![Page 1: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/1.jpg)
Page 1 of 91
GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY
The Patent Office at Bouddhik Sampada Bhawan, CP – 2, Sector – V, Saltlake, Kolkata - 700091
TENDER DOCUMENT: PART – I (TECHNICAL BID)
SUPPLY, INSTALLATION, TESTING & COMMISSIONING
OF
FULL VRF AIR CONDITIONING UNIT (1ST, 3RD & 5TH FLOORS)
AND ALLIED ELECTRICAL WORKS (GROUND TO TOP FLOORS)
FOR
INTELLECTUAL PROPERTY OFFICE,
BOUDDHIK SAMPADA BHAWAN, SALT LAKE,
KOLKATA – 700 091
Name & Address of Tenderer: __________________________
__________________________
__________________________
![Page 2: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/2.jpg)
Page 2 of 91
I N D E X
Sl. No. Particulars Section Page
Part-I Technical Bid 1 to 76
0.1 Part-I (Technical Bid) 3 to 4
0.1 Notice of Invitation of Tender I 5 to 7
0.2 General Rules & Instruction for the Guidance of
Tenderer II 8 to 9
0.3 Form of Tender III 10 to 11
0.4 Articles of Agreement IV 12 to 13
0.5 General Instructions to Contractors V 14 to 18
0.6 Special Conditions of Contract 19 to 21
0.7 Appendix-I 22
0.8 General Conditions of Contract 23 to 37
0.9 Technical Specification 38 to 63
0.10 List of Approved Materials 64 to 65
0.11 Safety Code 66 to 67
0.12 Tender Drawings 68 to 70
0.13 Tender Form (From-A to I) 71 to 76
Part- II
Financial Bid 77 to 91
0.1 Form of Bid 78
0.2 Price Schedule (Item Rate Bid) 79 to 91
![Page 3: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/3.jpg)
Page 3 of 91
Part – I (Technical Bid)
Ministry of Commerce & Industry Government of India The Patent Office at Bouddhik Sampada Bhawan, CP – 2,
Sector – V, Saltlake, Kolkata - 700091
NOTICE INVITING TENDER The Controller General of Patents, Designs and Trademarks (CGPDTM), invites online bid in 2 parts i.e. Part – I (Technical Bid) & Part – II (Financial Bid) from reputed Companies for the following work to be carried out based on design and drawings supplied by CGPDTM.
Sl. No.
Tender No.
Name of Project
Estimated Cost (Rs.)
Average Annual
Financial Turnover
during last three years
ending March 31,
2017
Successfully completing
similar works during last three years
ending March 31, 2017
1. POK/VRF Works-1/2017-18
Supply, Installation, Testing & Commissioning of Full VRF
Air Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091
Not Exceeding 130 (One Hundred Thirty ) Lakh
Rs. 100.00 Lakh
Two similar works of
value not less than 60% of estimated
cost OR one similar work of value not
less than 80% of estimated
cost. For the purpose of the above criteria, similar works of comprehensive Office Buildings / Commercial Complexes, etc. and electrical & allied works carried out by bidder in Government / Semi-Governments / Undertakings / Autonomous / Statutory Bodies / Local Bodies, reputed Corporate Firm shall be considered for Technical & Financial Bids. Following minimum documents should accompany along with the online bid offer for qualifying the eligibility criteria:
(1) Basic information about the organizations set-up, year of establishment, names of Directors/Partners /Proprietor, designation, address, contact nos. etc.
(2) Proof of experience justifying the qualifying criteria (i.e. Completion Certificate) and complete credential document duly attested.
(3) Copies of valid Trade License from Local Statutory Authority, GST Registration No.,
Copy of PAN / TAN card, Copy of registration with other organization, Details of litigations, if any.
![Page 4: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/4.jpg)
Page 4 of 91
(4) IT Returns for three consecutive years ending on March 31, 2017 or ending on March 31, 2016 as the case may be.
(5) List of competent personnel employed with the organization.
(6) List of plants & equipment’s available for work.
(7) The tender documents issued to the bidders duly signed and sealed in each page along with all the above documents including Technical Bid (Part – I) and Financial Bid (Part – II) should be submitted online. Earnest Money deposit shall be put in a sealed envelope super scribing ‘EARNEST MONEY’. Financial Bid (Part – II) Tender of the bidders found eligible in Part – I (Technical Bid) only will be opened.
(8) Tender document can be downloaded from below mentioned websites
http://www.ipindia.nic.in
http://www.tenders.gov.in
(9) CONTACT PERSON:
Sri T. P. Soren, Administrative Officer, Tel: 033 2367 1353
(10) An amount of Rs. 2,60,000.00 (Rupees Two Lakh Sixty Thousand only) in the form of Pay Order / Demand Draft drawn in favour of “The Controller of Patents” payable at Kolkata placed in envelope super scribing ‘EARNEST MONEY for the work of Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091
Interested parties should submit their complete details within the stipulated time and date as mentioned in para 0.8. of Section – I electronically on the CPP Portal, using valid Digital Signature Certificates. The applicant should apply for the work as noted in the table, indicating name of the work, etc. CGPDTM reserves the right to accept or reject any or all bids received, or terminate the entire process at any stage without assigning any reason whatsoever & without paying any compensation.
The Controller General of Patents, Designs and Trademarks
![Page 5: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/5.jpg)
Page 5 of 91
SECTION - I
NOTICE OF INVITATION OF TENDER Online bid in two parts on Item Rate basis are invited from bonafide, reputed and eligible Companies / Contractors for Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091 The Controller General of Patents, Designs and Trademarks Bouddhik Sampada Bhawan, CP- 2, Sector – V Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air
Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091
0.2. Estimated Cost : Not Exceeding 130 (One Hundred Thirty) Lakh 0.3.Time of Completion : 45 days.. The date of commencement shall be reckoned from
the date of Work Order issued to the successful tenderer. 0.4. Earnest Money : Rs. 2,60,000/-(Rupees Two Lakh Sixty Thousand only) by
Demand Bank Draft / Pay Order drawn in favour of “The Controller of Patents” payable at Kolkata.
