Baart sarkar Government of India kond`Iya ivaVut p`aiQakrNa Central Electricity Authority piScama xao~Iya ivaVut saimait Western Regional Power Committee ef -3, emaAayaDIsaI xao~, AMQaorI (pUva-), mauM ba[- - 400 093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093 Aa[- esa Aao : 9001-2008 ISO: 9001-2008 dUrBaaYa Phone: 022- 28221681; 28200194; 28200195;28200196 fO@sa Fax : 022 – 28370193 Website: www.wrpc.nic.in E-mail : [email protected] saM : Paxaoivasa/p`caa. / Pa`sasa-kaya-vaR%t /2011-12/7711 idnaaMk 23.08.2011 saovaa maoM, ivaYaya:- p.xao .iva.saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI 426 vaIM baOzk ka kaya-vaR%t. mahaodya, piMScama xao~Iya ivaVut saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI idnaaMk 12.08.2011 kao p xao iva saimait, mauMba[- maoMoM sampnna hu[- 426 vaIM baOzk ka kaya-vaR%t AapkI saUcanaaqa- saMlagna hO . Qanyavaad. BavadIya, saMlagna : ]Parao@tanausaar Sd/- ( esa sa%yanaarayaNa ) AQaIxaNa AiBayaMta (p`caalana)

Upload: trinhdang

Post on 30-May-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Baart sarkar Government of India kond`Iya ivaVut p`aiQakrNa

Central Electricity Authority piScama xao~Iya ivaVut saimait

Western Regional Power Committee ef -3, emaAayaDIsaI xao~, AMQaorI (pUva-), mauMba[- - 400 093

F-3, MIDC Area, Andheri (East), Mumbai - 400 093

Aa[- esa Aao : 9001-2008 ISO: 9001-2008

dUrBaaYa Phone: 022- 28221681; 28200194; 28200195;28200196 fO@sa Fax : 022 – 28370193 Website: www.wrpc.nic.in E-mail : [email protected]

saM: Paxaoivasa/p`caa. / Pa`sasa-kaya-vaR%t /2011-12/7711 idnaaMk 23.08.2011

saovaa maoM, ivaYaya:- p.xao.iva.saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI 426 vaIM baOzk ka

kaya-vaR%t.

mahaodya,

piMScama xao~Iya ivaVut saimait, mauMba[- kI Pa`caalana evaM samanvaya saimait kI idnaaMk 12.08.2011 kao p xao iva saimait, mauMba[- maoMoM sampnna hu[- 426 vaIM baOzk ka kaya-vaR%t AapkI saUcanaaqa- saMlagna hO .

Qanyavaad.

BavadIya,

saMlagna : ]Parao@tanausaar Sd/-

( esa sa%yanaarayaNa ) AQaIxaNa AiBayaMta (p`caalana)

Page 2: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

MINUTES OF 426th MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 12TH AUGUST 2011 AT

WRPC OFFICE, MUMBAI The 426th meeting of Operation & Co-ordination Sub-Committee of WRPC was held

on 12th August 2011 at WRPC, office, Mumbai. The list of participants is enclosed at Annex-I. Shri Manjit Singh, Member Secretary, WRPC chaired the meeting and welcomed the

members and participants to the 426th OCCM. He stated that frequency remained between 49.5 to 50.2 Hz for 93.33 % of the time during July 2011 compared with 90.93 % in the last month & remained below 49.2 & 49.5 Hz for 0.38 % & 4.81 % respectively. Frequency touched 48.8 Hz on nil occasions during the month.

Highlighting power situation in Western Region during July 2011, he stated that

Regional demand met decreased by 916 MW as compared to the month of June 2011 and unrestricted demand decreased by 337 MW. Western Regional Grid registered maximum demand of 33520 MW during July 2011, which was about 17.16 % more than the registered demand of 28610 MW met during the same month last year. (In June 2011, it was 34436 MW). The unrestricted demand was 38769 MW as compared to 34534 MW during the last year. The increase in unrestricted demand is of the order of 12.26 %. (In June 2011, it was 39106 MW). The capacity shortage in the region was about 5249 MW (In June 2011 it was 4670 MW). Capacity shortage in GETCO was 347 MW, in MPPTCL 535 MW, in CSPTCL 248 MW, in MSETCL 3093 MW & in Goa, it was 3 MW.

Referring to energy requirement and availability he stated that as against the unrestricted requirement of 21660 MUs in the month of July 2011 availability was 19862 MUs. There was energy shortfall of 1798 MUs. Maximum Energy availability per day was 739.60 MUs during the month of July 2011.The net export by Western Region to the neighboring regions was of the order of 2330.157 MUs against net scheduled export energy of 2113.933 MUs.

Thereafter the agenda items were taken up for discussion. ITEM No. 1: CONFIRMATION OF THE MINUTES

Minutes of 425TH meeting of Operation & Coordination Sub-Committee of WRPC held on 14th July 2011 at WRPC Office, Mumbai were forwarded vide letter No. WRPC/OPN/OCC-Minutes/2011-12/ 6689 dated 22.07.2011. No comments have been received.

The minutes of 425th meeting of Operation & Coordination were confirmed by the Committee. ITEM No.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF

JULY 2011 2.1 Frequency Particulars

SE (Opn.), WRPC stated that during July 2011 the system during July 2011 the system frequency was below 49.5 Hz for 4.81 % of time against 4.56 % of time during June 2011.The system frequency was within the permissible range of 49.5-50.2 Hz for 93.33 % of the time against 90.93 % of time during June 2011. The average monthly frequency was

Page 3: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

2

49.84 Hz during July 2011 and in June 2011 it was 49.89 Hz. Regarding operation in high frequency range, the system operation, frequency during the month of July 2011 was above 50.20 Hz for 1.86 % of time against 4.51 % of time during June 2011.

The detailed frequency particulars are enclosed at Annex- 2.1. The Sub-Committee noted the detailed frequency particulars.

2.2 Operational Discipline

SE (Opn), WRPC stated that from data available with WRPC it is observed that the average deviation in drawal per day from WR grid was 4.91 MUs (Overdrawl) and 1.942 MUs (Overdrawl) by NR, ER respectively and Max. Average exchange was 0.684 MUs by SR. The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and 17.071 MUs on 10th July respectively and the maximum exchange on SR was 6.074 MUs on 10th July. There was a net inter-regional export of 2330.157 MUs by WR against net export schedule of 2113.933 MUs.

The information concerning number of instances of significant violation of IEGC during the month of July 2011 as furnished by WRLDC is enclosed at Annex- 2.2 (A).

The details of recommended load shedding Vs actual load shedding carried out by

WR constituents during July 2011 as furnished by WRLDC are enclosed at Annex-2.2 (B). S.E. (Opn.), WRPC requested DGM, WRLDC to brief the committee on Grid

Operation during July 2011. CM, WRLDC in the presentation indicated broadly the performance of the grid.

Operational messages (A/B/C) issued to WR constituents during the month of July, 2011 were as below:

TTC MESSAGES issued to Regional Entities of WR during July -2011

CONSTITUENT GETCO MPPTCL MSETCL CSPTCL NTPC TOTALNO.OF TTC MSGS

3 2 1 1 8 15

WRLDC intimated that during July 2011, wind generation in Maharashtra and Gujarat States was 557 MUs and 453 MUs respectively. Ghatghar hydro power station in Maharashtra had operated for: 243 hrs in pumping mode. Koyna-IV had operated for: 951 hrs. in synchronous condenser mode. SSP had operated for 263 hrs. in synchronous condenser mode. There have been overdrawl/TTC violations by the other regions. Messages issued to NR/ER for over drawl & TTC violation during July, 2011 were as below:-

The Sub-Committee noted as above.

TYPE-A TYPE-B TYPE-C TOTAL GETCO 8 8

MPPTCL 1 1 MSETCL 2 1 3 CSPTCL 13 5 1 19 TOTAL 24 6 1 31

LINK NR ER TOTAL No of O/D Messages 20 6 26 No of TTC Messages 86 86

Page 4: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

3

2.3 Voltage Profile

SE (Opn), WRPC stated that as per the data received from WRLDC, Voltage profile at some of 765/400 kV sub-stations during the month of July 2011 as furnished by WRLDC is enclosed at Annex-2.3. He stated that voltages beyond the stipulated limits in IEGC were observed at certain S/S, the deviations of voltages from the accepted limit on either side were recorded at the following locations in WR grid which were noted by Committee:-

S.No. 765/400kV Sub-station

Max. Voltage observed (kV)

Date of incidence Min. voltage observed (kV)

Date of incidence

1 Indore 431 10.07.11 - - 2 Itarsi 430 10.07.11 - - 3 Karad 429 19.07.11 - - 4 Dhule 434 10.07.11 - - 5 Kasor 426 07.07.11 - - 6 Bhilai 427 19.07.11 - - 7 Jetpur 432 18.07.11 360 03.07.11 8 Bina 428 29.07.11 - - 9 Gwalior 433 09.07.11 371 19.07.11 10 Nagda 434 10.07.11 - - 11 Khandwa 438 09.07.11 - -

GETCO vide letter no. SLDC/CE/MIS/WRPC/3319 Dated 06.08.2011 ( Copy

enclosed at Annexure 2.3-A) intimated that injection of reactive power through Intra State /Central Sector lines results high voltage condition in Gujarat grid during night hours almost everyday.

The sub committee stressed that shunt capacitor should be switched off, reactor taken into service to curtail voltage. Also generators having adequate reactive power absorption margin should absorb MVAR so that terminal voltage is maintained.

DGM, WRLDC, stated that units at Sipat are continuously absorbing MVAR to curtail the voltage.

Sub committee requested generator utilities to absorb MVAR as per capability curves.

The Sub-Committee noted as above.

2.4 U/F Relay Operations

S.E. (Opn), WRPC stated that system frequency touched 48.8 Hz at nil occasions (integrated figures of two second block) during July 2011; AUFLS relay operations at 48.8 Hz had taken place as per details placed at Annex-2.4. There are in some occasion the frequency touched to 48.8 Hz as per data received from constituents which are instantaneous value. The Committee noted the UFLS operations in July 2011 as indicated in Annexure-2.4 2.5 Power Cuts / Load Restrictions

The committee noted the details of Power Cuts and Regulatory Measures during July 2011 as furnished by the state utilities as per the enclosed Annex.2.5.

Page 5: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

4

2.6 Details of Generating Units under Forced outages

Details of generating units under forced outages during July 2011 were discussed. APL -6, Wardha-1, Nasik-1& Parli-6 were deleted. RGPPL-1A, C’pur-6, TATA-8, AMK-4 & Satpura-6 were shifted to Planned outage. The modified details of force outages programme of Generating units are given in Annex-2.6. 2.7 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during July 2011 are given in

Annex-2.7. Dy. E, SLDC Kalwa intimated that C’pur Unit – 6(500 MW) was out from 12.07.2011 to 06.08.2011. MPPTCL representative intimated that Amarkantak Unit-4 & Satpura unit -4,6,7 were taken under plan outages.

The Sub-Committee discussed and finalized the planned outages.

ITEM No.3: OPERATIONAL PLANNING 3.1 Proposed outage programme of generating units The maintenance programme of generating units for August 2011 & September 2011 was discussed.

(1) Addl. CE, SLDC, GETCO informed that Gandhinagar –I, Wanakbori-II & SLPP-2 are deferred whereas outages of Adani -3 is postponed due to expert from China for attending the work could not arrive so far.

(2) SLDC, MSETCL representative informed that Chandrapur unit No – 6(500 MW), Chandrapur unit-1(210 MW), Nasik unit No.-5(210 MW) & Parli unit -7 (250 MW) were deferred. He further intimated that Bhusawal-II(220MW)is planned from 20.08.11 to 04.10.11, Parli-4(210MW) & Parli -3(250MW) are planned from 26.08.11 to 20.09.11 & 19.08.11 to 13.09.11 respectively.

(3) NTPC representative stated that Korba unit 6 & 7 will not be availing for outage. Gandhar GT – 3 scheduled to be out from 25.08.11 to 31.08.11 for A – Inspection.

(4) RGPPL representative requested for outages of Unit 1B & 2B from 21.09.11 to 31.10.11 & 06.09.11 to 20.09.11 respectively.

The Committee approved maintenance programme of the generating units for August 2011 & September 2011 as given in Annex 3.1.

The Sub-Committee finalized the outage schedule of generating units for the above period and is modified outages plan is placed at Annex 3.1.

3.2 Outage Programme of Transmission Lines/elements

The Committee discussed the maintenance Programme for transmission

lines/elements for the months of August 2011 & September 2011. With respect to agenda notes outages following changes were made after discussion.

(1) 500 kV HVDC pole 1 at Bhadrawati was rescheduled on 21.08.11 to 31.08.11, which was proposed on 03.08.11 to 15.08.11.

(2) 500 kV HVDC pole 2 at Bhadrawati was rescheduled on 08.08.11 to 20.08.11, which was proposed on 13.08.11 to 20.08.11.

(3) 400 kV Korba - Bhatapara was rescheduled on 24,25.08.11 which was proposed on 17,18.08.11

Page 6: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

5

(4) 400 kV Korba-Vindhyachal-I was rescheduled on 27.08.11 which was proposed on 24.08.11

(5) SLDC, MSETCL representative requested for C’pur-Parli-II & III line only on 08.09.11 &09.09.11 respectively.

