glig43_v2
TRANSCRIPT
-
8/11/2019 GLIG43_v2
1/15
1
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
SITE SURVEY REPORT
Project TECH/TCT-480-14/VMS-NSN OY-NSN VN-VNPT TECHNOLOGY
Province Gia Lai
Site name Ia Der 3 Site ID GLIG43
Site address Lng Breng 2- x IaDer- huyn Iagrai- Tnh Gia Lai
Old Configuration 2G Alcatel 4/4/4
New Configuration 3G NSN : 2/2/2
Date 14-07-2014
Surveyor name L Vn LangTelephone
number
0905588922
VMS EngineerTelephone
number
VNPT TECHNOLOGY APPROVED BY VMS
-
8/11/2019 GLIG43_v2
2/15
2
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
1. GENERAL
Geographicalcoordinates:
E107.96842N13.99432
1.2 Map Datum: WGS84
1.3 Location: Lng Breng 2- x IaDer- huyn Iagrai- Tnh Gia Lai
1.4 Site/station manager: Anh Thnh
Telephone: 0906421579
1.5 Type of building: House
1.6Building height(m.a.g.l):
3.5m
1.7Structure type
(tower/mast/boom):Guy Mass Tower 3 legs
1.8Structure height(m.a.g.l):
45m
1.9 Site Access Good
1.10 Road Condition: Good
1.11 Key Required: Yes
1.12 Site Access: Ok
1.13 Delivery Access: Good
2. 2G TECHNICAL DATA
2.1 Site type: Existing GSM 900
2.2 No. of cell: 3
2.3 No. and type of radio-cabinet: 1
2.4 No. of TRX: 62.5 Frequency band: 900
3. 3G TECHNICAL DATA
3.1 Site type: New
3.2 No. of cell: 3
3.3 No. and type of radio-cabinet: 1
3.4 No. of Carrier: 3
4. RF ANTENNA AND RF MODULE
4.1 Total height (m):45m
4.2 Existing 2G antenna data:
Height
(m)
Azimuth
(degree)
Mechani
cal Tilt
Electrical
Tilt
Cell A 42m 0 -2 6
Cell B 42m 120 -2 6
Cell C 42m 240 -2 6
4.3 Antenna 3G height (m.a.g.l): 40m
4.4Proposed Antenna 3G direction
(degrees):0/120/240
4.5 Proposed Antenna 3G tiltMechanical Tilt Electrical Tilt
0/0/0 4/4/4
4.6 Antenna 2G model: GSM900
-
8/11/2019 GLIG43_v2
3/15
3
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
4.7 Antenna 2G gain (dBi): 18
4.8 Antenna mounting required: Yes
4.9 Proposed RF module height (m): 38m
4.10 Grounding Bar Tower: No
4.11 Can attach antenna directly to towerwithout boom No
5. EQUIPMENT ROOM
5.1 Equipment room location: Tng 1 cch mt t 0.5m
5.2 Equipment room dimension 2800x3800x3000
5.3 Space available for equipment: Yes
5.4 Require renovation/Additional work: Yes(Need 1 CB AC 63A)
5.5 Equipment room air-conditioning: Yes
5.6 Equipment room lighting & security: Yes
5.7 Space available for new power Yes
5.8 Rack 19 available for SM Yes
5.9 Cable Ladder: New Existing
6. FEEDERLESS
6.1 No. fiber cable: 1
6.2 Length of fiber cable: 100m
6.3 No. jumper: 6
6.4 Total jumper length (m): 6x4m
7. ELECTRICAL DATA
7.1 AC power (DB Box): Yes
7.1.1 Main CB: 63_A 3 phase 1 phase
7.1.2 Current consumption(AC): ___A
7.1.3 CB Available for New Power System : _____A Number of CB available: 0
7.1.4 Need Breaker Brand:63A 1
7.4.5 AC lightning protector: Yes
7.2 Existing power system 1 Yes
7.2.1 DC PDB 48V
7.2.2 Rec. Capacity 1800W
7.2.3 Number of Rect Module 2
7.2.4 SPARE DC Circuit Breaker 2Type2x10A;
7.2.5 Battery Capacity 12V/3x180Ah;
7.3 Existing power system 2 No
7.3.1 DC PDB
7.3.2 Rec. Capacity
7.3.3 Number of Rect Module
7.3.4 SPARE DC Circuit Breaker Type A;
7.3.5 Battery Capacity Ah;7.4 Space for New Power System? Yes
-
8/11/2019 GLIG43_v2
4/15
-
8/11/2019 GLIG43_v2
5/15
5
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
PHOTOS AND SKETCH MAPS
12.