0.5. Cost of Tender : NIL (Soft copy can be downloaded from GOI CPPP portal,
www.ipindia.nic.in)
0.6. Availability of Tender : Tender document is available from following websites:-
http://www.ipindia.nic.in
http://www.tenders.gov.in 0.7. Tender to be : The Controller General of Patents, Design and Trademarks addressed to Bouddhik Sampada Bhawan, CP – 2, Sector – V, Saltlake Kolkata - 700091
0.8. Date and Place of : Up to 3.00 P.M. on 05/02/2018 on the CPP Portal, using Submission of Tender valid Digital Signature Certificates. More information useful for submitting online bids on the CPP Portal may be obtained at:https://eprocure.gov.in/eprocure/app. 0.9. Opening of Part-I : 06/02/2018 at 3.00 P.M. at the Office of the Controller
(Technical Bid) of Patents, Designs and Trademarks, Bouddhik Sampada Bhawan, CP – 2, Sector – V, Kolkata – 700091 0.10. Opening of Part-II : 08/02/2018 at 3.00 P.M. at the Office of the Controller
![Page 6: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/6.jpg)
Page 6 of 91
(Financial Bid) of Patents, Designs and Trademarks, Bouddhik Sampada Bhawan, CP – 2, Sector – V, Kolkata – 700091. The
Financial Bid (Part – II) Tender of the Bidder found eligible in Part – I (Technical Bid) only will be opened.
0.11. Validity of tenders : 270 (Two Hundred Seventy) Days from the date of opening of
tender. 0.12 Inspection of site : Any time before the date of submission of tender, the site can be Inspected with due written permission during office hours. Certificate of Inspection issued by the Patent Office to Be submitted with tender. 0.13. Liquidated damages : If Contractor fails to complete the job within the stipulated time,
for delay the authority will be entitled to charge liquidated damage @ 1% of the accepted contract sum per week subject to ceiling of 10% of the accepted contract.
0.14. Retention Money : 10% of the Value of the Work including EMD 0.15. Release of Retention : 50% after virtual completion of work and balance 50% expiry
Money of Defects liability period of Twelve months from the date of virtual completion . 0.16. Labour Cess : 1 % (One percent) of the Gross Bill value to be deducted as
per statutes. 0.17. Mode of submission : The bidders are required to submit soft copies of their bids
electronically on the CPP Portal, using valid Digital Signature Certificates. More information useful for submitting online bids on the CPP Portal may be obtained at: https://eprocure.gov.in/eprocure/app.
0.18. Clarification, if any : Interested Bidder may request for query regarding
any technical matter to the Patent Office and upon receipt of such request, approved Consultant / Architect of Patent Office shall attend the same.
0.19. Taxes : GST or any other Tax on materials or on finished works like
Work Contract Tax, Turnover Tax as applicable in respect of this contract shall be borne by the Contractor only and Authority will not entertain any such claim in this respect. TDS for Income Tax, Work Contract Tax and 1% Labour Cess shall be deducted as applicable from all bills / payments to be made in connection with this work.
0.20. The competent authority does not bind himself / herself to accept the lowest or any
other tender, and reserves to himself / herself the authority to reject any or all of the tenders received without the assignment of a reason. Tenders in which any of the prescribed conditions found missing are liable to be rejected.
0.21. Canvassing whether directly or indirectly, in connection with tenders is strictly
prohibited and the tenders submitted by the contractors who resort to canvassing will be liable to rejection.
![Page 7: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/7.jpg)
Page 7 of 91
0.22. This Notice Inviting Tender shall form a part of the contract document. The successful Tenderer / Contractor, on acceptance of his tender by the Accepting Authority, shall , within 07 days from the stipulated date of start of the work sign the contract consisting of :-
The notice inviting tender, all the documents including additional conditions,
specifications and drawings, if any, is forming the tender as issued at the time of invitation of tender and acceptance thereof together with any correspondence leading thereto.
0.23. The Authority does not bind itself to accept the lowest tender and reserves to itself the
right to reject any or all the tenders received without assigning any reasons thereof. The notification of award of contract will be made to the successful tenderer in writing by the Controller General of Patents, Designs and Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700 091.
0.24 Tender to be submitted online by the Tenderer within the date and Time as mentioned
in para 0.8. of Section – I. More information useful for submitting online bids on the CPP Portal may be obtained at: https://eprocure.gov.in/eprocure/app. Intending tenderers are advised to visit regularly CPP Portal https://eprocure.gov.in/eprocure/app till closing date and time of submission of tender for any corrigendum / addendum/ amendment.
0.25. The competent authority reserves the right to open and check the bid. The authority
also reserves the right of accepting the whole or any part of the tender and the tenderer shall be bound to perform the same at the rate quoted and within the time stipulated in such order. Although the bid validity is 270 days for the full work, however the work as stipulated in this tender document shall be completed within 45 days. Such work completion time is not guided by the bid validity of 270 days.
The Controller General of Patents, Designs and Trademarks Bouddhik Sampada Bhawan, CP-2, Sector – V,
Kolkata – 700 091
![Page 8: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/8.jpg)
Page 8 of 91
SECTION-II
GENERAL RULES AND INSTRUCTION FOR THE GUIDANCE OF TENDERER
Tenders in two parts i.e. Part – I (Technical Bid) & Part – II (Financial Bid) are hereby invited by the Controller General of Patents, Designs and Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091 for Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091 1. Tender Document consisting of the following :
i) Notice of Invitation of Tender
ii) General rules and instructions for the Guidance of Tenderers.
iii) Form of tender
iv) Articles of Agreement
v) General Conditions of Contract with Appendices
vi) Safety Code
vii) Technical Specifications
viii) Schedule of Quantities
ix) Drawings issued
2. All works proposed for execution by contract will be based on notice upon bonafide resourceful experienced agencies enlisted (Class – II) with CPWD, Govt. of West Bengal / Government of West Bengal Undertakings / other State or Central Government Agencies or outside bonafide agencies having experience in similar type of works.