(6) CE, SLDC, GETCO requested for inclusion of the following transmission element outages:

Sl No

Voltage in kV Line

Date From date To From To Basis Work System Agency

1 400 APL-Dehgam-II 14.08.11 31.08.11 0700 1900 Daily Insulator

replacement GETCO GETCO

2 400 Jhanor-GPEC-I 17.08.11 18.08.11 0800 1800 Daily Bay maintenance

GETCO GETCO

3 400 Jhanor-GPEC-I 17.08.11 18.08.11 0800 1800 Daily Bay maintenance

GETCO GETCO

4 400 Sugen-Vapi 24.08.11 24.08.11 0800 1800 Daily Bay maintenance

GETCO GETCO

5 400 Sugen-Jhanor 28.08.11 28.08.11 0800 1800 Daily Bay maintenance

GETCO GETCO

6 400 Kansari-Kankroli-I 30.08.11 30.08.11 0800 1800 Daily Bay maintenance

GETCO GETCO

7 220 Pirana-Bhat-1 17.08.11 17.08.11 0800 1800 Daily Line & Bay Maintenance GETCO GETCO

8 220 Bhilad-Ambethi-I 23.08.11 23.008.11 0900 1800 Daily PMM Work GETCO GETCO 9 220 Bhilad-Ambethi-II 27.08.11 27.08.11 0900 1800 Daily PMM Work GETCO GETCO 10 220 Bhilad-Ambethi-III 20.08.11 20.08.11 0900 1800 Daily PMM Work GETCO GETCO 11 220 Bhilad-TAPS 25.08.11 25.08.11 0900 1800 Daily PMM Work GETCO GETCO 12 220 Navsari-Nasik-I 26.08.11 26.08.11 0700 1700 Daily PMM Work GETCO GETCO 13 220 Navsari-Nasik-II 27.08.11 27.08.11 0700 1700 Daily PMM Work GETCO GETCO

The Committee agreed for the above addition. The finalized transmission line outage Programme is given in Annex 3.2

The Sub-Committee finalised the maintenance programme which is given at Annex 3.2.

3.3 Anticipated Power Supply Position for the months – August 2011 & September

2011 Anticipated Power Supply Position for the months of August 2011 & September 2011 were discussed. The details of anticipated regional deficit are given below: (All figures in MW)

AUGUST 2011 SEPTEMBER 2011 State/ Region Anticipated

Availability Anticipated Peak Demand

Shortage Anticipated Availability

Anticipated Peak Demand

Shortage

GETCO 8820 9240 420 9960 10340 380 MPPTCL 5510 6105 595 6395 7085 690 CSEB 2925 2980 55 2875 2990 115 MSETCL 14110 17400 3290 14390 17660 3270 GOA 400 425 25 400 420 20 DD 310 330 20 305 340 35 DNH 530 560 30 540 560 20 WR 30430 34720 4290 33630 37880 4250 Details of anticipated restricted & un-restricted demands for the months of August 2011 & September 2011 are given in Annex 3.3 (A). The hourly schedule load shedding programme proposed by WRLDC for the months of August 2011 & September 2011 as furnished by WRLDC is given at Annex. 3.3 (C). The

Page 7: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

6

details for anticipated station wise Availability & Energy for the months of August 2011 & September 2011 as furnished by the constituents is given at Annex. 3.3(B). The Sub-Committee noted as above. ITEM No. 4: OPERATIONAL STATISTICS FOR THE MONTH OF JULY 2011 4.1 The details of schedule Vs actual generation, demand, drawl of power from grid;

exchanges etc. are given in the following Annexure: Annex 4.1 - Schedule Vs Actual Generation and Requirement for July 2011 Annex 4.2 - Peak Demand: Schedule Vs Actual for July 2011 Annex 4.3 - Integrated Operation of the System for July 2011 Annex 4.4 - Operation of Inter State Tie lines during July 2011 Annex 4.5- Details of Declared Capacity, Schedules and Injections from Central sector Stations, Drawl Schedules and Entitlements of constituents during July 2011 Annex 4.6 - Inter System Exchanges for July 2011 Annex 4.7- Details of level of Major Reservoirs in Western Region for July 2011 Annex 4.8a- Month-wise loss of generation due to non-utilization of high cost of Naphtha fuel. Annex 4.8b -Month-wise loss of generation due to shortage of coal and gas fuels.

The sub-Committee noted as above

ITEM No. 5: SYSTEM DISTURBANCE IN WESTERN REGION WRLDC intimated that there was no major grid disturbance(GD-4 & above) in the Western Region during the July 2011. There were multiple trippings on 3rd, 4th & 5th July under foggy condition in Gujarat system. The consolidated list of other grid disturbances (GD -3 & below)as finalised by WRLDC is attached at Annexure- 5.

The Sub-Committee noted as above.

ITEM NO. 6: IMPLEMENTATION OF RECOMMENDATIONS OF VARIOUS ENQUIRY COMMITTEES ON GRID DISTURBANCES IN WR

The updated status of implementation of recommendations of the Enquiry

Committees on grid disturbances in WR is enclosed at Annex- 6. The Sub-Committee noted as above.

6.1 Confirmation of Healthiness status of SERs/DRs equipment in the system. Constituents have furnished the status of healthiness of SER/DRs in their systems on the

dates below:- Sl No. Name of constituents Date of Receipt 1 WRTS-I 04.08.2011 2 WRTS-II 03.08.2011 3 MPPTCL 12.08.2011 4 NTPC 05.07.2011 5 CSPTCL 05.08.2011 6 GETCO 12.08.2011 7 MSETCL 12.08.2011

Constituents of WR were requested to continue sending the information as per the recommendation of enquiry committee of Grid disturbances on 25.02.2007 and 28.02.2007.

The Sub-Committee noted as above.

Page 8: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

7

ITEM No. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR

COMMISSIONING OF REACTORS, TRANSMISSION LINES AND GENERATING UNITS IN WR.

7.1 Status of completion of ongoing Schemes for Commissioning of reactors.

As discussed in 426th OCCM and as per the present status available on the work for

providing additional reactors at the various locations in WR. Accordingly the information regarding the commissioning schedule is as below:

S. No.

400 kV Sub/stn.

Size (MVAR)

Implementing agency

Expected commissioning date

1. Khandwa 1x125 PGCIL Commissioned on 30th Sep. 2010 2. Dhule 2x50 MSETCL 1x50 MVAr is already

commissioned. 2nd reactor is commissioned on 11th December 2010.

3. Dehgam 1x125 PGCIL Commissioned on 29th October 2010

4. Kasor 1x125 GETCO Commissioned on 3rd May 2011

5 Soja 1x80 GETCO Commissioned on 30th April 2011

6 Rajgarh 1x125 PGCIL October 2011 7 Nagda 2x50 MPPTCL September 2011

The concerned utilities are requested that the reactors are installed and commissioned as per the above schedule.

The respective utilities were requested that the reactors are installed and commissioned according to the schedule agreed as above.

7.2(a) Status of completion of on going Transmission Schemes being executed/implemented by POWERGRID/ Other Agencies

The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows: - S. No. Name of the Line Target Completion

Date Remarks

POWERGRID 1 400 kV Rourkela-Raigarh D/C August -2011 Charged on 29.06.11

2 400 kV Ranchi-Rourkela D/C Charged on 30.11.2010

3 400 kV Raigarh –Raipur D/C Charged on 30.09.2010

4 400 kV D/C Korba(NTPC)-Birsinghpur(MPGENCO) September- 2011 5 400 kV D/C Birsinghpur (MPGENCO)-Damoh (PG) December -2010 Charged on 28.02.11

6 765 kV 2nd S/C Seoni (PG)-Wardha(PG) (initially to be operated at 400kV)

September – 2011

7 400 kV Wardha(PG)-Parli (PG) (Quad) D/C August -2011 Charged on 31.07.11

8 400 kV Raipur(PG)-Wardha(PG) D/C September- 2011 9 400 kV Bhadrawati(PG)-Parli (PG) D/C Charged on

31.03.2011 Commercial operationw.e.f. 01.06.11

10 400 kV Parli(MSETCL)-Parli(PG) D/C May- 2011 -do-

Page 9: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

8

11 400 kV Vapi(PG)-Navi Mumbai D/C Line October -2012 12 400 kV D/C Dehgam-Pirana line March 2010 Charged on 28.02.113 LILO of 400 kV D/C Bina-Nagda line at Sujalpur May 2011 Charged on 30.05.11

ommercial operation w.e.f01.06.11

14 400 kV D/C Mundra- Limbdi December-2011 15 400 kV D/C Mundra- Bachchau-Ranchodpur September -2011 16 400 kV Korba STPS- Raipur D/C June - 2011 Commercial operation

w.e.f. 01.07.11 CSPTCL 1 LILO of 400 kV Korba (W)-Bhilai at Raipur DCDS December-2011 2 400 kV Korba (W)-Khedamara DCDS Ckt I &II March-2012 MAHARASHTRA (IPTC route) by WRTransmission (Mah) Pvt. Ltd

1 400 kV Parli(PG)-Pune D/C March 2012 2 400 kV Pune (PG)-Aurangabad (MSETCL) D/C March 2012 3 400 kV Parli(PG)-Solapur D/C September 2011 4 400 kV Solapur(PG) –Kolhapur (MSETCL)D/C December 2011 5 LILO of 400 kV Chakan-Padgha(MSETCL) D/C at Pune

(PG), April-2011 Commissioned

on 15.04.11 6 LILO Lonikhand –Kalwa at Puna(PG) September-2011 7 LILO of Solapur (MSETCL)-Karad (MSETCL) 400 kV

S/C at Pandharpur/Solapur (PG) Nov 2010 Commissioned

on 21.01.11 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd 1 400 kV Rajgarh(PG)-Karamsad (GETCO) D/C Forest issue 2 400 kV Limdi (Chorania) (GETCO) –Ranchodpura

(Vadavi) (Gujarat) D/C May-2011 Charged on 16.05.11

ommercial operation w.e.f01.06.11

3 400 kV Ranchodpura (Vadavi)(GETCO)-Zerda (Kansari) (GETCO) D/C September-2011 It is observed that 2ND 660MW unit of Mundra TPS (APL) Phase –II was

commissioned in June, 2011, in view of above 400kV APL –Zerda 2 D/C lines need to be expedited to accommodate smooth transfer of power evacuation from station.

The Sub-Committee noted as above.

7.3 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2011-2012 The status regarding Generating units, commissioned /expected to be commissioned during the current year 2011-12 according the available information is as below:

Name of the Power Projects Unit No. Capacity (MW)

Date of Commissioning /Schedule Date

GUJARAT (i) Hazira CCPP (GSEG) GT+ST 350 July - 2011 (ii) Mundra TPP(Adani) Phase-II 2 660 Commissioned on 03.06.2011(iii) Mundra Ph-III 7 660 September -11 (iv) Mundra UMPP 1 800 November-11 2 800 March-12 (v) Pipavav (CCPP) 1 350 July- 11 (vi) Gujarat Lignite-NLC & GPCL JV Stage-I 1500 2011-12 (vii) Bhavnagar Lignite TPP-JV 500 2011-12 (viii) Ukkai TPS Extn. 6 500 July-11

Page 10: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

9

CHHATTISGARH Nil MADHYA PRADESH (i) Maheshwar(Hydro)

10x40

400

Deferred till March 2012

MAHARASHTRA

(i) Bhusawal Ext 4 500 Commissioned on 11.05.2011 5 500 October - 2011 (ii) Wardha Warora 1 135 Commissioned on 17.04.2011 (iii) JSW Ratnagiri TPP 4 300 July - 2011 (iv)Dhopawe TPP 1 800 Nov-11 (v) Chandrapur TPS Extn. 1 500 Dec-11 (vi)Uran CCPP Block-1 700 Nov-11 Block-2 340 Nov-11 CENTRAL SECTOR – NTPC (i) Sipat TPS Stage-I 2

3 660 660

July-2011 February 2012

The Sub-Committee noted as above. 7.4 Other Important Operation Events:

WRLDC facilitated the outage of 400kV Korba(NTPC)-Korba(W) and 400kV Korba(NTPC)-Vindhyachal-1 on 19-July-11 for stringing of up-coming 400kV Korba(NTPC)-Birsinghpur D/C.

On 08/06/11, Tower of 400 kV Satna-Bina circuit 1 and 2 collapsed at location no 565A. Ckt#2 was taken on ERS on 16/06/11.

Ckt#1 is taken on permanent towers on 15/07/2011 and ckt#2 on 31/07/2011. Congestion charges were applied on 22/07/11(02:00-05:00 hrs) and 23/07/11(01:00-

03:00 hrs) for congestion in WR-NR corridor. New Elements synchronised/charged

1. On 26/07/11, Khaparkheda Unit# 5(500 MW) of MSPGCL synchronised. 2. On 29/07/11, 400 kV Wardha-Parali ckt# 1 and ckt# 2 of POWERGRID

charged.

ITEM NO. 8: ANY OTHER ITEMS 8.1 OCC MEETING VENUE:

SE(O), WRPC stated that as per the earlier roster for hosting of meetings outside

WRPC, Mumbai following utilities have to yet host the meeting namely NHDC, REL, TPC, Adani Power and Torrent Power. However meetings could not be held outside Mumbai on continuous basis. The roster for hosting the OCC meetings outside WRPC, Mumbai is in the following order:

CSPTCL, GETCO, MSETCL, MPPTCL, NPCIL, NTPC,PGCIL, NHDC, REL, TPL,

Adani Power, and Torrent Power. It is proposed that NHDC, REL, TPC, Adani Power, and Torrent Power as mention above may host the meetings first. Thereafter roaster mentioned above may be followed with alternative meeting held outside Mumbai by the hosting utility. Periodic hosting of the OCC meetings at various generation, transmission or

Page 11: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

10

distribution venues will facilitated interactions with various groups in field & promote effective deliberations on the related issues. The sub-Committee discussed and agreed to the suggestions as above. The sub-committee requested that the constituent utilities may initiate timely advance action for making necessary arrangements for the meetings accordingly.

8.2 Planned Maintenance Outages of generating units

In pursuance of IEGC clause 5.7.4 “RPC shall submit quarterly, half yearly reports to commission indicating deviation in outages from the plan along with reasons. These reports shall also be put up on the RPC website.” Accordingly details of planned maintenance of thermal generating units available in this office during the Fourth quarter (April 11 to June 11) for the year 2011-12 was enclosed at Annex- 8.2. The deviation report from constituents is yet to be received. SE(O), WRPC requested the utilities to furnish the data within ten days otherwise the existing status shall be intimated to the H’ble commission CERC .

