iFIT-Presentation 3March 2005 GF Piping Systems
Installation systems in Germany
98 system supplier and 181 systems
Types of connections, number of system suppliers
clamp
glue weld
push
solder
hempen
crimps
press
iFIT-Presentation 4March 2005 GF Piping Systems
Are you looking for ...
... a new
installation system ?
iFIT-Presentation 5March 2005 GF Piping Systems
Higher productivity thanks to iFIT
Where does the time remain on the building site…..Time study of a supplier of detached houses and apartment houses (prefabricated houses)Source: Streif
others8%
breaks16%
absence8%
transport20%
work on the
constructions site
30%
search andcleaning
18%
iFIT-Presentation 6March 2005 GF Piping Systems
What do you expect ...
...from a new
installation system ?
iFIT-Presentation 7March 2005 GF Piping Systems
A system for plumbing and heating
basement distribution
risers
d16-d25
d16-d32
d16 / d20
connection to the radiator
d16 / d20
plumbing
apartment distribution
iFIT-Presentation 8March 2005 GF Piping Systems
quick - simple - toolless connection
2. Chamfering of the pipe
3. Attach the adaptor
4. Attach the adapter to the module until you hear the Click
1. Cut the pipe to length
iFIT-Presentation 9March 2005 GF Piping Systems
Disassembly possible
3. Replace the pipe
4. Remove the half shelves
5. Pullout the nipple
2. Screw off the body
1. Open the body with a tong
iFIT-Presentation 10March 2005 GF Piping Systems
Security means...
• Fully developed construction
• Longevity
• Production reliability
• High application safety
iFIT-Presentation 11March 2005 GF Piping Systems
Safe sealing:
double (sealing on the inside) O-ring sealing
Safe fixation:
well-tried and proven fixing mechanism
Fully developed construction
iFIT-Presentation 13March 2005 GF Piping Systems
Fully developed construction
Tensil tests with multi-layer pipe d16. The pipe breakes at a tensile force of 300 kg, the connection remains intact!
Safe sealing:
double (sealing on the inside) O-ring sealing
Safe fixation:
well-tried and proven fixation mechanism
iFIT-Presentation 15March 2005 GF Piping Systems
Fully developed construction
T-piece: demolition testsT-piece does not break off!
Mechanical stress under a pressure of20 bars
Destruction tests
Pipe with T-pieces
Squeeze test with a T-piece out of plastic:T-piece does not break off
iFIT-Presentation 16March 2005 GF Piping Systems
Test installations under different weather conditions
Test installation outside: in contact with building material (e.g. gypsum, polyurethane foam, etc.)
In operation since April 2002.
Fully developed construction
iFIT-Presentation 17March 2005 GF Piping Systems
Application safety means...
Application tests
More than 1000 connections on prototypes where tested from independent installers !
iFIT-Presentation 18March 2005 GF Piping Systems
Extensive field testing
Application safety means…
• Oktober 2003 - April 2004
• ca. 60 field test sites
• ca. 8000 connections
• no leaks
• suitability for building sites confirmed
iFIT-Presentation 20March 2005 GF Piping Systems
Production reliability means...
100 % examination fully automatic assembly and test of all adapters
iFIT-Presentation 22March 2005 GF Piping Systems
• Window
• Adapter - Module – Technology
• Clearly audible click indicates correct connection
• Push-fit connector (unverpresst undicht)
High application safety through...
iFIT-Presentation 23March 2005 GF Piping Systems
Module Technology
Less parts – more possibilities
Adapter d20
Adapter d16
Multi-Layer pipe
Polybutylen-pipe
Tee-Modul d16/d20
iFIT-Presentation 24March 2005 GF Piping Systems
Less parts – more possibilities
fitting number of fittings number of possibilities
Adapter d16 1 - Adapter d20 1 - Tee 16/20 1 6 Elbow 16/20 1 3 Coupling 16/20 1 3 Outlet joint 16/20 1 2 Transition adapter on thread 16/20 1 2 3 type of manifolds 16/20 1 5
8 fittings 21 possibilities
With 8 fittings 21 possibilities
Applicable for Multi-Layer pipes and Polybutylene pipes !
iFIT-Presentation 25March 2005 GF Piping Systems
Less parts – more possibilities
conventional system
Tees 16/20iFIT
Tees 16/20
Tee equal 16
Tee equal 20
Tee 20-16-20
Tee 20-20-16
Tee 20-16-16
Tee 16-20-16
Tee Modul 16/20
Adapter 16
Adapter 20
50% less parts!6 parts 3 parts
iFIT-Presentation 26March 2005 GF Piping Systems
Higher productivity thanks to iFIT
Where does the time remain on the building site…..Time study of a supplier of detached houses and apartment houses (prefabricated houses)Source: Streif
others8%
breaks16%
absence8%
transport20%
work on the
constructions site
30%
search andcleaning
18%
iFIT-Presentation 27March 2005 GF Piping Systems
Economical thanks to...
short installation times
low material costs
few tools
iFIT-Presentation 28March 2005 GF Piping Systems
Short installation times .....
20.72 22.88
10.88
6.8
5
2
2
0
5
10
15
20
25
30
push clamp press iFIT
Sec.
preparation
connection
....... 4 times faster than pressing in comparison with the time of a d16 connection
setting of the tool
change of the hydraulic jack
chamfer the pipe end
chamfer the pipe end