GOTECH Sp. z o. o.
Company location
Production Plant 74-105 Nowe Czarnowo
GOTECH sp. z o. o.Podmiejska-Boczna 1666-400 Gorzów Wlkp.
Company’s activity
The main fields of business:
Power industry and offshore
Technological and environment protection devices
Steel constructions Absorbers, tanks, ducts ESP Piping
Industrial construction
Comprehensive support of Investor Construction of industrial plants
in so called „turnkey system” Development and modernization Implementation of infratructure projects
Production Plant – Nowe Czarnowo
Area: 3 000 m2Capability: 200 t/month
New investment - Production Plant 2
Area: 3 500 m2Finish date: 11.2018
Production Plant – Szczecin Shipyard
Area: 2 000 m2Cranes: 2 x 100 t and 3 x 12,5 t
Production Plant – Szczecin Shipyard
Organization chart
Certificates
Quality System in compliance with EN ISO 9001:2015
Quality System in compliance with PN-EN ISO 3834-2:2007
welding standard
SCC SHE Checklist Contractors
EN 1090-1,2_EXC4 Factory Production Control (FPC)
Welding Certificate – EN 1090_035
Welding Certificate – EN 1090_363
OFFICE OF TECHNICAL INSPECTION - FOR REPAIR
OFFICE OF TECHNICAL INSPECTION - TO MODERNIZATION
Sale structure
Completed Projects - locations
Power industry and offshore
Power industry and offshore
Production of:
Power devices
Ofshorre industry
Environment protection devices
Technological devices
Tanks
Piping
Erection of:
Power boilers
Process pipelines
Steel structures
ESP
Flue gas ducts
Industrial installations
Power industry and offshore – Our Customers
Aker Solutions - Norway AE & E Inova - Germany Alstom Power Systems – Germany, Finland, Poland Bladt Industries – Denmark Botngaard - Norewy Donges SteelTec - Germany Envirotherm - Germany FLSmidth – Denmark, Germany Heitkamp Ingenieur und Kraftwerksbau – Germany Hitachi Power Europe - Germany Küttner - Germany Kronoholding – Switzerland Nikolajsen Holding Naestved - Denmark Paul Wurth – Luxembourg PBN - Denmark PGE Polska Grupa Energetyczna GiEK S.A. – Poland RAFAKO S.A. – Poland Siemens Poland Steinmüller Babcock Environment - Germany Tubilah – Norway
Ordered by : Bladt Industries A/S, DenmarkProject : Fabrication incl. coating of Anode Cages 28 offPlace : Hornsea 1 OWF, United Kingdom 2017/2018
Ordered by : Bladt Industries, DenmarkProject : Beatrice Offshore Windfarm ProjectPlace : United Kingdom / 2017
Ordered by : Heitkamp Ingenieur und Kraftwerksbau, GermanyProject : Delivery and assembly of Metal Works – 100 tPlace : Nuclear Power Plant Olkiluoto 3, Finland / 2017
Ordered by : Heitkamp Ingenieur und Kraftwerksbau, GermanySpecial platforms
Ordered by : Erbud Industry Sp. z o.o. , PolandProject : Execution of discharging and storage station for ammonia
water of SCR station Place : Pomorzany Power Plant, Poland / 2017
Ordered by : Siemens Polska Sp. z o.o.Project : Delivery and assembly of the steel structure with claddings – 1000 tPlace : PGE GiEK S.A Oddział Gorzów, Poland / 2015-2016
Ordered by : Aalborg Engineering A/S, DenmarkProject : Erection of the boiler supporting structure – 350 tPlace : PGE EC Gorzów Wlkp. S.A., Poland / 2016
Ordered by : Bioenergy Farm Stanowice Sp. z o.o., Poland Project : Construction of the Heat and Power PlantPlace : Stanowice, Poland / 2015