SKETCH MAPS OF INSTALLATION SPACE
12.1. Site Platform Equipment room (overview)
SSiitteeOOvveerrvviieeww((FFrroonntt)) SSiittee OOvveerrvviieeww((TToopp))
IInnlleett//OOuuttlleett MMaasstteerrGGrroouunnddBBaarr
-
8/11/2019 GLIG43_v2
6/15
6
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
12.2.Side View Building height, Antenna pole length, Antenna pole and RF module
location
TToowweerroovveerrvviieeww AAnntteennnnaappoolleellooccaattiioonn
TToowweerr RRFFMMoodduullee((FFlleexxii))MMoodduulleeLLooccaattiioonn
Vtrlpantenmi
RF Module
-
8/11/2019 GLIG43_v2
7/15
7
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
OOuuttddoooorrLLaaddddeerr
OOuuttddoooorrLLaaddddeerr
12.3.Equipment rom
RRoommoovveerrvviieeww SSyysstteemmMMoodduullee((FFlleexxii))MMoodduulleeLLooccaattiioonn
Vtrlp3G SystemModulemi
-
8/11/2019 GLIG43_v2
8/15
8
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
DDCCPPoowweerr((iiffuusseeddeexxiissttiinnggppoowweerr))
AACCBBooxxPPoossiittiioonn
12.4.GPS
GG
PP
SS
VtrlppowerSystem mi
-
8/11/2019 GLIG43_v2
9/15
9
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
12.5.Environment Photos
IIttiinncclluuddeess1122pphhoottooss::00,,3300,,6600,,9900,,112200,,115500,,118800,,221100,,224400,,227700,,330000aanndd333300..
PPhhoottooooff00ooddiirreeccttiioonn PPhhoottooooff3300
ooddiirreeccttiioonn
PPhhoottooooff6600ooddiirreeccttiioonn PPhhoottooooff9900
ooddiirreeccttiioonn
-
8/11/2019 GLIG43_v2
10/15
10
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
PPhhoottooooff112200ooddiirreeccttiioonn PPhhoottooooff115500
ooddiirreeccttiioonn
PPhhoottooooff118800ooddiirreeccttiioonn PPhhoottooooff221100
ooddiirreeccttiioonn
PPhhoottooooff224400ooddiirreeccttiioonn PPhhoottooooff227700
ooddiirreeccttiioonn
-
8/11/2019 GLIG43_v2
11/15
11
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
PPhhoottooooff330000ooddiirreeccttiioonn PPhhoottooooff333300
ooddiirreeccttiioonn
13. SKETCH MAP OF OBSTACLES
NNooOObbssttaaccllee
No.Direction(degree)
Height ofobstacle
Distance fromobstacle to
BTS
Obstacle description
1
2
3
4
200m
100m
0
30
60
90
120
150
240
210
180
300
330
270
N
300m
400m
500m
-
8/11/2019 GLIG43_v2
12/15
12
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
14. PROPOSED ANTENNA POSITION
-
8/11/2019 GLIG43_v2
13/15
13
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
15. SITE & FLOOR LAYOUT
-
8/11/2019 GLIG43_v2
14/15
14
Site Survey Report
SiteID: GLIG43Project: TECH/TCT-480-14/VMS-NSNOY- NSN VN VNPT TECHNOLOGY
-
8/11/2019 GLIG43_v2
15/15
15
Site Survey Report
SiteID: GLIG43Project: TECH/TCT 480 14/VMS NSNOY NSN VN VNPT TECHNOLOGY