good 3g resume

Upload: manishchaturvedi19

Post on 03-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Good 3g Resume

    1/5

    Sr RF Engineer

    Resume keywords summary: Sr RF Engineer, TEMS, Huawei, MCOM, M2000, PRS, NASTAR,Ericsson, CME, UMTS, 2G, I-RAT, HSPA/HSPA+

    Contact Information

    Please log in to see the contact information!Work Experience

    Experience level: 5-10 yearsProfile/Cover Letter: ASHISH TANDONMobile +91-9621523789 (M) +91 9793760188E-Mail [email protected] / [email protected]

    Seeking assignments in RF Planning & Optimization with an organization of high reputeCurrently having a work visa for RSA with 2 years validity and B1/B2 visa for US with 10 yrsvalidity.Executive SummaryResult proven professional with 5+ years of experience in Radio frequency planning, networkoptimization, drive testing of wireless network & RF survey with a sound knowledge ofUMTS/GSM.Excellent knowledge on planning and optimization tools like TEMS investigation, Genex probe,Genex assistant, iManager 2000, LMT, PRS, Sonar, CME, MCOM, MapInfo, NastarGSM/WCDMA, Actix, MIPT

    A true believer with expertise in managing operations with key focus on ensuring optimalutilization of resources and timely deliveries.

    A self motivated person which good interpersonal skills & strong analytical, problem solving &organisational abilities.

    Organisational Experience

    Huawei Technologies Ltd, South Africa, (Through First Point Group, London) Since Nov102G/3G RF Optimization Consultant for Vodacom Phase III/IV Swap project

    Accountabilities

    RRC/RAB Setup Success rate, CS/PS call drop rate improvement after swapResponsible for the improvement for Code/power/CE/Iub CongestionRecommendations for WBPP Card to overcome CE congestion, escalate TX issues to controlIub Congestion.TP Analysis for the overshooting cells and for the missing neighbor analysis with the help ofNASTAR2G-3G and 3G-2G Neighbor Audit, Inter freq, Inter RAT HO auditResponsible for the improvement of R99/HSDPA/HSUPA KPIsSC re-Planning, PCPICH power distributions for customer complain area.

  • 7/28/2019 Good 3g Resume

    2/5

    Identifying High RTWP cells and recommendation to improve RTWP by optimizing theattenuation values.Daily report generation with the help of PRS.Traffic dimensioning to improve the TCH/SDCCH blocking. Recommendations to change of FR-HR dynamic threshold settings and including addition of TRx in order to Network PerformanceImprovement.

    Analysis of TCH/SDCCH drop on day to day basis using KPIs and resolving the problem of cellshaving high drops by either changing the frequencies or replacing faulty hardwares.KPI monitoring on daily basis on cell level and BSC Level and resolving the problems with highCDR, CSSR and poor HOSR.Traffic/Power mapping based on the field measure power & Surveyed power and traffic data forbefore the swap, provided by Operator.Frequency optimization in order to improve the network quality by considering Co-Adjacentchannel interference.Involved in swap execution from Motorola to Huawei & analysis of pre-benchmark test & post-benchmark test.Post-swap optimization. Also, actively participated in getting approval from customer and finalnetwork acceptance.

    To enable the features on GSM like Flex Abis enable, PDCH on DCS band in IUO N/WRecommendation for the addition/deletion of neighbors on the basis of Measurement Reportsdata provided by NASTAR.Involve in the Optimization activities for Voice /Data.To monitor the Performance and KPIs during the time of swap and provide theHourly/Daily/Weekly report regarding the swap activities and plan of actionThoroughly involved in the Worst cells Optimization activities.Involved in the activities of cell level acceptance and cluster level acceptance immediate afterthe swap

    Previous Assignment

    NSN/Huawei Technologies Ltd, Tanzania (Through GTL Tanzania Ltd) June10 Nov10Team Leader/Sr. RF Engineer for Zain/Airtel Re-Launching GSM 900/1800/UMTS project

