GEOTECHNICAL INVESTIGATION FOR THE PROPOSED
CONSTRUCTION PROJECT AL-QADDAR HOMES MURREE NEAR MASYARI EXPRESSWAY, MURREE.
November, 2017
Client: AL-QADDAR HOMES MURREE
Submitted By:
CONSULTANTS . LABORATORY & FIELD TESTING . ANALYSIS
5-B/H-Block Commercial, Architects Engineers Housing Scheme, Near Shaukat Khanam Hospital Lahore. Ph: 042-35954850-51, 35978820 www.buildingstandards.com.pk
GEOTECHNICAL INVESTIGATION FOR THE PROPOSED CONSTRUCTION OF AL-QADDAR HOMES MURREE NEAR
MASYARI EXPRESSWAY, MURREE.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
TABLE OF CONTENTS
Sr.# DESCRIPTION PAGE #
1.0 INTRODUCTION 01
THE SCOPE OF WORK 03
2.0 FIELD INVESTIGATION 04
2.1 DRILLING OF BOREHOLES 04
2.2 LABORATORY TESTING 05
3.0 SUB SURFACE CONDITIONS 06
3.1 SUBSOIL CONDITION 06
3.2 GROUND WATER CONDITION 06
4.0 FOUNDATION DESIGN CONSIDERATION 07
4.1 GENERAL 07
4.2 SELECTION OF FOUNDATION TYPES 07
4.3 RECOMMENDATION FOR DEPTH OF FOUNDATION 07
4.4 ELASTIC SHEAR MODULUS 08
4.5 MODULUS OF SUBGRADE REACTION (KS) 09
4.6 COEFFICIENTS OF EARTH PRESSURE 09
5.0 THE EARTHWORK 11
5.1 CLEARING, GRUBBING, LEVELING AND GRADING 11
5.2 EXCAVATIONS 11
5.3 FILL MATERIAL 12
5.4 PLACEMENT AND COMPACTION 13
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
TABLE OF CONTENTS
6.0 CONSTRUCTION ASPECTS 14
APPENDIX A 15
FIGURES AND TABLES
APPENDIX B 19
BOREHOLE LOGS
APPENDIX C 26
GRAIN SIZE ANALYSIS
APPENDIX D 62
PICTURES
NOTES AND COMMENTS 64
1
Ref. No.: BS/171111-049 Date: 11/11/17
INTRODUCTION
Building Standards has been engaged by “Al-Qaddar Homes
Murree” for carrying out geotechnical investigations for
the proposed construction of Al-Qaddar Homes Murree near
Masyari Expressway, Murree.
The principal objective of the investigation was to
evaluate the surficial and subsurface conditions at the
site, select appropriate geotechnical parameters and to
make recommendations for the foundation design of and
allowable bearing pressures for the building structure.
Following the receipt of Notice to Proceed by the
authority, Building Standards commenced the field
investigation campaign with a team in November 2017 to
the site. Concurrent with field activities, selected
representative subsurface samples obtained from the
boreholes were tested at Building Standards laboratories
in Lahore.
This report on geotechnical investigation covers the
reporting requirement stipulated in the scope of work.
The report contains the main text together with tables,
figure, borehole logs and laboratory test data.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
2
The main text of the report presents a general
geotechnical assessment of the project area, details of
the investigation performed and an appreciation of the
subsurface conditions as well as recommendations and
conclusions with respect to the foundation design for the
proposed structures based on the investigation results.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
3
THE SCOPE OF WORK
The purpose of the investigation was to determine the
subsoil conditions for the construction of Al-Qaddar
Homes Murree near Masyari Expressway, Murree, and to
evaluate the subsoil parameters for determining the
allowable bearing capacity of the soil. Specifically the
scope of work included:
Field exploration, in-situ testing and sampling.
