global country city building - mindtree · global country city building i i i i key performance...

13
10 Occupant Comfort 98 % Energy Consumption (MWH) 273 Water Consumption (MWH) 57 Equipment Health 98 % Equipment Status 981 966 Working 15 Faulty View details Total No Of Equipments Alarms Summary 55 Alarms Normal Critical Moderate FAHU Breakdown at WCP1 02:56pm 23 Sept 17 FAHU Breakdown at WCP1 02:56pm 23 Sept 17 Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17 Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17 Maintenance Maintenance Safety Safety Category Latest on Top 02 22 31 View details Country Global City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40 100% <100% 90% 96% 94% 92% 98% 100% Buildings Bengaluru MTWP1 MTWP2 MTWP3 MTWP5 MTEP1 Welcome to the Demo of Gladius Connected Buildings Gladius Connected Buildings is an IoT platform, which acts as a smart layer to your existing infrastructure. It provides a responsive building system that integrates IT, OT and IoT on to a single platform. Click to see how Gladius Connected Buildings can help you achieve your building management goals of occupant comfort, energy efficiency, and equipment health. Experience our Demo NEXT Click Here to talk to our SME

Upload: others

Post on 16-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

(MWH)

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

100%<100%

90%

96%

94%

92%

98%

100%

Buildings

Bengaluru

MTW

P1

MTW

P2

MTW

P3

MTW

P5

MTE

P1

Welcome to the Demo of Gladius Connected BuildingsGladius Connected Buildings is an IoT platform, which acts as a smart layer to your existing infrastructure. It provides a responsive building system that integrates IT, OT and IoT on to a single platform. Click to see how Gladius Connected Buildings

can help you achieve your building management goals of occupant comfort, energy efficiency, and equipment health.

Experience our Demo NEXTClick Here

to talk to our SME

Page 2: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

100%<100%

90%

96%

94%

92%

98%

100%

Buildings

Bengaluru

Cubic Meter

MTW

P1

MTW

P2

MTW

P3

MTW

P5

MTE

P1

Occ

upan

t com

fort

in %

Click on any of the above to explore

Page 3: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

Cubic Meter

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

100%<100%

90%

96%

94%

92%

98%

100%

Buildings

Bengaluru

Occ

upan

t com

fort

in %

MTWP1

MTWP2

MTWP3

MTWP5

MTEP1

B

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

Ticket Summary

Page 4: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

100%<100%

90%

96%

94%

92%

98%

100%

Buildings

Bengaluru

Cubic Meter

MTWP1

MTWP2

MTWP3

MTWP5

MTEP1

B

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

Click here to talk to our SME for a

detailed discussion

Ticket Summary O

ccup

ant c

omfo

rt in

%

Page 5: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

(MWH)

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

100%<100%

90%

96%

94%

92%

98%

100%

Buildings

Bengaluru

MTWP1

MTWP2

MTWP3

MTWP5

MTEP1

B

Heatmaps

Current

Back

Occupancy Comfort MTW P1 Floor 4

Equipment Status Fault status

AHU 1 left wing On Working

AHU 2 left wing On Faulty

MTW P1 Floor 4 Zone1

Equipment Status Fault status

VAV 1 left wing On Working

VAV 2 left wing On Faulty

MTW P1 Floor 4 ZoneN

Equipment Status Fault status

VAV n left wing On Working

VAV m left wing On Working

MTW P1 Floor 4

Equipment Status Fault status

AHU 1 left wing On Working

AHU 2 left wing On Faulty

Serving Equipment details

OverAll

+_ +

Bangalore - MTWP1

Worst

Ideal

Click here to talk to our SME for a

detailed discussion

Page 6: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

57Equipment Health

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

Buildings Select<25>25

98%

Cubic Meter

MTWP1 MTWP2 MTWP3 MTWP5 MTEP1

Ener

gy C

onsu

med

in M

WH

00

15

10

05

20

25

Bengaluru, IndiaCO2KWHOverallPer SqFt

Compare

%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

Ticket Summary

Page 7: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

Buildings Select100%<100%

Cubic Meter

MTWP1 MTWP2 MTWP3 MTWP5 MTEP1

Ener

gy C

onsu

med

in M

WH

00

15

10

05

20

25

Bengaluru, IndiaCO2KWHOverallPer SqFt

Compare

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

Ticket Summary

Page 8: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

CountryGlobal City Building

Energy Consumption Bengaluru 56MWH

CO2KWH Overlay Energy Actuations

2017

000

1500

1000

500

2000

2500

12.00am 02.00am 04.00am 06.00am 08.00am 10.00am 12.00pm 02.00pm 04.00pm 06.00pm 08.00pm

