42AC3SWM53 2.5519 BEEMER 010
REPORT ON
GEOPHYSICAL SURVEYS
on the property of
LYNCO RESOURCES INC.
BEEMER TOWNSHIP PROPERTY, ONTARIO
LANDSJohn Rawlinson Lill,B.Sc.P.Eng.f""""" Scarborough, Ontario.
April 29th,l 983
-2-
PROPERTY S ACCESS (Continued)
It can be reached by taking gravel roads south
from Timmins to Ferrier Lake. A tractor road goes to the
property, a distance of two miles, from the end of the
gravel road.
During the present survey, access to the property
was gained by taking a bush plane from Gogama 32 miles
to the south and landing on Telluride Lake, part of which
is in the southwest corner of the property.
SURVEYS
Three types of surveys were carried out on the lake
parts of three claims? L 578028, L 578029, L 578030.
Picket lines cut for the land part of the survey
during 1981, were extended on to Telluride Lake and to the
claim boundaries.
On completion of the surveys, the pickets were
removed from the lake.
-3-
ELECTROMAGNETIC SURVEY
This was carried out employing a Ronka EH-16, using
Cutler Maine, U.S.A. transmitting station. All readings were
taken facing south.
One conductor was located during the survey. This
crosses baseline "B" at about 14+OOS.
MAGNETIC SURVEY
This survey was carried out using a McPhar M50QA
magnetometer. Readings were taken at 50 foot intervals.
On lines 0+00 and 4+OOE, anomalous values up to
500 gammas near the shore were detected.
These may be due to a basic igneous flow or
intrusive.
RADIOMETRIC SURVEY
The McPhar TC 33A scintillometer was employed.
Readings were taken at 100 foot intervals. No anomalous
readings were located.
-4-
CONCLUSIONS
One EM conductor was located with no magnetic
correlation.
The magnetic anomalous readings are believed to be
due to a basic rock type.
Prospecting the land near these areas during the
summer season might reveal the causes for the anomalous
zones.
The surveys have been filed for assessment work
credits with the Ministry of Natural Resources.
Respectfully submitted,
JoHh Rawlinson Lill, B.Sc.P.Eng,
JRL:d
Ontario
rftjto.txpenures
Minina AclType o.' SjurveyU) -T. ^.k ̂ ' ,
Claim Moldr,-c- - II
42At3SWf*53 8.5519 BEEMER
Addr/l/*-,:- /?5SY*'AJ
see
Survey Companyi.-'*- 1 1' f A*, /T S Jii't . /y a" J
Dete of Survey (from A to) /*T . j' *? t \ /V v3 .*^ Day l Mo. l Yr. | DaV j Mo. l Yr.
2 , liTotal Miles of line Cut
J -t.' i.-Name and Address of Author (of Geo-Technical report)
'.r^Y-v /r- /, /x ^ a s '/l r /','''6-Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Men Days
Complete reverse side and enter total (s) here
Airborne Credits
Note: Special provisions
credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other W
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Electromagnetic
Megneto meter
Radiometric
Days par Claim
-4*f '-**~ (
-^ (
f*t|y4
Day* par Claim
Days per Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Cleim(s)
Calculation of Expenditure Days Cradits Total
Total Expenditures Days Credit*
|S 1 * [ 15| *Instruction*
Total Day* Credits may be apportioned at the claim holder's choice. Enter number of days credit* per claim selected In column* at right.
Mining Claims Traversed (List in numerical sequence)Mining Claim
Prefix
:.Number
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. OeyiCr.
Total number of mining claims covered by this report of work.
Date Recorded Holder or Agent (Signature)
Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facts set/forth in the Report of Work annexed hereT6"Theving performed the) work or witnessed same during and/or after its completion and the annexed report tt true.
Name end Postel Address of Penon Certifying ,
Date Certified Certified by (Signeture) ^ ,
Ontario
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT
File.