The Sub-Committee noted the above.

8.3 Construction of Garudeshwar weir for reversible operation of RBPH of SSP:

In the 425th OCC meeting, NCA have given a proposal for the construction of weir at Garudeshwar so that reversible operation of RBPH at SSP can be carried out. The proposal is enclosed in Annex 8.3(A). Since the GETCO representatives were not present in last OCCM because of heavy rain, the committee decided to present NCA representation in the forthcoming OCC. The hand out of presentation of NCA was enclosed at Annexure 8.3(B) in minutes of 425th OCCM for reference of constituents.

During the 426th OCC meeting Shri N K Bhandari, Member(Power), NCA explained the usefulness of the above project- namely water can be pumped back and pumped storage utilization of water can be done. The details of the anticipated cost and the project is given in the presentation, enclosed at Annex Annexure 8.3(C).

GETCO representatives expressed that the above power is a clean power and the

project shall facilitate the load dispatchers by providing a facility of pumped storage. Other representatives from MPPTCL, MSETCL and CSPTCL expressed that from technical and operation point of view it is desirable to have a facility which shall provide for pumped storage facility. However the commercial and all other related aspects of the project may require to be looked into by the concerned groups.

8.4 Overloading of 220 kV Kawas-Ichchhapore line:

In the 424th OCC meeting AGM(OS), NTPC (WRHQ), Mumbai intimated vide letter No. QSR/OS/WRPC/F17 dated 04.07.2011 that 220 kV Kawas-Ichchhapore line has been overloading on regular basis since last four-five week leading to tripping of Units & station blackout at Kawas. The tripping details of lines & units is enclosed at Annexure 8.4(A).

Further CE(SLDC), GETCO informed vide letter No: SLDC/CE/MIS/2761 dated 06.07.2011 that the 220 kV Kawas-Ichchhapore line has been overloading on regular basis due to heavy drawl by M/s Essar Power Limited. The detail matter is enclosed at Annexure 8.4 (B).

Since GETCO & ESSAR representative were not present in last meeting hence it was decided that the same was to be discussed in the forthcoming OCC.

Page 12: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

11

During the 426th OCC meeting Shri R K Aash DGM, NTPC Kawas gave a presentation of the problem enclosed at Annexure 8.4(C), which is summarized as below:

1) The loading on 220 kV Kawas-Ichchhapore section is around 300 to 350 MW as the generation at Kawas is in the range from .300- 600 MW. Sometimes power from Haldarwa is circulating to Essar.

2) The fluctuation of high loading may lead to damage to substation equipments on the above feeder requiring immediate replacement. The overloading had however led to tripping of units at Kawas on 16.06.2011 NTPC seriously requested the sub-committee to address the issue suitably.

3) It is therefore suggested to limit the loading on these lines to safe values, if required by opening of lines by GETCO.

4) GETCO were requested to briefly outline the cause that might have led to the present situation of overloading.

Addl CE SLDC, GETCO stated that 220 kV Ichchhapore is further connected to Essar

and from there to Sachin via D/c line. Since Essar power is not maintaining Injection/ Drawl as per Schedule therefore heavy drawl takes place from 220 kV Kawas- Ichchhapore line. He further stated that various messages were issued by GETCO to Essar to maintain grid discipline. He added that at present 220 kV Kawas – Vav line is LILOed at Ichchhapore with LILO of around 1 – 1.2 km length.

Shri Tushar Bhat Sr. VP, M/s Essar stated that the loads in Essar had increased due to

increase in production capacity. Further due to gas non availability the generation availability was not adequately large as a result Essar had to draw power from the grid.

The Sub-committee observed that 220 Kawas- Ichhapure line loading should be

restricted to safe levels so that damage to equipment at Kawas is avoided. GETCO proposed that the portion from 220 kV Kawas- Ichchhapore may be replaced

by high ampacity conductor so that the problem could be resolved. Accordingly he requested that the matter may be taken up in Standing Committee on PSP of WR.

NTPC were of the opinion that increasing the ampacity of the conductors may take care of the problem of transmission line but not of the bay equipments owned by NTPC. Further the high ampacity and corresponding low resistance is likely to lead to an increase in the power flow on 220 kV Ichhapore – Kawas line. Hence they proposed that the existing LILO of 220 kV Kawas-Vav line at Ichhapore may be removed and the line may be made 220 kV Kawas-Vav D/c, as per original scheme. Further they stated that GETCO had commissioned two bays in Kawas NTPC switchyard in 1999 and instead may add a D/c line from 220 kV Kawas – Ichhapore. GETCO representative intimated that because of severe ROW problem this may not be feasible. NTPC further requested GETCO to survey all existing double circuit towers through which LILO has been done and were of the opinion that it may be feasible to construct 220 kV Kawas-Ichhapore D/c line without any major changes in existing transmission line system. This will solve the problem on permanent basis. GETCO representative agreed to look into the same and revert back.

NTPC informed that at present the 220 kV Kawas-Haldarwa 1 & 2 are kept off at times to control the loading on 220 kV Kawas-Ichhapore. NTPC further requested to keep open Kawas-Ichhapore line, keeping it as emergency standby and restoring Kawas-Haldarwa-I & II lines in service for increased system stability.

The sub-committee discussed the matter and suggested that the following three alternatives may be reviewed by GETCO in view of above and reverts back in the next OCCM for further action on the matter.

Page 13: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

12

(1) Replacing the 220 kV Kawas- Ichchhapore portion of conductor with high ampacity conductor.

(2) Alternately LILO the second Kawas-Vav line at Ichchhapore keeping the portion from Vav- Ichchhapore LILO point open and charged from Vav end. This would make the configuration as 220 kV Kawas- Ichchhapore D/c and Ichchhapore (LILO) point – Vav D/c open and charged from Vav end. In that case necessary availability to PGCIL for 220 kV Kawas- Vav D/c could be given as line is kept open due to grid constraints.

(3) The existing LILO of 220 kV Kawas-Vav line at Ichhapore may be removed and the line may be made 220 kV Kawas-Vav D/c, as per original scheme. Instead add a D/c line from 220 kV Kawas – Ichhapore. Also restore the 220 kV Kawas-Haldarwa 1 & 2 Ckts.

Further Sub-committee requested M/s Essar that the dispatch instructions of

GETCO may be strictly complied with so that line loading remains within safe limits.

8.5 System Studies for APL:

APL unit 6 of 660 MW had been synchronized but the generation in the Adani TPS complex could be kept at an ex-bus value of up to 1800 MW. SE(O), WRPC informed that a system study forwarded by GM,CEA was carried out jointly by CTU/CEA/GETCO/WRLDC/WRPCon 05.08.2011 at New Delhi and the following was recommended as outcome of the study.

For transfer of power from APL Mundra 6th unit of 660 MW as an interim arrangement till availability of 400 kV APL Mundra – Zerda D/c line following requirement need to be met :- i) Commissioning of 38% FSC on 400 kV APL Mundra-Dehgam D/c ii) Commissioning of 400 kV Limbdi-Vadavi-Zerda D/c line iii) Operationalization of SPS for instantaneous tripping of one 660 MW unit in the

event of outage of one circuit at 400 kV level iv) Existing SPS scheme is to be modified for instantaneous tripping of one 330

MW unit at 220 kV level in the event of outage of one circuit at 220 kV level at APL

v) Operation setting and performance of SPS shall be coordinated with WRLDC, SLDC GETCO and WRPC and should be in operation as per the outcome.

vi) Dispatch above 1800 MW at APL shall be as per the SLDC / WRLDC instructions based on real time operational conditions

Addl CE, GETCO stated that M/s APL may submit the complete details of proposed SPS along with tripping scheme of 330 MW unit at 220 kV level. APL representative informed that they have worked out the SPS in the case of non availability of FSC. Addl CE, GETCO stated the commercial aspects shall however require to be addressed before any additional dispatch instructions (above 1800 MW) can be issued by SLDC GETCO.

The Sub-Committee noted as above.

8.6 Long outage of line on system over voltage:

CM WRTS-II intimated vide letter no. WRTS-II:VD:O&M:DB:253/933 dated

05.08.2011, that in WRTS-II, the following 400kV lines connected to MPPTCL system are kept out of service on system constraints (system over voltage/over load condition) since more than 2-3 months. These lines are to be charged periodically for some times to check its

Page 14: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

426th OCCM MINUTES

13

healthiness. However SLDC(MPPTCL) is not allowing for charging these lines. Outage of lines for longer period may not be advisable due to previous experienced in case of some of the lines earlier. POWERGRID have therefore requested MPPTCL to allow for charging these lines at least once in a month to confirm its healthiness and to avoid the problem in real condition.

TRIPPING NAME OF THE ELEMENT DATE TIME

400 kV Damoh -Bhopal-I 25.04.11 16:51 400 kV Damoh - Bhopal -II 26.04.11 17:54 400 kV Damoh – Birsinghpur-II 02.05.11 15:05 400 kV Damoh – Birsinghpur-I 07.05.11 09:41 400 kV Rajgarh-Nagda-I 30.05.11 11:30

EE, SLDC- MPPTCL agreed to look into the matter & allow test charging as early as

possible. Sub committee also suggested charging from 66kV or 132kV line crossing may be

explored so that these open lines are kept charged and prevent any unwanted incidents. The Sub-Committee noted as above.

8.7 RGMO Analysis:

• WRLDC representative informed that they are regularly reporting the performance of RGMO response in the OCC forum. Presently detailed analysis of the 59 units(14,465 MW) out of 73 units(14,756 MW) that have confirmed participation in RGMO. SCADA data is not available for 14 units (291 MW). The following table shows the break up of analysis of 73 units, carried out during July-2011.

RGMO (21) 5125 MW FGMO (5) 1200 MW NORESPONSE (21) 6255 MW NOT RUN (12) 1855 MW NO TELEMETRY (14) 291 MW TOTAL (73) 14,756 MW

• WRLDC stated that they have not yet received information regarding Ghatghar Hydro units (2x125MW) and JSW Jaigad units (3x300MW) and had requested the concerned utilities to confirm the status at the earliest. WRLDC intimated that 13 units (790MW) had applied for exemption to CERC. 96 units (14350 MW) have informed that there are some problems in implementing RGMO. WRLDC intimated that generators were requested to approach CERC in case the problems continue to persist before the problems get cleared and RGMO made operational that generators may intimate nature of problems faced in implementing RGMO. WRLDC intimated that out of 187 (31046 MW) eligible units telemetry was available for 153 units (29210 MW). The other details are enclosed in Annex 8.5. WRLDC were requested to get the telemetry availability expedited.

The Sub-Committee noted as above.

ITEM NO. 9: DATE AND VENUE OF NEXT OCC MEETING It is proposed to hold 427th meeting of Operation and Coordination Committee of WRPC on 10th September (Saturday) 2011 at OMKARESHWAR hosted by NHDC.

********

Page 15: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 1

p xao iva sa kI p`caalana evaM samanvaya saimait kI 426 vaIM baOzk maoM ]pisqat sadsyaaoMM ko naama

k` . naama pdnaama saMgazna 1 manajaIt isaMGa sadsya saicava piScama xao~Iya ivaVut saimait 2 Aao pI isaMh AQaIxaNa AiBayaMta (vaaiNajya) piScama xao~Iya ivaVut saimait 3 sa%yanaarayaNa esa AQaIxaNa AiBayaMta (p`caalana) piScama xao~Iya ivaVut saimait 4 DI pI isaMh ]p inadoSak (p`caalana) piScama xao~Iya ivaVut saimait 5 ela ko esa razaOOr ]p inadoSak (p`caalana) piScama xao~Iya ivaVut saimait 6 DI baI SaMkrrava sahayak inadoSak (p`caalana) piScama xao~Iya ivaVut saimait 7 baI Aao baagaDo AQaIxaNa AiBayaMta maharaYT\ rajya iva]kM ilaimaToD 8 vaI DI paNDo kaya-palak AiBayaMta maharaYT\ rajya ivaparokM ilaimaToD 9 DI jao kaolho ]p kaya-palak AiBayaMta maharaYT\ rajya ivaparokM ilaimaToD 10 pI e pTola mau#ya AiBayaMta gaujarat ivaparokM ilaimaToD 11 baI baI maohta Avar mau#ya AiBayaMta gaujarat ivaparokM ilaimaToD 12 jao ena panacaaolaI Avar mau#ya AiBayaMta gaujarat ivaparokM ilaimaToD 13 Aar e Samaa- kaya-palak AiBayaMta map` rajya iva]kM ilaimaToD 14 jaI dIixat sahayak AiBayaMta map` rajya iva]kM ilaimaToD 15 vaI ena isaMh kaya-palak AiBayaMta C rajya ivaparokM ilaimaToD 16 yau e vamaa- maha p`baMQak piScama xao~Iya Baar p`oYaNa koMd`` 17 vaI e mautI- ]p maha p`baMQak piScama xao~Iya Baar p`oYaNa koMd`` 18 vaI ko EaIvaastva Avar maha p`baMQak piScama xao~Iya Baar p`oYaNa koMd`` 19 pI Aar vaanaKoDo mau#ya p`baMQak pavar iga`D naagapur 20 saI esa baaobaDo mau#ya p`baMQak piScama xao~Iya Baar p`oYaNa koMd`` 21 DI vaRhnaMda p`baMQak pavar iga`D baDaodra 22 Parsa baagaDo AiBayaMta piScama xao~Iya Baar p`oYaNa koMd`` 23 hir naaqa Avar maha p`baMQak ena TI pI saI ilaimaToD 24 Aar ko AaSa ]p maha p`baMQak ena TI pI saI ilaimaToD 25 pI ena naagaraja mau#ya p`baMQak ena TI pI saI ilaimaToD 26 Aimat piDyaar ]p p`baMQak ena TI pI saI ilaimaToD 27 Ainata koSakr ]p p`baMQak ena TI pI saI ilaimaToD 28 pI Aar gaZvao mau#ya p`baMQak TaTa Paavar kM ilaimaToD 29 baI ko dasa ]p maha p`baMQak AarjaIpIpIela 30 ema eca xai~ya maha p`baMQak TaoronT pavar ilaimaToD 31 pI eca z@kr p`baMQak TaoronT pavar ilaimaToD 32 e ko Qaavalao p`baMQak TaoronT pavar ilaimaToD 33 Aar ko gauPta Aao esa, Tarapur 3, , 4 prmaaNau ivaVut inagama 34 SatISa Aar saI [-, kakrapar prmaaNau ivaVut inagama 35 esa esa gaadro esa Aao [- prmaaNau ivaVut inagama 36 ena ko BaMDarI sadsya (ivaVut) nama-da inayaM~Na p`aiQakrNa 37 DI ko sa@saonaa kaya-palak AiBayaMta nama-da inayaM~Na p`aiQakrNa 38 homaMt paNDo sahayak kaya-palak AiBayaMta nama-da inayaM~Na p`aiQakrNa 39 ema Aar ra]t e vaI pI AdanaI pavar ilaimaToD 40 ]dya i~vaodI Avar maha p`baMQak AdanaI pavar ilaimaToD 41 ijagar z@kr mau#ya p`baMQak AdanaI pavar ilaimaToD 42 tuSaar Ba+ esa vaI pI essaar ilaimaToD 43 ArivaMd kumaar vaI pI essaar ilaimaToD 44 Aao esa p`baMQak essaar ilaimaToD

