Geotechnical ConsiderationsCompaction, Seepage, Pipe Joints, etc.
by
Hal Van AllerMaryland Dam Safety
![Page 2: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/2.jpg)
Wetter is Better!
• Benefits of Higher Degree of Compaction
– Higher shear strength– Lower permeability– Lower compressibility
• Negatives of Higher Degree of Compaction– Lower flexibility– Hydraulic fracture– Higher swell
pressures
![Page 3: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/3.jpg)
Embankment Fill Compaction
![Page 4: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/4.jpg)
Typical Specification
• Commonly specified range of placement water content is -2 to +2 percent of Standard Proctor Optimum
![Page 5: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/5.jpg)
Problems when too dry
• Allowing compaction 1 to 2 percent dry of optimum allows overcompaction (brittle)
• A typical clay soil can easily be compacted to 107 percent of its maximum Standard Proctor dry density if a water content of -2 % from optimum is allowed
![Page 6: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/6.jpg)
Inflexible fill compacted dry of optimum
Imprint of Sheepsfoot
Roller
Hard Discrete
Lifts
![Page 7: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/7.jpg)
Suggested Specification
• Better to specify 0 to +4 percent wet of optimum as an allowable placement water content range
• Difficult to over-compact soils at higher water contents
• But, wet soils may shrink when dry, so may not be appropriate for dry pond embankments
![Page 8: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/8.jpg)
Embankment Cracking
![Page 9: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/9.jpg)
Have you calibrated your nuclear gage today?
Nuclear gage is the most common method for measuring density and water content of compacted fills
![Page 10: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/10.jpg)
NRCS Experience
• Wet Density values are reliable if gage is kept calibrated
• Water Content readings usually require calibration
• Dry Densities obtained using corrected water contents are reliable
![Page 11: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/11.jpg)
NRCS Experience
• Nuclear meter measured water contents are usually higher than oven dry water contents
• Particularly for clay and mica rich soils.• Nuclear meter water content readings
may be lower than oven dry for loess soils
![Page 12: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/12.jpg)
ASTM D3017Water Content of Soil and Rock in Place
by Nuclear Methods (Shallow Depth)
• Measure water content with nuclear meter
• Obtain sample at meter location and measure oven dry or microwave water content
• Compute correction factor -(equipment manual)
![Page 13: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/13.jpg)
Importance of Corrections
• Many construction personnel are unaware of the need to evaluate this factor
• Large errors in water content result in large errors in computed dry density
![Page 14: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/14.jpg)
Potential Problems
• Poor calibration of equipment• Nuclear water contents not compared to
oven dry• NRCS experience is that nuclear meter
water content uncorrected for clay soils is commonly from 2-6 percent higher than oven dry water contents
![Page 15: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/15.jpg)
Typical Incorrect Conclusionsmade with uncorrected w%
• Water % is 5 percent wet of optimum• Dry Density is only 94.1 % of Maximum
Dry Density
• Fill is rejected as being not dense enough
• Fill is rejected as being too wet
![Page 16: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/16.jpg)
Filter Diaphragms
![Page 17: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/17.jpg)
Advantages of Filter Diaphragms
• Better compaction of the fill adjacent to the conduit
• Cracks that form in the fill along the conduit will be stopped by the filter
• No formwork for anti-seep collars• Separate diaphragm is not required if
chimney drain used
![Page 18: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/18.jpg)
Disadvantages
• Requires careful filter design• Compaction of the filter requires special
consideration• Many engineers are comfortable with
anti-seep collars and may resist new technology
![Page 19: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/19.jpg)
Filter Diaphragm Design• Design for finest soil/coarsest filter combination• Filter must be fine enough to prevent piping of the
base soil without clogging, and• Must be permeable enough to allow for seepage
flow to exit quickly.• Design guidelines on MDE “ftp” site• ASTM C-33 sand is usually suitable for fine soils
![Page 20: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/20.jpg)
Filter diaphragm limits
Excavation Limits 2(H):1(V) or flatter
Potential Hydraulic Fractures
Sand Filter Diaphragm
![Page 21: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/21.jpg)
Differential Settlement
Potential Cracks
![Page 22: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/22.jpg)
Filter placement after embankment fill
![Page 23: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/23.jpg)
Other Considerations
• Place filter before pipe/cradle!• Design engineer should be involved in
construction to ensure filter is compatible with actual embankment soils
![Page 24: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/24.jpg)
PLACEMENT MOISTURE
• Placement moisture is critical for obtaining the desired density.
• Complete saturation and drainage is often best for densifying fine drainfill.
• The problem with moisture in sand and some gravels occurs at certain moisture contents when bulking occurs.
![Page 25: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/25.jpg)
BULKING
Capillary water
Particle movement is restricted by forces holding the particles together.Bulking is caused by a
film of capillary water on the particle surface that, when contacting other particles, tends to pull the particles together.
The particles are positioned in an uncompacted manner and it takes high compactive effort to overcome the bulking forces.
![Page 26: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/26.jpg)
Saturation Eliminates BulkingComplete saturation and subsequent draining of drainfill materials will cause the particles to be suspended and then resettle in a more dense state. This may be the best method for obtaining specified density.
Capillary water is removed after saturation.
![Page 27: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/27.jpg)
Filter Suitability
![Page 28: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/28.jpg)
![Page 29: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/29.jpg)
![Page 30: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/30.jpg)
![Page 31: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/31.jpg)
![Page 32: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/32.jpg)
![Page 33: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/33.jpg)
![Page 34: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/34.jpg)
![Page 35: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/35.jpg)
Concrete Pipe Spillways• Materials
– ASTM C-361– AWWA C-300, C-301, C-304– Precast box culverts not acceptable
• Cradle– Reinforced or Unreinforced ?
• Settlement and Joint Extensibility– Camber ?
![Page 36: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/36.jpg)
Concrete Pipes
In addition to pipe standard specification, engineer should specify:
• Joint type (concrete, steel end rings, etc)• Gasket type• Amount of joint extensibility• Cradle details
![Page 37: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/37.jpg)
Joint Extensibility
![Page 38: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/38.jpg)
Joint Extensibility
40 ft dam on soft foundation with one foot settlement.
Each pipe joint may open 1.5 inches (L=20 ft)
L
![Page 39: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/39.jpg)
Reinforcement not continuous across pipe joints
Section Profile
Preformed joint filler
![Page 40: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/40.jpg)
Other Considerations
• Require as-built certifications at end of sediment control phase
• Design engineer should be involved in construction
• Design not done until structure is complete
![Page 41: Geotechnical Design Considerations Compaction, Seepage ...€¦ · PLACEMENT MOISTURE • Placement moisture is critical for obtaining the desired density. • Complete saturation](https://reader033.vdocument.in/reader033/viewer/2022053107/60766734ceb2e557a61740d3/html5/thumbnails/41.jpg)