 12 12 0.15 1.8

V Geologist (Min-pet)

2 1 12 13 0.15 1.95

VI Geologist (GIS/Computer)

1 1 6 7 0.15 1.05

TOTAL 30.80

Note:

Monthly salary for the Core Team has been proposed after keeping in view the following factors:-

a. Boarding & Lodging Charges of each member of the core team have to be paid by

themselves.

b. Attachment of Associated staff (technical and helper) as per need on activities to action

basis.

c. Technical Support (IT & Communication gadgets).

d. To meet the security charges for working in remote areas of D.G.Khan and Rajan Pur

Page 30: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 30 of 33

(B) Breakup of the Technical Activities as per SOW

Sr.

No. Activity

Lump Sum Cost

(PKR in Million)

2. Management/Admin/Logistics etc. 10.00

3. Reconnaissance, Data Compilation and Field Work 03.00

4. Geological Mapping, Geophysical Survey, GIS/Digitization applications 16.50

5. Pitting, Trenching, Aditting, representative sampling and handling etc. 15.00

6. Sample analysis, 13.00

7. Shallow confirmatory drilling 78.75

8. Data compilation, reporting 2.15

TOTAL 138.40

GRANT TOTAL OF TABLE OF A+B (30.80+138.40) 169.20

Page 31: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 31 of 33

(C) Cost Justification for the Technical Activities Sr.

No. Justification

Lump Sum Cost

(PKR in Million)

2. Management/Admin/Logistics etc. are kept as lump sum 10.00

3. Reconnaissance survey, Data compilation and Field work will involve traveling

of team of three (3) geo-scientific experts along with supporting staff and

necessary equipments, their boarding lodging for 2-3weeks and reporting.

03.00

4. Geological Mapping, Geophysical Survey & GIS/Digitization applications

For geological mapping Rs.5.00 million

For GIS analysis and map digitization Rs.1.50 million

For geophysical survey Rs.10.00 million

Approximately Point of Observations (POBs) = 500

(Gravity, Magnetic & IP as may be required)

Unit cost for per point of observation in Rs. = 20,000

16.50

5. Pitting, Trenching, Aditting, representative sampling and handling etc. 15.00

6. Sample analysis.

Approximately No. of samples to be analyzed = 1,000

(Including drilling logs)

Per sample cost in Rs. XRD, XRF = 13,000

[(The XRD & XRF (Rs.6000 for each) for analysis is estimated as information

received from Geo-Sciences Lab, GSP and remaining Rs.1000 included for

sample preparation & transportation charges.)].

13.00

7. Shallow confirmatory drilling.

Approximately No. of boreholes (BHs) = 35-40

Approximately meter-age can be drilled = 3500-4000

(Each BH depth may be varied from 70-120 meter)

Estimated drilling rate in Rs. = 20000-25000 per meter

78.75

8. Data compilation, reporting

Report writing, printing, binding, scanning, geological map preparation, map

digitization's/grid referencing, development of soft versions, lab data

presentations, approximately 15 hard & soft copies of final report will be

submitted.

2.15

Total 138.40

Grant Total (30.80+138.40) 169.20 Note: The above costs and calculation are guesstimates. Actual payments will be made on

the basis of lowest bid received and expenditures thereof.

Page 32: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 32 of 33

Annexure-F

ACTIVITY WISE DETAILS

Sr.

No.

PLANNED

ACTIVITIES DURATION

2021-22 (FY) 2022-23 (FY) 2023-

24

(FY)

Oct.

Nov.

Dec.

Jan.

Feb.

March

Apr. to

June

July to

Sept.

Oct. to

Dec.

Jan.

to

Marc

h.

Apr. to

June

July

to

Sep.

1 Appointment of

Consultant

2 Literature Review Related Past literature,

information and record of the

exploration / prospecting,

mining, production etc. of the

minerals under concessions,

propose and present promising

areas for SOW.

3 Execution of SOW

by Consultant and

supervision by

Client

i Mobilization of the

Resource of the Consultant

and submission of

inception report.

ii Submission of 1st interim

Progress report

iii Submission of 2nd Interim

Progress Report

iv Submission of 3rd Interim

Progress Report

v Submission of 4th Interim

Progress Report

vi Submission of 5th Interim

Progress Report

4 Submission of reports and Recommendations

I Draft report and

recommendations by the

Consultant

ii Final report and

recommendations by the

Consultant

Page 33: GEOPHYSICAL SURVEY FOR EXPLORATION OF METALLIC …

Page 33 of 33

ANNEXURE-G

DELIVERABLES AND TIMELINES FOR THE CONSULTANT

Sr. No. Deliverable Timelines

(Days)

COMMENCEMENT OF CONSULTANT JOB WITH EFFECT FROM AGREEMENT DATE

i. Mobilization of the resources of the Consultant 30

ii. Inception Report 90

iii. 1st Interim Report:

Submission of Geological and Geophysical Reports and Drilling Plan

180

iv. 2nd Interim Progress Report:

Submissions of Interim/Periodic Drilling Data and Assays Reports

300

v. 3rd Interim Progress Report:

Submissions of Interim/Periodic Drilling Data and Assays Reports

360

vi. 4th Interim Progress Report:

Submissions of Interim/Periodic Drilling Data and Assays Reports

480

vii. 5th Interim Progress Report:

Submissions of Interim/Periodic Drilling Data and Assays Reports

600

viii. Draft Final Report 650

ix. Final Report 660