Page 1: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

The Norwegian Public Roads AdministrationGetting there safely, together

17/06/2018

Photo: Knut Opeide

Page 2: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

A modern transport system is safe to use and accessible to all, while safeguarding the environment both locally and globally.

17/06/2018

Photo: Knut Opeide

Terje Moe Gustavsen Director General

Norwegian Public Roads Administration

Page 3: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

NPRA Organisation Chart

The structure of our organisation

17/06/2018

Page 4: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Organised by regionNational organisation

17/06/2018

● The Directorate of Public Roads

● Five Regions

● 72 Driver and Vehicle LicensingOffices

● 7,600 employees

Page 5: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

From a builder of roads to a competence-based organisation

We have changed a lot in 150 years

17/06/2018

Photo: Knut OpeideUnknown photographer, from the archives of The Norwegian Road Museum, dated around 1930

Page 6: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Four main focus areas

● Mobility

● Road safety

● The environment

National objectives for Norwegian transport policy

17/06/2018

Photo

:: K

nut

Opeid

e

Photo

:: H

enri

ett

e E

. B

uste

rud

Photo

: K

nut

Opeid

e

Photo

: K

nut

Opeid

e

Page 7: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Our budget breaks down as follows:

Operation, maintenance and development is expensive

17.06.2018

30.2billion

5.1billion

2018 ANNUAL BUDGET

The total budget comprises approx. NOK 35,3 billion, 30.2 bn is government funding and 5.1 bn comes from external funds (road tolls and advance allocations) In addition, NPRA administrate construction work on county roads for around NOK 20 billion.

Page 8: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Our governing documentsInterchangeable transport policy priorities

17/06/2018

Page 9: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

New structure 2020

17.06.2018

19 Counties today 10 Counties in 2020

NPRA are administration onbehalf of the counties

Counties administrate themselves

Page 10: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Different Project Modelsused in Norwegian Road Projects

17.06.2018

Photo: Håkon Aurlien

BB (Bid – Build) dominates

DB (Design – Build)

DBO (Design – Build – Operate)

DBFO – PPP: Design-Build-Finance-Operate, Private Public Partnership

Page 11: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Contract portfolio

Contracts (building) 2017

17.06.2018

Feilkilde:Not all contractsbelow 2 millNOK areincluded

26

6775 73

50

2917

11

Under 2 mill kr 2-5  mill kr 5 - 10 mill kr 10-25 mill kr 25-50 mill kr 50- 100 mill kr 100-250 mill kr 250 mill +

Contract size Number Value mill NOK

Below 2 mill NOK 26 35

2-5 mill NOK 67 219

5 -10 mill NOK 75 536

10-25 mill NOK 73 1 153

25-50 mill NOK 50 1 803

50-100 mill NOK 29 2 203

100-250 mill NOK 17 2 729

250 mill + 11 4 470

SUM 348 13 149

Page 12: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Operations and maintenance, 104 contracts

~ NOK 6 billions

Page 13: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Location of ongoing PPP contracts

Oslo

Trondheim

2006: Lyngdal –

Flekkefjord

2005: Klett - Orkanger

2009: Grimstad – Krisisansand

Page 14: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Ongoing PPP contacts, 25 years operation period

● “Orkdalsvegen” (E39 Klett - Orkanger )Length ~27 kmConstruction completion-handing back: 2005 – 2030

● “Allfarveg” (E39 Lyngdal – Flekkefjord)Length ~ 38 kmConstruction completion – handing back : 2006 – 2031

● “Agder OPS Vegselskap” (E18 Grimstad – Krisisansand)Length, 4-lane motorway ~38 kmConstruction completion - handing back: 2009 – 2034

Page 15: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Experience from the ongoing PPP contracts

● The current contract documents have worked well in the ongoingcontracts.

● Payment mechanisms have generally worked well.

● Long operation and maintenance periods stimulate focus onoperation and maintenance also during the construction period.

● Important:Focus on safety and occupational health.

● Important: Clearly defined road condition at the end of the operation and maintenance period.

● Important: Provisions are required in the Contract for large and unexpectedwork that may be necessary in the operation period.

Page 16: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Location, upcoming PPP projects

Oslo

Løten - Elverum

Hålogalandsvegen

(Tjeldsund-Gullesfjordbotn-Langvassbukt)

Sotrasambandet

NOK 9500 mill. project cost

~ 9 km lengthNOK 5100 mill. project cost

~ 26 km length

NOK 8500 mill. project (PPP) cost

~ 80 km length

Page 17: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Upcoming PPP projects

● Rv.3/rv.25 Løten-Elverum, Hedmark County ~ 26 km Approximately NOK 5100 mill. project costFinancial close 30 May 2018.

