german-thai technology conference biogas in thailand 8th of june 2558 … · full service during...

13
page 1 Dr. rer. nat. Nils Rottmann “Green Asia” a Thai - German cooperation German-Thai technology conference "Biogas in Thailand" 8 th of June 2558 B.E. presented by Dr. Nils Rottmann, CEO of BioEnergy Germany Co. Ltd and NORTH TEC BIOGAS THAILAND Co. Ltd. © by MOE Thailand

Upload: others

Post on 04-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 1 Dr. rer. nat. Nils Rottmann

“Green Asia” a Thai - German

cooperation

German-Thai technology conference "Biogas in Thailand" 8th of June 2558 B.E.

presented by Dr. Nils Rottmann,

CEO of BioEnergy Germany Co. Ltd

and NORTH TEC BIOGAS THAILAND Co. Ltd.

© by MOE Thailand

Page 2: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 2 Dr. rer. nat. Nils Rottmann

Our general aims: turnaround in energy policy, from fossil-fuel to renewable energy

fair and suitable prices ecological, economical and social sustainable inspiring of the people

development, installation and operation of biogas plants/projects best and latest technology social and ecological responsibility agricultural, MSW and industrial waste biogas plants

cooperation with local partners rural development research and development of new suitable products cooperation with subcontractors and deliverer

“green Asia made in Thailand” 1st biogas in Thailand and at 2nd biogas in south-east Asia made in Thailand

Page 3: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 3 Dr. rer. nat. Nils Rottmann

Looking for partner:

sales / project development (agriculture, industry, fertilizer production)

- of machinery/technology or whole projects

engineering offices/company - use of our technology

construction companies - earth- and concrete foundation work - steel construction, pipeline construction

fertilizer production / sales investors or investment consultancy

… open for further ideas …

Page 4: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 4 Dr. rer. nat. Nils Rottmann

turnkey biogas systems BTO and BOO Model systems plant management optimization and expansion delivery of components service & maintenance control room monitoring (24/7) biological (laboratory) services consulting & financing automation control systems cabinet construction software and database development power solutions robotic technology special purpose machinery

The NORTH-TEC Group

The steadily growing NORTH-TEC GROUP consists of several companies which

operate in various branches:

Page 5: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 5 Dr. rer. nat. Nils Rottmann

headquater of NORTH-TEC Maschinenbau GmbH, Bredstedt, Germany control room of NORTH-TEC Maschinenbau GmbH (24/7, live control of biogas plants)

Experiences > 12 years:

installation of biogas plants i.e. in Germany, Italy, Latvia and Croatia

biological support/monitoring of more than 300 international biogas plants

service and maintenance of more than 600 biogas plants p.a

repowering and optimization of existing plants

optimization of plant biology and substrate use

consequent development of technology, concepts and biology

connecting of economy, ecology and social factors/society

Page 6: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 6 Dr. rer. nat. Nils Rottmann

Special features: located in Nakhon Ratchasima (German and Thai staff) service and contact in Thailand as well as in different languages full service during the whole project, all from one source laboratory service & service and maintenance of all our products different plant models (turnkey, BTO, BOO, up to 20 Years guaranty) latest German technology and practice proofed equipment special products (made in Germany) - technical building NT 9000 - plant control system - NT power Pro software - online data base (ODB) - 24/7 control room - separation unit NT1000 V2 high efficient process biology: thermophilic process

pump distributor inside of the technical building NT9000

Page 7: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 7 Dr. rer. nat. Nils Rottmann

Monitoring and engineering services feasibility studies, project development, complete licensing process plant engineering and plant construction monitoring and controlling of the of test run plant monitoring: continuously monitoring of all important parameters of the biogas plant 24/7 monitoring via NT/BEG control room plant management financial monitoring and accounting laboratory services for biogas plants system design, input material and energy calculation consultancy for biogas plant operation, manufacturing/installation, use of input materials (organic waste, organic byproducts, energy crops or organic waste water) financing service

Page 8: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 8 Dr. rer. nat. Nils Rottmann

Technical building NT9000 “plug and play” technical heart of the biogas plant approx. 9 m long, 2.70 m tall and 3 m wide a fire-resistant partition wall divides the building central control station for the plant pre-commissioned in Germany and shipped to whereever needed placed between two tanks (incl. i.e. switching cabinets, desulphurization unit, heating circuit distributor, compressed air supply, compact distributor with a substrate rotary lobe pump)

Page 9: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 9 Dr. rer. nat. Nils Rottmann

Plant control system with NT power Pro software

user-friendly and intuitive design extremely high degree of automation: keep control of every drive and sensor in the plant detailed failure reports: priorization of alarms and forward to mobile phone helpful diagrams visualize plant parameters reduced energy consumption through the Energy management recipe management all data is stored in the online data base

Page 10: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 10 Dr. rer. nat. Nils Rottmann

24/7 Control room

a team of technicians offer 24/7 plant control surveillance guarantees optimal servicing of the biogas plant at any time further, we analyze plant system failure reports and give advice on how to solve them the NORTH-TEC BIOGAS THAILAND service team is available 24 hours a day, 7 days a week to move out to the biogas plant

Page 11: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 11 Dr. rer. nat. Nils Rottmann

Biological support

0

2000

4000

6000

8000

10000

12000

14000

0 2 4 6 8 10 12 14 16 18 20 22 24

Pro

du

ctio

n o

f el

ectr

icit

y [k

W/d

]

term of operation [weeks]

start up phase of a 500 kW biogas plant

mit biol. Betreuung ohne biol. Betreuung

ca. 4-6 weeks

0

2000

4000

6000

8000

10000

12000

14000

58 60 62 64 66 68 70 72 74 76 78 80 82

Pro

du

ctio

n o

f el

ectr

icit

y [k

W/d

]

term of operation [weeks]

operation phase of a 500 kW biogas plant

mit biol. Betreuung ohne biol. Betreuung

96%

85%

with biological support very experienced operator without biological support

with biological support very experienced operator without biological support

difference in start up phase (week 0-10): ca. 250.000 kWh (1,460,000 THB) (for 1 MW plant = 2,920,000 THB) safe and fast start up less stress rapidly revenue

difference in operation phase: ca. 8,000 THB per day (for 1 MW plant = 16,000 THB) less fluctuation in operation and higher operation level

Page 12: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 12 Dr. rer. nat. Nils Rottmann

natural gas substitute simple, robust and efficient technology e.g. for industrial processes, households as well as fuel for natural gas cars

Gas conditioning via membrane technology Upgrade to a gas quality up to natural gas (methane >99,5%) no waste water treatment easy process, little maintenance no chemicals involved fits into a standard container flexible operation easy to scale-up high methane yield high product gas quality

Page 13: German-Thai technology conference Biogas in Thailand 8th of June 2558 … · full service during the whole project, all from one source laboratory service & service and maintenance

page 13 Dr. rer. nat. Nils Rottmann

contact: Dr. rer. nat. Nils Rottmann graduate environmental scientist CEO – BioEnergy Germany Co., Ltd. CEO – NORTH TEC BIOGAS THAILAND Co., Ltd [email protected] www.bioenergy-germany.com [email protected] www.north-tec.de references and further information on request

“Green Asia” made in Thailand

© by MOE Thailand