L.A. Turbine welcomes
CFE
January 28, 2010
![Page 2: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/2.jpg)
22
L.A. Turbine Locations
L.A. Turbine Headquarters
29151 Avenue PennValencia, CA 91355USATel: +1 (661) 294-8290Fax: +1 (661) 294-8249www.laturbine.com
L.A. Turbine EuropeZAC de Normandie Parc
Hôtel d′Entreprises27120. DOUAINS. France.
Office: +33 (0) 232 52 46 24Fax: +33 (0) 970 62 25 02
![Page 3: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/3.jpg)
33
Turboexpander Experience
ManagementJohn Maskaluk: former-Rotoflow Operations Manager (9 years)Halina Jasinska: former-Rotoflow QA Manager (19 years)Lota Kubota: former-Rotoflow QA Administrator (9 years)Idris Kebir: former-Rotoflow Project Management (27 years)David Bloss: former-Rotoflow & Mafi-Trench Project Management (12 years)
EngineeringTolic Markovitch: former-Rotoflow Wheel Specialist (29 years)Richard Samson: former-Rotoflow Control Engineering Manager (35 years)Muching Lin: former-Rotoflow Gas Dynamics (32 years)Leo Pomerants: former-Rotoflow Systems Engineer (30 years)Jackie Yeh: former-Rotoflow Gas Dynamics (10 years)Lidia La Serna: former-Rotoflow Core Lead Design Engineer (30 years)William Koo: former-Rotoflow Systems Engineer (28 years)Tinh Ngo: former-Rotoflow Drafter / Stack up (25 years)Lai Tran: former-Rotoflow Designer / Stacker(25 years)
Assembly and Field ServiceJulio Oliva: former-Rotoflow Manufacturing-Assembly Manager (35 years)Segundo Diaz: former-Rotoflow Packaging Manager (29 years)Gerardo Garcia: former-Rotoflow System Assembly (5 years)Mike Beneteau: former-Rotoflow Field Service Manager (32 years)
![Page 4: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/4.jpg)
44
Products / Services
New Equipment
Geothermal Applications
Redesign
Control Systems
Spare Parts
Repairs
Engineering Services
Field Services
Rotoflow® and other Turboexpander Manufacturer Support
Magnetic Bearings
Products Services
![Page 5: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/5.jpg)
555
LAT Team
Management, 4
Shop Floor, 20
Sales & Marketing, 3
Engineering, 19
Project Management, 4
Field Service, 2
Administration, 6
2009 Total Employees: 54
![Page 6: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/6.jpg)
66
ProductsNew Equipment – Oil & Gas
L.A. Turbine designs and manufactures Turboexpanders for use in Hydrocarbon Gas Processing, Air Separation, Refrigeration and Energy Recovery Industries:
•Expander-Compressor•Expander-Generator•Expander-Brake
![Page 7: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/7.jpg)
77
ProductsNew Equipment – Geothermal
L.A. Turbine is the most experienced manufacturing company of Turboexpander equipment to generate power from geothermal renewable energy.
300+ years of experience in geothermal Turboexpander Technologies.
Our team built the equipment for Mammoth Pacific and Steamboat Nevada (Ormat) as well for CalEnergy in Salton Sea.
14,000 HP Geothermal Turboexpander
![Page 8: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/8.jpg)
88
PLC Control with HMI (Panel View)
L.A. Turbine offers full control systems. Features including:•Panel View HMI•Ethernet Compatibility•Upgradable and Expandable
![Page 9: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/9.jpg)
99
ServicesEngineering Services
Front-end engineering design and systems integration Vibration testing and analysis Performance testing Rotordynamics (lateral and torsional) Finite Element stress and structural dynamic Analysis (FEA) Computational Fluid Dynamics (CFD) Machinery refurbishment re-rates and upgradesSophisticated Three- Dimensional (3D) Modeling Advanced product/prototype development Training and course development
![Page 10: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/10.jpg)
101010
ServicesRepairs
L.A. Turbine has the ability and expertise repair, reproduce, or manufacture turboexpander replacement parts at a significantly lower cost while providing shorter lead-times compared to OEM’s.
![Page 11: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/11.jpg)
111111
ServicesField Service
24 hours day - 7 days week serviceInspection and evaluation Turboexpander,Turbocompressor, Gear Box, and Pump overhaulEquipment Removal and InstallationLaser and Conventional AlignmentField BalancingVibration MonitoringPickup & DeliveryTurnaroundsParts FabricationSeals & GasketsOil and Magnetic Bearings
![Page 12: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/12.jpg)
1212
Full In – House Machine Shop
L.A. Turbine has full, in-house machine shop capabilities that give us full control over quality and timing of a project.
