get in touchenergikontoretostergotland.rationellit.se/.../beast_leaflet2_edit_new.pdf · the sole...

2
The sole responsibility for the content of this leaflet lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EASME nor the European Commission are responsible for any use that may be made of the information contained therein. Lead Partner East Sweden Energy Agency Project Coordinator - Ylva Ek [email protected] +46 13 29 09 97 www.energiost.se BEAST project started in March 2014 and will be implemented by February 2017 (36 months). Project Partners Co-funded by the Intelligent Energy Europe Programme of the European Union Get in Touch www.beastproject.eu www.facebook.com/BEASTprojectEU https://twitter.com/BEASTprojectEU Co-funded by the Intelligent Energy Europe Programme of the European Union IEE/13/839/S12.675536 Spain Canary Islands Institute of Technology (ITC) Wind Diesel System for Fuerteventura – Off-grid electrification with RES of a small remote fishing village in the island of Fuerteventura. Proposal is for a wind-diesel system to substitute diesel consumption with RES. Analysis of the technical and economic feasibility, and addressing multilevel governance issues is ongoing. Microgrid for La Graciosa – Electrification solution for a small community - a high RES penetration microgrid combining PV, low power wind turbines, energy storage and ICTs (Demand Management; wind-solar forecasting). The system is being designed, including analysis of dynamic stability and technical and economic feasibility. Issues related to multilevel governance being addressed. Croatia University of Zagreb (UNIZAG FSB) Infrastructure and public procurement of electric vehicles – In Dubrovnik-Neretva County workshops were held on SEAP management and business model generation. Business plan for introduction of infrastructure prepared, two semi-fast chargers installed by NP Mljet. Promoting the procurement of electric and plug-in hybrid vehicles ongoing. Biomass district heating CHP – BEAST project organized Jam session, which gathered interested stakeholders to identify all barriers and search for possible solutions. National utility company HEP Toplinarstvo is finishing feasibility study to provide a solution acceptable to all stakeholders on the CHP system in the City of Velika Gorica. Community RES on islands – Dubrovnik-Neretva County has the biggest potential for utilization of solar energy in Croatia so the implementation of RES is primarily focused on solar energy. After holding workshops, completion of the business plan is ongoing and PV ESCO model for implementation of photovoltaic solar panels on the roofs in the County. United Kingdom United Kingdom Western Isles Council (CNES) Low Carbon and Energy Efficient Properties – Partners have defined the business case for increased investment in External Wall Insulation for ‘hard to treat’ houses in the Outer Hebrides. Through BEAST we are now pursuing additional finance and funding to support this Local Energy Supply Company – We have created ‘Hebrides Energy’, a community interest company set up to provide access to cheaper, green electricity in an area with the highest levels of fuel poverty in the United Kingdom Commercialisation of Marine Energy in the Outer Hebrides – The Outer Hebrides has a significant marine energy resource and the largest fully consented marine energy site in the world Through BEAST we are working with developer interests and government to identify and progress actions to accelerate the timescale for deploying marine energy in the Outer Hebrides.

Upload: others

Post on 08-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Get in Touchenergikontoretostergotland.rationellit.se/.../BEAST_leaflet2_edit_new.pdf · The sole responsibility for the content of this leaflet lies with the authors. It does not

The sole responsibility for the content of this leaflet lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EASME nor the European

Commission are responsible for any use that may be made of the information contained therein.

Lead PartnerEast Sweden Energy AgencyProject Coordinator - Ylva [email protected]+46 13 29 09 97www.energiost.se

BEAST project started in March 2014 and will be implemented by February 2017 (36 months).

Project Partners

Co-funded by the Intelligent Energy EuropeProgramme of the European Union

Get in Touch

www.beastproject.eu

www.facebook.com/BEASTprojectEU

https://twitter.com/BEASTprojectEU

Co-funded by the Intelligent Energy EuropeProgramme of the European Union

IEE/13/839/S12.675536

SpainCanary Islands Institute of Technology (ITC)Wind Diesel System for Fuerteventura – Off-grid electrification with RES of a small

remote fishing village in the island of Fuerteventura. Proposal is for a wind-diesel

system to substitute diesel consumption with RES. Analysis of the technical and

economic feasibility, and addressing multilevel governance issues is ongoing.

