GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH
PRECAST DECK PANELS WITH UHPC CLOSURE JOINTS
SR 211 OVER BEECH CREEK
Bill DuVall, P.E. and Dexter Whaley, P.E.Georgia Department of Transportation
Office of Bridge Design
![Page 2: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/2.jpg)
• SR 211 / Beech Creek
• Rapid Deck Replacement
• Rapid Span Replacement
• Use of Precast Elements
• Ongoing and Future Work
ABC TECHNIQUES IN GEORGIA
2
![Page 3: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/3.jpg)
RAPID DECK REPLACEMENT
I-285 over Cobb
Parkway
I-285 over Buford
Highway
3
![Page 4: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/4.jpg)
EXODERMIC DECK PANELS
4
![Page 5: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/5.jpg)
RAPID SPAN REPLACEMENT
5
![Page 6: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/6.jpg)
RAPID SPAN REPLACEMENT
6
![Page 7: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/7.jpg)
PRECAST BRIDGE ELEMENTS
7
![Page 8: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/8.jpg)
PRECAST SUBSTRUCTURE
8
![Page 9: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/9.jpg)
SPMT
9
![Page 10: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/10.jpg)
SR 211 / BEECH CREEK
10
![Page 11: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/11.jpg)
• 148’ Single Span Bridge
• 40’ Gutter to Gutter
• Ultra High Performance Concrete (UHPC) for Joint Connections
• Full Depth Precast Deck Panels
• 60 Day Road Closure
PROJECT OVERVIEW
11
![Page 12: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/12.jpg)
DEMOLITION
• Clearing & Grubbing• Work Bridge• Demolition – June 1st
• 4 Days
12
![Page 13: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/13.jpg)
END BENTS
• HP 14 x 102 Piles• 3500 psi 24hr Accelerated Concrete• Cast In Place• 7 Days
13
![Page 14: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/14.jpg)
BEAMS
• 72” Bulb Tees• 10,000 psi Concrete• Steel Diaphragms• 2 Days
14
![Page 15: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/15.jpg)
FULL DEPTH PRECAST PANELS
• 4500 psi Concrete• 8 ¾” Depth• #5 Bars
• 6” T&B, Trans• 12”/6” T&B, Long
• 8’/9’ x 21’-5”
15
![Page 16: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/16.jpg)
JOINTS
• 2” Joint Top Opening• 5” Bar Lap• Why UHPC?
16
![Page 17: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/17.jpg)
SHEAR CONNECTION
• #5 Bar Hoop – 4”• 2” Minimum Depth
17
![Page 18: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/18.jpg)
PLACING PANELS
• 20 Minutes per Panel• 2 Days
![Page 19: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/19.jpg)
UHPC MIXING PLANTS
• 2 Mixers• Continuous Pour• Batch about 15 Minutes• LaFarge Personnel On-site• 2 Days
19
![Page 20: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/20.jpg)
UHPC COMPONENTS
• Cement - 1 Bag• Steel Fibers – 4 Bags• Safety Gear Required
• Tyvek Suits• Respirators• Gloves
![Page 21: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/21.jpg)
UHPC COMPONENTS
• Water/Ice – 130 lbs• P150 Super Plasticizer – 33.6 lbs• Digital Scale
21
![Page 22: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/22.jpg)
TESTING UHPC
22
![Page 23: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/23.jpg)
PLACING UHPC
23
![Page 24: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/24.jpg)
CONSTANT HEAD PRESSURE
• Chimneys• Covered Joints
24
![Page 25: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/25.jpg)
FORMWORKS
• Wood• Steel?• 8 Days
25
![Page 26: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/26.jpg)
ENDWALLS
• Forming Endwalls • Backfilling• Approach Slabs• Barriers• 9 Days
26
![Page 27: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/27.jpg)
FINISHING TOUCHES
• Paving• Bridge Grooving• Final Grading• Striping• 3 Days
27
![Page 28: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/28.jpg)
OPEN TO TRAFFIC
59 DAYS!
28
![Page 29: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/29.jpg)
LESSONS LEARNED
• Experience Using UHPC
• Larger Joint Openings
• Cost vs. Benefit
• Tolerances
• 30 Day Road Closure
29
![Page 30: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/30.jpg)
CONTRACT INFORMATION
Award: July 31, 2015
Bid Amount: $2,681,640.30
E.R. Snell Contractor, Inc.
Structural Engineering Solutions, LLC
30
![Page 31: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/31.jpg)
SPECIAL THANKS
Lawrence Kahn, Ph.D., P.E. – Georgia Institute of Technology
Ben Graybeal, Ph.D., P.E. – Federal Highway Administration
31
![Page 32: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/32.jpg)
FUTURE PROJECTS
• Elliott Road Bridge Replacement
– Precast Deck Panels
• Blackhall Road Bridge
– Decked Bulb-T’s
• Courtland Street Bridge Replacement
– Anticipate Incremental Launching
32
![Page 33: GEORGIA’S RAPID REPLACEMENT UTILIZING FULL-DEPTH …...Mar 16, 2017 · georgia’s rapid replacement utilizing full-depth precast deck panels with uhpc closure joints sr 211 over](https://reader033.vdocument.in/reader033/viewer/2022051814/60397a1a934d74200c78f2dd/html5/thumbnails/33.jpg)
CONTACT INFORMATION
Bill DuVall, P.E.
404-631-1985
Dexter Whaley, P.E.
404-631-1909
33