giles swimlanes presentation final

Upload: colin-mcallister

Post on 06-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Giles Swimlanes Presentation Final

    1/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Nathan Giles

    President and CEO

    Efficient Enterprise Engineering, Inc.

    (Ex3)

    Swim LanesChange the Future

  • 8/3/2019 Giles Swimlanes Presentation Final

    2/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    IfI always appear

    prepared, it is because

    before entering on an

    undertaking, I have

    meditated long and haveforeseen what may occur. It

    is not genius which reveals

    to me suddenly and

    secretly what I should do in

    Napoleon Bonaparte

    The True Power of Genius

    circumstances unexpected by others; it is thought and

    preparation.

  • 8/3/2019 Giles Swimlanes Presentation Final

    3/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Reason for Mission

    Strength ofOpponentMilitary, Political, Civilian Infrastructure,

    Communication, etc.

    Required Strength forSuccessMilitary, Communication, Political, etc.

    Identify the resources, steps, and coordination activitiesrequired to launch an invasion force on a specific date

    and secure victory.

    Objective

    Considerations

  • 8/3/2019 Giles Swimlanes Presentation Final

    4/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Define the enemy

    Identify strengths and weaknesses

    Develop overall strategy

    Planning Meeting Inputs

  • 8/3/2019 Giles Swimlanes Presentation Final

    5/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Planning MeetingOutputs

    Resources Identified

    Battle Plan Developed

    Assignments Made

    Start

    JamEnemy

    RADAR

    Destroy

    Gun

    Emplacements

    RemoveExplosives

    from Bridge

    Guard

    Approaches

    Roll

    Battalion

    over Bridge

    End

  • 8/3/2019 Giles Swimlanes Presentation Final

    6/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Identify Force Components

    Start

    Jam

    Enemy

    RADAR

    Destroy

    Gun

    Emplacements

    Remove

    Explosives

    from Bridge

    Guard

    Approaches

    Roll

    Battalion

    over Bridge

    End

  • 8/3/2019 Giles Swimlanes Presentation Final

    7/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Imagine individual,

    disconnected, and

    uncoordinated calls

    made to different force

    components

    instructing them to

    attack the specific

    positions and take

    specific actions.

    Execute the Plan

  • 8/3/2019 Giles Swimlanes Presentation Final

    8/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Result: Chaos & Failure

    Start

    JamEnemy

    RADAR

    DestroyGun

    Emplacements

    RemoveExplosives

    from Bridge

    BattalionStuck

    Failure

    WildWea

    sles

    were

    late! Noacc

    ess

    tobridge

    Bridge

    Blown

    HeavySA

    M

    Activity

  • 8/3/2019 Giles Swimlanes Presentation Final

    9/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Developed initially by industrial engineers to

    define a successful manufacturing processes.

    A swimlane chart is designed to eliminate all

    potential points offailure.

    What is a Swimlane Chart?

    Identifies all players

    Identifies all stepsincluding Quality

    Control

    Identifies all

    dependencies

    Change Control Process (OPIE)

    Customer

    Development

    Database

    Project

    Manager

    User

    Change RequestRecordCreated

    (Status = 1)

    RequestReceived

    Accepted?

    Update(Status = 2)

    RequestDenied

    Update(Status = 3)

    Y

    N

    DiscussinWeeklyStatus

    Meeting

    RequestAccepted

    Give Taskto Project

    Lead

    SubmitsChangeRequestvia

    OPIE

    Update(Status = 4)

    RequestCompleted

    Satisfied?

    Notification

    Notification

    Update(Status = 5)

    N

    Y

    DocumentChanges/

    Justification

    ReceiveChange Order

    CustomerSign-offNeeded?

    Y

    ReviewandReturn

    Decision

    N

    Notification

    End

    CreateTask

    TaskCompleted

    NewChangeRequest

  • 8/3/2019 Giles Swimlanes Presentation Final

    10/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Approach to Swimlane Diagramming

    1. Identifies all related or involved parties

    C&C

    F4-Sq

    uadron

    FACSquad

    F-15Squadron

    EODS

    quad

    Infantry

    Company

  • 8/3/2019 Giles Swimlanes Presentation Final

    11/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Approach to Swimlane Diagramming