Page 16: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 2.1

maah jaulaa[- 2011

1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

1.1 MAXIMUM FREQUENCY 50.27 Hz. BETWEEN 1700 Hrs & 1800 Hrs Hrs. ON 03.07.2011

AiQaktma AavaRi%t 3 jaulaa[- 2011 kao 1700 AaOr 1800 bajao ko baIca

1.2 MINIMUM FREQUENCY 49.37 Hz. BETWEEN 1900 Hrs & 2000 Hrs Hrs. ON 04.07.2011

nyaUnatma AavaRi%t 4 jaulaa[- 2011 kao 1900 AaOr 2000 bajao ko baIca

1.3 AVERAGE FREQUENCY 49.84 Hz.

AaOsat AavaRi%t

2. INSTANTANEOUS ta%kailak

2.1 MAXIMUM FREQUENCY 50.49 Hz. AT 06:05:00 Hrs. ON 19.07.2011

AiQaktma AavaRi%t 19 jaulaa[- 2011 kao 06:05:00 bajao

2.2 MINIMUM FREQUENCY 48.80 Hz. AT 19:43:00 Hrs. ON 25.07.2011

nyaUnatma AavaRi%t 25 jaulaa[- 2011 kao 19:43:00 bajao

3. %AGE OF TIME WHEN FREQUENCY WAS JULY 2011 JUNE 2011 MAY 2011

AavaRi%t ka samaya p`itSat maoM jaulaa[- 2011 jaUna 2011 ma[- 2011

3.1 BELOW 48.5 Hz. 0.00 0.00 0.00 48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00 48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.38 0.54 0.20 48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 4.43 4.02 2.92

49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 16.56 12.81 13.62 49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 50.2 Hz. 76.77 78.12 78.60 49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 50.2 Hz. AND 50.3 Hz. 1.68 3.62 2.80

50.2 hT\ja AaOr 50.3 hT\ja ko baIca3.8 BETWEEN 50.3 Hz. AND 51 Hz. 0.18 0.89 1.86

50.3 hT\ja AaOr 51.0 hT\ja ko baIca3.9 BETWEEN 51.0 Hz. AND 51.5 Hz. 0.00 0.00 0.00

51.0 hT\ja AaOr 51.5 hT\ja ko baIca3.10 ABOVE 51.5 Hz. 0.00 0.00 0.00

51.5 hT\ja ko }pr

4.1 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

4.2 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

4.3 NO. OF TIMES FREQUENCY 0 0 0 TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2011

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr )

Page 17: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak – 2.5 ANNEX - 2.5

jaulaa[- 2011 maah ko daOrana piScama xao~ maoM ivaVut kTaOityaaM/ pabaMidyaaM

Power Cut/Restrictions in Western Region for the month of July 2011 ivaYaya : - jaulaa[- 2011 ko daOrana piScama xao~ maoM ivaVut kTaOityaaM/ pabMaidyaaM Subject: - Power Cut/Restrictions in Western Region for the month of July 2011 k : gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut/ Restriction on Industries

a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday, then they will have to staggered on notified day only & cannot avail as per their choice.

b) All industries are required to keep their recess timings staggered. 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2. Power supply to Agricultural & Rural Sectors a) Up to 13th July 11 only 10 hours power supply in staggered form in rotation of day and night is given to

Agriculture. No supply during rest of 14 hours. From 14th July 2011 only 8 Hrs. Power supply in staggered Form in rotation of day & night is given to Ag No supply during rest of 16 Hrs.

b) Jyotigram Yojana 24 hrs. 3 Anya jaanakarI 3. Any other information: NIL. K : maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

pabandI ka samaya Restriction Timing

ivavarNa Details ivaVut kTaOtI kI maa~a Quantum of

power cut (MW) sao From tk To

p`it idna kula }jaa- kTaOtITotal Energy Cut

(MUs /day (a) HT/LT ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabaMidyaaM (b) Baar inayamana Load Shedding

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil (c) Anya jaanakarI Other information

1.Weekly Off 2.Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector: -

p`it idna AapUit- GaMTo Supply Hours per day ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)

2.1 Three-Phase Supply 01.07.11 31.07.11 17:16 11:47 13:24 2.2 Single-Phase Supply 01.07.11 31.07.11 00:00 00:00 00:00 2.3 Remarks / Note One day weekly off ek idna saaPtaihk CuT\TI

-2-

Page 18: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

3 Anya jaanakarI 3. Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max. (Hrs) Min. (Hrs) Average (Hrs) 3.1 Commissionary H. Qtrs. 01.07.11 31.07.11 23:43 22:49 23:12 3.2 District Head Qtrs. 01.07.11 31.07.11 22:50 21:08 21:56 3.3 Tehsil Head Qtrs. 01.07.11 31.07.11 21:07 16:10 17:40

ga : maharaYT/ Maharashtras 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

pabandI ka samaya Restriction Timing

ivavarNa Details ivaVut kTaOtI kI maa~a Quantum of

power cut (MW) From To

p`it idna kula }jaa- kTaOtI Total Energy Cut

(MUs /day (a) Power Cuts/Restriction on HT/ LT Industries (b) Load Shedding From 01.07.11 to 31.07.11

SaUnya Nil

@ 0-3200

SaUnya Nil

00.00

SaUnya Nil

24.00

SaUnya Nil

@ 38 MUs/day

(c) Any other information 1.Weekly Off 2. Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

p`it idna AapUit- GaMTo Supply Hours per day ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)

2.1 Three-Phase Supply 01.07.11 31.07.11 18:00 14:00 16:00 2.2 Single-Phase Supply 01.07.11 31.07.11 20:00 16:00 18:00

3 Anya jaanakarI Any other information: Note: * @ 1800 MW of Agricultural load is supplied by Ag. feeder separation scheme, where 08.00 hrs of supply is made available. @ 1200 MW of rural area load is covered against single-phasing scheme, where 06.00 hrs of 3 phase supply is made available.

@ 90% of load shedding is done through Load Management Schemes like AG feeder separation & single phasing.

Page 19: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

-3- Ga : C%tIsagaZ, Chhattisgarh: 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

pabandI ka samaya Restriction Time

ivavarNa Details ivaVut kTaOtI kI maa~a Quantum of power cut (MW)

sao From

tk To

p`it idna kula }jaa- kTaOtI

Total Energy Cut (MUs /day)

00.00(Av)

00.00(Av)

00.00 (Av) 56.80 (Av) 00.00(Av) 00.00 (Av)

1.Rural 89.64(Av) 2.Town Feeders (C-1to C-6 & X) (Av)

- - -

17.00 - -

130.44 -

- - -

23.00 - - - -

- - -

0.341 - -

0.377 -

(A) Scheduled (a) (i) Power Cuts/ Restriction on HT Industries (ii) Power Cuts/Restriction on LT Industries (iii) Power Cuts/Restriction on Rural (iv) Agriculture pump (v)Urban/ Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

3. HT Industries .212.39 (Av) 40.16 0.270 Total Energy Cut/day 0.993

( b) Any other information 1.Weekly Off/staggering of power supply

1day(In a week as per consumer’s option) 50MW(Av.)

-

-

0.039

2 kRiYa xao~ kao ivaVut AapUit- 2. Power supply to Agricultural Sector

p`it idna AapUit- GaMTo Supply Hours per day ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date Max. (Hrs) Min. (Hrs) Average (Hrs)

2.1 Three-Phase Supply 01.07.11 to 31.07.11, 6.00 Hrs (Power cut)

18.00

2.2 Single-Phase Supply - - - - - 2.3 Remarks/Note/ - - - - -

3 Anya jaanakarI / Any other information: SaUnya Nil ca : gaaovaa Goa: SaUnya Nil

Page 20: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Pa xao Baa p` kond`, iga`D p`baMQanaM WRLDC,GM

Annex-2.6

Paavar isasTma Aa^prooSana karpaorooSana ilaimaToD (Baart ko pavarigaD̀` inagama ilaimaToD kI ek pUUNa- svaaima%va vaalaI kMpnaI)

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

Power System Operation Corporation Ltd. (A wholly owned subsidiary of Power Grid Corporation of India Ltd)

Western Regional Load Despatch Centre Mumbai

Ainayaaoijat yauinaT Aa}Toja ka jaUlaO 2011 ka ivastarIt byaaOra Details of forced unit outages during the month of July 2011

Anau k`maaMk

Sl. No.

yauinaT Unit xamata maogaava^T Cap(MW)

saMGaTk Constituent

sao From idnaaMk samaya

tk To idnaaMk samaya

karNa Reason

Date Time Date Time 1. epIela APL-6 660 gaujarat Gujarat 03.07.11 1101 10.07.11 0200 Testing work

2. eelaTIpIesa ALTPS-2 125 gaujarat Gujarat 04.07.11 0540 13.07.11 0015 Valve leakage

3. epIela APL-5 660 gaujarat Gujarat 05.07.11 0434 14.07.11 0244 Evacuation line tripped

4. DblauTIpIesa WTPS-2 210 gaujarat Gujarat 05.07.11 1308 08.07.11 1900

BTL

5. esaelapIpI SLPP-2 125 gaujarat Gujarat 06.07.11 1444 10.07.11 1046 BTL

6. esaelapIpI SLPP-3 125 gaujarat Gujarat 07.07.11 0523 11.07.11 1032 Evacuation line tripped

7. epIela APL-6 660 gaujarat Gujarat 12.07.11 1115 19.07.11 1333 BTL

8. ijaTIpIesa GTPS-2 210 gaujarat Gujarat 19.07.11 1115 25.07.11 0935 Bus fault at Gandhinagar

9. eelaTIpIesa ALTPS-1 125 gaujarat Gujarat 28.07.11 1800 02.08.11 1704 Auxiliary supply fail

10. ijapok GPEC-3 219 gaujarat Gujarat 30.07.11 0557 AnauplabQa Still out

C&I problem

11. ]rNa Uran-8 108 maharaYT/

Maharashtra 06.06.11 2312 22.07.11 2116

Tripped in jerk

12. Bausaavala Bhusawal-3 210 maharaYT/ Maharashtra

05.07.11 0039 12.07.11 1034 Feasibility test of ESP

13. plaI- Parli-7 250 maharaYT/ Maharashtra

07.07.11 1214 13.07.11 1100 BTL

14. plaI- Parli-4 210 maharaYT/ Maharashtra

09.07.11 1310 AnauplabQa Still out

Low vacuum

15. naaisak Nasik-4 210 maharaYT/ Maharashtra

10.07.11 1130 14.07.11 0240 Wet coal problem

16. plaI- Parli-3 210 maharaYT/ Maharashtra

13.07.11 0715 21.07.11 0307 BTL

17. irlaayansa Reliance-1 210 maharaYT/ Maharashtra

13.07.11 0100 16.07.11 1616 BTL

Page 21: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Pa xao Baa p` kond`, iga`D p`baMQanaM WRLDC,GM

18. vaQaa- Wardha-2 135 maharaYT/ Maharashtra

14.07.11 1840 NA Maintenance works

19. ]rNa Uran-6 108 maharaYT/ Maharashtra

17.07.11 1152 31.07.11 0632 Stator E/F

20. ]rNa Uran-AO 120 maharaYT/ Maharashtra

17.07.11 1152 03.08.11 Outage of unit 5&6

21. TaTa TATA-5 500 maharaYT/ Maharashtra

19.07.11 2302 27.07.11 0051 BTL

22. naaisak Nasik-3 210 maharaYT/ Maharashtra

23.07.11 0155 17.08.11 AOH

23. vaQaa- Wardha-4 135 maharaYT/ Maharashtra

24.07.11 0640 NA AOH

24. KaprKoDa Khaperkheda-2 210 maharaYT/ Maharashtra

24.07.11 1427 27.07.11 1955 BTL

25. Bausaavala Bhusawal-2 210 maharaYT/ Maharashtra

28.07.11 1111 31.07.11 2335 BTL

26. esajaITIpIesa SGTPS-2 210 maQyap`doSa Madhya Pradesh

11.07.11 1628 15.07.11 0050 furnace pressure high

27. esaijaTIpIesa SGTPS-1 210 maQyap`doSa Madhya Pradesh

21.07.11 2142 25.07.11 1915 Coal shortage

28. isapt Sipat-1 660 enaTIpIsaI NTPC

30.06.11 1332 13.07.11 1901 Boiler loss of fuel

29. gaaMQaar Gandhar-1 219 enaTIpIsaI NTPC

07.07.11 1620 12.07.11 1430 Less requisition

30. kavaasa Kawas-1A 116 enaTIpIsaI NTPC

09.07.11 0035 25.07.11 0856 Less requisition

31. kavaasa Kawas-1c 164 enaTIpIsaI NTPC

09.07.11 0030 NA Less requisition

32. kavaasa Kawas-1B 106 enaTIpIsaI NTPC

11.07.11 0900 21.07.11 0030 Inspection work

33. kavaasa Kawas-1B 164 enaTIpIsaI NTPC

21.07.11 1506 25.07.11 1132 Less requisition

34. gaaMQaar Gandhar-2 219 enaTIpIsaI NTPC

23.07.11 0202 NA Less requisition

Note: Units out for more than 72 hrs are only included.