OverallPer SqFt

Ener

gy C

onsu

med

in K

WH

Energy Consumption Map Last 30 Days 24 Hour

12.00am 02.00am 04.00am 06.00am 08.00am 10.00am 12.00pm 02.00pm 04.00pm 06.00pm 08.00pm 10.00pm 12.00am Avg. Ambient Temperature Occupancy

Occupancy Avg. Ambient Temperature

1 Se

p 20

17 to

30

sep

2017

Energy Source Breakup

Energy Usage

19KKWH

19KKWH

Solar

Plug load

Water System

Electricity

HVAC

Diesel Gen

Lighting

50%

48%

23%

23%

27%

24%

05%

Energy Consumption / Floor

Floor 1-

Floor 5-

Floor 3-

Floor 2-

Floor 6-

Floor 4-

Floor L-

KWH

Asending OverallPer SqFt

00 1K 1.5K 2K 2.5K 3K 3.5K 4K

Compare

<900 900-1200 1200-1500 1500-1800 1800-2100 2100-2200 >2200

00° 05° 10° 15° 20° 25° 30° 35° 40°-30° -25° -20° -15° -10° -05°00 10 20 30 40 50 60 70 80

X100 People Power consumed in KWH Temperature in °C>30°C <30°C<3000>3000

Click here to talk to our SME for a

detailed discussion

Page 9: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

Buildings Select100%<100%

Cubic Meter

MTWP1 MTWP2 MTWP3 MTWP5 MTEP1

Equi

pmen

t hea

lth in

Per

cent

age

00%

60%

40%

20%

80%

100%

Bengaluru, IndiaCO2KWHOverallPer SqFt

Compare

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

Ticket Summary

Page 10: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

CountryGlobal City Building

Last Updated 20/04/2018 13:45:40 CHILLER PLANT P1 AND P2 Mfg : Danfoss Type : ODPRR22SRh20

Alarms (30) Ticket (20) Automated Control (20)

Sensors Status

32

30 Working2 Faulty

View details

Total No Of Sensors

Ticket ID Category Equipment P Status

TKT1009 02:56pm 23 Sept 17

TKT1234 02:56pm 23 Sept 17

Time

Coun

t

FAHU-1 HRW is inefficient

FAHU-1 P1 Open

Equipment is in Manual control for more than a day

FAHU-1 P2 Open

Last 7 Days

Filter

29th sep 30th sep 1st Oct 2st Oct 3st Oct 4st Oct 5st Oct

6-

5-

4-

3-

2-

1-

ON/OFF Command ON/OFF Status AlarmsTemperature

MTW

MTWP1

MTWP2

MTWP3

P2 P1

Chiller 1 Chiller 2 Chiller 3 Chiller 4 Primary Pump 1 Primary pump 2 Primary pump 3 Primary pump 4 Primary pump 5

Chiller 1 Chiller 2 Chiller 3 Chiller 4 Primary Pump 1 Primary pump 2 Primary pump 3 Primary pump 4 Primary pump 5

Chiller 1 Trip status Chiller 1 Alarm status Chiller 2 Trip status Chiller 2 Alarm status Chiller 3 Trip status Chiller 3 Alarm status Chiller 4 Trip status Chiller 4 Alarm status Primary Pump 1 Trip status

Chiller 1 Chilled water supply temp Chilled water return temp Chilled water temp. set pt. Chiller 2 Chilled water supply temp Chilled water return temp Chilled water temp. set pt. Chiller 3