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
O aa
Type of Survey(s) Township or AreaClaim Hoirier(*)r
TRc A 4 e- a/g r/ cA &B /H G- O-
j ve,
Td 14M A , L. 'liSurvey Company —— Author of Report —— Address of Anthm- Lo f i firn CASS
3a HAS A . / it"*
Covering Dates of Survey.
Total Miles of Line Cut —
JfJte - A fAtL 2. 9 S f 3(linecutting to office)
1 SPECIAL PROVISIONSCREDITS REQUESTED——— ——ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.
Geophysical -Electromagnetic-
—RflHinrnrtrir,, ——
-Other
r.fnlnmral
f^nrhrmjral
DAYSper claim
Z O
*0
AIRBORNE CREDITS (Special provision crediti do not apply to airborne lurveyi)
Magnetometer. .Electromagnetic. . Radiometric(enter days per claim)
RTHNATTTRF;Author of Report or Agent
Res. Geol.. .Qualifications.Previous Surveys
File No. Type
,................. .........,........
Date Claim Holder
• •••••••••••••x*
RECEIVED———— l^f^AuBJ-"--
MINING LANDS SECTION
MINING CLAIMS TRAVERSED List numerically
(number)
S?S
OK
\
TOTAL CLAIMS.
837 (5/79)
GEOPHYSICAL TECHNICAL DATA
GROUND SURVEYS If more than one survey, specify data for each type of survey
Number of Stations 7(0Station interval. Profile scale ——
/00 /h #6* tsf fi C.
S - 30 *
.Number of
.Line spacing
Contour interval. C*
CInstrument 500 /?
C/t
Accuracy — Scale constant. Diurnal correction method. Base Station check-in interval (hours). Base Station location and value ——— X. 0 -1-00 1-0* Z
-oo bs 3. Z 4-
C
ROMAGN
InstrumentCoil configuration Coil separation —— Accuracy ————— Method:
Parameters measured.
R0 V K A f 6e R J 2 ^ AS TA- L* / f
D Fixed transmitter D Shoot back CD In line CD Parallel lineO&A, & TA.1-IOM A/ AA 1 7. J? k
(ipecify V.L.F. nation)
/AS
GRA
Instrument.Scale constant.
made.
Base station value and location.
accuracy.
ZCH< N
C fa.
NM
z
Instrument ————————— Method D Time DomainParameters — On time .
-Off i
Power.Electrode array — Electrode spacing , Type of electrode
time.
D Frequency Domain — Frequency ———— P^. Range _______
SELF POTENTIALInstrument
Survey MfthnH
Cnrrertinns made
Tt ana f
RADIOMETRICInstrument _______________ ft cfltf## r C 3 l #Values measured ___________ TarAL. 6-4 fits* AEnergy windows (levels) ________________ fi* f /lStsfHeight of instrument ̂ ———...^ /J i P L/Zts&L, -—^——-——. Background CountSize of detecOverburden
Size of detector _____________ ** 5 " ft/AA^r&A X h
(type, depth - include outcrop map)
OTHERS (SEISMIC, DRILL WELL LOGGING ETC.) Type of survey
Instrument ̂ ^-^-^—-———^——————-^—^———^^AccuracyParameters measured
Additional information (for understanding results).
AIRBORNE SURVEYS Type of survey(s) ———— Instrument(s) ——————
(ipecify for each type of survey) Accuracy————^-,.^-^-——————
(specify for each type of turvey) Aircraft used————————————————————————————————Sensor altitude.Navigation and flight path recovery method.
Aircraft altitude_______________________________Line Spacing^— Miles flown over total area________________________Over claims only.
GEOCHEMICAL SURVEY - PROCEDURE RECORD
Numbers of claims from which samples taken.
Total Number of Samples. Type of Sample.
(Nature of Material)Average Sample Weight——————— Method of Collection————————
Soil Horizon Sampled. Horizon Development. Sample Depth————— Terrain————————
Drainage Development———————————— Estimated Range of Overburden Thickness.
ANALYTICAL METHODS Values expressed in: per cent
p. p. m. p. p. b.