3. The site of the work is available. 4. Tenders are to be submitted in soft copies of their bids electronically on the CPP Portal,
using valid Digital Signature Certificates. 5. Bidder should take into account any corrigendum published on the tender document
before submitting their bids. 6. Part – I (Technical Bid) will be opened as mentioned in para 0.9. of Section – I. After
verification of the documents submitted in Part – I, the successful Bidders will be shortlisted. The Financial Bid of the Bidders found successful in Part – I will only be opened subsequently as mentioned in para 0.10. of Section – I.
7. When there is a difference between the rates in figure and in words, the rate which
corresponds to the amount worked out by the Contractor, shall be taken as correct.
![Page 9: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/9.jpg)
Page 9 of 91
When the amount of any item is not worked out by the Contractor or it does not correspond with the rate written either in figures or in words, then the rate quoted by the Contractors in words shall be taken as correct.
8. The Contractor, whose tender is accepted will be required to furnish by way of security
deposit for the due fulfillment of his contract, such sum as detailed in Clause No. 06 of the General Conditions of Contract.
9. The acceptance of a tender will rest with the Controller General of Patents, Designs and
Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091, who does not bind itself to accept the lowest tender and reserves to itself the authority to reject any or all the tenders received without assignment of any reason. All tenders in which any of the prescribed conditions are not fulfilled or are incomplete in any respect are liable to be rejected.
The Employer reserves the right to accept the tender in full or in part and the tenderer
shall have no claim for revision of rates or other conditions if his tender is accepted in parts.
10. Canvassing in connection with tenders is strictly prohibited and tenders submitted by the
Contractors who resort to canvassing will be liable to rejection. 11. On acceptance of the tender, the name of the accredited representative(s) of the
Contractor who would be responsible for taking instructions from the Employer / Architect shall be communicated to the Employer / Architect.
12. GST, Work Contract Tax or any other tax on materials or on finished work in respect of
this contract whether in vogue or likely to be imposed in future shall be payable by the Contractor and the Employer will not entertain any claim whatsoever in this respect at any time. Rates should be firm and include all these taxes.
![Page 10: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/10.jpg)
Page 10 of 91
SECTION-III
FORM OF TENDER Date:……./…../2018 To The Controller General of Patents, Designs and Trademarks Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091 Respected Sir (s), Re : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd &
5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091
1. I/We refer to the tender notice issued by The Controller General of Patents, Designs and
Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091 on your behalf in connection with the above work.
2. I/We do hereby offer to perform, provide, execute, complete and maintain the work in
conformity with drawings, conditions of contract, specifications, schedule of quantities for the sum and at the respective rates quoted in the schedule of quantities.
3. I/We have satisfied myself / ourselves as to the site conditions, examined the drawings
and all aspects of the tender conditions. Subject to above, I/We do hereby agree, should this tender be accepted in whole or in part to:
a) Abide by and fulfill all the terms and provisions of the said conditions annexed hereto: b) Complete the work within 6 (Six) weeks, as stipulated by working in two or three shifts, if
considered necessary by the Authority at no extra cost.
4. I/We have deposited earnest money of Rs. 2,60,000/- (Rupees Two Lakh Sixty Thousand only) in the form of Demand Draft / Pay Order, payable at Kolkata and drawn in favour of “The Controller of Patents”. I/We note that the same shall not bear any interest and is subject to forfeiture solely by The Controller General of Patents, Designs and Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091 discretion if:
i) The work is not commenced by me / us from the date of issue of formal Work Order
. ii) The offer is withdrawn within the validity period of acceptance.
or iii) The agreement of the contract is not executed within 15 days from award of contract.
5. I/We understand that you are not bound to accept the lowest or any tender you receive.
6. The acceptance of this tender shall constitute a binding contract and any failure as
mentioned in item 4 above shall constitute a breach of contract by us and the tender accepting authority shall be entitled to have the work executed at our risk and cost and to claim extra cost / expenditure incurred by them from us.
![Page 11: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/11.jpg)
Page 11 of 91
7. Our Bankers are : i) ii) iii) 8. Name of Partners / Directors of our Firm : i) ii) iii)
iv)
Yours faithfully, Signature of Contractor with Seal & Date. Name of Partner / Director of the : Name…………………………………… Firm Authorized to sign or Name of attorney to sign the contract. :
Designation……………………………… (Certified true copy of power of attorney should be attached) Signature and addresses of Witnesses : a) Signature:……………………………. Name…………………………………. Address……………………………….. ……………………………………….. b) Signature:……………………………. Name…………………………………. Address……………………………….. ………………………………………..
![Page 12: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/12.jpg)
Page 12 of 91
SECTION-IV
ARTICLES OF AGREEMENT
ARTICLES OF AGREEMENT made the _________ day of ________ 2018 between the Controller General of Patents, Designs and Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091 (hereinafter called the Employer) of ONE PART
And M/s.____________________________________________________________________ (Hereinafter called the Contractor) of the OTHER PART.
WHEREAS the Employer is desirous of Supply, Installation, Testing & Commissioning of Full
VRF Air Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top
Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700
091 and has caused drawings and bills of quantities showing and describing the work to be
done as per the Architectural / Design as approved by the Employer.
AND WHREAS the said Drawings, the Specifications have been understood and examined by
or on behalf of the parties hereto.
AND WHEREAS the Contractor has agreed to execute upon and subject to the conditions set
forth herein and to the conditions set forth in the General Conditions of Contract and other
conditions mentioned in the Tender Documents (all of which are collectively hereinafter referred
to as the said conditions) the works shown upon the said Drawings and /or described in the said
Specifications therein set forth amounting to the sum as therein arrived at or such other sum as
shall become payable there under (hereinafter referred to as the said Contract Amount).