Laboratory testing
Analyses of data gathered through field and
laboratory investigations and preparation of report
including determination of allowable bearing
pressure under the foundations and recommendations
regarding safety of the structure.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
4
PHASE – I
FIELD INVESTIGATION It comprises as under:
1. DRILLING OF BOREHOLES
The field investigations included drilling of six
(06) boreholes at the locations marked by the
client. The borehole extended down to a depth of
6.0m below the existing ground level.
Exploratory borings of diameter 100 mm (4 inch) were
drilled using drilling Rig. Boreholes were
stabilized using casing. Standard Penetration Tests
(SPTs) were performed in accordance with ASTM D-1586
at 1.0m intervals up to the final depth explored.
SPT-Resistance values (N values) are shown on boring
logs attached in Appendix-B.
The disturbed samples recovered were preserved in
polythene bags and then placed in plastic
containers. All the samples were transported to the
Building Standards, Laboratory and other reputed
Laboratories in Lahore for testing.
Estimates of relative density of granular soils and
consistency of the cohesive soils given on the
boring logs, in general, are based on the SPT
resistance as recommended by Terzaghi and shown in
Table No. 1 (Appendix-A).
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
5
2. LABORATORY TESTING Selected soil samples from each test pit were tested
in laboratory at Lahore for classification and
determination of strength characteristics. All
laboratory tests were performed in accordance with
Standard ASTM procedures. The laboratory tests on
selected soil samples included the following:
a. Moisture content
b. Grain Size Analysis
c. Liquid and Plastic Limit Tests
d. Direct Shear Test
The summary of the laboratory test results is
presented in Table No. 2. The laboratory test
results are presented in Appendix-C.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
6
PHASE – II
THE SUBSURFACE CONDITIONS AT THE SITE
1. SITE CONDITIONS
The Al-Qaddar Homes Murree will be constructed at
Masyari Expressway, Murree. The site is about 11.0m
below road level.
2. SUBSOIL CONDITIONS (STRATIGRAPHY) The subsoil consists of heterogeneous deposits
consisting of soil mixed with gravel, cobbles and
boulders. The soil consists of predominantly clayey
silt with sand and exists in stiff to hard condition
of compactness.
Standard Penetration Tests (SPTs) were performed at
the site but their validity for design purpose is
not ascertained due to the presence of gravel,
cobbles and boulders. However careful observation at
the rate of penetration and the resistance offered
by the soil strata to the drilling operation was
made in order to access the state of compactness of
the sub soils. In general it was observed that the
compactness of the soil improves with depth.
2. GROUNDWATER
The groundwater was not encountered up to the
maximum depth of 6.0m below the existing ground
level during drilling operations conducted in
November 2017.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
7
PHASE – III FOUNDATION DESIGN CONSIDERATION 1. GENERAL
In order for the foundations to be safe, the load
carrying strata must be competent to sustain the
imposed loading without undergoing shear failure and
at the same time any settlements of the foundations
must not exceed the tolerable limits. Therefore, the
load carrying characteristics of the strata must be
evaluated from these two considerations.
2. SELECTION OF FOUNDATION TYPES Considering the competence of the strata, as
evaluated from the investigation results and the
type of the structures to be constructed either
R.C.C strip or mat foundation should be used for the
design of foundations.
3. RECOMMENDATION FOR DEPTH OF FOUNDATION
Taking into consideration the subsoil conditions and
the type of the structure, following recommendations
are made for the foundation design of the building
structures:
At the footprints of the foundations excavate and
remove the existing soil to a depth of 2.5m below
the existing ground surface.
Compact the bottom of excavation to a density not
less than 95% of the dry density obtained by
Modified AASHTO compaction test (ASTM D1557).
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
8
Raise the level to 2.0m depth below the existing
ground surface by using dense lean concrete.
Following the above recommendations, R.C.C strip
footing can be designed for a net allowable
bearing pressure up to 80 kPa (0.8 t/ft2) and mat
foundation can be designed for a net allowable
bearing pressure upto 110 kPa (1.1 t/ft2)
The bottom of excavations and all engineering fill
must be compacted to 95% of the dry density
obtained by Modified AASHTO compaction test (ASTM
D1557).
