gerald j. carey gardens brooklyn, ny · carey gardens $ 86,711,000 total # 4 682 1,681 8.37 8 46 23...
TRANSCRIPT
GERALD J. CAREY GARDENSBrooklyn, NY
2
13
W 24TH STREET
W 23RD STREET
W 22ND STREET
MERM
AID AVENU
E
SURF AVEN
UE
NORTH
PROPOSED ELEVATED CENTRAL HEATING PLANT BUILDING, WITH PARKING BELOWNEW GENERATOR
ADDITION AT BUILDING 3SITE BOUNDARY
SITE BOUNDARY
SITE BOUNDARY
EXISTING PARKING
EXISTING BALL COURT
EXISTING BALL COURT
EXISTING PARKING
EXISTING PARKING PROPOSED EMERGENCY GENERATORS
EXISTING BUILDINGS PROPOSED BOILER HALL
PROPOSED MECHANICAL ADDITIONS
PROPOSED MECHANICAL ADDITION AT BUILDING 2
EXISTING COMMUNITY
CENTER
IMAGE “A”IMAGE “C”
IMAGE “A” - PROPOSED ELEVATED CENTRAL HEATING PLANT BUILDING CONCEPTUAL - NOT FINAL
IMAGE “C” - RENOVATED LOBBY AND NEW PLANTED FLOOD BARRIER
IMAGE “B” - TYPICAL PLAN OF LOBBY RENOVATION AND NEW PLANTED FLOOD BARRIER
NEW PLANTED FLOOD BARRIER “LEVEE”, WITH INTEGRATED SEATING
AUTOMATIC FLOOD BARRIER
NEW STAIR OVER TOP OF “LEVEE”
NEW ENTRANCE DOORS, WINDOWS, AND FINISHES AT RENOVATED LOBBY
IMAGE “B”IMAGE “B”
IMAGE “B”
NEW YORK CITY HOUSING AUTHORITYSANDY RECOVERY PROGRAM MANAGEMENT OFFICE
Sandy Recovery ProgramPermanent Repairs
Districts
Development
Current estimated allocation necessary for FEMA scope
Residential Buildings Apartments Population Acreage Congressional
State Assembly
State Senate
City Council
CAREY GARDENS 86,711,000$ Total # 4 682 1,681 8.37 8 46 23 47Est. Construction Start*
Q2-16# of Damaged Bldgs. funded by FEMA**
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
▪
All Residential Buildings
Site Restoration (sidewalks, fencing and ground fill to positive drain, etc.) of Sandy damaged areas as well as any areas that may be affected by construction
Site Restoration - (Asphalt resurfacing) of Sandy damaged areas as well as any areas that may be affected by construction
Repair and restore architectural features (walls, floors) of common areas damaged by flooding. Replace doors, frame & hardware damaged by flooding
Remove underground fuel oil storage tank(s) as required.
Installation of stairwell lighting
Restoration of Sandy damaged portions of mechanical, electrical and plumbing systems
New building to house boiler equipment above the DFE
Dry flood proofing above DFE to protect building envelope in flood prone areas
Contents damaged as a result of Sandy (i.e. equipment and supplies)
Restoration of play ground surface areas and play structures damaged by Sandy
Replacement of underground conduits & site lighting (in Sandy flooded areas)
CCTV and Layered Access Systems
Installation of stand-by generators to provide full back-up power
Abate & restore building crawl spaces
New electrical annexes to be located above the Design Flood Elevation (DFE) to house new C/T cabinets
Full roof replacement
FEMA 428 Scope
DFE ‐ Design Flood Elevation* These are estimated dates and are subject to change**The determination of whether a building was damaged by Sandy and eligible for funding was made by FEMA