gİzlİ – clk enerji İçi1 clk enerjİ smart metering pilot project april 2015

5
GİZLİ – CLK Enerji İçi 1 CLK ENERJİ Smart Metering Pilot Project April 2015

Upload: vivian-strickland

Post on 22-Dec-2015

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GİZLİ – CLK Enerji İçi1 CLK ENERJİ Smart Metering Pilot Project April 2015

GİZLİ – CLK Enerji İçi 1

CLK ENERJİSmart Metering Pilot Project

April 2015

Page 2: GİZLİ – CLK Enerji İçi1 CLK ENERJİ Smart Metering Pilot Project April 2015

GİZLİ – CLK Enerji İçi

CLK Energy One of the Biggest Energy Companies in Turkey

CLK Energy, established as the association of Cengiz, Limak, and Kolin groups operates in the utility sector, with Akdeniz, Boğaziçi, Çamlıbel, Uludağ Electricity Distribution and Retail Companies. It is one of the leading groups in the utility sector, operating in four different regions, 11 provinces and having more than 10 million customers.

Boğaziçi Elektrik

Uludağ Elektrik

Akdeniz Elektrik

Çamlıbel Elektrik

Page 3: GİZLİ – CLK Enerji İçi1 CLK ENERJİ Smart Metering Pilot Project April 2015

GİZLİ – CLK Enerji İçi 3

Smart Meter Pilot Project Details

• This is an R&D project that we have approval from EMRA and our consultant is DNV GL (formerly KEMA) for this project.

• Our Smart Metering Pilot project consists of several thousand smart meters from different vendors with PLC, RF and hybrid communication technologies.

• We will implement these meters in the 4 distribution networks considering different network topologies and climate conditions.

• The objective of this project is to install possible different technologies and testing interoperability, accuracy, communication, interference, robustness etc. issues under different network topologies and different climate conditions.

• The first phase of this project has started and IDIS meters will be implemented for this phase.

• For the second phase, we will implement PLC (G3, PRIME), RF and hybrid solutions and test the performance with the consultancy of DNV GL (formerly KEMA) and report to the EMRA.

• We will also implement an MDM system to analyze the incoming data, investigate issues and gather reports during this project.

Page 4: GİZLİ – CLK Enerji İçi1 CLK ENERJİ Smart Metering Pilot Project April 2015

GİZLİ – CLK Enerji İçi 4

Smart Meter Pilot Project Details

TR 1

IDIS - SFSK

DC1, DC2, … M1, M2, … M1, M2, … M1, M2, …

TR 2

G3-OFDM

DC1, DC2, … M1, M2, … M1, M2, … M1, M2, …

TR 3

PRIME-OFDM

DC1, DC2, … M1, M2, … M1, M2, … M1, M2, …

1

2

3

TR 4

RF

DC1, DC2, … M1, M2, … M1, M2, …

4

TR 5

RF+PLC

DC1, DC2, … M1, M2, … M1, M2, …

5

Page 5: GİZLİ – CLK Enerji İçi1 CLK ENERJİ Smart Metering Pilot Project April 2015

GİZLİ – CLK Enerji İçi

Thank you!

İlker DURSUNR&D and Innovation Director