Page 22: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Annex- 2.7

maah jaulaa[- 2011 maoM yaaojanaabaQd Aa]Toja ko AMtga-t ]%padk yauinaTaoM ka ivavarNa

k`maaMk yauinaT saM xamata karNaidnaaMk samaya idnaaMk samaya

S. No. Unit No. Capacity Reason(MW) Date Time Date Time

1.0 gaujarat GUJARAT

1.1 vaaNakbaaOrI Wanakbori 5 210 30.07.11 00:16 20.08.11 AOH1.2 vaaNakbaaOrI Wanakbori 1 210 09.07.11 11:14 25.08.11 AOH1.3 gaaMQaInagar Gandhinagar 2 120 21.06.11 00:21 16.07.11 21:02 AOH1.4 isa@ka Sikka 2 120 22.06.11 02:00 19.07.11 11:40 AOH1.5 isa@ka Sikka 1 210 20.07.1 00:00 09.08.11 AOH1.6 AdanaI pavar ilaimaToD APL 2 330 16.07.11 21:44 01.08.11 19:55 AOH1.7 SLPP 1 125 17.07.11 02:19 11.08.11 AOH

2.0 map`iva]kMila MPPGCL

2.1 AmarkMTk AMK 4 120 01.06.11 31.08.11 Major R & M Work/COH2.2 satpura Satpura 4 62.5 25.07.11 14.08.11 AOH2.3 satpura Satpura 6 200 29.07.11 16.09.11 AOH2.4 satpura Satpura 7 210 01.07.11 30.07.11 AOH2.5 esajaITIpIesa SGTPS 3 210 26.07.11 12:08 31.08.11 AOH3.0 Craivabaao CSEB

3.1 kaorbaa (pU) Korba (E) Extn -1 250 07.06.11 11:20 25.07.11 22:50 AOH3.2 LANCO 2 300 11.07.11 23:55 30.07.11 AOH4.0 maraiva]kMila MSPGCL

4.1 caMd`pur Chandrapur 7 500 29.06.11 21:40 16.08.11 COH4.2 caMd`pur Chandrapur 6 500 12.07.11 17:24 06.08.11 AOH4.3 parlaI Parli 6 250 16.06.11 05:50 21.07.11 03:07 AOH4.4 T/ambao Trombay 8 250 15.07.11 01:45 13.08.11 Boiler rectification work4.5 Aar jaI pI pI ela RGPPL 1 A 220 20.05.11 13:20 02.09.11 Rotor Replacement

5.0 koMd``Iya xao~ Central Sector5.1 ivanQa esaTIpIesa VSTPS 7 500 19.07.11 00:03 12.08.11 AOH5.2 ivanQa esaTIpIesa VSTPS 10 500 15.06.11 01:24 10.07.11 21:51 AOH

Anaulagnak 2.7

DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGE DURING JULY 2011

caalaU ikyaa/caalaU haonao kI saMBaavanaa

Sync. on /Exp. by

baMd ikyaa

Taken out on

Page 23: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Agast 2011 AaOr isatmbar 2011 maoM ]%padk yauinaTaoM ko p`staivat AnaurxaNa kaya-k`ma ka ivavarNa

k`maaMk yauinaT saM xamata karNa

(maogaavaaT)

(MW) sao From tk To sao From tk To1 gau}ivainaila GUVNL

1.1 ]ka[- Ukai 3 200 17.08.11 15.09.11 AOH1.2 ]ka[- Ukai 4 200 20.09.11 19.10.11 AOH1.3 vaaNakbaaOrI Wanakbori 3 210 02.09.11 01.10.11 AOH1.4 AdanaI pavar 4 330 17.08.11 10.09.11 AOH1.5 SLPP 3 125 08.09.11 05.09.11 AOH2 map`iva]kMila MPPGCL

2.1 AmarkMTk AMK 3 210 01.04.11 30.09.11 COH2.2 satpura Satpura 9 210 01.09.11 20.10.11 COH2.3 esajaITIpIesa SGTPS 1 210 15.09.11 05.10.11 AOH2.4 esajaITIpIesa SGTPS 2 210 05.09.11 19.10.11 COH

3 Craiva]kMila CSPGCL

3.1 kaorbaa (pU) Korba (E) 2 50 16.09.11 30.09.11 AOH3.2 kaorbaa (pU) Korba (E) 3 50 01.09.11 15.09.11 AOH3.3 kaorbaa (p) Korba (W) 3 210 03.08.11 25.08.11 AOH3.4 kaorbaa (p) Korba (W) 1 210 24.09.11 17.10.11 AOH3.5 kaorbaa (p) Korba (W) 4 210 01.09.11 23.09.11 AOH

4 maraiva]kMila MSPGCL4.1 T/ambao Trombay 7A/B 180 19.08.11 26.08.11 AOH4.2 Bhusawal II 210 20.08.11 04.10.11 COH+DCS WORK4.3 Parli 4 210 25.08.11 20.09.11 AOH4.4 Parli 3 250 19.08.11 13.09.11 AOH4.5 RGPPL GT 1B 220 21.09.11 31.10.11 Rotor replcement4.6 RGPPL GT 2B 240 06.09.11 20.09.11 C I Inspection5 koMd``Iya xao~ Central Sector

5.1 ivanQa esaTIpIesa VSTPS 6 210 08.09.11 27.09.11 COH5.2 gaMQaar gaOsa Gandhar GT 2 144.3 30.09.11 25.10.11 C-Inspection5.3 gaMQaar gaOsa Gandhar GT 3 144.3 25.08.11 31.08.11 A-Inspection5.4 gaMQaar gaOsa Gandhar ST 224.49 30.09.11 21.10.11 LPT Inspection

Anaulagnak 3.1Annex- 3.1

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2011 AND SEPTEMBER 2011

vaaiYa-k AnaurxaNa yaaojanaa Aa]Toja p`staivat / vaastivak

S. No. Unit No. Capacity ko Anausaar Aa]Toja

Outage as per Annual Maintenance Plan

Outage Proposed/Availed Reason

Page 24: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Sl NoVoltage in kV Line Date Fromdate To From To Basis Work System Agency

1 500 HVDC Pole-II at C'pur 08.08.11 20.08.11 0800 1700 Cont. Maintenance Work MSETCL MSETCL2 500 HVDC Pole-I & II at C'pur 13.08.11 15.08.11 0800 2200 Cont. Maintenance Work MSETCL MSETCL3 400 APL-Dehgam-II 14.08.11 31.08.11 0700 1900 Daily Insulator replacement GETCO GETCO4 400 Indore - Nagada 16.08.11 16.08.11 0800 1700 Daily PMM Work MPPTCL MPPTCL5 400 V'chal - Jabalpur - I 17.08.11 18.08.11 0800 1800 Daily PMM Work CENTRAL NTPC6 400 Jhanor-GPEC-I 17.08.11 18.08.11 0800 1800 Daily Bay maintenance GETCO GETCO7 400 Nagda-Rajgarh-I 18.08.11 19.08.11 0800 1700 Daily PMM Work MPPTCL MPPTCL8 400 Korba-Bhilai-II 19.08.11 19.08.11 0800 1800 Daily Relay testing CENTRAL NTPC9 500 HVDC Pole-I at C'pur 21.08.11 31.08.11 0800 1700 Cont. AMP Work MSETCL MSETCL10 400 Nagda-Rajgarh-II 23.08.11 24.08.11 0800 1700 Daily PMM Work MPPTCL MPPTCL11 400 Sugen-Vapi 24.08.11 24.08.11 0800 1800 Daily Bay maintenance GETCO GETCO12 400 V'chal - Jabalpur - II 24.08.11 25.08.11 0800 1800 Daily PMM Work CENTRAL NTPC

13 400 Korba-Bhatapara 24.08.11 25.08.11 0800 1800 Cont. for connectivity of ACBL tharmal Station CENTRAL WRTS-I

14 400 Korba-Bhilai-I 26.08.11 26.08.11 0800 1800 Daily Relay testing CENTRAL NTPC15 400 Nagda-ISP 26.08.11 27.08.11 0800 1700 Daily PMM Work MPPTCL MPPTCL16 400 Korba-V'chal-I 27.08.11 27.08.11 0800 1800 Daily Relay testing CENTRAL NTPC17 400 Sugen-Jhanor 28.08.11 28.08.11 0800 1800 Daily Bay maintenance GETCO GETCO18 400 Kansari-Kankroli-I 30.08.11 30.08.11 0800 1800 Daily Bay maintenance GETCO GETCO19 400 Padgha-TAPS 02.09.11 02.09.11 0900 1800 Daily Q M Work MSETCL MSETCL

20 400 Bhusawal-Koradi 02.09.11 02.09.11 0900 1800 Daily Replacement of disc damper MSETCL MSETCL

21 400 Koradi-Akola 03.09.11 03.09.11 0900 1800 Daily Replacement of disc damper MSETCL MSETCL

22 400 Sipat-Raipur-I 05.09.11 06.09.11 0800 1800 Daily Maintenance Work CENTRAL NTPC23 400 C'pur-Parli-III 08.09.11 08.09.11 0900 1800 Daily Fixing of Spacer MSETCL MSETCL24 400 C'pur-Parli-II 09.09.11 09.09.11 0900 1800 Daily Fixing of Spacer MSETCL MSETCL25 400 C'pur-Bha' wati-III 15.09.11 15.09.11 0900 1800 Daily AMP Work MSETCL MSETCL

220 kV Lines

Sl NoVoltage in kV Line Date Fromdate To From To Basis Work System Agency

1 220 Pirana-Bhat-1 17.08.11 17.08.11 0800 1800 Daily Line & Bay Maintenance GETCO GETCO2 220 Bhilad-Ambethi-I 23.08.11 23.008.11 0900 1800 Daily PMM Work GETCO GETCO3 220 Bhilad-Ambethi-II 27.08.11 27.08.11 0900 1800 Daily PMM Work GETCO GETCO4 220 Bhilad-Ambethi-III 20.08.11 20.08.11 0900 1800 Daily PMM Work GETCO GETCO5 220 Bhilad-TAPS 25.08.11 25.08.11 0900 1800 Daily PMM Work GETCO GETCO6 220 Navsari-Nasik-I 26.08.11 26.08.11 0700 1700 Daily PMM Work GETCO GETCO7 220 Navsari-Nasik-II 27.08.11 27.08.11 0700 1700 Daily PMM Work GETCO GETCO

ICT

Sl NoVoltage in kV Name of ICT Date Fromdate To From To Basis Work System Agency

1 765/400 1000 MVA ICT-II at Sipat 23.08.11 24.08.11 0800 1800 Daily Maintenance Work CENTRAL NTPC2 400/132 200 MVA IBT-I at Sipat 20.09.11 21.09.11 0800 1800 Daily Maintenance Work CENTRAL NTPC

Maintenance Programme of Transmission Elements for the months of August 2011 & September 2011

Agast 2011 AaOr isatmbar 2011 maah maoM T/aMsaimaSana elaImaoMT\sa ka AnaurxaNa kaya-k`ma Anaulagnak 3.2

Page 25: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 3.3(A)

Agast 2011 AaOr isatmbar 2011 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2011 AND SEPTEMBER 2011

maaMga }jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2011 isatmbar 2011 Agast 2011 isatmbar 2011

AUGUST 2011 SEPTEMBER 2011 AUGUST 2011 SEPTEMBER 2011

1 gaujarat

saIimat 9200 10300 5900 6300

AsaIimat 9240 10340 5910 6310

2 maQya p`doSa

saIimat 5560 5670 3050 3172

AsaIimat 6105 7085 3435 3705

3 C<aIsagaZ,

saIimat 2960 2975 2355 2370

AsaIimat 2980 2990 2375 2380

4 maharaYT/

saIimat 17300 17550 10100 10200

AsaIimat 17400 17660 10150 10250

5 gaaovaa

saIimat 405 400 265 265

AsaIimat 425 420 275 275

6 dmana dIva

saIimat 315 325 200 200

AsaIimat 330 335 210 210

7 DI ena eca

saIimat 545 550 385 385

AsaIimat 560 560 390 390

8 piScama xao~

saIimat 34010 35402 22255 22892

AsaIimat 34718 37875 22745 23520

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

Page 26: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 3.3(B) ]plabQa xamata evaM }jaa- Agast 2011 AaOr isatmbar 2011

k`maaMk sToSana ka naama AUGUST 2011 SEPTEMBER 2011Sl. No. Station Name }jaa- Energy maaMga Demand }jaa- Energy maaMga Demand

(Gwh) (MW) (Gwh) (MW)k (A) gaujarat GUJARAT

jalaIya HYDRO1 ]ka[- Ukai 25 150 25 1502 ]ka[- ela baI saI eca Ukai LBCH 2 3 2 33 kDanaa Kadana 10 60 10 604 esaesapI sao ihssaa SSP GUVNL Share 66 204 97 173

kula jalaIya TOTAL(H) 103 417 134 386tapIya THERMAL

1 TaoronT pavar ilaimaToD yauinaT saI sao jaI 268 500 258 5002 Qauvarna Dhuvaran 105 200 70 2003 ]ka[- yauinaT 1 sao 5 Ukai -1 to 5 435 790 430 7904 gaaMQaInagar 1 sao 5 Gandhinagar - 1 to 5 573 800 554 8005 vaaNakbaaOrI 1 sao 7 Wanakbori - 1 to 7 705 1455 920 14556 ]%trna Utran 325 510 355 5107 isa@ka Sikka 113 200 140 2008 kcC ilagnaa[-T Kutch Lignite 127 260 160 2509 saUrt ilagnaa[-T Surat Lignite 275 375 265 375

