golaski labs · 2021. 7. 22. · c-pace required documents •c-pace pre-application form •energy...
TRANSCRIPT
GOLASKI LABSJuly 13, 2021
Roofmeadow
P4 Hub
P4 Hub Phase 2
IaMC
MDPMBG
Available Spacefor Lease
Parking
Parking
• The energy conservation measures (ECM) proposed for inclusion in the project are as follows:
• • High-efficiency cooling provided by new rooftop units
• • Variable speed control on air handling units, which allows fans to slow down when
• demand is low.
• • Replacement of existing windows with insulated, low-e glazing systems.
• • LED lighting in all spaces, fixture count per lighting drawings.
• • Additional insulation being installed along with roof replacement.
• • Low-flow plumbing allows not only water savings but hot water energy savings.
Energy Conservation Measures
C-Pace Required Documents
• C-Pace pre-application form
• Energy Audit Report
• Declaration of Condominium (mixed-use projects)
• Plats and Plans as required by the Uniform Condominium Act (mixed-use projects)
• Breakdown of percentage interest of each condo unit (mixed-use projects)
• Appraisal of commercial space (mixed-use projects)
• Mortgage Lienholder Consent Form
• Final C-Pace Application
• Statement of Levy and Lien of Assessment Agreement
• Diversity and Inclusion Plan