IT IS HEREBY AGREED AS FOLLOWS
0.1. In consideration of the said Contract Amount to be paid at the times and in the manner
set forth in the said conditions, the Contractor shall upon and subject to the said
conditions execute and complete the work shown as per the Drawings and described in
the said specifications and instructions issued by the Architect form time to time.
0.2. The Employer shall pay the Contractor the said Contract amounts or such other sums as
shall become payable on satisfactory completion of work and on production of the
certificate of payment issued by the said Architect, at the times in the manner specified
in the said conditions.
0.3. The said conditions and appendix thereto shall be read and construed as forming part of
this Agreement, and the parties hereto shall respectively abide by, submit themselves to
the said conditions and perform the agreements on their part respectively in the said
conditions contained.
0.4. The plans specifications, directions, instructions, agreement and documents etc.
mentioned therein shall form the basis of this Contract.
0.5. The rates offered by the contractor and accepted by the Employer include Contract
Tax/GST. and any other taxes or duties etc. in complete, as may be applicable up to the
![Page 13: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/13.jpg)
Page 13 of 91
end of contract to carry out the work in respect of Supply, Installation, Testing &
Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th floors) and Allied
Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik
Sampada Bhawan, Salt Lake, Kolkata – 700 091 to be paid at the rates quoted in the
tender, till the completion of the work.
0.6 The Contractor shall provide details of all his Laborers to the Employer and ensure
security, safety and cleanliness of the premises. The Contractor shall not cause any type
of hindrance to the other employees of Employer.
0.7. The Contractor shall provide every reasonable facility to other agencies for carrying out
of all works in the manner laid down in the said conditions, and shall make good at their
cost any damages done to walls, floors etc., after the completion of such works to the
satisfaction of the Architect.
0.8. The Employer reserves to itself the right of altering the drawings and nature of the work
by adding to or omitting any items of work or having portions of the same carried out
without prejudice to this Contract.
0.9. Time shall be considered as the essence of this Contract and the Contractor hereby
agrees to commence the work immediately after the work order is awarded as
mentioned in such work order(s).
0.10. All payments by the employer under this Contract will be made only at Kolkata.
0.11. All Disputes arising out of or in any way connected with this agreement shall be deemed
to have arisen at Kolkata and only courts in Kolkata shall have jurisdiction to determine
the same.
0.12. That the several parts of this Contract have been read by the Contractor and fully
understood by the Contractor and has satisfied himself about the correctness and
feasibility thereof.
IN WITNESS WHEREOF THE EMPLOYER and the Contractor have set their respective hands
to these present hereof the day and year hereinabove written.
Employer: Contractor:
Signature Signature
__________________________ _________________________ (Name & Designation with Seal) (Name & Designation with Seal) In the presence of in the presence of
1) _______________________ 1)_________________________
Address __________________ Address________________________
2) _______________________ 2) ___________________________
Address __________________ Address ______________________
![Page 14: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/14.jpg)
Page 14 of 91
SECTION-V
GENERAL INSTRUCTIONS TO CONTRACTORS
0.1 The bidders are required to submit soft copies of their bids electronically on the CPP Portal, using
valid Digital Signature Certificates not later than closing time and date as mentioned in para 0.8.
of Section – I.
0.2 a) Tender shall remain open to acceptance by the Employer for the period of 270 (Two Hundred
Seventy) days from the last date of receiving the tenders which period may be extended by
mutual agreement and the Tenderer shall not cancel or withdraw the tender during this period.
The similar work for other floors, if awarded, during the extended period has to be carried
out by the Contractor at the same rate of tender accepted without any extra charges
matching with the existing electrical systems.
b) The Tenderer must use only the forms issued by the Employer for the purpose of the tender.
0.3(a) The tender form must be filled in English and all entries must be made by hand and written in ink.
If any of the documents is missing, or unsigned; the Employer in its discretion may consider the
tender invalid.
b) Rates should be quoted in word and figures both & if any discrepancy, only rate quoted in word
will be guiding. All erasures and alterations made, while filling the tender must be attested by
initials of the Tenderer. Overwriting of figures is not permitted and failure to comply with either
of these conditions will tender the tender void at the Employer’s option. No advice of any change
in rate or conditions after the opening of the tender will be entertained.
c) Each of the tender documents should be signed by the person or persons submitting the tender in
token of his/their having acquainted himself/ themselves with the General conditions of Contract
and site conditions, specifications, special conditions, etc. As laid down. Any tender with any of
the documents not so signed will be rejected.
d) The tender submitted on behalf of a firm shall be signed by all the partners of the firm or by a
partner who has the necessary authority on behalf of the firm to enter into the proposed Contract.
Otherwise the tender may be rejected by the Employer.
0.4. The Employer does not bind itself to accept the lowest or any tender and reserves to itself the
right to accept or reject any or all the tenders, either in whole or in part, without assigning any
reasons for doing so.
0.5 Intending Tenderers shall pay an initial Earnest Money of Rs. 2,60,000/-(Rupees Two Lakh Sixty
Thousand) only by a Demand Draft/ Banker’s Cheque drawn in favour of “The Controller of
Patents” payable at Kolkata. Tender for which Earnest Money is not submitted will not be
considered. The Earnest Money will be returned to the Tenderer if his tender is not accepted but
without any interest thereon.
Under no circumstances the Earnest Money and/or Security Deposit will be accepted in the form
of fixed deposit receipt or bank or insurance guarantee.
![Page 15: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/15.jpg)
Page 15 of 91
0.6. The total initial Security Deposit shall be 2% (Two percent) of the Contract amount and the
amount is to be paid by the successful Tenderer on acceptance of his tender (the amount paid as
earnest money at the time of submission of the tender shall be adjusted) and shall be held by the
Employer as security deposit for the execution and due fulfillment of the Contract. No interest
shall be paid on the said deposit.
0.7(a) Over and above the Initial Security Deposit under clause and as further security for the due
fulfillment of the Contract by the Contractor; 8% of the value of the work done will be deducted
by the Employer from each payment to be made to the Contractor as retention Money and thus
making the total security deposit amount to 10 % (Ten percent) of the value of the work done.