Microgrid for La Graciosa – Electrification solution for a small community - a high

RES penetration microgrid combining PV, low power wind turbines, energy storage

and ICTs (Demand Management; wind-solar forecasting). The system is being

designed, including analysis of dynamic stability and technical and economic

feasibility. Issues related to multilevel governance being addressed.

CroatiaUniversity of Zagreb (UNIZAG FSB)Infrastructure and public procurement of electric vehicles – In Dubrovnik-Neretva

County workshops were held on SEAP management and business model

generation. Business plan for introduction of infrastructure prepared, two semi-fast

chargers installed by NP Mljet. Promoting the procurement of electric and plug-in

hybrid vehicles ongoing.

Biomass district heating CHP – BEAST project organized Jam session, which

gathered interested stakeholders to identify all barriers and search for possible

solutions. National utility company HEP Toplinarstvo is finishing feasibility study to

provide a solution acceptable to all stakeholders on the CHP system in the City of

Velika Gorica.

Community RES on islands – Dubrovnik-Neretva County has the biggest potential

for utilization of solar energy in Croatia so the implementation of RES is primarily

focused on solar energy. After holding workshops, completion of the business plan

is ongoing and PV ESCO model for implementation of photovoltaic solar panels on

the roofs in the County.

United KingdomUnited Kingdom Western Isles Council (CNES)Low Carbon and Energy Efficient Properties – Partners have defined the business

case for increased investment in External Wall Insulation for ‘hard to treat’ houses in

the Outer Hebrides. Through BEAST we are now pursuing additional finance and

funding to support this

Local Energy Supply Company – We have created ‘Hebrides Energy’, a community

interest company set up to provide access to cheaper, green electricity in an area

with the highest levels of fuel poverty in the United Kingdom

Commercialisation of Marine Energy in the Outer Hebrides – The Outer Hebrides

has a significant marine energy resource and the largest fully consented marine

energy site in the world Through BEAST we are working with developer interests and

government to identify and progress actions to accelerate the timescale for

deploying marine energy in the Outer Hebrides.  

Page 2: Get in Touchenergikontoretostergotland.rationellit.se/.../BEAST_leaflet2_edit_new.pdf · The sole responsibility for the content of this leaflet lies with the authors. It does not

CyprusCyprus Energy Agency (CEA) Energy efficiency measures and penetration of RES to the Municipal Swimming

Pool of Lakatamia Municipality – CEA carried out an energy audit to identify the

potential for energy savings. Measures proposed are - optimization of pool and pumps

operation, installation of biomass boiler, solar thermal system for hot water, and

installation of photovoltaics .These will be implemented by an ESCO. Energy savings

calculated as potentially up to 81,900 €/year (66%) and 352 MWh of primary

energy/year.

Upgrade of the Street Lighting in 20 local authorities in Cyprus – aiming to

significantly reduce carbon dioxide emissions and the annual spend for public lighting.

55, 940 pieces of existing lighting will be replaced with new LED lighting. Expected

energy savings around 50%. The procurement for ESCO launched in August 2015,

contract under preparation.

Energy efficiency measures and penetration of RES to the Municipal Town hall of

Aradippou Municipality – Municipal staff joined the capacity building activities

through BEAST, the energy audit of the building was completed in June 2015 and

recommends installation of thermal insulation, automations to the lighting, and proper

management of the electrical appliances. It is expected to use ESCO model for

implementation.

NorwayMore and Romsdal County Council (MRFYLKE)Electric vehicles, their infrastructure, fleet analysis and public procurement –

Two electric car races up the steep roads « The Troll Ladder» initiated large

participation and media involvement, an electric bus conference in Geiranger with

successful test-drive of two fully electric busses up the steep mountain roads

encouraged use of electrical busses in rural areas. All eight-speed chargers within

the project have been installed and in use.

Implementation of Energy Management System (EMS) - Eco-Lighthouse in a

number of public buildings – The County Authority is continuously working with

implementation of the Eco lighthouse management in all of its higher secondary

schools, dental districts and the central administration.