A senior geotechnical engineer should certify that
the compaction and foundations works have been
accomplished according to recommendations.
4. ELASTIC SHEAR MODULUS
The Shear Modulus relates shear strain to shear
force. This modulus, also referred as Modulus of
Rigidity is determined by following relationship
(Ref: Foundation Analysis and Design by J.E. Bowles)
Shear Modulus:
G = E
2 1( )
Where,
E = Modulus of Elasticity
= Poisson’s Ratio
In the present case, using SPT ‘N’ values empirical
correlations available in the literature; the
elastic modulus for on-site soils from depth below
about 2.0m can be taken as 10 MPa. Taking ‘E ‘as 10
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
9
MPa and = 0.3 the Shear Modulus is estimated as
3.8 MPa.
5. MODULUS OF SUBGRADE REACTION (KS) Vertical Modulus of Subgrade Reaction (Ks) also
referred as soil “spring” constant or coefficient of
subgrade reaction is defined as the deformation
induced in the soil per unit application of
pressure. This modulus is frequently used for design
of mat foundations and rigid pavements. Its
magnitude is not only a function of stiffness of the
foundation supporting strata, but it is also
depended on the foundation size and its rigidity.
The Modulus of Subgrade Reaction can be estimated
using the following relationship (Ref.: Foundation
Analysis and Design by J.E. Bowles).
Ks = 30(FOS)qa for 50 mm settlement
The value of Ks for on-site soil has been estimated
as 9,000 kN/m3.
6. COEFFICIENTS OF EARTH PRESSURES
The coefficients of earth pressures for granular
soils are essentially functions of the angle of
internal friction (). In case of heterogeneous
soils, such as those occurring at the site, the
estimation of coefficients of earth pressures should
be based on the shear strength parameters along the
weakest planes in the soil mass. The adopted value
of 16 degrees is therefore considered realistic for
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
10
earth pressure calculations. Accordingly the
coefficients of active, passive and at rest
pressures are estimated as follows:
(a) Coefficient of
Active Earth Pressure (Ka) = 1-Sin = 0.57 1+Sin
(b) Coefficient of Passive Earth Pressure (Kp) = 1+Sin = 1.77
1-Sin (c) Coefficient of "At rest" Earth Pressure (Ko) = 1-Sin = 0.72
In case of backfill materials, it is considered that
as recommended in subsequent section, the materials
shall be granular and compacted to a dry density of
not less than 95% of the maximum Modified Proctor
Density (ASTM D 1557) in case of the structural
fill, and not less than 90% in case of general
backfill. The granular backfill materials compacted
to these recommended density will develop an angle
of friction of the order of 35 degrees. Therefore
the coefficients of Earth Pressures for the well-
compacted engineering fill will be as under:
Active Earth Pressure (Ka) = 0.27
Passive Earth Pressure (Kp) = 3.69
At rest Earth Pressure (Ko) = 0.43
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
11
THE EARTHWORK
1. CLEARING, GRUBBING, LEVELING AND GRADING Prior to any construction activity at the site, it
must be cleared of all debris, and surface
vegetation. This can be carried out by
graders/dozers. For leveling and grading, stakes
should be installed on a grid marked by Surveying
Crews. The required levels to be attained through
cut or fill at the grid points must also be
identified.
The leveling and grading can be carried out by
normal earth moving machine. As predominantly silty
and sandy soils will be encountered in excavation
throughout the project area, no special problems are
anticipated in excavating and moving these soils
with excavators, scrappers and dozers.
2. EXCAVATIONS
The excavations for construction of foundations,
other substructures or for trenches for utility
lines can be made by using conventional earth moving
machinery including scrappers, dozers and trenchers
etc.