On issuance of the Consultant’s Certificate of the virtual completion of the works, the Contractor
would be paid 50% of Retention Money and remaining 50% will be released by the Employer
along with the final completion certificate issued by the Consultant only after rectification of the
defects pointed out during the defects liability period of one year (from the date of virtual
completion) are carried by the Contractor.
b) All the compensation or other sums of money payable by the Contractor to the Employer under
the terms of this Contract may be deducted from his Earnest Money and the security deposit, if
the amount so permits and the Contractor shall, unless such deposit has become otherwise
payable within ten days after such deduction, make good in cash the amount so deducted.
0.8. The Contractor shall not assign the Contract to any other contractor or he shall not sublet any
portion of the Contract except with written consent of the Employer. In case of breach of these
conditions, the Employer may ask the Consultant to serve a notice in writing to the Contractor
rescinding the Contract whereupon the security deposit shall stand forfeited to the Employer,
without prejudice to his other remedies against the Contractor.
0.9. The Contractor shall carry out all the work strictly in accordance with Drawings, specifications,
directions, details and instructions issued from time to time by the Consultant. If in opinion of the
Consultant , changes have to be made in the design and with the prior approval of the Employer
they desire the Contractor to carry out the same, the Contractor shall carry out the same without
any extra charge. The Authorities’ decision in such cases shall be final and shall not be open to
arbitration.
0.10. All reinforced concrete work shall comply with the requirements of controlled concrete as per
latest I.S. codes. Necessary laboratory shall be established at site for mix design, on volumetric
basis or Trial method basis for testing of cubes as directed by Consultant Requirement of I.S.
codes shall prevail over the tender Specification if any, or necessary Test C certificates from
Govt. authorized Laboratories may be required.
0.11. The Tenderer must obtain for himself on his own responsibility and at his own expenses all the
information which may be necessary for the purpose of making a tender and for entering into a
Contract and must examine the drawings and must inspect the site of work and acquaint himself
![Page 16: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/16.jpg)
Page 16 of 91
with all local conditions, means of access to the work, nature of the work and all matters
pertaining thereto.
0.12. The Rates quoted in the tender shall include all charges for clearing of site before commencement
as well as after completion, double scaffolding, centering, boxing, staging planking, timbering
and pumping out water including bailing, fencing, hoarding, plant and equipment, storage and
other sheds for which he shall at his cost obtain necessary prior approval from the concerned local
authority, watching & lighting, by night as well as day including Sundays and Holidays,
temporary plumbing and electric supply protection of the public and safety within the compound
and adjacent roads, streets cellars, vaults, chemicals pavement, walls, houses, buildings and all
other erection, matter or things and the Contractor shall take down and remove any or all such
centering, scaffolding, staging, planking, timbering, strutting, shoring, etc., as occasion shall
require or when ordered to do so, and fully reinstate and make good all matters and things
disturbed during the execution of work and to the satisfaction of the Consultant. The rates quoted
shall be deemed to be for the finished work to be measured at site. The rates shall also be firm
and shall not be subject to exchange variations, labour conditions, fluctuations in railways
freights or any other conditions whatsoever Levied by the Central Government or any State
Government or local authority on supply of building materials / labour and for undertaking the
work under this Contract, if applicable. No claim in respect of sales tax, works Contract tax, GST,
Excise Duty, or any other taxes, duties or levies shall be entertained by the Employer.
0.13. The whole of the proposed WORK must be completed within specified months from the date of
issue of Work Order, failing which a specified penalty per week by which the work is delayed
beyond the date of completion specified, will be levied as liquidated damages, subject to
maximum limit as specified in appendix- I of the Total Contract Price. The above period has been
fixed taking into account all Sundays and other public holidays and all other factors such as rains
and curing period required and no extension or non-working period shall be granted for these or
any other reasons whatsoever. Work shall not be delayed even on payment of penalty beyond 3
months from the completion date as specified. Thereafter the Contract shall be deemed to have
been terminated at the Employer’s sole discretion and in such event the employer shall be entitled
to continue with the remaining work through any other agency at the Contractor’s risk and cost.
If the labour employed by the Contractor falls within the purview of the provision of the E.S.I.
Act 1948, the contribution payable by him in respect of such labour will be deducted from his
bill, unless otherwise the Contractor has produced a receipt of such payments.
0.14. If the Progress of the work gets behind the bar Chart by 20%, specified penalty will be recovered
for the delayed period from the Contractor’s bill, which will be released as and when the
Contractor recovers the progress as per the Bar Chart and Completes the entire work within the
Contract period or extended period as approved by the Employer.
![Page 17: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/17.jpg)
Page 17 of 91
0.15. The Contractor shall not be entitled to any compensation for any loss suffered by him on account
of delays in commencing or executing the work, whatever the cause of delays may be, including
delays arising out of modification to the work entrusted to him or in any sub-contracts connected
therewith or delays in awarding Contracts for other trades or project or in commencement or
completion of such works or in procuring Government controlled or other building materials or in
obtaining water and power connections for construction purposes or for any other reason
whatsoever and the Employer shall not be liable for any claim In respect thereof. The Employer
does not accept liability for any sum besides the tender amount subject to such variations as are
provided for herein.
0.16. The successful Tenderer is bound to carry out any items of work necessary for the completion of
the job even though such items are not included in the tender. The Employer will issue schedule
of instructions in respect of such additional items in writing.
0.17. The successful Tenderer must cooperate with the other Contractors appointed by the Employer as
advised by the Consultant, so that the work shall proceed smoothly with least possible delay and
to the satisfaction of the Employer and Architect.
0.18. The Contractor must bear in mind that all the work shall be carried out strictly in accordance with
the specifications and directions made by the Employer with the advice of the Consultant and also
in compliance of the requirements of the Local public authorities and no deviations on any
account will be permitted.
0.19. The successful Tenderer should make his own advanced arrangement to obtain all materials
required for the work.