    Highlights2G-3G and 3G-2G Neighbor Audit, Inter freq, Inter RAT HO auditRRC/RAB Setup Success rate, CS/PS call drop rate improvement after swapTP Analysis for the overshooting cells

    Analyzed results of drive test of the network with competitors network and provided solutions forbad quality or poor signal and patches, if any.Recommend new macro sites based on drive test results, analysis and necessary actions on

    customer complaints, high utilized cells, etc. to project team for execution.Improved handover success rate by removing/defining neighbors using NASTAR GSM and byremoving co BCCH/BSIC neighbors.Handled interference analysis of Co-channel (C/I) and Adjacent channel (C/A).Network Optimization by KPI analysis on cell to cell ( BTS 3900) basis and BSC level (BSC6900) and change the parameters as per the requirement.

    NSN/Huawei Technologies Co. Ltd, Tanzania (Through GTL Tanzania Ltd) Nov09 June10

  • 7/28/2019 Good 3g Resume

    3/5

    Team Leader/Sr. RF Engineer for Zain Swap project for 2G & 3G from Ericsson to Huawei

    HighlightsPlanned the DT Route for pre-benchmarking and post-benchmarking for swapping of Ericsson/

    ALU RNC to Huawei RNC using the DT tool Genex Probe V 2.2 and WCDMA Scanner TSML-W.

    Detailed analysis of log file for the parameters such as RSCP, Ec/Io, Rx Power, Tx Power, P-SC, RLC throughput and also reasons for CSSR, call drop, HSDPA low DL/UL throughput.Based on the log file analysis, prepared reports according to client requirement and tuned thecluster on both parametric level and field optimization.Execute the test for IBS for voice calling, video calling, PS384 and HSPA/HSPA+.Checked the site status from LMT and tracing.Neighbor addition from 2G to 3G and vice versa.For 2G swap - Planned the DT route for single site validation after swapping of BSC using IdleMode test, Dedicated Mode test, MOS test and PS(EDGE/GPRS).Optimize the cluster and reach to the the KPIs before the target time.

    Huawei Technologies Co. Ltd, Tanzania (Through GTL Tanzania Ltd) Jan09 Oct09Sr. RF Engineer for Zantel TKP project

    HighlightsPlanned the DT route and decided cluster boundary for single site verification & clusteroptimization.Monitored KPI and optimizing network parameters (Handover Parameters, Cell Parameters) atcell and BSC level using Huaweis M2000 and LMT to improve the KPIs of network for voice &data.Planned DT route for changing from single band (900MHz) to dual band (900/1800MHz).

    Analyzed log files for voice & data for single site verification & cluster optimization and to detectfeeder swap, low C/I cells, overshooting, missing neighbor, Co and Adjacent BCCH cells.

    Responsible to resolve the interference problem with baseband hopping as well as synthesizerhopping in a single network.

    Ericsson India Pvt. Ltd., Lucknow (Through NUTEK India Ltd) May07 Dec08RF Engineer on Rollout project of Bharti Airtel

    HighlightsPerformed drive tests and site migrations using TEMS Investigation and analyzed data of RFdrive test to determine network problems, poor coverage areas, interference, call drops andhandover problems.

    Analyze the interference (C/I , C/A) and suggest the new frequency for better quality.

    Responsible for deciding orientation & tilting of GSM antennas for optimum coverage.Auditing of new sites and verifying the hardware, tilt, antenna height & orientation according tothe planning database.Handled clutter analysis for B.T.S. sites and defined azimuth/tilt of antennas.Handled site selection and survey (GSM-900/1800).Prepared excel sheet and map grid with MapInfo Professional.Was responsible for initial tuning and optimization of new sites.Provided marketing inputs for the planning team.Scholastics

  • 7/28/2019 Good 3g Resume

    4/5

  • 7/28/2019 Good 3g Resume

    5/5