● Rv.555 Sotrasambandet, Hordaland County ~ 9 kmApproximately NOK 9500 mill. project cost

Approved by the Parliament/Stortinget 15. May 2018

● E10/rv.85 Tjeldsund-Gullesfjordbotn-Langvassbukt, Nordland and Troms Counties ~ 80 kmApproximately NOK 8500 mill. project cost

NPRA are preparing the project

Page 18: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Location Rv.3/rv.25 Løten- Elverum

NIB

18

Oslo

Trondheim

Page 19: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Location Rv.3/rv.25 Løten- Elverum

NIB

19

Objectives:

● The major freight transport between Oslo and Trondheim

● The region Hamar/Elverumis a joint residential and labour market.

● Continuous pedestrian and cycle lane between Hamarand Elverum

● Improved: mobility, traffic safety, public safety, residential environment

Project cost NOK 5100 mill

Page 20: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Location Rv. 555 Sotrasambandet

Bergen Oslo

Page 21: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Kolltveit

Storavatnet

Bergen

city

centre

Project cost NOK 9500 mill

Location Rv. 555 Sotrasambandet

Objectives:- Connection between Bergen

and the island municipalities Fjell, Sund and Øygarden (36,500 inhabitants).

- The project objectives include improved mobility, increased traffic safety and regularity.

- AADT at 26,000 on the current two lane road gives high accident rates. (also challenging for the traffic management during construction)

- Improvements for public transport, pedestrians and cyclists.

Page 22: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

New mainroad – tunnels, bridges, intersections(not so much regular road building)

KryssStraume

KryssBildøy

KryssValen

KryssDrotningsvik

KryssStoravatnet

KryssKolltveit

Kolltveit

Straume

Storavatnet

Tunnel

Bridge

Intersection

intersections

Page 23: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Illustrations – new and old Sotra Bridge

Rv.555 Sotrasambandet

Page 24: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Main elementsRv.555 Sotrasambandet

9 km 4-lane road, which includes:

4 bridges (Sotra bridge 875 m plus totally 550 m of smaller bridges

4 tunnels, tunnels totally 4,6 km (double-tube)

4 major junctions

Pedestrian and cycle lanes, 14 km. Upgrading the local road network, partially with new public transport lanes. 2 km of high-voltage tunnels, re-routing of major power line.

Page 25: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

New main road. Profile Straume - Storavatnet

Kryss i fjell

StoravatnetNew Sotra-bridge DrotningsviktunnelArefjordtunnel Valen

2 km

Svært krevende prosjekt helt i «ytterkant» av regelverket

• Tunnelsikkerhet • Stigning• Kryss i fjell• Drift og vedlikehold (tunnel)• Beredskap (tunnel)• Bru (600m)

Very demanding project on the very edge of current regulations

• Safety in tunnels• Inclanation• Junction in tunnels• Operate and maintainace (tunnel)• Bridge (600m)

25

Page 26: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

New Sotra-bridge

KolltveitBildøy

Straume

Knarrevik

Drotningsvik

Storavatnet

Suspension bridge

26

Page 27: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered a maximum traffic of over 32,000 vehicles crossing the bridge in one day.

The narrow road makes it impossible to prioritize public transport.

The very narrow road-shoulders makes it nearly impossible to cycle or walk across the bridge.

The bridge represents the only connection between Bergen and Sotra / Øygarden.

This makes it very vulnerable to storms, accidents and emergency situations.

A new bridge and a new road are crucial for the region's continual growth.

Outdated and overloaded road

27

Page 28: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Location and objectives Hålogalandsvegen

Oslo

Narvik

Trondheim

Objectives:

• Reduce travel time for the freight

• Reduced travel time to Evenes airport

• Improved regularity

Page 29: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

European/National road no. E10/Rv85 Hålogalandsvegen

Page 30: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

The scope of the PPP projectE10/ rv. 85 Tjeldsund-Gullesfjordbotn-Langvassbukt

Page 31: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

E10/rv. 85 Tjeldsund –Gullesfjordbotn–Langvassbukt

80 km 2-lane highway

28 km tunnels, in total

Page 32: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

National Tourist Routes

Yesterday’s transport, today’s tourist attraction

17/06/2018

Photo: Jarle Wæhler

Page 33: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

A film about the NPRA

Getting there safely, togehter

17/06/2018

Page 34: Getting there safely, together The Norwegian Public Roads … · 2018. 6. 19. · The existing Sotra-bridge is dimensioned for 12,000 cars, but at the most there has been registered

Thank you for your attention!