SEMINAR ON
GOAL ORIENTED PROJECT PLANNING FOR EFFECTIVE
PROBLEM SOLVING
By-Vinaya Kumar H M
Ph.D scholar
OUTLINE OF THE PRESENTATION Introduction
Clarification of concepts Types of plans Principles of GOPP Description of GOPP steps GOPP for problem solving
INTRODUCTION
Leon. J. Rosenberg Management tool Bilateral and Multilateral NGO’s Mandatory for Financial aid Participatory
If you really want to do something you’ll find the way;
If you don’t, You’ll find an excuse.
- Jim Rohn
To understand the GOPP and its related concepts
To get an insight about the procedure and steps involved in GOPP
To use GOPP as a tool for effective problem solving
UNDERSTANDING OF GOPP AND ITS
RELATED CONCEPTS
Goal reflects our purpose in the life and have wide-spread impact on our lives
‘A’ Priority Goals – “MUST DO” Goals
‘B’ Priority Goals – “DESIRABLE TO DO” Goals
‘C’ Priority Goals – “CAN WAIT” Goals
Innovative Village Preparatory Project
Goal
The longer term or wider objective
Objective:Immediate aims of the project –
what is set out to do
Outcomes Effects or change in the project aims to
bring about.
Outputs What the project will specially deliver. Task to be completed or activities to
be implemented.
ActivitiesWhat needs to be done to achieve the
outputs.
GOPP GOPP stands for Goal Oriented Project
(Programme or Participatory) Planning. Also know as OOPP In French GOPP know as PIPO In German as ZOPP LF is also used as a term
GOPP An innovative tool
interactive workshops
Using the GOPP approach, all the stakeholders and (future) partners are involved
GOPP HAS POTENTIAL USE Used in a wide variety of situations since the
1980s and has proved to be robust and effective in helping groups defining clear objectives and designing related action plans
An excellent method for improving team effectiveness, HRM and problem solving
Planning and re-planning of interventions
The idea of GOPP is to make sure
• That decisions are reached and recorded• That if anything left undecided the reasons for
this are agreed and • That team members reach a consensus on the
aims and actions of the project.• Key to it all is the facilitator, who remains
neutral and ensures objectivity.
GOPP aims:• To improve the quality of the analysis made by the group
of partners in the design phase of a project • To make the project more coherent and transparent by
clarifying the responsibilities of each partner• To provide trust and self-confidence to project partners• To improve the capacity of the group of partners to
achieve more results in a limited time • To create accountability • A planning instrument
Types of plans in the management sectors
• Purposes or missions • Objectives • Strategies • Policies • Procedure • Rules • Programmes and • Budgets
Strategic Management Model
Strategy Formulation
Strategy Implementation
Evaluation and Control
Mission
Objectives
Strategies
Policies
Feedback/Learning
Environmental Scanning
Societal Environment
General Forces
Task Environment
Industry Analysis
Structure Chain of Command
Resources Assets, Skills
Competencies, Knowledge
Culture Beliefs, Expectations,
Values
Reason for existence
What results to accomplish by when Plan to
achieve the mission & objectives Broad
guidelines for decision making
Programs
Activities needed to accomplish a plan
Budgets
Cost of the programs Procedures
Sequence of steps needed to do the job
Process to monitor performanceand take corrective action
Performance
External
Internal
THE HIERARCHY OF PLANS
PERT (Programme Evaluation Review Technique) and CPM (Critical Path Method)• Techniques of project management useful in
the basic managerial functions of Planning scheduling and control
• used to break down the large projects to individual jobs or events and arranged in a logical network
• Plan your work first…..then work your plan
Activity
Activ
ity
Activity
Activity
Activit
y
Activity
Activity
Activity
Activity
Activity Activ
ity
Activity
PERT and Time Estimates
Optimistic Time Estimate
Pessimistic Time Estimate
Most probable/ Most likely Time Estimate
The PERT Assumption
Activities are independent
The CPM Model
• A “Deterministic” rather than “probabilistic” model
• Allows for variations in job times as the planned and expected outcome of resource assignments
• Advantages of CPM and PERT
The procedure and steps involved in GOPP
GOPP: Principles and Steps
Principles of GOPP
• Planning is done logically and completely
documented
• Planning is done in groups, together with those who
have to implemented
• Planning first determines the goal and then the
appropriate measure to achieve the goal
Objectives of GOPP
• Identify potential participants in a project
• Improve communication and cooperation
• Analyze the causes and effects of a given core
problem
• Define realistic, definite and sustainable project
objectives
• Clarify the scope of responsibility of project participants
• Specify necessary project inputs/activities necessary to achieve results and
• Provide sound basis for supervising projects, monitoring and controlling progress, evaluating impact and making appropriate changes when necessary
Steps involved in GOPP • 1 Analysis of project´s Context• 2 Analysis of Stakeholders• 3 Problem Analysis/Situation Analysis• 4 Objectives Analysis• 5 Plan of Activities• 6 Plan of Resources/Inputs• 7 Indicators/measurements• 8 Risk Analysis • 9 Analysis of Assumptions
Problem analysis
Complex Problem Diagram
Example of Problem Tree
Example of a Project Planning Matrix
GOPP FOR PROBLEM SOLVING
• A problem is the difference between someone’s actual state and the state he wants to be in.
• A well-defined problem is already half way to being solved
• The seriousness of the anticipated efforts of a problem determines both how the problem is perceived and how urgently a solution is sought
PHASES OF GOPP PROCESS
Preparation stage
Execution stage
Evaluation stage
• The principles of GOPP ensures and confirm that it is an effective tool for defining the problem and solving it effectively.
• It helps to retain what has proved successful, remember the steps which improved progress and discover the weak points
• GOPP assists extension in problem-solving by lending support to people in solving their problem by helping them to analyze it in a structured way, as well as by informing and motivating them to solve it.
Benefits of Structured Problem Solving process
Remove time lost in debate Identify weak points in processesDiscover systemic causesExplain with reasons why an incident occurredGives a factual representation of the incidentCompare what actually happened against what
should have happened, at any point during the incident
It avoids the complexity of reality
Conclusion
• The primary strength of the technique is considered to be the principle of basing all planning on the analysis of existing problems, as perceived by those who actually have to deal with them
• This anchors each plan in reality, assures its relevance and ensures that the interests of the ‘beneficiaries’ are served first and foremost, rather than those of the ‘suppliers’