32°C 60% RH

COMMANDS STATUS CPM LEVEL ALARM

SET POINTS

SENSOR VARIABLE

System command

Off command

Multi select command

Bypass flow direction Plant trip alarm

Place holder alarm

Place holder alarm

Place holder alarm

Place holder alarm

Place holder alarm

Place holder alarm

Differential pressure setpoint

Temperature setpoint

Diff. pressure transmitter header

Differential pressure transmitter P1

Differential pressure transmitter P2

Bypass flow

ON

OFF

ON

OFF

ON

OFF

OFF

OFF

OFF

OFF

ON

ON

OFF

ON

OFF

OFF

OFF

OFF

OFF

ON

FWD TRIP

TRIP

TRIP

TRIP

TRIP

TRIP

TRIP

14 bar

14 bar

14 bar

14 bar

14 bar14 °C

14 °C 14 °C

14 °C 14 °C

Select

OFF

ON

OFF

ON

OFF

ON

OFF

ON

ON

1 °C

14 °C

Equipments ground floor

Equipments MTWP1&MTWP2

CPM P1&P2

Equipments Zone1

Equipments Zone2

MTWP5

Floor1

Zone1

Zone2

Ground

Floor3Floor2

Floor4

AHU East VAVE 1 VAVE 2 VAVE 3

Chiller Chiller1 Chiller2 Chiller3 Chiller4Primary PumpsSecondary Pumps

CPM P1&P2

Page 11: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

CountryGlobal City Building

Last Updated 20/04/2018 13:45:40 CHILLER PLANT P1 AND P2 Mfg : Danfoss Type : ODPRR22SRh20

Alarms (30) Ticket (20) Automated Control (20)

Sensors Status

32

30 Working2 Faulty

View details

Total No Of Sensors

Ticket ID Category Equipment P Status

TKT1009 02:56pm 23 Sept 17

TKT1234 02:56pm 23 Sept 17

Time

Coun

t

FAHU-1 HRW is inefficient

FAHU-1 P1 Open

Equipment is in Manual control for more than a day

FAHU-1 P2 Open

Last 7 Days

Filter

29th sep 30th sep 1st Oct 2st Oct 3st Oct 4st Oct 5st Oct

6-

5-

4-

3-

2-

1-

ON/OFF Command ON/OFF Status AlarmsTemperature

MTW

MTWP1

MTWP2

MTWP3

P2 P1

Chiller 1 Chiller 2 Chiller 3 Chiller 4 Primary Pump 1 Primary pump 2 Primary pump 3 Primary pump 4 Primary pump 5

Chiller 1 Chiller 2 Chiller 3 Chiller 4 Primary Pump 1 Primary pump 2 Primary pump 3 Primary pump 4 Primary pump 5

Chiller 1 Trip status Chiller 1 Alarm status Chiller 2 Trip status Chiller 2 Alarm status Chiller 3 Trip status Chiller 3 Alarm status Chiller 4 Trip status Chiller 4 Alarm status Primary Pump 1 Trip status

Chiller 1 Chilled water supply temp Chilled water return temp Chilled water temp. set pt. Chiller 2 Chilled water supply temp Chilled water return temp Chilled water temp. set pt. Chiller 3

32°C 60% RH

COMMANDS STATUS CPM LEVEL ALARM

SET POINTS

SENSOR VARIABLE

System command

Off command

Multi select command

Bypass flow direction Plant trip alarm

Place holder alarm

Place holder alarm

Place holder alarm

Place holder alarm

Place holder alarm

Place holder alarm

Differential pressure setpoint

Temperature setpoint

Diff. pressure transmitter header

Differential pressure transmitter P1

Differential pressure transmitter P2

Bypass flow

ON

OFF

ON

OFF

ON

OFF

OFF

OFF

OFF

OFF

ON

ON

OFF

ON

OFF

OFF

OFF

OFF

OFF

ON

FWD TRIP

TRIP

TRIP

TRIP

TRIP

TRIP

TRIP

14 bar

14 bar

14 bar

14 bar

14 bar14 °C

14 °C 14 °C

14 °C 14 °C

Select

OFF

ON

OFF

ON

OFF

ON

OFF

ON

ON

1 °C

14 °C

Equipments ground floor

Equipments MTWP1&MTWP2

CPM P1&P2

Equipments Zone1

Equipments Zone2

MTWP5

Floor1

Zone1

Zone2

Ground

Floor3Floor2

Floor4

AHU East VAVE 1 VAVE 2 VAVE 3

Chiller Chiller1 Chiller2 Chiller3 Chiller4Primary PumpsSecondary Pumps

10

22 °C

°C

min

Ok

Yes

Yes

Cancel

Multi select

Release

!