    2. Identifies all stepsincluding Quality ControlSecure a Bridgehead

    D-2D-3

    C&C

    Infantry

    Company

    F-15

    Squadron

    FACSquad

    EODS

    quad

    F4-Squadro

    n

    StartIssue GoOrder

    D-2:55LaunchSortie

    D-2:35

    LaunchSortie

    D-2:10BeginJamming

    D-2:05

    InsertFAC

    D-2:15LaunchSortie

    D-2:00

    Paint Target

    D-1:55LaunchWeapons

    D-2:25LaunchSortie

    D-1:50RTB

    D-1:50

    RecoverFAC

    D-1:40

    RTB

    D-1:40StopJamming

    D-1:35

    RTB

    D-1:45InsertEOD

    D-1:25SecureBridge

    D-2:10Begin

    Maneuvers

    D-1:35TakeSouth

    Approches

    B

  • 8/3/2019 Giles Swimlanes Presentation Final

    12/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Approach to Swimlane Diagramming

    3. Identifies all dependenciesSecure a Bridgehead

    D-2D-3

    C&C

    Infantry

    Company

    F-15

    Squadron

    FACSquad

    EODS

    quad

    F4-Squadron

    StartWeather

    OK?

    Abort

    SignalReadiness

    YAll UnitsReady?

    Issue GoOrder

    Y

    N N

    Signal

    Readiness

    SignalReadiness

    SignalReadiness

    Signal

    Readiness

    D-2:55LaunchSortie

    D-2:35

    LaunchSortie

    D-2:10Begin

    Jamming

    Jamming

    Active?

    D-2:05

    InsertFACY

    Abort

    N

    D-2:15LaunchSortie

    D-2:00Paint Target

    TargetPainted?

    Abort

    N

    D-1:55Launch

    Weapons

    Y

    TargetDestroyed?

    D-2:25LaunchSortie

    D-1:50RTB

    D-1:50Recover

    FAC

    D-1:40

    RTB

    D-1:40Stop

    Jamming

    D-1:35RTB

    Abort

    N

    D-1:45InsertEOD

    Y

    D-1:25

    Secure

    Bridge

    D-2:10Begin

    Maneuvers

    Defenses

    Destroyed?

    Abort

    N

    D-1:35TakeSouth

    Approches

    B

  • 8/3/2019 Giles Swimlanes Presentation Final

    13/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Would you ever undertake

    a military mission without

    a detailed and

    comprehensive plan?

    Would a corporation ever

    consider a manufacturing

    process that was not well

    orchestrated?

    Questions:

  • 8/3/2019 Giles Swimlanes Presentation Final

    14/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Observations:

    Intense planning is fundamental to the

    operational side ofthe military, as well as the

    manufacturing side ofbusiness.

    Process engineering like this is generally not

    part ofa business curriculum.

    By applying the principles ofindustrial

    engineering to the business side ofthe house,

    substantial process efficiency is achieved.

  • 8/3/2019 Giles Swimlanes Presentation Final

    15/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Sharing of Best Practices

    The military has consistently analyzed industry

    best practices and vice versa to enhance

    operational performance.

    Swimlane diagramming exercises can help set

    clear expectations and can also be used to

    greatly improve communication across

    organizational silos, which traditionally have

    been points offailure.

  • 8/3/2019 Giles Swimlanes Presentation Final

    16/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    SecureaBridgehead

    D-2D-3

    C&C

    Infantry

    Company

    F-1

    5Squadron

    FACSquad

    EOD

    Squad

    F4-Squadron

    StartWeathe r

    OK?

    Abort

    SignalReadiness

    YAllUnits

    Ready?

    IssueGo

    OrderY

    N N

    SignalReadiness

    Signal

    Readiness

    SignalReadiness

    SignalReadiness

    D-2:55LaunchSortie

    D-2:35LaunchSortie

    D-2:10

    BeginJamming

    JammingActive?

    D-2:05InsertFACY

    Abort

    N

    D-2:15

    LaunchSortie

    D-2:00PaintTarget

    Target

    Painted?

    Abort

    N

    D-1:55LaunchWeapons

    Y

    TargetDestroyed?

    D-2:25LaunchSortie

    D-1:50

    RTB

    D-1:50

    RecoverFAC

    D-1:40RTB

    D-1:40

    StopJamming

    D-1:35RTB

    Abort

    N

    D-1:45InsertEOD

    Y

    D-1:25

    SecureBridge

    D-2:10

    BeginManeuvers

    DefensesDestroyed?

    Abort

    N

    D-1:35

    TakeSouthApproches

    B

    CoordinatedEffort

  • 8/3/2019 Giles Swimlanes Presentation Final

    17/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    CoordinatedEffort Swimlane

    Secure a Bridgehead

    D-2D-3

    C&C

    Infantry

    Company

    F-15Squadron

    FACSquad

    EODS

    qua

    d

    F4-Squadron

    StartWeather

    OK?