10 e@rImaaoTa ilagnaa[-T Akrimota Lignite 145 200 70 12011 jaI Aa[- pI saI ela GIPCL 220 310 210 31012 [- esa esa e Aar ESSAR 320 480 320 48013 jaI pI [- saI GPEC 425 620 300 62014 jaI esa [- jaI GSEG 108 150 105 15015 saujaona Sugen (GT 1+ GT 2+GT 3) 830 1147 825 114716 CPP GAS+APL 1133 1565 1040 156517 WIND GENERATION 170 200 125 200

kula tapIya Total (T) 6277 9762 6147 9672kula jalaIya+tapIya Total (H+T+WIND) 6550 10379 6406 10258tarapur 1 sao ihssaa TAPS-I (50% Share) 72 144 72 144koMd`Iya xao~ sao pa~ta CS Entitlement 1421 2096 1417 2156State`s Own Availability(Excluding Bilateral Purchase) 8043 12619 7895 12558

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr.(50%share) 0 0 10 802 ponca Pench 23 150 35 1503 baargaI Bargi 65 90 59 904 banasaagar 1 Taonsa Bansagar 1 Tons 150 315 120 3155 banasaagar 2 Bansagar II (Deolondh) 8 15 12 256 banasaagar 3 Bansagar III (Silpara) 0 0 0 07 banasaagar 4 Bansagar IV (Zinaha) 4 10 10 158 Madikheda 40 60 15 509 ibarisaMGapur Birsingpur 10 20 10 27

10 rajaGaaT Rajghat 15 25 10 4011 Pench to MSPGCL 8 50 12 5012 [Midra saagar Indira Sagar 250 900 221 87513 Omkareshwar 135 380 110 35014 esaesapI sao ihssaa SSP MPPGCL Share 235 727 345 616

kula jalaIya TOTAL(H) 935 2692 956 2633

AVAILABLE CAPACITY & ENERGY :- AUGUST 2011 AND SEPTEMBER 2011Agast 2011 isatmbar 2011

Page 27: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 3.3(B)/2

k`maaMk sToSana ka naama AUGUST 2011 SEPTEMBER 2011Sl. No. Station Name }jaa- Energy maaMga Demand }jaa- Energy maaMga Demand

(Gwh) (MW) (Gwh) (MW)

tapIya THERMAL1 AmarkMTk II AMK II Unit 1 & 2 0 0 54 772 AmarkMTk III AMK III Unit 5 116 156 112 1563 satpura I Satpura-I(60%Share) 80 107 86 1194 satpura II Satpura-II Unit 6 & 7 98 132 128 1775 satpura II Satpura-II Unit 8 & 9 194 261 93 1286 esajaITIpIesa I SGTPS-I Unit - 1 & 2 188 254 61 857 esajaITIpIesa II SGTPS-II Unit 3&4 108 146 210 2938 esajaITIpIesa III SGTPS-III-5 307 410 298 440

kula tapIya Total (T) 1092 1466 1041 1475kula jalaIya+tapIya Total (H+T) 2026 4158 1998 4108

koMd`Iya xao~ sao pa~ta CS Entitlement 1398 2054 1403 2086

State`s Own Availability(Excluding Bilateral Purchase) 3424 6212 3401 6194

ga (C) C<aIsagaZ, CHHATISGARHjalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 30 120 30 1202 Gangrel + Mini Hydro 8 19 8 19

kula jalaIya TOTAL(H) CSEB 38 139 38 139tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 to 4 119 200 86 200 2 kaorbaa(pU) Korba (E) Unit 5 to 6 90 240 138 240 3 kaorbaa (p) Korba (W) Unit 1 to 4 407 840 274 8404 kaorbaa ([- baI) Korba EB Unit 1 34 250 144 2505 kaorbaa ([- baI) Korba EB Unit 2 110 250 144 250

kula tapIya Total (T) 760 1780 787 1780

kula jalaIya+tapIya Total (H+T) 798 1919 825 1919koMd`Iya xao~ sao pa~ta CS Entitlement 452 654 456 656

State`s Own Availability(Excluding Bilateral Purchase) 1251 2573 1281 2575

Ga (D) MAHARASHTRA maharaYT/jalaIya HYDRO

1. kaoyanaa 1AaOr 2 Koyna 1 & 2 35 300 20 200 2. kaoyanaa III Koyna III 23 150 45 150 3. kaoyanaa IV Koyna IV 78 600 15 500 4. kaoyanaa DIpIeca Koyna DPH 15 20 0 20 5. TaTa jalaIya TATA Hydro 120 444 120 444 6. vaOtrNaa Vaitarna 9 60 9 60 7. eladarI Eldari 0 0 0 0 8. BaTgar AaOr vaIr Bhatgar & Vir 0 0 0 0 9. pOzana Paithan 1 0 1 0 10. itlaarI Tillari 10 0 10 0

Agast 2011 isatmbar 2011

Page 28: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 3.3(B)/3

k`maaMk sToSana ka naama AUGUST 2011 SEPTEMBER 2011Sl. No. Station Name }jaa- Energy maaMga Demand }jaa- Energy maaMga Demand

(Gwh) (MW) (Gwh) (MW) 11. BaIra Tola rosa Bhira Tail Race 10 80 10 80 12. GaTgar Ghatghar 36 250 36 25013. Anya CaoTo jalaIya Small Hydro (others) 12 62 9 6214 ponca sao ihssaa Pench Share 33.33% 8 50 12 5015 esaesapI sao ihssaa SSP MSPGCL Share 112 344 163 292

kula jalaIya TOTAL(H) 468 2360 450 2107tapIya THERMAL

1 naaisak 1 AaOr 2 Nasik Unit -1& 2 0 0 0 02 naaisak 3 Nasik Unit -3 45 140 120 1503 naaisak 4 Nasik Unit -4 120 150 120 1404 naaisak 5 Nasik Unit -5 120 150 120 1405 T/ambao 1 sao 4 Trombay Unit 1 to 4 0 0 0 06 T/ambao 5 Trombay Unit -5 300 450 300 4507 T/ambao 6 Trombay Unit -6 300 450 300 4508 T/ambao 8 Trombay Unit -8 71 150 130 2509 T/ambao 7 Trombay Unit -7 120 140 130 150

10 kaoraD,I 1 sao 4 Koradi Unit -1 to 4 0 0 0 011 kaoraD,I 5 Koradi Unit -5 100 140 100 13012 kaoraD,I 6 Koradi Unit -6 100 140 100 13013 kaoraD,I 7 Koradi Unit -7 100 140 100 13014 Bausaavala 1 Bhusawal Unit -1 0 0 0 015 Bausaavala 2 Bhusawal Unit -2 80 130 0 016 Bausaavala 3 Bhusawal Unit -3 125 180 120 18017 parlaI 1 AaOr 2 Parli Unit -1& 2 0 0 0 018 parlaI 3 Parli Unit -3 100 160 100 15019 parlaI 4 Parli Unit -4 60 130 30 10020 parlaI 5 Parli Unit -5 100 165 100 16021 parlaI 6 Parli Unit -6 140 165 140 16522 parlaI 7 Parli Unit -7 140 170 140 17023 KaprKoD,a Khaperkheda Unit 1&2 245 360 240 36024 KaprKoD,a Khaperkheda Unit 3&4 275 360 270 36025 parsa 2 Paras-2 0 0 0 026 parsa 3 Paras-3 90 170 90 17027 parsa 4 Paras-4 130 190 130 19028 ]rna Uran (Gas) 160 220 190 22029 ]rna Uran (WHR) 155 190 150 19030 caMd`pur 1 Chandrapur Unit -1 100 135 100 13531 caMd`pur 2 Chandrapur Unit -2 100 135 100 13532 caMd`pur 3 Chandrapur Unit -3 100 135 100 13533 caMd`pur 4 Chandrapur Unit - 4 100 135 100 13534 caMd`pur 5 Chandrapur Unit -5 200 380 190 38035 caMd`pur 6 Chandrapur Unit -6 200 380 194 38036 caMd`pur 7 Chandrapur Unit -7 125 300 200 38037 DhaNaU 1 AaOr 2 Dahanu Unit-1&2 372 500 360 50038 CPP 830 1150 830 115039 RGPPL Block I 0 0 0 040 RGPPL Block II 1150 1600 1050 160041 RGPPL Block III 0 0 0 0

kula tapIya Total (T) 6453 9490 6444 9465kula jalaIya+tapIya Total (H+T) 0 10426 6894 10152tarapur sao ihssaa TAPS-I (50% Share) 6921 144 72 144koMd`Iya xao~ sao pa~ta CS Entitlement 0 3039 2067 3095State`s Own Availability(Excluding Bilateral Purchase) 72 13609 9033 13391

Agast 2011 isatmbar 2011

Page 29: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Anaulagnak 3.3(B)/4

k`maaMk sToSana ka naama AUGUST 2011 SEPTEMBER 2011Sl. No. Station Name }jaa- Energy maaMga Demand }jaa- Energy maaMga Demand

(Gwh) (MW) (Gwh) (MW)ca (E) gaaovaa GOA

1 Aa[- pI pI irlaayaMsa IPP Reliance 20 35 20 352 koMd`Iya xao~ sao pa~ta CS Entitlement 213 308 214 308

State`s Own Availability(Excluding Bilateral Purchase) 233 343 234 343

C (F) dmana dIva AaOr DIenaeca DD & DNHkoMd`Iya xao~ sao pa~ta CS Entitlement 129 186 129 188

ja (G) CENTRAL SECTOR 1. ena pI saI N.P.C.

1.1 tara`pur 1 TAPS Unit -1 80 160 80 1601.2 tara`pur 2 TAPS Unit -2 80 160 80 1601.3 tara`pur 3 TAPS Unit -3 300 480 300 4801.4 tara`pur 4 TAPS Unit -4 300 480 300 4801.5 kakrapr 1 KAPS Unit -1 50 125 50 1251.6 kakrapr 2 KAPS Unit -2 50 125 50 125

kula ena pI saI NPC Total 860 1530 860 1530 2. ena TI pI saI N.T.P.C.

2.1.1 kaorbaa esaTIpIesa 1 KSTPS Unit-12.1.2 kaorbaa esaTIpIesa 2 KSTPS Unit-22.1.3 kaorbaa esaTIpIesa 3 KSTPS Unit-32.1.4 kaorbaa esaTIpIesa 4 KSTPS Unit-4 1837 2600 1837 26002.1.5 kaorbaa esaTIpIesa 5 KSTPS Unit-52.1.6 kaorbaa esaTIpIesa 6 KSTPS Unit-62.1.7 kaorbaa esaTIpIesa 7 KSTPS Unit-7

kula kaorbaa KSTPS Total 1837 2600 1837 26002.2.1 ivanQa esaTIpIesa VSTPS Unit 1- 6 860 1260 902 12602.2.2 ivanQa esaTIpIesa VSTPS Unit 7 - 8 600 1000 600 10002.2.3 ivanQa esaTIpIesa VSTPS Unit 9 - 10 700 1000 700 1000

kula ivanQayaacala VSTPS Total 2160 3260 2202 32602.3.1 SIPAT STPS-1 342 500 353 5002.3.2 SIPAT STPS-2 342 500 353 500

TOTAL SIPAT 684 1000 707 10002.4.1 kvaasa gaOsa 1e Kawas GT-1A 2.4.2 kvaasa gaOsa 1baI Kawas GT-1B 2.4.3 kvaasa esaTI 1saI Kawas ST-1C 484 651 472 6562.4.4 kvaasa gaOsa 2e Kawas GT-2A 2.4.5 kvaasa gaOsa 2baI Kawas GT-2B 2.4.6 kvaasa esaTI 2saI Kawas ST-2C

kula kvaasa KGPS Total 484 651 472 6562.5.1 gaMQaar gaOsa 1 Gandhar GT-12.5.2 gaMQaar gaOsa 2 Gandhar GT-2 2.5.3 gaMQaar gaOsa 3 Gandhar GT-3 362 620 323 6202.5.4 gaMQaar esaTI 4 Gandhar ST-4

kula gaMQaar GGPS Total 362 464 323 6203 sardar saraovar SSP 413 1275 605 10804 poMca Pench 22.5 150 34.5 150

piScamaI xao~ WESTERN REGIONWR Own Availability (Excluding Bilateral Purchase) 22703 36422 22543 36138

Agast 2011 isatmbar 2011

Page 30: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

maah jaulaa[- 2011 kI yaaojanaabaQd banaama vaastivak ]%padna evaM ]plabQata

k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary Sr. Station Name Energy Peak Energy Peak Consumption No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)k (A) gaujarat GUJARAT

jalaIya HYDRO 1. ]k[- Ukai - 1 5.02 75

]k[- Ukai - 2 2.64 75]k[- Ukai - 3 0.94 75]k[- Ukai - 4 1.65 75]k[- Ukai (Total) 54 150 10.24 152 0.149

2. ]k[- ela baI saI eca Ukai LBCH - 1 0.46 2]k[- ela baI saI eca Ukai LBCH - 2 0.73 2]k[- ela baI saI eca Ukai LBCH (Total) 2 3 1.19 3 0.017

3. kDanaa Kadana - 1 0.00 0 0.000kDanaa Kadana - 2 1.42 42 0.059kDanaa Kadana - 3 0.90 40kDanaa Kadana - 4 2.44 43 0.061kDanaa Kadana (Total) 10 60 4.76 120 0.009