Current Value

Set to

Release

Defferred Time

Actuations Value Time Actuated by

Description of rule 30 minutes System14/05/2018, 12.15 pm

Description of rule 30 minutes System14/05/2018, 12.15 pm

Description of rule 30 minutes System14/05/2018, 12.15 pm

Last One hour

KWH

Select Time Period

Exceeding Range 14-28°C

29

Pending Actuations

Cool-off Period remaining

Value to be set to

Description of rule 30 minutes 24

Description of rule 30 minutes 24

Description of rule 30 minutes 24

Page 12: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

10

Occupant Comfort

98%

Energy Consumption (MWH)

273Water Consumption

Cubic Meter

57Equipment Health

98%

Equipment Status

981

966 Working15 Faulty

View details

Total No Of Equipments

Alarms Summary

55Alarms

NormalCritical Moderate

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Maintenance

Safety

Safety

Category Latest on Top

02 22 31

View details

CountryGlobal City Building

i i i i

Key Performance Indicators Last Updated 20/04/2018 13:45:40

Buildings Select<25>25

MTWP1 MTWP2 MTWP3 MTWP5 MTEP1

Wat

er C

onsu

mpt

ion

in C

ubic

Met

er

00

15

10

05

20

25

Bengaluru, IndiaCO2KWHOverallPer SqFt

Compare Click to explore

863

75%Satisfied Respondents

Unsatisfied Respondents

Closed Tickets652

Open Tickets211

SLA Breach037

Overview Critical Tickets IOT Gen Tickets

23 41 04 143

Ticket Summary

Occupant comfort is now a measurable KPI

Page 13: Global Country City Building - Mindtree · Global Country City Building i i i i Key Performance Indicators Last Updated 20/04/2018 13:45:40

PadmanathanSen. Facility ManagerDashboard

Energy Overview Water

Bengaluru

Bengaluru India Buildings

Period

Occupancy comfort

Bengaluru Dashboard 104 F | Co o

90%

96%

94%

92%

98%

100%

MTWP1 MTWP2 MTWP3 MTWP5 MTEP1

Buildings Compare

Now Week Month Year Custom

Equipment Status

525

520 Working05FaultyOccupancy Comfort

99%Energy Consumed MWH

97Water Consumption cubic meter

32Equipment Health

99%View details

Total No Of Equipments

GladiusConnected Building

Add Widgets

10

1.03pm 8th Oct 2017

1.03pm 8th Oct 2017

Bengaluru 99% Alarms Summary

26Alarms

NormalP3P1 Critical Moderate P2

Category Latest on Top369

76%Satisfied

Tickets

Satisfied Tickets

Unsatisfied Tickets

Closed Tickets263

Open Tickets90

SLA Breach16

Ticket Summary 20/09/2017 to 20/10/2017

Overview Critical Tickets IOT Gen Tickets

10 18 02 61

02 09 15

FAHU Breakdown at WCP1 02:56pm 23 Sept 17

Fire Alarm WCP3-2F-070 02:56pm 23 Sept 17

Maintenance

Safety

Faulty Equipment List

MTWP3 05/10/2017P2 “FAHU-X” HRW is inefficientFAHU -1MTWFAHU1

MTWP3 05/10/2017P2 Equipment is in Manual control for more than a dayFAHU -1MTWFAHU1

MTWP1 03/10/2017P2 BFV stuck Chiller-1 MTWCHILLER3

MTWP3 02/10/2017P3 Pressure sensor value out of operational rangeAHU-2MTWAHU2

MTWP3 01/10/2017P2 Ambient Temperature sensor is to be ReplacedFAHU -4MTWFAHU4

Equipment ID Equipment Name Building DatePriority Description