    Abort

    SignalReadiness

    YAll UnitsReady?

    Issue GoOrder

    Y

    N N

    SignalReadiness

    Signal

    Readiness

    SignalReadiness

    Signal

    Readiness

    D-2:55LaunchSortie

    D-2:35LaunchSortie

    D-2:10

    BeginJamming

    JammingActive?

    D-2:05InsertFAC

    Y

    Abort

    N

    D-2:15

    LaunchSortie

    D-2:00

    Paint Target

    Target

    Painted?

    Abort

    N

    D-1:55

    LaunchWeapons

    Y

    TargetDestroyed?D-2:25LaunchSortie

    D-1:50

    RTB

    D-1:50

    RecoverFAC

    D-1:40RTB

    D-1:40

    StopJamming

    D-1:35

    RTB

    Abort

    N

    D-1:45InsertEODY

    D-1:25

    SecureBridge

    D-2:10

    BeginManeuvers

    Defenses

    Destroyed?

    Abort

    N

    D-1:35

    TakeSouthApproches

    B

  • 8/3/2019 Giles Swimlanes Presentation Final

    18/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Swimlane Diagram Example

    Change Control Process (OPIE)

    Customer

    Development

    Database

    Project

    Manager

    User

    Change RequestRecordCreated

    (Status = 1)

    RequestReceived

    Accepted?

    Update(Status = 2)

    RequestDenied

    Update(Status = 3)

    Y

    N

    Discussin

    Weekly StatusMeeting

    RequestAccepted

    Give Task

    to ProjectLead

    SubmitsChangeRequestvia

    OPIE

    Update(Status = 4)

    RequestCompleted

    Satisfied?

    Notification

    Notification

    Update(Status = 5)

    N

    Y

    Document

    Changes/Justification

    ReceiveChangeOrder

    Customer

    Sign-offNeeded?

    Y

    ReviewandReturn

    Decision

    N

    Notification

    End

    CreateTask

    TaskCompleted

    NewChangeRequest

  • 8/3/2019 Giles Swimlanes Presentation Final

    19/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Questions and Conclusions

    Nathan Giles

    President and CEO

    Efficient Enterprise Engineering, Inc.

    (Ex3)

  • 8/3/2019 Giles Swimlanes Presentation Final

    20/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Secure a Bridgehead

    D-2D-3

    C&C

    I

    nfantry

    Company

    F-15Squadron

    FACSquad

    EODS

    quad

    F4-Squadron

    StartWeather

    OK?

    Abort

    SignalReadiness

    YAll Units

    Ready?

    Issue Go

    OrderY

    N N

    Signal

    Readiness

    Signal

    Readiness

    Signal

    Readiness

    Signal

    Readiness

    D-2:55LaunchSortie

    D-2:35

    LaunchSortie

    D-2:10

    BeginJamming

    Jamming

    Active?

    D-2:05

    InsertFACY

    Abort

    N

    D-2:15

    LaunchSortie

    D-2:00

    Paint Target

    Target

    Painted?

    Abort

    N

    D-1:55

    Launch

    Weapons

    Y

    Target

    Destroyed?

    D-2:25

    LaunchSortie

    D-1:50

    RTB

    D-1:50

    Recover

    FAC

    D-1:40

    RTB

    D-1:40

    StopJamming

    D-1:35

    RTB

    Abort

    N

    D-1:45

    InsertEODY

    D-1:25

    Secure

    Bridge

    D-2:10

    Begin

    Maneuvers

    Defenses

    Destroyed?

    Abort

    N

    D-1:35

    TakeSouth

    Approches

    B

  • 8/3/2019 Giles Swimlanes Presentation Final

    21/21

    Ex3 2003 Ex3 Confidentialand Proprietary

    Change Control Process (OPIE)

    C

    ustomer

    Developm

    ent

    Database

    Project

    Manager

    User

    Change RequestRecordCreated

    (Status = 1)

    Request

    Received

    Accepted?

    Update(Status = 2)

    Request

    Denied

    Update(Status = 3)

    Y

    N

    Discussin

    Weekly Status

    Meeting

    Request

    Accepted

    Give Task

    to Project

    Lead

    SubmitsChange

    Requestvia

    OPIE

    Update(Status = 4)

    Request

    Completed

    Satisfied?

    Notification

    Notification

    Update(Status = 5)

    N

    Y

    Document

    Changes/

    Justification

    ReceiveChangeOrder

    Customer

    Sign-off

    Needed?

    Y

    Reviewand

    ReturnDecision

    N

    Notification

    End

    CreateTask TaskCompleted

    NewChange

    Request