O O CD
Cu, Pb,
Others_
Zn, Ni, Co, Ag, Mo, As,-(circle)
Field Analysis (.Extraction Method. Analytical Method- Reagents Used__
Field Laboratory Analysis No.(————————^.
SAMPLE PREPARATION(Includes drying, screening, crushing, ashing)
Mesh size of fraction used for analysis,,————
Extraction Method. Analytical Method , Reagents Used———
Commercial Laboratory (- Name of Laboratory-— Extraction Method—— Analytical Method—— Reagents Used^———-
.tests)
-tests)
GeneraL General.
August 17, 1983 2.5519
Lynco Resources Limited Suite 80688 University Avenue Toronto, Ontario H5J 1T6
Dear Sir:
RE: Geophysical (Radiometric) Survey on Mining Claims L 578023 et at In Beemer Township.
Uith reference to the above mentioned survey, radiometric surveys must bo accompanied by a coloured outcrop nap. Please submit an outcrop nap (1n duplicate) quoting File 2.5519.
For further Information, please contact Mr. F.W. Matthews at 41G/9G5-13GO.
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A lUftPhone: 416/965-1380
S. Hurstrsc
cc: Mining RecorderKirkland Lake. Ontario
cc: f'.r. John R.40 Firth Crescent Scarborough, Ontario M1G 2J5
Ministry ofNaturalResources
Ontarfc)
GeotechnicalReportApproval
Mining Lands Comments
a* .
B To: Geophysics MAComments
[~| Wish to see again with corrections
To: Geology - Expenditures
Comments
Pi Approved |~1 Wish to see ageln with corrections
D
Signature
To: Geochemistry
Comments
|~| Approved | l Wish to see again with correctionsDate Signature
l [TO: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)
1593(81/10)
2.55191983 06 01
Mr. George J. KoleszarMining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, OntarioP2N 1A2
Dear Sir:
We have received reports and maps for a Geophysical (Electromagnetic and Magnetometer and Radiometric) survey submitted under Special Provisions (credit for Performance and Coverage) on mining claims L 578028-29*30 In the Township of Beemer.
This material will be examined and assessed and a statement of assessment work credits will be Issued.
We do not have a copy of the report of work which Is normally filed with you prior to the submission of this technical data. Please forward a copy as soon as possible.Yours very truly,
E. F, AndersonDirectorLand Management BranchWhitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3Phone: (416) 965-1380 A. Barr:md
cc: Lynco Resources Ltd.Suite 806, 88 University Avenue Toronto, Ontario M5J 1T6Mr. John R. L111 40 Firth Crescent Scarborough, Ontario MlG 205
JOHN R. LILL, B.Sc., P.Eng. GEOLOGIST
Tel: (416) 439-8309
April 29th, 1983
40 FIRTH CRESCENT SCARBOROUGH, ONTARIO
MlG 2J5
RECEIVED
MINfNG LANDS SECTIONDepartment of Natural Resources,Mining Lands Section,Room 6450,Whitney Block,TORONTO, Ontario M7A INS
Attention of F. W. Mathews
Gentlemen:
Enclosed are two copies of my report along with
Report of Work and Technical Data Statement on the
Beemer township property of Lynco Resources Inc.
Report of Work form has been sent to the Mining
Recorder in Larder Lake.
Yours
JohprRawlinson Lill, B. Se. P.Eng.
JRL:d ends. 2
Ministry ofNaturalResources
Ontario
Report of Work(Geophysical, Geological, Geochemical and Expenditures)
The Mining Act
Instruction*: Please type or print.- If number of mining claims traversed
exceeds space on this form, attach a list.Note: Only days credits calculated in the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
Do not use shaded areas below. .
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total (s) here
tAirborne Credits
Note: Special provisions
credits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Electromagnetic
Magnetometer
Radiometric
Days per Claim
hOzo2.6
Days per Claim
Days per Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Claim(s)
Calculation of Expenditure Days Credits
Total Expenditures
$ ± 1 5
Total Days Credits
-l
Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date Recorded Holder or Agent (Signature)
ification Verifying Report of Work
Mining Claims Traversed (List in numerical sequence)Mining Claim
Prefix
LNumber
Expend. Days Cr.