After reaching the designed foundation level and
before placing the foundation it is recommended that
the soil should be well compacted by using an
appropriate roller or equivalent.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
12
3. FILL MATERIALS
3.1 General Fill
The on-site material obtained from excavation
of topsoil is not suitable for general
backfilling at the site. The general backfill
should be granular and should contain limited
fines.
3.2 Structural Fill
The fill intended to support the structural
foundations or floors must comprise only the
"select materials". The "select fill material"
must be free of organic and other deleterious
substances. The material must be granular in
texture and be 100 percent passing 10cm sieve
and not more than 20 percent passing No. 200
sieve. The portion of the material passing No.
40 sieve shall have a maximum liquid limit of
35 percent and maximum plasticity index of 12.
It is estimated that a significant fraction of
the excavated on-site overburden soil material
does not meet the above recommended gradation
requirements for structural fill.
3.3 Backfill for Utility Trenches and
around Substructures
The soils used for backfilling the trenches and
around substructures must be free draining when
impermeability is not required, when free
drainage is desired, or when particularly good
bedding or foundations of low compressibility
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
13
are desired. Tractor compacted fill or fills
compacted by consolidating processes, the
materials used must be free draining sandy and
gravelly soils. When good bedding is required
under and around concrete pipe, the material
can easily be made to flow and can be compacted
to high density in the critical wedge under the
pipe and between the pipe and trench surfaces,
providing proper procedures are used for
wetting and vibrating the material.
4. PLACEMENT AND COMPACTION
It is recommended that structural fill be placed in
a manner that it extends a minimum distance beyond
the outer perimeters of structural foundations equal
to twice the average foundation width. Permanent
slopes beyond width should not be steeper than 1
vert: 3 Horz. All fill materials must be placed in
layers not exceeding 20 cms in loose state- In case
of general fill each layer should be compacted to a
dry density not less than 90% as determined by
Modified Proctor Compaction Tests (ASTM D-1557), or
to a minimum relative density of 70 percent. In case
of structural fill, the compacted density must not
be less than 95% determined on the basis of Modified
Proctor Compaction Tests (ASTM D-1586), or not less
then 75% of the relative density.
All compaction should be carried out at a moisture
content, within a tolerable range of -2 to + 2
percent of optimum.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
14
CONSTRUCTION ASPECTS We recommend the following measures for long-term
stability of the structures.
Compact the bottom of the excavation to not less
than 95% of the dry density obtained by Modified
AASHTO Compaction Test (ASTM D-1557) using
appropriate compaction equipment (such as tamping
plates).
A pad of at least 6 inches of 1:4:8 PCC (well
compacted) should be placed on the prepared ground
before placing foundations.
Engineering fill (A-1-a, A-1-b or A-3) should be
used as a back fill material. The commonly available
back fill material is A-3 (sand).
Plinth protection slab sloping away from the
buildings should be provided around the structure to
reduce ingress of water to foundation soils.