0.20 For water and power, the Contractors for subsidiary trades if appointed by the Employer shall be
allowed connection from the temporary water and power supply arranged by the General
Contractor for civil works and for such facility the sub-contractors will pay to the general
Contractor the consumption charges to be decided by the Consultant. The sub-contractors shall
install a sub-meter for measuring consumption of electric energy at their own cost and maintain
the wiring installation in good condition and order and pay the consumption charges directly to
the General Contractor. If no such facility is available at site of work and if available but found
inadequate is shall be the responsibility of the Contractor to make his own arrangement for
obtaining water and power at his own cost.
0.21. All Municipal fees charges / taxes etc. for drainage and water connection and for its consumption
for construction purposes shall be borne by the contractor and fees and deposits if any payable for
permanent connections shall be paid by the Employer. The Employer to the electric supply
authority will pay the fees for electric supply connection and cable charges for the permanent
supply. For electrical consumption during construction period by the contractor, a meter shall be
installed for the contractor and the charges will be recovered from contractor’s bill.
![Page 18: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/18.jpg)
Page 18 of 91
0.22. The Contractor shall at his own cost strictly comply with the provision of safety code annexed
hereto.
0.23. The security deposit of the successful Tenderer will be forfeited if he fails to comply with any of
the conditions of the Contract.
0.24. The Tenderer is requested to visit the site of work before filling up the tender.
0.25. The Contractor shall study all relevant drawing / plans in order to enable himself to offer correct
rate for the proposed work, to the entire satisfaction of the Consultant and Employer.
0.26. The tender drawings are only to give an idea about the work. The Consultants reserve their right
to amend, alter or delete any design details which may be necessary for the proposed execution
and implementation of propose work and the Contractors shall not claim anything extra for such
changes.
0.27. The Employer’s decision in all matters relating to the plans, the specifications, terms and
conditions related to the construction work as also the levy of the liquidated damages will be final
and binding to the Contractor.
0.28. Fluctuations in the prices of any materials will not be taken into account either for compensation
or for damages or for extra. The rates quoted shall be firm throughout the tender of the contractor
(including extension of time, if any granted)
0.29. The Contractor shall comply with all the requirements of the health department particularly in
regard to anti – malaria measures.
0.30. The Contractor shall not assign the Contract or sublet any portion except with the written
permission of the Consultant and Employer.
30.1 Storage and safe custody of materials, equipment, A.C. machines etc. will be the sole
responsibility of the Contractor. The Patent Office will not be responsible for any damage,
theft of the same from site.
0.31. Acceptance of the tender will be solely at the discretion of the Controller General of Patents,
Designs and Trademarks, Bouddhik Sampada Bhawan, CP-2, Sector – V, Kolkata – 700091who
does not bind himself / herself to accept the lowest or any other tender or part thereof. No reason
will be furnished for acceptance or rejection of any tender.
I/We hereby declare that I /We have read and understood the above general instructions to the Contractor
and accept the same as part of the tender conditions.
Witness: Signature of Contractor / Tenderer
Date:
![Page 19: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/19.jpg)
Page 19 of 91
SPECIAL CONDITIONS OF CONTRACT
1. The time allowed for the completion of work is 45 days from the date of issue of the work
order.
2. The contractor will submit his tender after examining the tender documents, scope of
work, specifications , clauses, additional terms of contract agreement, special terms &
conditions, bill of quantities etc. and visiting the site personally (site visit is compulsory
before filing tender bid). The Certificate of Inspections issued by the Authority in
prescribed Format (Form - I). The tenders submitted without inspection certificate will be
summarily rejected.
3. Bid file with any item with zero price is deemed to be violating the terms of tender and not
consider for financial comparison and rejected for violating term and condition of tender.
4. The offer shall remain valid for 270 days from the last date of receiving the tenders. The
value of tender can be increased or decreased and any item can be added, deleted,
withdrawn or substituted without any notice as per the requirements without assigning any
reason.
5. If a tenderer whose tender is accepted and fails to undertake the work as per the date of
issue of award letter, the earnest money deposited will be forfeited and no payment will be
given for the work done by vendor.
6. The CGPDTM does not bind itself to accept the lowest or any tender and reserves the right
to reject any or all tenders without assigning any reason.
7. The CGPDTM will not pay any expense, whatsoever incurred by tenderer for the
preparation and submission of tenders.
8. This notice inviting tender, will form part of the contract agreement to be executed by the
successful tenderer with “The Patent Office”.
9. The successful tenderer shall have to sign the contract agreement within 07 days of the
allotment of work.
10. Correspondence, if any, on the tender shall be addressed to the The Administrative
Officer, The Patent Office, Bouddhik Sampada Bhawan, CP-2, Sector-V, Salt Lake,
Kolkata and any communication addressed to any other shall not in any manner to be
binding upon The Patent Office.
11. Even though the applicants may meet the above criteria, they are subject to be disqualified
if they have:
a. Made misleading or false representation in the form, statement and attachments
submitted, Or
b. Record of poor performance such as abandoning the work, not properly completing
the contract, inordinate delays in completion, litigation history, or financial failures,
![Page 20: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/20.jpg)
Page 20 of 91
etc. Or
c. Found to have been black listed in any work assigned by department earlier which
was not completed within prescribed period and rest of the work being completed by
department from another vendor. Or
d. Conditional tenders or Telegraphic tenders or Tenders containing remarks uncalled
for or Tenders not submitted on prescribed Performa or Tenders submitted late shall
be rejected.
12. The tenderer shall quote his rates in words and figures with reference to each item and must
enter for all the items shown in the attached Bill of quantities. Incomplete offer shall be
liable for rejection.
In case there is a discrepancy in “words” and “figures”, the rate in words will be taken as
correct for evaluation of tender. It is mandatory for the tenderer to quote the rates for all the
items, failing which the tender will be rejected.
13.The tenderer shall submit the EMD in the form of demand draft / pay order in original to
the office before closing of tender i.e. before 3PM of 05/02/2018.