Mining ClaimPrefix Number
Expand. Days Cr.
Total number of mining claims covered by this report of work.
For Office Die OnlyTotal Days Cr. Recorded
Date Recorded
Data Approved am Recorded
Mining Recorder
Branch Director
hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name and Postal Address of Person Certifying *.f LJ inF j f r H CAPS
1362 fS 1/9)
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by
consultants, draftsmen, etc..
Type of Survey
Technical Days Credits
Line-cutting Days Total Credits
No. of Claims
Day* par Claim
X 7
Line-cutting Days Total Credits
X 7
X 7 -
Line-cutting Days Total Credits
No. of Claim*
Days per Claim
V
\\ \
TN
l l
'Y-V .'-
\
4W 00 4E 6E 8E I2E I6E 20E 27-1-70 E
L. 578024narrow
"i, qtz.veiif-
L.578022
L 578023
L 578021
BL. A Az.090 c
578028 L 578025
L. 578026
Cedar i some
. SpruceL.578027
T e l l u r i d e
Lake
l____ — __J— l/Qtz. vems irregular to 2' wide,trend shearing NE
P'tg la *
L. 578030 *
L.57S029
Slightly higher
with S pru ce
Telluride Lake
5780211 57*022 l37B023|578(M4,
:r V-~^f f 37802815780271576068 (578036 /*U———ii————^-Wi———
LOCATION, MAPSCALE : l' 1/2 M ILE
L- E G E N D
ANDESITE
a ) massive
b) pillowed
TUFF
GABBRO
——*- D own slope
C—-*1 Outcrop
x. Small outcrop
.—.—— Approximate geological boundary
*"" Trench
^ \ Bulldozed area
Swampy ground
Survey dates : June II -20, 1981
LYNCO RESOURCES INC.
GEOLOGICAL SURVEYBEEMER TOWNSHIP PROPERTY ,,
LARDER LAKE MINING D IVISION, ONTARIO
J.LILL SCALE: r*200' , juLY.i5,i98i
* J:-
42A83S*e*53 2.5519 BEEMER 200
^•. t j tJ ^,s^^ J --r.^^mi.M^;^ ....• i .^-; . fe^ ^^J8P^.^: ? - -^
^ —-*--i ^-..-!^:-.;,,. ^ '•;;. ;̂ i V/. ^ ^g^^A^-^ J 4- -••-X:.^-:^^.:, '
^;^F^^:-^, - , -.?--.'-- ' - ~ . A'.- 1 ' -j.,'' ~ - - -' \ . ; - J-* 'T.': ; .':\- ~;~y.- ' .'~,. --1 . -. ; " - :.' -'- ' V ' ^i.V 'i '"'' -' ' .-1 ' - ' ^" ' "'- "' ' ' " "; t ' -' S - '^ '- " t "ff!--"^'-: V^^f/*?:,*^:?;: , "' V . -V'!L---' ' ••"••'^ \,V**" VvvV -"" ' ; ^ ' ci* •//':S-'il "~.. :, -. ' ^ .rill.:.-:.'.. ;K,.. ; - '-- f" i-' - ^ - r '--' ••••-- -^ic^.-A- , ,, ;-',:as *? ..' ^ ' t . .,1*'. . ^ ' ; ,- ,. -, - '..' - - - , a.{.;'~. -,'* -.- - , - -'";-V " te'.^:'' - fa ''*. - ^v ; - ; -'' ,''Ji ,'; ' - ' *, -?,- i;, ' .'."V .-/.;--K--j . ' ,.', ^V^At'i'si.