Proper surface drainage should be provided in the
project area and the area should be graded to keep
the surface runoff away from the structure. The
ingress of water from any source should be avoided.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
15
APPENDIX - A
FIGURES AND TABLES
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
16
TABLE NO. 1 EMPIRICAL VALUES FOR , qu, Dr AND UNIT WEIGHT OF SOILS BASED ON THE SPT
GRANULAR SOILS
Description Very Loose Loose Medium Dense Very
Dense
Relative Density, Dr 0–0.15 0.15–0.35 0.35–0.65 0.65–0.85 0.85–1.00
Standard Penetration Test value, N 0–4 5–10 11–30 31–50 51–UP
Approximate angle of internal friction, (degree) 25–28 28–30 30–35 35–40 38–43
Approximate range of moist unit weight, (pcf) 70–100 90–115 110–130 110–140 130–150
Submerged unit weight, sub 60 55–65 60–70 65–85 75
COHESIVE SOILS
Description Very Soft Soft Firm Stiff Very
Stiff Hard
Unconfined compressive strength, qu (tsf) 0–0.25 0.25–0.5 0.5–1.0 1.0–2.0 2.0–4.0 4.0–UP
Standard Penetration Test value, N 0–2 3–4 5–8 9–16 17–32 33-UP
Approx. range of saturated unit weight, sat (pcf) 100–120 100–130 120–140 130+
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
17
TABLE NO. 2
6Dep
th (m)
Soil Classification Atterberg’s Limit
Moisture Content
Direct Shear Unconfined
Compressive Strength
kPa. Gravel %
Sand %
Silt & Clay % LL% PL% PI% C
kPa o
Borehole No. 01
1.0 41 20 39 33 22 11 11.1 -- -- --
2.0 68 31 01 28 20 08 8.1 6.4 24.6 --
3.0 23 25 52 30 20 10 14.0 -- -- --
4.0 41 11 48 33 22 11 18.7 7.2 24.9 --
5.0 70 08 22 34 22 12 6.7 -- -- --
6.0 49 17 34 33 22 11 17.3 -- -- --
Borehole No. 02
1.0 27 21 52 35 20 15 14.8 -- -- --
2.0 35 11 54 34 22 12 14.8 -- -- --
3.0 56 11 33 33 22 11 12.0 4.4 25.5 --
4.0 59 09 32 33 22 11 12.0 -- -- --
5.0 50 17 33 Non-Plastic 8.4 2.7 26.2 --
6.0 43 17 40 Non-Plastic 8.1 -- -- --
Borehole No. 03
1.0 -- 19 81 35 20 15 15.4 -- -- --
2.0 12 25 63 32 22 10 16.7 -- -- --
3.0 47 19 34 28 20 08 9.1 -- -- --
4.0 56 33 11 28 20 08 12.4 6.3 23.9 --
5.0 18 27 55 28 20 08 11.1 -- -- --
6.0 15 13 72 28 20 08 14.9 7.4 24.6 --
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
18
TABLE NO. 2
6Dep
th (m)
Soil Classification Atterberg’s Limit
Moisture Content
Direct Shear Unconfined
Compressive Strength
kPa. Gravel %
Sand %
Silt & Clay % LL% PL% PI% C
kPa o
Borehole No. 04
1.0 35 27 38 26 18 08 13.6 -- -- --
2.0 -- 18 82 35 22 13 22.0 -- -- --
3.0 14 18 68 34 20 14 11.5 5.2 25.3 --
4.0 55 13 32 28 20 08 14.1 -- -- --
5.0 21 15 64 34 22 12 6.0 -- -- --
6.0 23 22 55 28 20 08 14.1 4.2 24.1 --
Borehole No. 05
1.0 26 22 52 28 20 08 14.6 -- -- --
2.0 Dry Sand Stone -- -- -- -- --
3.0 13 27 60 28 20 08 -- 4.9 25.1 --
4.0 52 15 33 28 20 08 13.2 -- -- --
5.0 40 23 37 28 20 08 6.2 -- -- --
6.0 23 28 49 28 20 08 -- 4.2 26.0 --
Borehole No. 06
1.0 03 30 67 28 20 08 17.2 -- -- --
2.0 32 19 49 28 20 08 14.1 3.9 25.2 --
3.0 28 20 52 28 20 08 16.3 -- -- --
4.0 55 14 31 26 18 08 11.5 -- -- --
5.0 32 31 37 27 19 08 7.5 -- -- --
6.0 08 27 65 33 22 11 12.4 6.3 24.7 --
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
19
APPENDIX - B
BOREHOLE LOGS
+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -
Depth(in mtr.) Sample
Disturbed SampleUndisturbed SampleS.P.T.Water TableDrill Core SampleVane Shear Test
REMARKS:
Date of CommencementDate of Completion
Tested By:
Checked By:t
Z
Strata Encountered LegendS.P.T.No. ofBlows
S.P.T. CURVEThick-ness
BORE HOLE NO.SHEET NO.WATER TABLE
of:::
1BH-01
1
Refusal
Refusal
Refusal
Refusal
Refusal
Refusal
1
2
3
4
6
7
8
9
5
10
G. Qasim
03-11-2017
03-11-2017
PROJECT:
CLIENT:
BrownHardSilty Claywith Gravel &Sandy Stone
Coordinates
20
Al-Qaddar Group of Companies
Proposed Construction of Al-QaddarHomes Murree.