District heating from bioenergy plants (woodchip and biogas) – Several

investigations, workshops and a seminar held with aim to increase the interest and

knowledge on opportunities for biogas production in the county. One special case is

the possibility to utilize waste heat from a natural gas processing plant for use in the

biogas production process.

The fish sludge biogas pilot plant at Smøla is completed as per the first part of the

BEAST project.

BelgiumProvince of Flemish Brabant (PFB)Provincial Helpdesk Energy Management – EPC Coaching trajectory – The Helpdesk

coaches municipalities that can benefit from Energy Performance Contracting. EPC

coaching trajectory in 4 steps has been developed, leading to the assignment of an

EPC facilitator. Seven municipalities received coaching and by 2016, all seven

municipalities will have assigned an EPC facilitator.

SwedenEast Sweden Energy Agency (ESEA)Promotion of E-vehicles and their infrastructure – A big E-vehicle event “E Road

East” was organized along with a road show and testing of electric cars for

municipality use. Support for municipalities to seek loans for the charging

infrastructure was given, 9 semi fast chargers built and two municipalities now

driving 5 e-vehicles.

Coordination of goods in Norrköping – BEAST has calculated the climate

benefits of the project. Work started to improve the procurement process for local

food producers, as one identified barrier was that small local food producers find

it complicated to submit tenders to the municipality.

Waste heat utilization in Boxholm – As a result of a BEAST jam session with

stakeholders in January 2015, the municipal council decided to proceed with

investing in a technology-enhanced way to store residual energy from Ovako.

BEAST has provided support in applying for funding to implement the action.

ItalyValtellina Mountain Community of Morbegno (CMM)Cycling lane connection with the Valtellina bike ring – The new path connects the

existing circuits in the area, enhancing new multifunctional tourism offer through a

tangible tour around the mountain area and on the river side. Encouraging a new

sustainable energy efficiency approach in everyday/vacation moments and

enhancing the valley landscape, the cycle lane contributes to the shift towards a low

carbon economy.

Energy efficiency refurbishment of CMM headquarter – The project showed its

guarantee of annual CO2 emission savings, upgrading the architecture of the CMM

building in an environment friendly way, respecting both the design and the energy

efficiency aspects. The project offers best practice for similar public buildings in the

area.

Low Impact Hydropower plant – The project represents best practice for the valley,

which will facilitate the implementation of similar plants in neighbouring

municipalities. The project is an opportunity to change the present water pipeline

and to improve the service to the public thanks to an innovative system enabling us

to emit 100 times less CO2, compared to the existing scheme.

Energy efficiency and renewables are booming, but what can we do to ensure the sustainability of this process? As winter settles upon our hemisphere these questions become of the utmost importance. Halfway through the 36 month BEAST project we have quite a few results to share with you.

BEAST is fostering the implementation of SEAPs by establishing structures for the efficient delivery of SEAPs, identifying and preparing 23 bankable energy projects and implementing actions leading to measurable energy savings and increased utilisation of energy from renewable sources.

Knowledge exchange and implementation of actions is organised in three clusters: STEER, SAVE and ALTENER, adding extra value for targeted exchange of best practice and implementation of energy actions.

The first results of the project actions: Energy savings - 23 081 MWh

Increase in renewable energy production – 6164 MWh

Reduced GHG emissions – 21 227,31 tCo2 equivalents

Investments – 40 543 000 EUR

LatviaZemgale Regional Energy Agency (ZREA)Promotion of use of electric vehicles – ZREA provided consultations and assistance

in project applications for purchase of electric vehicles, increasing the number of

electric vehicles in Latvia. Marathon of Electromobiles in May 2015 in 4 locations

gathered 200 people.

Energy efficiency in multi-residential buildings – Putting in place the preconditions

for energy efficient refurbishments of multi-residential buildings, and assisting in

preparation of project applications. Informative campaign planned.

Promotion of EE and RES solutions – information, capacity building for decisions on

the possible installations of EE and RES technologies. Preparation of the procurement

for design and installation of the solar collectors, dissemination activities done. Work

ongoing on RES powered pedestrian crossings.