4. pnama PANAM & Madhuban Dam 1 & 2 0 0 1.21 4 0.003 6. kula jalaIya TOTAL(H) 66 213 17.41 225 0.178

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 35 60 34.36 62 3.6972 TaoronT pavar ilaimaToD yauinaT DI 59 120 77.91 123 6.4353 TaoronT pavar ilaimaToD yauinaT [- 61 110 69.58 114 6.7794 TaoronT pavar ilaimaToD yauinaT ef 50 110 70.43 115 6.8745 TaoronT pavar ilaimaToD yauinaT jaI TI 1 24.90 376 TaoronT pavar ilaimaToD yauinaT jaI TI 2 7.41 337 TaoronT pavar ilaimaToD yauinaT esa TI jaI 16.13 358 Qauvarna tapIya Dhuvaran - 5 0 0 0.00 0 0.0009 Qauvarna tapIya Dhuvaran - 6 0 0 0.00 0 0.000

10 Qauvarna tapIya Dhuvaran - GT 1 0.00 0 0.00011 Qauvarna tapIya Dhuvaran - GT 2 0.00 0 6.30212 Qauvarna tapIya Dhuvaran - STG 101.19 19913 ]ka[- yauinaT 1 Ukai -1 20 90 11.26 84 2.24914 ]ka[- yauinaT 2 Ukai -2 15 90 0.00 0 0.54815 ]ka[- yauinaT 3 Ukai -3 149 200 110.28 201 11.20216 ]ka[- yauinaT 4 Ukai -4 96 200 120.24 201 12.45217 ]ka[- yauinaT 5 Ukai -5 150 210 118.41 212 10.18118 gaaMQaInagar 1 Gandhinagar - 1 67 90 56.71 88 5.42419 gaaMQaInagar 2 Gandhinagar - 2 32 90 16.92 96 3.13220 gaaMQaInagar 3 Gandhinagar - 3 145 200 135.58 213 14.09521 gaaMQaInagar 4 Gandhinagar - 4 150 210 121.13 214 12.50922 gaaMQaInagar 5 Gandhinagar - 5 50 210 44.43 214 4.50823 vaNakbaaorI 1 Wanakbori - 1 44 205 38.12 206 87.55324 vaaNakbaaOrI 2 Wanakbori - 2 150 205 87.75 20725 vaaNakbaaOrI 3 Wanakbori - 3 150 205 137.14 20626 vaaNakbaaOrI 4 Wanakbori - 4 155 210 140.99 21227 vaaNakbaaOrI 5 Wanakbori - 5 155 210 123.60 21228 vaaNakbaaOrI 6 Wanakbori - 6 50 210 123.75 21029 vaaNakbaaOrI 7 Wanakbori - 7 155 210 148.71 21330 ]%trna Utran GT 1 0 0 6.58 28 3.15231 ]%trna Utran GT 2 0 0 10.34 29 0.00032 ]%trna UTRAN - GT- 3 100 135 13.89 31 0.00033 ]%trna UTRAN - GT-4 0 0 135.69 234 5.03734 ]%trna UTRAN - STG-I 0 0 16.57 49 0.00035 ]%trna UTRAN - STG-II 279 375 86.70 143 0.000

Anaulagnak 4.1/2

k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary Sr. Station Name Energy Peak Energy Peak Consumption No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)

36 isa@ka Sikka - 1 70 110 38.77 102 5.19837 isa@ka Sikka - 2 70 110 27.75 122 3.96438 kcC ilagnaa[-T Kutch Lignite - 1 45 70 3.46 53 9.04739 kcC ilagnaa[-T Kutch Lignite - 2 45 70 21.02 6940 kcC ilagnaa[-T Kutch Lignite - 3 47 75 34.34 5541 kcC ilagnaa[-T Kutch Lignite - 4 0 0 42.22 77 5.27242 saUrt ilagnaa[-T Surat Lignite - 1 39.17 126 4.53343 saUrt ilagnaa[-T Surat Lignite - 2 63.26 122 7.03944 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 56.33 117 9.04745 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 42.50 11646 jaI Aa[- pI saI ela GIPCL GT - 1 9.19 32 1.58147 jaI Aa[- pI saI ela GIPCL GT - 2 16.81 3248 jaI Aa[- pI saI ela GIPCL GT - 3 12.07 3349 jaI Aa[- pI saI ela GIPCL ST - 1 21.29 4950 jaI Aa[- pI saI ela GIPCL GT - 4 55.71 103 2.16851 jaI Aa[- pI saI ela GIPCL ST - 2 30.35 5052 [- esa esa e Aar ESSAR GT - 1 52.64 102 4.49353 [- esa esa e Aar ESSAR GT - 2 57.10 10554 [- esa esa e Aar ESSAR GT - 3 23.14 99

173 240

60 100

95

Actual vaastivakSchedule yaaojanaa

36 100

140

95 140

Actual vaastivak

200

350 480

SCHEDULE VS ACTUAL GENERATION & AVALABILITY FOR JULY 2011

Schedule yaaojanaa

Anaulagnak 4.1

140

Page 31: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

55 [- esa esa e Aar ESSAR STG 80.39 15756 jaI pI [- saI GPEC GT - 1 38.83 138 1.95357 jaI pI [- saI GPEC GT - 2 58.63 132 1.50658 jaI pI [- saI GPEC GT - 3 68.88 132 1.91059 jaI pI [- saI GPEC STG 104.69 22560 jaI esa [- jaI GSEG GT - 1 27.02 51 2.23561 jaI esa [- jaI GSEG GT - 2 26.86 4862 jaI esa [- jaI GSEG STG 32.06 4963 Sugen (GT 1 + GT 2) 0 0 202.30 383 11.93364 saIpIpI sao Aayaat Imp from CPP+MUNDRA 50 100 942.51 1988

kula tapIya Total (T) 6108 9427 5044.62 8842 381.213kula jalaIya+tapIya Total (H+T) 6399 10034 5062.03 8958 381.391ivaMD [najaI- Wind Energy 456.88kula jalaIya+tapIya+hvaa Total (H+T+Wind) 5518.90 8958ivainamaya Exchanges (+) 469.90 saIimat }jaa- maaMga Restricted Energy Req. 5500 5988.80

K (B) MADHYA PRADESH maQya p`doSajalaIya HYDRO

1 cambala pir Chambal Pr.(50%share) 6 60 1.20 641.1 gaaMQaI saagar Gandhi Sagar 0.00 0 0.0801.2 raNaa p`tap sagar R.P.Sagar 0.04 84 0.0301.3 javaahr sagar Jawahar Sagar 2.36 43 0.020

2 ponca Pench 5 75 14.11 160 0.0503 baargaI Bargi 27 75 47.53 90 0.0604 baargaI Bargi (LBCH) 0.00 05 banasaagar Toansa Bansagar-1 (Tons) 60 300 41.38 211 0.2306 banasaagar Bansagar-2 (Deolondh) 6 15 0.00 07 banasaagar Bansagar-3 (Silpara) 0 0 0.60 10 0.0008 banasaagar Bansagar-4 (Zinaha) 6 8 0.23 4 0.0309 maoDIKoDa Medikheda 7 40 31.89 60

10 ibarisaMGapur Birsingpur 3 20 9.89 20 0.03011 Tavaa Tawa 0 0 0.00 012 rajaGaaT Rajghat 5 30 3.96 10 0.05013 Omkareshwar 50 250 129.38 381 0.60914 [Midra saagar Indira Sagar 90 550 236.35 965 0.908

kula jalaIya TOTAL(H) MPPGCL 265 1423 502.41 2277 2.912Anaulagnak 4.1/3

k`maaMk sToSna ka naama }jaa- carma }jaa- carma Auxillary Sr. Station Name Energy Peak Energy Peak Consumption No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 0.00 0 14.0602 AmarkMTk II AMK II Unit -2 0.00 03 AmarkMTk III AMK III Unit -5 0 0 138.38 218 04 satpura I Satpura-I(60%Share) 85 115 76.58 141 15.5305 satpura II Satpura-II Unit 6 89.77 185 11.3506 satpura II Satpura-II Unit 7 5.33 1707 satpura II Satpura-II Unit 8 85.34 160 21.3308 satpura II Satpura-II Unit 9 90.40 1659 esajaITIpIesa 1 SGTPS Unit - 1 72.82 178 17.640

10 esajaITIpIesa 2 SGTPS Unit - 2 74.39 18011 esajaITIpIesa 3 SGTPS Unit - 3 84.75 195 20.32012 esajaITIpIesa 4 SGTPS Unit - 4 111.80 21013 esajaITIpIesa 5 SGTPS Unit - 5 297 399 317.10 514

kula tapIya Total (T) 1127 1515 1146.66 2068 120.920kula jalaIya+tapIya Total (H+T) 1587 3627 1649.08 4345 123.832Injection from WIND 45.38 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 1694.46 4345ivainamaya Exchanges (+) 1171.98 saIimat }jaa- maaMga Rest. En. Req. 3080 2866.44

ga (C) CHHATTISGARH C<aIsagaZ,jalaIya HYDRO

1 hsadova baaMgaao Hasdeo Bango 20 120 12.13 120 0.1202 Gangrel 4 19 0.00 0 0.0003 Mini Micro KWB 0.78 7

kula jalaIya TOTAL(H) CSEB 24 139 12.91 127 0.129tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 30 50 33.93 48 15.6912 kaorbaa (pU) Korba (E) Unit-2 30 50 36.53 503 kaorbaa (pU) Korba (E) Unit-3 30 50 29.56 444 kaorbaa (pU) Korba (E) Unit-4 30 50 36.38 505 kaorbaa (pU) Korba (E) Unit -5 53 120 77.64 110 13.8266 kaorbaa (pU) Korba (E) Unit -6 71 120 64.84 1047 kaorbaa (p) Korba (W) Unit -1 125 210 153.79 210 33.8118 kaorbaa (p) Korba (W) Unit -2 60 210 155.64 2109 kaorbaa (p) Korba (W) Unit -3 125 210 134.32 201 24.002

10 kaorbaa (p) Korba (W) Unit -4 125 210 138.49 20411 KORBA(EB) Extn - 1 149 250 34.60 258 5.82612 KORBA(EB) Extn - 2 149 250 0.00 0 0.000

kula tapIya Total (T) 895.73 1491 93.15613 baalakao sao Aayaat BALCO Import 0.00 014 ijandla sao Aayaat JINDAL Import 54.31 440

kula tapIya Total (T+IPP) 976 1780 950.04 1931

Actual vaastivak

430

Schedule yaaojanaa

248

209156

0 0

102 137

257191

184

90 150

600

Page 32: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

kula jalaIya+tapIya Total (H+T) 996 1900 962.95 2058 93.284ivainamaya Exchanges (+) 295.67 0saIimat }jaa- maaMga Rest. En. Req. 2215 1258.62 2058

Ga (D) MAHARASHTRA maharaYT/jalaIya HYDRO

1 kaoyanaa 1AaOr 2 Koyna 1 & 2 70 300 104.06 600 2.7342 kaoyanaa III Koyna III 46 150 78.71 3203 kaoyanaa IV Koyna IV 156 600 134.24 11204 kaoyanaa DIpIeca Koyna DPH 5 20 7.02 395 TaTa jalaIya TATA Hydro 120 444 187.18 462 0.6546 vaOtrNaa Vaitarna 9 60 13.05 617 eladarI Eldari 0 0 0.00 248 BaTgar AaOr vaIr Bhatgar & Vir 0 0 0.00 99 pOzana Paithan 1 0 1.86 59

10 itlaarI Tillari 10 0 16.38 6111 BaIra Tola rosa Bhira Tail Race 10 80 15.02 8312 GaTGar Ghatghar 36 250 23.59 25213 Anya CaoTo jalaIya Small Hydro (others) 12 62 3.37 0

kula jalaIya TOTAL(H) 475 1966 753.81 2058 3.388Anaulagnak 4.1/4

k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary Sr. Station Name Energy Peak Energy Peak Consumption No. (Gwh) (Mw) (Gwh) (Mw) (Gwh)

tapIya THERMAL1 naaisak 1 Nasik Unit -1 0 0 0.00 02 naaisak 2 Nasik Unit - 2 0 0 0.00 03 naaisak 3 Nasik Unit -3 110 150 66.26 1954 naaisak 4 Nasik Unit -4 110 150 91.24 1965 naaisak 5 Nasik Unit -5 110 140 99.48 1866 T/ambao 4 Trombay Unit -4 0 0 0.00 07 T/ambao 5 Trombay Unit -5 330 450 277..59 4908 T/ambao 6 Trombay Unit -6 170 450 209.10 5109 T/ambao 8 Trombay Unit -8 0 0 63.76 235