Nil
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
End of Borehole
+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -
Depth(in mtr.) Sample
Disturbed SampleUndisturbed SampleS.P.T.Water TableDrill Core SampleVane Shear Test
REMARKS:
Date of CommencementDate of Completion
Tested By:
Checked By:t
Z
Strata Encountered LegendS.P.T.No. ofBlows
S.P.T. CURVEThick-ness
BORE HOLE NO.SHEET NO.WATER TABLE
of:::
1BH-02
1
Refusal
Refusal
Refusal
Refusal
Refusal
Refusal
1
2
3
4
6
7
8
9
5
10
G. Qasim
04-11-2017
04-11-2017
PROJECT:
CLIENT:
BrownHardSilty Claywith Gravel &Sandy Stone
Coordinates
21
Al-Qaddar Group of Companies Nil
End of Borehole
Proposed Construction of Al-QaddarHomes Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
Depth(in mtr.) Sample
Disturbed SampleUndisturbed SampleS.P.T.Water TableDrill Core SampleVane Shear Test
REMARKS:
Date of CommencementDate of Completion
Tested By:
Checked By:t
Z
Strata Encountered LegendS.P.T.No. ofBlows
S.P.T. CURVEThick-ness
BORE HOLE NO.SHEET NO.WATER TABLE
of:::
1BH-03
1
37
Refusal
Refusal
Refusal
43
34
1
2
3
4
6
7
8
9
5
10
G. Qasim
04-11-2017
04-11-2017
PROJECT:
CLIENT:
Coordinates
22
Al-Qaddar Group of Companies Nil
+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -
End of Borehole
BrownHardSilty Claywith Gravel
Proposed Construction of Al-QaddarHomes Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
Depth(in mtr.) Sample
Disturbed SampleUndisturbed SampleS.P.T.Water TableDrill Core SampleVane Shear Test
REMARKS:
Date of CommencementDate of Completion
Tested By:
Checked By:t
Z
Strata Encountered LegendS.P.T.No. ofBlows
S.P.T. CURVEThick-ness
BORE HOLE NO.SHEET NO.WATER TABLE
of:::
1BH-04
1
10
Refusal
Refusal
Refusal
Refusal
25
1
2
3
4
6
7
8
9
5
10
G. Qasim
05-11-2017
05-11-2017
PROJECT:
CLIENT:
Coordinates
23
Al-Qaddar Group of Companies Nil
+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -
End of Borehole
BrownStiff to HardSilty Claywith Gravel
Proposed Construction of Al-QaddarHomes Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
Depth(in mtr.) Sample
Disturbed SampleUndisturbed SampleS.P.T.Water TableDrill Core SampleVane Shear Test
REMARKS:
Date of CommencementDate of Completion
Tested By:
Checked By:t
Z
Strata Encountered LegendS.P.T.No. ofBlows
S.P.T. CURVEThick-ness
BORE HOLE NO.SHEET NO.WATER TABLE
of:::
1BH-05
1
49
Refusal
Refusal
Refusal
Refusal
Refusal
1
2
3
4
6
7
8
9
5
10
G. Qasim
06-11-2017
06-11-2017
PROJECT:
CLIENT:
Coordinates
24
Al-Qaddar Group of Companies Nil
+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -
End of Borehole
BrownHardSilty Claywith Gravel &Dry Sand Stone
Proposed Construction of Al-QaddarHomes Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
Depth(in mtr.) Sample
Disturbed SampleUndisturbed SampleS.P.T.Water TableDrill Core SampleVane Shear Test
REMARKS:
Date of CommencementDate of Completion
Tested By:
Checked By:t
Z
Strata Encountered LegendS.P.T.No. ofBlows
S.P.T. CURVEThick-ness
BORE HOLE NO.SHEET NO.WATER TABLE
of:::
1BH-06
1
Refusal
Refusal
Refusal
Refusal
Refusal
Refusal1
2
3
4
6
7
8
9
5
10
G. Qasim
07-11-2017
07-11-2017
PROJECT:
CLIENT:
Coordinates
25
Al-Qaddar Group of Companies Nil
+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -- - - - - -+ + + +- - - - - -
End of Borehole
BrownHardSilty Claywith Gravel
Proposed Construction of Al-QaddarHomes Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
26
APPENDIX – C
GRAIN SIZE ANALYSIS
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
27
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 01 1.0 Silty Clay with Gravel 33.0 22.0 11.0
Client: Al-Qaddar Homes Murree.
