• Case histories Large-scale underground mine site characterization
MnDOT T.H. 53 relocation project
• Key points: Both projects required rock characterization
One data set was large, and one was very large
Data integration, software, and visualization are key
Two Case Histories of Data Management
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 3
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
Minnesota T.H. 53 RealignmentNear Virginia, MN
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 4
• Multiple information sources, each providing a different view of the rockMapping of rock exposures
Drilling
DTH logging
• Integration is key
• Software is critical
Key Points
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 5
• Insert Text Here
Roadway Realignment Concepts
W-1
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 6
TH53 Realignment
Historic Iron Ore Pit Iron Ore Pit Today
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 7
E-2 Alternative
Construct new, shorter, tall bridge through currently inactive mining area, further north of current US 53 alignment.
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 8
Principal Motivation–Design of Post Mining Rock Slopes
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 9
• RPA Photogrammetry:Extensive rock exposures available, but…
Mapping by personnel—access to large expanses of the slopes was prohibitive
LIDAR—problematic because of the distance across the pit lake
Photogrammetry does not expose personnel to the hazards of working on the rock slopes
Provides joint persistence information
• Acoustic Televiewer / Optical Televiewer loggingOriented core provides orientation, but…
Optical and acoustical logging provides orientation and estimate of discontinuity aperture and infilling thickness
What Methods and Why Chosen?
OrientationSpacing
Aperture & infilling thickness
OrientationSpacing
Persistence
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 10
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
RPA-Based Photogrammetry
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 11
Equipment & Planned flights
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 12
Resulting image with joints identified
3,176 total features mapped
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 13
Stereonets
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 14
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
Acoustic & Optical Logging
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 15
• Mount Sopris Instruments (MSI) 5MXA-1000 Matrix logger
• MSI 4WNA-1000 truck-mounted winch
• MSI 2CAA-1000 three-arm caliper probe
• Advanced Logic Technologies (ALT) ABI40-2G acoustic televiewer
• ALT OBI40 Mark V optical televiewer
• Borehole survey tool: GYRO SHOT®
Down-the-hole tools & methods
ATV
OTV
Photo courtesy of Hager Geosciences, Inc.
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 16
Plan View of Boring Program
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 17
• Depth
• 3D virtual core
• OTV image (unrolled)
• ATV image (unrolled)
• Caliper
• Features
ATV/OTV Logs
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 18
• Seventeen coreholes were logged
• Logged footage was about 6,800 ft
• Number of features logged Total about 12,320
Bedding features logged was about 8,703
Joint features logged was about 3,617
Some statistics
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 19
Raw data from ATV/OTV
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 20
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
Combined Data
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 21
Orientation Results
Photogrammetry (all domains, excl bedding)
ATV/OTV (all domains, excl bedding)
Photogrammetry & ATV/OTV (all domains, exclbedding)
All Data
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 22
KATS (Itasca’s In-House Kinematics Analyst)Discontinuity* Dip Dip Direction Friction Angle
Mean St Dev Mean St Dev Mean St DevJoint Set 1 81.7 6.2 110 90.6 43.5 26.3Joint Set 2 79.1 6.9 207 70.2 43.5 26.3Joint Set 3 80.3 7.1 183 89.1 43.5 26.3Joint Set 4 80.5 7.6 214 89.3 43.5 26.3Bedding Plane 11.9 6.5 254 84.2 44.4 24
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 23
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
East Highwall Fault
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 24
East Highwall Fault
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 25
Investigating Fault Location
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 26
Oblique View
SB Alignment
NB Alignment
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 27
Looking Down Strike of Shear Plane
SB Alignment
NB Alignment
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 28
East Pier Fault
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 29
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
3D 3DEC Models
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 30
Comprehensive Model
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 31
Model with Joints
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 32
FOS 1.5 Plasticity
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 33
FOS 1.5 Displacement Contours~1/2”
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 34
FOS 1.5 Magnified Displacements
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 35
• GoCAD Data integration and visualization
Targets the geology and geomechanics market
Developed for the petroleum industry
• Excel@Risk
Visual Basic routines
• Access
Software Tools
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 36
• Primary input for isthmus slopes, also contributed to design of east pier and abutment
• Increased reliability of kinematics analysis of possible block and wedge failures
• Demonstrated that three joint sets are vertical and one is subvertical, and was critical to identifying a slope failure mechanism by flexural toppling
• Assisted with investigation of a fault near the east pier
How did the characterization help the project?
CIVIL ● MANUFACTURING ● MINING ● OIL & GAS ● POWER GENERATION
January 20, 2017 Data Management for Rock Design Slide 37
17 Feb 2016:Pier 2 Foundations Complete18 Drilled Piles