Grade Separa)on and Rail Alignments
![Page 2: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/2.jpg)
Benefits of Grade Separa0on
• Improve safety • Enable higher train speeds • Minimize delay to 16th Street Bus Rapid Transit • Incompa0ble train and bus overhead wire systems • Minimize traffic delay and queuing • Prevent neighborhood traffic diversion • Eliminate train horn noise
To create grade separa0on, either the streets or the tracks need to be depressed
![Page 3: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/3.jpg)
Mission Bay Street Under Tracks
Source: CaHSRA
![Page 4: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/4.jpg)
16th Street Under Tracks
Source: CaHSRA
Kaiser MOB site
DaggeQ Place Development (400 residen0al units, 46K office)
![Page 5: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/5.jpg)
16th Street Under Tracks
Source: CaHSRA
Kaiser MOB site
DaggeQ Place
![Page 6: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/6.jpg)
7th Street Underpass, Oakland
• Inhospitable pedestrian realm • Exacerbates barrier between neighborhoods • Inhibits access to adjacent land uses
![Page 7: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/7.jpg)
• Reconnect neighborhoods • Improve aesthe0cs • Reduce noise • Enable access to adjacent land uses
Preferred design would depress tracks under street – like a subway
Underground tracks enable poten0ally straighter or shorter route than exis0ng alignment
![Page 8: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/8.jpg)
Alterna0ve Rail Alignments Considered
Source: SFCTA
West Route • Conflicts with Moscone & SFMOMA • No Mission Bay sta0on (except spur)
East Route • Poten0al conflicts with Mission Bay
building pilings • Relocated Mission Bay sta0on to east
DTX Route • Retain 0ght curve at 7th/Townsend • Mission Bay sta0on remains
![Page 9: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/9.jpg)
1. Connect to DTX at 4th/Townsend Sta0on? 2. Avoid major sewer infrastructure 3. Avoid structures on pilings 4. During construc0on: • Maintain Caltrain opera0on • Minimize disrup0on to local land uses • Accommodate local circula0on and regional traffic
Constraints on Poten0al Rail Alignments
![Page 10: Gillian Gillett 01-10-12 SPUR](https://reader034.vdocument.in/reader034/viewer/2022051816/5463c342af795979338b4644/html5/thumbnails/10.jpg)
• Simplest op0on • May not be physically or structurally
feasible
Op0on 1: Trench in between freeway pilings