14. The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor, shall be reckoned from the date of Work Order to commence
the work is given to the contractor. The contractor shall prepare and submit a schedule for
work execution in the form of a bar chart/CPM network and submit the same for approval
of The Patent Office, Kolkata. The work on the contract shall be executed according to
the approved schedule as aforesaid and shall throughout the stipulated period of the
contract be proceeded with all due diligence (time being deemed to be the essence of the
contract on the part of the contractor).
14.1 Completion Time: The work should be completed in all respects and commissioned
within the stipulated period of 45 days, failing witch penalty charges @ 1% of the
total value of work per week, to the maximum of 10% of the contract amount will
be recovered as penalty.
15. Payment will be made as per scheduled given in the tender.
16. Nothing will be paid extra in Labor rate/items rates.
17. For bad work or incomplete work no payment will be given to contactor and tender shall be
cancelled and given to 2nd lowest bidder.
18. No advance payment will be made to the contractor.
19. Material should be shown / inspected to the concerned Engineer-In-Charge / Care taker/
Supervisor before installation/ filling / charging.
20. Work will be the completed to the entire satisfaction of the Authority.
21. Incomplete work will be got done through other agency at the risk and cost of the
![Page 21: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/21.jpg)
Page 21 of 91
contractor.
22. The contractor shall maintain in good condition all work-executed till the completion of
entire work allotted to him.
23. The contractor shall keep progress or the different parts simultaneously as far as possible so
that minimum breakage and repairs are required. The entire work shall be handed over in
satisfactory finished state.
24. Recovery for the damaged done to the office building by the contractor or his Labor will be
made from the bill of contractor.
25. The contractors shall be responsible for any injury or accident to the Labor working at site
and no claim shall be given by the office.
26. Tenderer must collect the ‘Certificate of Inspection’ (Form – I) from the Authority and
submit with technical bid online failing which tender shall not be accepted for Financial
Bid opening.
27. Before tendering, the tenderer shall inspect the site to fully acquaint himself about the
condition in regard to accessibility of the site, nature and extent of ground, working
condition of site and locality including stocking of materials, installations of tools and
plants (T&P) etc. conditions affecting accommodations and movement of labour etc.
required for the satisfactory execution of the work contract. No claim what so ever on such
account shall be entertained by the office in any circumstances.
28. CGPDTM reserves the right to forfeit the earnest money if the contractor fails to commence
the work within stipulated time.
29. The Contractor should furnish a performance security to Patent Office, Kolkata for an
amount of 10% of the quoted price valid up to 12 months from the date of award of
Contract. The payment will be released subject to the production of this document. The
contractor shall also give in writing the functional warranty of the unit repaired for
minimum period of 12 months from the date of completion of work duly approved by the
committee.
30. The EMD may be adjusted against the Performance Security Deposit to be furnished by the
successful tenderer.
31. The performance security deposit would be refunded after the successful completion of
warranty period and no interest would be paid.
![Page 22: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/22.jpg)
Page 22 of 91
APPENDIX –I
HEREIN BEFORE REFERRED TO
1 Defect liability period : Twelve months from the date of virtual completion of
the work awarded.
2. Period of final measurement : Three months from the date of submission of Final
Bill together with all other requisite details.
3. Date of commencement : From the date of Work Order issued to Contractor.
4. Period of completion : 45 days from the date of commencement shall be reckoned
from the date of Work Order issued to the successful
tenderer.
5. Liquidated damages at the
rate of : 1% of the total value of the work per week, to the
maximum of 10% of Contract amount subject to
discretion of the Authority.
6. Minimum value of works
for Interim Certificates
: As per Mode of Payment mentioned in the tender
7. Earnest Money Deposit : Rs. 2,60,000/-(Rupees Two Lakh Sixty Thousand) only by Crossed Demand Draft / Pay Order / Bankers Cheque
drawn in favour of “Controller of Patents” payable at
Kolkata.
8. Initial Security Deposit : 2% (Two percent) of the net accepted value of the
Tendered amount.
8a. Retention Money : 8% (Eight percent) from each Bill
9. Total Retention Money : Not to exceed 10% of the value of work (including
EMD)
10. Release of Retention Money : 50% after virtual completion and balance 50% after
expiry of the defects liability period from the date of
virtual completion.
11. Period for honoring
Certificates : 30 days for Interim Certificates and six (6) weeks for
the final certificate from the date of certification
12. Interest for delayed
payment. : Nil.
13. Labour Cess : 1% (one) will be Deducted from each Certified Bill
(Gross Bill) as per statutes.
EMPLOYER CONTRACTOR
Date:
![Page 23: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/23.jpg)
Page 23 of 91
GENERAL CONDITIONS OF CONTRACT
1. Interpretation Clause: In construing these conditions, the specifications and Contract
agreement, the following words shall have the meanings herein assigned to them, except where
the subject or context otherwise requires.
a) “Employer” shall mean The Controller General of Patents, Designs and Trademarks
(CGPDTM) and shall include its assigns and successors in office.
b) “Engineer in Charge” shall mean The Controller General of Patents, Designs and
Trademarks (CGPDTM) and shall include its assigns and successors in office.
c) “Architect” shall mean Appointed Consultant / Architect of the Patent Office.
d) “Contractor” or Contractors shall mean the Contractor to whom the work is awarded and shall
include its assigns and successors in office and shall include the proprietors, partners, successors
of the said firm and the legal representative of a deceased partner.
In the case of individual: “Contractor” shall mean individual Shri …………………………………………
Trading in the name and style of………………………………………………………………………..……
And shall include his heirs, successors and legal representatives.