Location: Near Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
28
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 01 2.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
29
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 01 3.0 Silty Clay with Gravel 30.0 20.0 10.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
30
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 01 4.0 Silty Clay with Gravel 33.0 22.0 11.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
31
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 01 5.0 Silty Clay with Gravel 34.0 22.0 12.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
32
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 01 6.0 Silty Clay with Gravel 33.0 22.0 11.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
33
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 02 1.0 Silty Clay with Gravel 35.0 20.0 15.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
34
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 02 2.0 Silty Clay with Gravel 34.0 22.0 12.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
35
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 02 3.0 Silty Clay with Gravel 33.0 22.0 11.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
36
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 02 4.0 Silty Clay with Gravel 33.0 22.0 11.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
37
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 02 5.0 Stone Nil
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
38
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 02 6.0 Stone Nil
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
39
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 03 1.0 Silty Clay with Gravel 35.0 20.0 15.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
40
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 03 2.0 Silty Clay with Gravel 32.0 22.0 10.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
41
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 03 3.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
42
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Perc
ent
finer
by
wei
ght (
%)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 03 4.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
43
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 03 5.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
44
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 03 6.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
45
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 04 1.0 Silty Clay with Gravel 26.0 18.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
46
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 04 2.0 Silty Clay with Gravel 35.0 22.0 13.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
47
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 04 3.0 Silty Clay with Gravel 34.0 20.0 14.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
48
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 04 4.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
49
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 04 5.0 Silty Clay with Gravel 34.0 22.0 12.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
50
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 04 6.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
51
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 05 1.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
52
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 05 3.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
53
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 05 4.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
54
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 05 5.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
55
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 05 6.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
56
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 06 1.0 Silty Clay with Gravel 28.0 20.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
57
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 06 2.0 Silty Clay with Gravel 28.0 20.0 18.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
58
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand S i l t o r C l a y
Coarse Fine Coarse Medium Fine B.H. No. Depth (m) Classification LL (%) PL (%) PI (%)
Project: Proposed Construction of Al-Qaddar Homes Murree. 06 3.0 Silty Clay with Gravel 28.0 20.0 18.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
59
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 06 4.0 Silty Clay with Gravel 26.0 18.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
60
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 06 5.0 Silty Clay with Gravel 27.0 19.0 8.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
61
P A R T I C L E S I Z E D I S T R I B U T I O N C U R V E
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.1110100 Particle size (mm)
Per
cent
fin
er b
y w
eigh
t (%
)
Gravel Sand
S i l t o r C l a y Coarse Fine Coarse Medium Fine
B.H. No. Depth (m) Classification LL (%) PL (%) PI (%) Project: Proposed Construction of Al-Qaddar
Homes Murree. 06 6.0 Silty Clay with Gravel 33.0 22.0 11.0
Client: Al-Qaddar Homes Murree.
Location: Near Masyari Expressway, Murree.
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
62
APPENDIX – D
PICTURES
Construction of Al-Qaddar Homes Murree near Masyari Expressway, Murree.
63