![Page 13: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/13.jpg)
1313
Internal Functions
![Page 14: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/14.jpg)
1414
Full Engineering Analysis
L.A. Turbine fully engineers each machine and it’s individual parts before any production, using 3 dimensional modeling.
![Page 15: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/15.jpg)
1515
IGV Inlet Guide Vane Operations Principle
![Page 16: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/16.jpg)
1616
Turboexpander Inlet Guide Vaneswith Friction Free Double Piston Ring
![Page 17: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/17.jpg)
1717
Turboexpander Inlet Guide Vanes
![Page 18: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/18.jpg)
1818
Turboexpander withOil Bearings
This bearing design provides increased wear allowance in comparison to conventional tilting pad bearings. The precision manufacturing tolerances of L.A. Turbine’s bearings maintain shaft alignment and protect the seals more effectively than conventional tilting pad bearings.
L.A. Turbine bearings are constructed from bronze and are Babbitt metal lined. The advantages of this lining are that it is self-repairing (after minor upsets) and that it cannot adhere to or damage the shaft. Should bearing service be required, the bearing lining can be replaced rather than replacing the entire bearing.
![Page 19: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/19.jpg)
1919
L.A. Turbine Movie
![Page 20: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/20.jpg)
20
CASE 1: L6000 Frame
20
Cabezal (Mezcla)P 600
psig
Vapor Alta
Presión
Aguaseparada
Vapor BajaPresión
Agua separada
Agua separada a
230 psig
Turbo-generador
Vapor a P 500
psig
Vapor a
230 psig
Entrada aSeparador(Mezcla)P 500
psig
Red alta presión
A centrales actuales
de generació
nRed baja presión
Saturated Temp: 470 oF
Group 1: 234.7 ton/hrGroup 2: 186.9 ton/hrGroup 3: 189.6 ton/hr
![Page 21: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/21.jpg)
21
CASE 1: L6000 Frame
21
Operating Condition Group 1 Group 2 Group 3
UNIT Exp Exp ExpMolecular Weight 18.02 18.02 18.02
Inlet P1 (PSIG) 500 500 500
T1 (F) 470 470 470
Outlet P2 (PSIG) 230 230 230
T2 (F) 399 399 399
Flow (ton/hr) 234.7 187 189.6(lb/hr) 517420 412040 417992
Delta Hs (Btu/lbm) 61.1 61.1 61.1ACFM Inlet 7770 6187 6277
Outlet 16238 12931 13118Shaft Speed 14,000 16,000 16,000Specific Speed 1,516 1,546 1,558Diameter (in) 18.50 16.50 16.50Efficiency (%) 86.0% 86.0% 86.0%Wheel Power (hp) 10677 8502 8625Wheel Power (kw) 7962 6340 6432Weight Liquid 2 (%) 6.0 6.0 6.0Tip Speed (fps) 1130 1152 1152
Z1 / Z2 & Zavg 0.838/0.901 0.838/0.901 0.838/0.901
Flanges In (in) 20 20 20Gas Velocity (fps) In 59 47 48Flanges Out (in) 24 24 24Gas Velocity (fps) Out 86 69 70
![Page 22: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/22.jpg)
22
Tubería y Válvulas de corte 4x24”, 800 t/h,
180 psig
150 psig
Turbogenerador180 psig
CASE 2: JT Valve (Butterfly Valve)
22
Saturated Temp: 380 oF
Wheel Power: ~ 1,537 kW/unit
4x
CASE 3: JT Valve (Butterfly Valve)
Secador
Vapor 375 t/h Calidad = 99%
169.2 psig
110 psig
E/RCPU
375 t/h105 psig
Turbogenerador
Saturated Temp: 380 oF
Wheel Power: ~ 3,261kW/unit
2x
![Page 23: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/23.jpg)
23
CASE 2: JT Valve (Butterfly Valve)
23
![Page 24: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/24.jpg)
2424
General Arrangement
![Page 25: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/25.jpg)
2525
General Arrangement
![Page 26: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/26.jpg)
2626
Service Assembly
![Page 27: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/27.jpg)
2727
Wheels – closed and open
![Page 28: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/28.jpg)
2828
Core Design Features
![Page 29: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/29.jpg)
2929
Engineering OptimizationWheels, Nozzles, Rotor
![Page 30: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/30.jpg)
3030
MSC Cross Section
![Page 31: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/31.jpg)
3131
P & ID and System Schematic
![Page 32: Geothermal Presentation_jan 2010](https://reader033.vdocument.in/reader033/viewer/2022061214/549dff6cb379599b618b45c8/html5/thumbnails/32.jpg)
3232
Thank you
from