GIF++ gas systems. Gas supply. neutral gases : tot 9 lines Ar , CO2, N2, He, SF6, CF4 and 3 spare pipes Distribution panels: 4 gas service area + 1 preparation zone flammable gases or gases with very low vapour pressure : tot 6 lines - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 1

GIF++ gas systems

11/07/2014

Page 2: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 2

neutral gases: tot 9 lines ▫ Ar, CO2, N2, He, SF6, CF4 and 3 spare pipes▫ Distribution panels: 4 gas service area + 1 preparation zone

flammable gases or gases with very low vapour pressure: tot 6 lines▫ iC4H10, CH4, Ar/H2(optional), C2H2F4 and 2 spares. Lines and room heated.▫ Distribution panels: 1 gas service area (flammable gases)

1 normal exhaust 1 exhaust for potentially flammable mixtures

11/07/2014

Gas supply

Page 3: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 3

At full capacity the gas mixing zone will contain ▫ 6 mixing racks▫ 3 closed loop gas systems ▫ 2 analysis racks ▫ 1 control rack▫ 5 spare racks

Gas analysis: ▫ 1 O2 and H2O analysis rack (LHC design: automatic

scan between all gas streams selected. ▫ Gas chromatograph will be integrated in the O2-H2O

analysis rack. ▫ 1 Infrared analysis rack for monitoring iC4H10

concentration in cosmic trigger. ▫ Hardwired interlock signal to stop the system will be

send in case problem (DSS)

11/07/2014

Gas service area

Page 4: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 4

Start-up version:▫ 2 mixing racks (cosmic and beam trigger)▫ 1 closed loop gas systems (cosmic trigger ?) ▫ 2 analysis racks ▫ 1 control rack

11/07/2014

Gas service area

Construction procedure/design as for LHC gas systems

Page 5: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 5

• Gas mixture distribution: Each distribution panel: 6 supply (outer diameter 8 mm) and 6 return (outer diameter 10 mm).

The gas distribution is divided in:▫ panels for neutral mixtures (type A) ▫ panels for mixtures that might contain flammable gases (type B).

Gas service area ▫ 6 panels type A ▫ 2 panels type B

Irradiation bunker ▫ 6 panels type A ▫ 2 panels type B

Preparation area▫ 3 panels type A ▫ 1 panels type B

11/07/2014

Gas mix distribution

Construction on-going

Page 6: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 611/07/2014

Gas mixers Remote control and monitoring. All info available on DIP through GCS and GppCS

Page 7: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 711/07/2014

Gas distribution panels

Page 8: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 8

Gas supply panel neutral gases 80 cm x 40 cm x 35 cmIR CL

2

CL1

CL3

Spar

esup

sup Gas supply panel flammable gases 80 cm x 40 cm x 35 cm

sup sup

11/07/2014

mixsup

Mix

1

Mix

2An

al

Ctrl

Mix

3

Spar

e

sup

Spar

e

Spar

e

mix mix mix mix

RPC1

RPC2

TGC1

Spar

e

supmix mix mix

mix mix Mixture distribution panels 60 cm x 30 cm x 35 cm

Gas service zone – final layout

iC4H10, R134a, SF6

nC5H12, CH4, CO2

Detection nC5H12Detection CH4

Detection iC4H10

Page 9: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 1011/07/2014

mix mix mixmix sup

Preparation zone– final layout

iC4H10, nC5H12

Detection nC5H12Detection CH4

Detection iC4H10

Mobile head Mobile head

Page 10: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 1211/07/2014

Irradiation bunker– final layout

TGC – nC5H12TGC – nC5H12

iC4H10, nC5H12, CH4, R134a, SF6

iC4H10, nC5H12, CH4, R134a, SF6

Detection nC5H12Detection CH4

Detection iC4H10

Mobile headMobile head

Page 11: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 1311/07/2014

Irradiation bunker

TGC – nC5H12TGC – nC5H12

iC4H10, nC5H12, CH4, R134a, SF6

iC4H10, nC5H12, CH4, R134a, SF6

Detection nC5H12Detection CH4

Detection iC4H10

Mobile head

Page 12: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 1411/07/2014

Conclusions – start-up version

First version to start-up the facility:

1. 20 distribution panels2. Simplified version of control rack (basic functionality like connection to remote pvss

interface for recording flows, gas systems status, …)3. 2 gas mixing racks for the fixed installations (beam and cosmic trigger setups). Any

additional mixer for users will cost about 15 kCHF (not included in the present list).4. 1 IR analysis rack (needed to operate cosmic trigger gas system). 5. 1 analysis rack (O2+H2O+ gas chromatograph). 6. 1 closed loop gas system.

Page 13: GIF++ gas systems

R. Guida CERN/PH-DT-DI 15

Small recirculation systemsTwo small systems developed: Prototype used at GIF (2003)

New simplified version for lab R&D (2012-2014)

26/6/2014

Page 14: GIF++ gas systems

Ernesto, Roberto PH-DT-DI gas service 1611/07/2014

Gas systems – future upgrades

Many possibilities for future upgrades to be discussed with users for resources:1. Upgrade control rack for more units (mixers, analysis, re-circulation systems, … )2. Additional IR analysis rack for second mixer using flammable gas3. 3 mixers for users (15 kCHF each)4. 3 new gas recirculation systems for users5. Install more distribution panels (?)