Ordered by : Paul Wurth, LuxembourgProject : Delivery of Granulation Tank with Condensation Tower - 130 tPlace : Głogów, Poland / 2015
Ordered by : Bladt Industries, DenmarkProject : Delivery of secondary steel for Offshore Wind Farm – 250 tPlace : Gwynt Y Mor / 2011
Ordered by : Bladt Industries, DenmarkProject : Manufacture of primary and secondary steel for OWF – 760 tPlace : Baltic 2 / 2013, 2014
Ordered by : KÜTTNER GmbH, GermanyProject : Engineering, fabrication and erection of three coal silos – 250 tPlace : Steel mill Voestalpine Stahl, Linz, Austria / 2013
Ordered by : KÜTTNER GmbH, GermanyProject : Engineering, fabrication and erection of three coal silos – 250 tPlace : Steel mill Voestalpine Stahl, Linz, Austria / 2013
Ordered by : Aker Solutions, NorwayProject : Delivery of Subsea Template structure – 210 tPlace : Svalin, Norway / 2012
Ordered by : RAFAKO S.A., PolandProject : Delivery and assembly of absorber – 470 tPlace : PGE ZE Dolna Odra S.A., Poland / 2010, 2011
Ordered by : RAFAKO S.A., PolandProject : Delivery and assembly of flue gas ducts – 500 tPlace : PGE ZE Dolna Odra S.A., Poland / 2010, 2011
Ordered by : Donges SteelTec / Hitachi Power Europe, Germany Project : Delivery and assembly of coal bunkers 4 offPlace : KW Rotterdam, Netherlands / 2010, 2011
Ordered by : Donges SteelTec / Hitachi Power Europe, GermanyProject : Delivery of coal bunkers 5 offPlace : KW Maasvlakte, Netherlands / 2009-2010
Ordered by : Donges SteelTec / Hitachi Power Europe, Germany Project : Delivery and assembly of coal bunkers 4 offPlace : KW Wilhelmshaven, Germany / 2009
Ordered by : KÜTTNER GmbH, GermanyProject : Delivery and erection of coal silos.Place : HKM Duisburg, Germany / 2007, 2008
Ordered by : AE & E INOVA GmbH, GermanyProject : Delivery and erection of flue gas- and air ductsPlace : GKW Dillingen, Germany / 2007, 2008
Ordered by : FISIA Babcock Environment GmbH, GermanyProject : Delivery of absorbers, flue gas ducts and support structures for 3 linesPlace : Shuaibah – Saudi Arabia / 2006, 2007
Ordered by : FISIA Babcock Environment GmbH, GermanyProject : Engineering and delivery of two DeNox reactors Place : Hemweg – Amsterdam, the Netherlands / 2006
Ordered by : Lurgi Lentjes AG, GermanyProject : Delivery and erection of three furnaces type RowitecPlace : INDAVER – Antwerp, Belgium / 2005
Ordered by : Tubilah AS – NorwegiaProject : Fish farms deliveryPlace : Mosterhamn, Norway 2002 - 2005
Ordered by : FLSmidth A/S, DenmarkProject : Mechanical erection c/w insulation of ESPPlace : Koping – Sweden / 2003
Ordered by : Elektrim – Megadex SA, PolandProject : Delivery and erection of steam turbine housing of steam-gas unit Place : Zielona Góra – Poland / 2003
Ordered by : KRONOHOLDING – SwitzerlandProject : Delivery and erection of incinerating plant GEKAPlace : Kronopol Żary, Poland / 1999
Ordered by : FLS miljo A/S, DenmarkProject : Modernization of OP650 boiler - low emission burnersPlace : PGE ZE Dolna Odra S.A., Poland / 1996
Ongoing fabrication projects
Project No. 1Ordered by : Bladt IndustriesProject : Fabrication of secondary steel, 28 pcs Anode Cages – 560 tPlace : Hornsea Project One HOW01, United Kingdom / 2017 ÷ 2018
Project No. 2Ordered by : Steinmüller Babcock Environment Project : Fabrication of flue gas ducts – 150 tPlace : AGR Herten Project, Germany / 2017