10 T/ambao 7A gaOsa Trombay -7A (Gas) 87.82 123 2.81511 T/ambao 7ba Trombay -7B (WHR) 48.62 6712 kaoraD,I 1 Koradi Unit -1 0 0 0.00 013 kaoraD,I 2 Koradi Unit -2 0 0 0.00 014 kaoraD,I 3 Koradi Unit -3 0 0 0.00 015 kaoraD,I 4 Koradi Unit -4 0 0 0.00 016 kaoraD,I 5 Koradi Unit -5 110 140 94.20 18117 kaoraD,I 6 Koradi Unit -6 110 140 103.35 18118 kaoraD,I 7 Koradi Unit -7 105 140 105.80 20019 Bausaavala 1 Bhusawal Unit -1 0 0 82.24 17520 Bausaavala 2 Bhusawal Unit -2 50 120 87.92 19021 Bausaavala 3 Bhusawal Unit -3 90 180 0.00 022 parlaI 1 Parli Unit -1 0 0 0.00 023 parlaI 2 Parli Unit - 2 0 0 0.00 024 parlaI 3 Parli Unit -3 110 160 62.18 17225 parlaI 4 Parli Unit -4 115 165 48.94 16326 parlaI 5 Parli Unit -5 110 165 69.14 16327 parlaI 6 Parli Unit -6 75 100 17.85 18628 parlaI 7 Parli Unit -7 120 180 77.60 22529 KaprKoD,a 1 Khaperkheda Unit -1 120 180 132.54 21030 KaprKoD,a 2 Khaperkheda Unit -2 115 180 100.09 20031 KaprKoD,a 3 Khaperkheda Unit -3 120 180 142.66 22232 KaprKoD,a 4 Khaperkheda Unit -4 120 180 152.97 22533 parsa Paras-2 0 0 0.00 034 parsa Paras-3 130 190 102.48 23735 parsa Paras-4 190 220 108.66 25836 ]rna Uran (Gas) 190 220 164.01 48837 ]rna Uran (WHR) 60 190 83.08 0 7.99138 caMd`pur 1 Chandrapur Unit -1 100 135 94.61 16039 caMd`pur 2 Chandrapur Unit -2 100 135 83.45 15340 caMd`pur 3 Chandrapur Unit -3 100 135 118.77 19441 caMd`pur 4 Chandrapur Unit - 4 50 100 116.29 17942 caMd`pur 5 Chandrapur Unit -5 250 380 267.83 43543 caMd`pur 6 Chandrapur Unit -6 250 380 95.70 44044 caMd`pur 7 Chandrapur Unit -7 0 0 0.00 045 DhaNaU 1 Dahanu Unit-1 182.97 265 15.30846 DhaNaU 2 Dahanu Unit-2 191.53 263 16.27147 CPP 0.00 0.00 851.47 1287.0048 RGPPL Block I 0 0 230.57 31549 RGPPL Block II 1050 1450 471.10 65720 RGPPL Block III 0 0 477.50 657 15.674

kula tapIya Total (T) 6068 9045 5583.77 7886 322.726MAH. Wind Generation 556.88 0kula jalaIya +tapIya Total (H+T+Wind) 6637 10005 6894.46 10153 368.499

Tivainamaya Exchanges (+) 2340.24saIimat }jaa- maaMga Rest. En. Req. 10000 9234.70

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 11.39 16ivainamaya Exchanges 234.81saIimat }jaa- maaMga Rest. En. Req. 275 410 246.20 422

C (F) dmana AaOr dIva DAMAN & DIU 179.39 276

128 150

372 500

Actual vaastivakSchedule yaaojanaa

Page 33: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

ja (G) dadra nagar hvaolaI DNH 391.36 562kula DD &DNH (T) 129 186 570.75 838

Anaulagnak 4.1/5

k`maaMk sToSana ka naama }jaa- carma }jaa- carma Auxillary Sr. Station Name Energy Peak Energy Peak Consumption No. (Gwh) (Mw) (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1. ena pI saI N.P.C. 1.1 tara`pur 1 TAPS Unit -1 80 160 115.00 160 16.3241.2 tara`pur 2 TAPS Unit -2 80 160 120.16 1601.3 tara`pur 3 TAPS Unit -3 300 480 392.51 536 64.3101.4 tara`pur 4 TAPS Unit -4 300 480 259.19 4391.5 kakrapr 1 KAPS Unit -1 50 125 166.32 536 31.3951.6 kakrapr 2 KAPS Unit -2 50 125 161.95 439

kula ena pI saI NPC Total 860 1530 1215.13 22692. ena TI pI saI N.T.P.C.

2.1 kaorbaa esaTIpIesa 1 KSTPS Unit-1 155.64 223 2.2 kaorbaa esaTIpIesa 2 KSTPS Unit-2 147.10 216 2.3 kaorbaa esaTIpIesa 3 KSTPS Unit-3 152.06 221 2.4 kaorbaa esaTIpIesa 4 KSTPS Unit-4 378.86 5292.5 kaorbaa esaTIpIesa 5 KSTPS Unit-5 307.42 5262.6 kaorbaa esaTIpIesa 6 KSTPS Unit-6 377.46 5272.7 kaorbaa esaTIpIesa 7 KSTPS Unit-7 345.56 525

kula kaorbaa KSTPS Total 1837 2600 1864.08 2729 119.0622.7 ivanQa esaTIpIesa 1 VSTPS Unit-1 155.78 2092.8 ivanQa esaTIpIesa 2 VSTPS Unit-2 156.54 2112.9 ivanQa esaTIpIesa 3 VSTPS Unit-3 155.53 214

2.10 ivanQa esaTIpIesa 4 VSTPS Unit-4 157.00 2152.11 ivanQa esaTIpIesa 5 VSTPS Unit-5 150.46 2102.12 ivanQa esaTIpIesa 6 VSTPS Unit-6 156.33 2072.13 ivanQa esaTIpIesa 7 VSTPS Unit-7 214.17 5062.14 ivanQa esaTIpIesa 8 VSTPS Unit-8 368.28 5082.15 ivanQa esaTIpIesa 9 VSTPS Unit-9 369.00 5182.16 ivanQa esaTIpIesa 10 VSTPS Unit-10 242.06 520

kula ivanQayaacala VSTPS Total 2160 3260 2125.15 3316 140.423 3.1 saIpt -4 -SIPAT-4 360.80 519.00 3.2 saIpt -5 SIPAT-5 385.55 518.00

kula saIpt -SIPAT TOTAL 746.35 1037.00 41.854.1 kvaasa gaOsa 1e Kawas GT-1A 27.83 1034.2 kvaasa gaOsa 1baI Kawas GT-1B 22.34 1034.3 kvaasa esaTI 1saI Kawas ST-1C 28.90 1134.4 kvaasa gaOsa 2e Kawas GT-2A 65.48 1054.5 kvaasa gaOsa 2baI Kawas GT-2B 66.26 1044.6 kvaasa esaTI 2saI Kawas ST-2C 76.71 114

kula kvaasa KGPS Total 484 651 287.52 625 4.9005.1 gaMQaar gaOsa 1 Gandhar GT-1 65.30 1315.2 gaMQaar gaOsa 2 Gandhar GT-2 58.60 1345.3 gaMQaar gaOsa 3 Gandhar GT-3 84.30 1305.4 gaMQaar esaTI 4 Gandhar ST-4 113.60 205

kula gaMQaar GGPS Total 362 620 321.80 606 5.3605.1 esa esa pI SSP RBPH - 1 37.83 1775.2 esa esa pI SSP RBPH - 2 41.10 1765.3 esa esa pI SSP RBPH - 3 43.25 1775.4 esa esa pI SSP RBPH - 4 56.99 1775.5 esa esa pI SSP RBPH - 5 70.78 1765.6 esa esa pI SSP RBPH - 6 92.23 1765.7 esa esa pI SSP CHPH - 1 2.16 305.8 esa esa pI SSP CHPH - 2 4.37 305.9 esa esa pI SSP CHPH - 3 4.09 32

5.10 esa esa pI SSP CHPH - 4 3.56 325.11 esa esa pI SSP CHPH - 5 2.14 31

kula esa esa pI SSP Total 342 1210 358.49 1214 0.1796.1 kula poMca Pench Total 5 75 14.11 160 0.0506.2 Jindal Injection 612.03 06.3 Amarkantak Lanco 222.79 0

(I) piScamaI xao~ WESTERN REGION ga`aosa ]%padna Gross generation 22849.60

(J) ]plabQata Availability 22413.78 naoT ivainamaya Net Exchanges (+) -2247.15 ]plabQa }jaa- Energy Availability 21655 20166.63

Schedule yaaojanaa Actual vaastivak

Page 34: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

maah jaulaa[- 2011 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 4.2PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2011 ANNEX-4.2

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRi<aApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Totalgaujarat GUJARAT

pMjaIkRt Registered 10724 - - - 10724 04.07.11 2000 49.35

saIimat Restricted 10100

AsaIimat Unrestricted 10140 10309 621 141 0 11071 05.07.11 2100 49.61

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 6013 6013 08.07.11 0500 49.95

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 5334 - - - 5334 04.07.11 2100 49.71

saIimat Restricted 5560

AsaIimat Unrestricted 6215 5334 481 54 0 5869 04.07.11 2115 49.71

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 2449 2449 23.07.11 0615 49.81

C<aIsagaZ, CHHATTISGARHpMjaIkRt Registered 2925 2925 28.07.11 2000 49.57

saIimat Restricted 2780

AsaIimat Unrestricted 2800 2721 402 50 0 3173 13.07.11 2100 49.47

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 1355 1355 22.07.11 1400 50.10

maharaYT/ MAHARASHTRApMjaIkRt Registered 15541 - - - 15541 04.07.11 1100 49.65

saIimat Restricted 18150

AsaIimat Unrestricted 18250 14961 3490 183 0 18634 01.07.11 2100 49.65

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 10535 10535 09.07.11 0400 50.18

gaaovaa *GOApMjaIkRt Registered 410 422 - - 422 05.07.11 1930 49.89

AsaIimat Unrestricted 410 422 0 3 - 425 05.07.11 1930 49.78

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 225 225 18.07.11 0200 50.01

dmana evaM dIva DDpMjaIkRt Registered 254 - - 254 06.07.11 1500 49.66

AsaIimat Unrestricted 254 25 3 - 282 06.07.11 1500 49.66

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 235 235 14.07.11

dadra va na hvoalaI DNHpMjaIkRt Registered 562 - - 562 04.07.11 1100 49.65

AsaIimat Unrestricted 562 10 - 572 04.07.11 1100 49.65

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 404 404 01.07.11

piScama xao~ WESTERN REGIONpMjaIkRt Registered 33520 - - - 33520 04.07.11 2100 49.43

saIimat Restricted 35491

AsaIimat Unrestricted 36293 33520 4580 669 0 38769 04.07.11 2100 49.43

nyaUnatma pMjaIkRt maaMga Min. Registered Demand 23607 23607 23.07.11 0500 50.08 NOTE: LS = Load Shedding

PC/RM = Power Cuts/Regulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.

Page 35: Government of India kond`Iya ivaVut p`aiQakrNawrpc.gov.in/occ/426occ_minute.pdfGovernment of India ... The maximum overdrawal by NR and ER was 16.681 MUs on 27th July and ... The sub

Start Date End Date No of Days Start Date End Date No of DaysReason

1 GANDHINAGAR 1 120 20.06.11 03.08.11 45 COH Not Availed2 120 21.06.11 Exp By AOH

Outage availed without plan during period

4 210 26.04.11 16.05.11 21 10.04.11 30.04.11 21 AOH Preponned2 WANAKBORI 3 210 02.06.11 22.06.11 21 AOH Not Availed

4 210 02.06.11 28.06.11 27 AOH Outage availed without plan during period

7 210 20.06.11 10.07.11 21 AOH Not Availed3 KLTPS 1 70 25.06.11 15.07.11 21 AOH Not Availed

3 75 10.06.11 12.10.11 125 10.04.11 12.05.11 43 AOH/TG ROTOR REPAIR

Preponned

1 KORBA(E) 1 50 01.06.11 30.06.11 30 COH Not Availed3 50 19.04.11 18.05.11 31

2 KORBA(WEST) 2 210 24.06.11 16.07.11 23 AOH Not Availed3 KORBA-III 1 120 16.06.11 08.07.11 22 AOH Not Availed

1 SATPURA 1 62.5 20.06.11 11.07.11 22 AOH Not Availed3 62.5 01.05.11 21.05.11 214 62.5 20.06.11 10.07.11 21 06.05.11 30.05.11 26 AOH Preponned5 62.5 01.05.11 22.05.11 22 AOH Not Availed6 200 01.06.11 26.06.11 26 AOH Not Availed

2 SGTPS 5 500 08.06.11 17.06.11 10

4 210 06.05.11 30.05.11 25Outage availed without plan during period

1 KORADI 7 210 01.06.11 26.06.11 26 AOH Not Availed2 NASIK 3 210 22.06.11 17.07.11 26 AOH Not Availed3 PARLI 3 210 08.04.11 13.05.11 26 COH Not Availed

6 250 27.05.11 21.06.11 26 16.06.11 16.07.11 31 AOH Postponned7 250 01.06.11 26.06.11 26 AOH Not Availed

4 CHANDRAPUR 4 210 01.06.11 26.06.11 26 AOH Not Availed

7 500 29.06.11 15.08.11 49 COH Outage availed without plan during period

5 RGPPL1A 350 07.05.11 07.07.11 61 20.05.11 27.07.11 69

Rotor & compressor replacement Postponned

CTG1B 220 01.04.11 30.04.11 30 15.03.11 17.05.11 63C - INSPECTION &

CONTROL UPGRADATION

Preponned+duration extemded

6 JAIGAD1 275 12.05.11 30.05.11 19 Outage availed without plan

during period

1 KORBA5 500 10.05.11 03.06.11 25 BLR + GEN Not Availed

2 VSTPS 2 210 01.04.11 06.04.11 6 Boiler License Renewal

Not Availed5 210 01.04.11 20.04.11 20 BLR+GEN Not Availed

3 KAWAS GT 1A +WHRB 106 05.05.11 11.05.11 7 "A" Inspection Not Availed

GT 1B +WHRB 106 14.06.11 28.06.11 15"B" Inspection (Repl of Stg-2

bucket )Not Availed

GT 2A 116 04.04.11 10.04.11 7 A-Inspection

4 JHANOR GT 1 +WHRB 1 144.3 25.05.11 03.06.11 10 "B" Inspection Not AvailedGT 2 144.3 29.06.11 26.07.11 29 "C" Inspection Not AvailedST 224.49 29.06.11 15.07.11 18 Minor Inspection +

CoatingNot Availed

Not planned during Period

CETRAL SECTOR

MADHYA PRADESH

MAHARASHTRA

Not planned during Period

Not planned during Period

GUJARAT

Not planned during Period

Not planned during Period

CHHATISHGARH

Annex - 8.1Planned & Actual Maintenance of Thermal Generating Units in WR During Apr 11 to June 11

Sr no. Station Name Unit No. Capacity(MW) Proposed schedule of planned maintenance Actual Planned maintenance Status Remarks Reason of deviation