"iV'tfi* ;
-v.;:^'
48 0 IO'
i vL. \. feJ/A
57802(1578022 15785S(B780a4,
-fl l
, L- i r L- /-0780281! 578027 1 57802 6 1 576028 ^
J^L^ \ \iZ9T5780Sol L
3M
MountjoyLofce
UJ. to
LOCATION MAPSCALE : l "s 1/2 MILE
C*;g-2M
zor
' JK
L E G E N D
Station, reading in gammas
A ^ Base station
A Control station
Contour interval ; ^00 gammas
Over 2000 gammas
1500-200O gammas
1000-1500 gammas
50O - IOOO gammas
Under 500 gammas
Instrument : Mcphar M 500 A
Survey dates :s -\:-,-
LYNCO RESOURCES
WAQNfTOMETlBv̂ i* " '*"
BEEMER TOWNSHfP
;.,;-^" "^4'rttf '^^^IM^-*^^ x.•'^^lIfel^:': ;-'W;M^. :-^^?'^^*
•"*!^, "^'"r- "-•- ' -,. "i " '" ; ?-*'\ ' ' '^'- ' - t''-- - t .-'-':^-r^it"'-"- " -•*-^^:;.^,, ^^•^:^^^m.-,.' ' ' **.'"- - 1 l f •"'t;!-' ' :-*.-^-'-*;."- f "
•-.-- r*:: * fc.'ict" irf'.i,.,* ;w
••* i s-,- .. . . -•wK- i 'I y '-r-y ' " ^' .'^• 1rvOV?.-,V^::5:̂ *! ---.-;'^L- - -v ^'fi*: . ^, ;- - " •'* ^-'*(- '*v-?^r; - . "' "i ' '. -- -'
"•p - ' "f'''r ";#-*' ;i''. 4l'"'"' i' . *' 'W'L* *s-' "Si ' ' -i'i ; ' i'-i 1 ".'" ' ' t""^"r ' : t -.- M-.1&4...;. ! L .t-*., ;-'-W'.' l :- 'BJ-'.-y'V-i- v- '^^^••-A
^^r^^^^^^^^^^v^Ti^s^^^^^^^Tn^r^^T^^^^^^^^^^^^^r^^
y"l'
4W 00 6E 8E I2E 16 E 20E 24E 27+70 E
2.5519 BEEMER
L. 57 8 0:30 r;
.578029^ .
f Q z T of b f ̂J v 6 y
48 0 IO'
\
5780311 378022 l579023|57B024,
y i.. l v. f j 37802eiP7BC
l^rp^i3780281278027 (578026 1578025
7~ ~
37902
LOCATION MAPSCALE ! l"' 1/2 MILE
Mountjoy Lake
LEGEND
IN PHASE
Solid line 07ooff vertical
QUADRATURE
Dashed line •^ off horizontal
Profile Scale : l" ' 30Vo
Instrument: Ronka EM. 16
Transmitter Station : Cutler, Maine
AU readings facing north
^ Strong conductor
O Weak conductor
Survey dates! June 11-20, 1981
5 j Bulldozed areas
8I 0 20'
LYNCO RESOURCES INC.
ELECTROMAGNETIC SURVEYBEEMER TOWNSHIP PROPERTY
LARDER LAKE MINING DIVISION, ONTARIO
JULY, (5,1981J.LILL SCALE: r-200'
320
4W 00 4E 6E 8E I2E I6E 20E 24E 27+70 E
42A83SWW53 2.5519 BEEMB?
^BL.'A Az.090
Telluride
48 0 IO'
l_tTV fl L. i \L^J/ L5780211 57802 2 1578023 j 578024,
5780281578027 157802 6 [ 578O25 — — -j. —. —--L.
LOCATION MAPSCALE : l"' 1/2 MILE
Mountjoy Lake
LEG N D
Station, reading in counts per second at all Gamma Energy levels of 01 Mev and higher
nstrument: MCphar TC'33A
Instrument elevation ; Hip level
Survey dates : June II - 20, 1981
^ -rt- ffr6 i B ulldozed areas
LYNCO RESOURCES INC.
SCINTILLOMETER SURVEYBEEMER TOWNSHIP PROPERTY
LARDER LAKE MINING DIVISION, ONTARIO
SC'ALE: i"*200'J.LILL
230