Project No. 3Ordered by : EnvirothermProject : Fabrication of fabric filters, 2 off and support structure – 350 tPlace : Fredrikstadt Project, Norway / 2018
Industrial construction
We execute all the stages of construction:
Preparation of the concept Design Gaining building permit Realization of all systems Installaltion of machines and technological devices Occupancy permit
Industrial construction:
Industrial construction – Our Customers Adient Poland Sp. z o.o. – Poland AHRENS Textil – Service - Germany ALGONTEC – Spain Bee Polska Sp. z o.o. – Poland ELEAR Jerzy Lisowski – Poland Energopol S.A. – Poland Faurecia S.A. – Poland FILTRY-HAFT – Poland HEIDENHAIN – MICROPRINT – Germany HTMP Sp. z o.o. – Hollland Kiel Sp. z o.o. – Germany L & BEE – Belgium Lamix – Poland Neofac Polska Sp. z o.o. – Poland Replastik Sp. z o.o. – Poland TACONIC Sp. z o.o. – USA TPV Displays – Taiwan Witpol Sp. z o.o. – Poland
Ordered by : Gmina Miasto Szczecin, PolandProject : Modernization and reconstruction of the lower-secondary-schoolPlace : Szczecin, Poland / 2017-2018
Ordered by : TPV Displays, TaiwanProject : Construction of Production Plant – 30.100 m2Place : Gorzów Wlkp., Poland / 2017-2018
Ordered by : Johnson Controls Polska Sp. z o.o., PolandProject : Development of Production Plant – 10.500m2Place : Świebodzin, Poland / 2016
Ordered by : Kiel Polska Sp. z o.o. - GermanyProject : Construction of production plant – 4.300m2Place : Nowy Tomyśl, Poland / 2011
Ordered by : TACONIC Sp. z o.o., USAProject : Construction of Production Plant – 2.800m2Place : Kostrzyn n/Odrą, Poland / 2009-2011
Ordered by : TPV Displays, TaiwanProject : Development of Production Plant, stage II – 38.000 m2Place : Gorzów Wlkp., Poland / 2008-2011
Ordered by : TPV Displays, TaiwanProject : Development of Production Plant – stage I – 24.300m2 Place : Gorzów Wlkp., Poland / 2008-2011
Ordered by : ALGONTEC, SpainProject : Production Plant – total built-up area 6.000 m2Place : Kostrzyn nad Odrą, Poland 2008
Ordered by : Filtry-Haft, PolandProject : Construction of Production Plant– 4.700m2Place : Gorzów Wlkp., Poland 2007
Ordered by : HTMP Sp. zoo - HollandProject : Production Plant – total built-up area 1.829 m2Place : Gorzów Wlkp., Poland 2007
Ordered by : L&Bee, BelgiumProject : Production Plant – total biult-up area 3.500 m2Place : Kostrzyn on Oder, Poland 2006
Ordered by : Ahrens Textil - Service, GermanyProject : Industrial laundry – total built-up area 4.000 m2 m2Place : Gorzów Wlkp., Poland 2006
Ordered by : ELEAR Jerzy Lisowski, PolandProject : Service station – total built-up area 2.000 m2Place : Gorzów Wlkp., Poland 2006
Ordered by : hmp HIDENHAIN - MICROPRINT, GermanyProject : Production Plant – total built-up area 4.000 m2Place : Gorzów Wlkp., Poland 2006
Ordered by : ENERGOPOL - 7, PolandProject : Hall for F -16 aircraftPlace : Krzesiny, Poland 2002
Project No. 1Ordered by : Faurecia Legnica S.A. Project : Reconstruction of the Production PlantPlace : Legnica, Poland / 2018 ÷ 2019
Project No. 2Ordered by : TPV Polska Sp. z o.o.Project : Construction of the connectorPlace : Gorzów Wlkp., Poland / 2018
Project No. 3Ordered by : Caps S. A.Project : Warehouse construction Place : Gorzów Wlkp., Poland / 2018 ÷ 2019
Ongoing fabricaton projects
Local community
www.gotech.pl
GOTECH Sp. z o. o.