In the case of Company: Contractor” shall mean
............................................. …………………………………………....a company incorporated under
………………………………………… ……………............ and having its registered office at
……………………………………………………………………………………………………………
and shall include its successors and assigns.
d) Site: “Site” shall mean site of the Contract works permitted to the Contractor for execution of the
work as per this Contract. However notwithstanding what is contained in this tender, it is clearly
and explicitly understood that the parties hereto that rights title and interest of any nature
whatsoever including its physical possession of the site shall always vest with Employer and the
Contractor shall be only licensee on the site.
e) This Contract: shall mean the Articles of Agreement, General / Special instructions, General
Conditions, Appendix & Annexure, Schedule of Quantities, Specifications, Drawings and
amendments & other directions attached hereto and duly signed.
f) Notice in writing: Notice in writing or writing notice shall mean a notice in written typed or
printed characters sent (unless delivered personally or otherwise provided to have been received
by registered post to the last known private or business address or registered office of the
addressee and shall be deemed to have been received when in the ordinary course of post it would
have been delivered.
g) Act of insolvency: Shall mean any type of insolvency as defined by the presidency towns’
insolvency act or the provincial insolvency act or any act amending such original.
![Page 24: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/24.jpg)
Page 24 of 91
h) Net prices: If in arriving at the Contract amount, the Contractor shall have to add to or deduct
from the total of the items in the tender any sum either as a percentage or otherwise then the net
price of any item in the tender shall be the sum arrived at by adding to or deducting from the
actual figure appearing in the tender as the price of that item a similar percentage or proportionate
sum provided always that in determining the percentage or proportion of the sum so added or
deducted by the percentage or proportion of the sum so added or deducted by the Contractor the
total amount of any prime cost in terms and provisional sums of money shall be deducted from
the total amount of the tender.
i) The Works: Shall mean the work or works to be executed under the contract for Supply,
Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th floors)
and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik
Sampada Bhawan, Salt Lake, Kolkata – 700 091 of The Controller General of Patents, Designs
and Trademarks (CGPDTM),
2. Scope of Contract: The Contractor shall carry out and complete the said work in every respect in
accordance with this Contract and with the directions of and to the satisfaction of the Architect /
Employer. The Architect may in his absolute discretion and from time to time issue further
drawings and/or written instruction, details directions and explanations which are hereafter
collectively referred to as Architect’s instructions in regard to:-
a) The Variation or modification of the design quality or quantity or works or the addition or
omission or substitution of any work.
b) Any discrepancy in the Drawings or between the schedule of quantities and/or drawings and/or
specifications.
c) The removal from the site of any materials brought thereon by the Contractor and the substitution
of any material therefore.
d) The removal and or re-execution of any works executed by the Contractor.
e) The dismissal from the works of any person employed thereupon by the Contractor at the sole
discretion of the Architect/ Consultant without assigning any reasons thereof.
f) The opening up for inspection of any work & covered up.
g) The amending and making good any defect under Clause 18 hereof.
The Contractor shall forthwith comply with and duly execute any work comprised in such
Architect’s instructions provided always that verbal instructions, directions and explanations
given to the Contractor or his representative upon the works by the Architect shall, if involving a
variation be confirmed in writing by the contractor within seven days, and if not dissented from in
writing within a further seven days by the Architect , such shall be deemed to be Architect’s
instructions with the scope of the Contract.
3. Drawings and schedule of quantities of agreement: The Contract shall be executed in
triplicate and the Architect, the Employer and the Contractor shall be entitled to one executed
![Page 25: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/25.jpg)
Page 25 of 91
copy each for his use. The Contractor on the signing hereof shall be furnished by the Architects
free of cost one copy of each of the said Drawings and of the specification and one copy of and
all further drawings issued during the progress of the agreed works. Any further copies of such
drawings required by the Contractor shall be paid for by him. The Contractor shall keep one copy
of all drawings at the site of works and the Architect or his representative shall at all reasonable
times have access to the same. Before the issue of the final certificate to the Contractor, he shall
forthwith return to the Architect all drawings & specification.
4. Contractor to provide everything necessary at his cost: The Contractor shall provide at his
cost everything necessary for the proper execution of the works according to the intent and
meaning of the Drawings, Schedule of quantities and Specifications taken together whether the
same may or may not be particularly necessary shown or described therein provided that the same
can reasonably be inferred there from, and if the Contractor finds any discrepancy in the
drawings or between the drawings, schedule of quantities and specifications he shall immediately
and in writing refer the same to the Architect who shall decide which is to be followed.
5. Setting out of works: The Contractor shall set out of the works and shall be responsible for the
true and perfect setting out of the same and for the correctness of the positions, levels, dimensions
and alignment of all parts thereof. If at any time error in this respect shall appear during the
progress of the works or even after the completion of the works; the Contractors shall, if so
required, at his own expense rectify such error to the satisfaction of the Architect.
6. Materials and workmanship to confirm to description: All materials and workmanship shall
so far as procurable be of the respective kind described in the Schedule of quantities and /or
Specifications. And in accordance with the Architects instructions and the Contractor shall upon
the request of the Architect furnish him with all invoices, accounts receipts and other vouchers to
prove that the specifications of materials comply therewith. The Contractor shall on his own
arrange for and/ or carry out any test of any materials which the Architect may require.
Contractor should arrange to get the Test Certificate for any materials brought for their own
project use from the reputed agencies if asked for.
7. Contractor’s superintendence and representative at the works: The Contractor shall give all
necessary personal superintendence during the execution of the works, and as long thereafter as
the Architect may consider necessary until the expiration of the defects liability period stated in
the Appendix hereto. The Contractor shall also during the whole time the works are in progress
employ competent and qualified engineers & supervisors as approved by the Architect who shall
be constantly in attendance at the works while the men are at work. The said engineers
/supervisors will not be removed from the site, without the Architect’s prior approval and without
the proper replacement as approved by the Architect. Any directions, explanations, instructions or
notices given by the Architect to such representative shall be deemed to have been given to the
Contractor.
![Page 26: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/26.jpg)
Page 26 of 91
8. Dismissal of workmen : The Contractor shall on the direction of the Architect and /or Employer
immediately dismiss form the works any person employed thereon by him who may in the
opinion of the Architect/Employer be incompetent or misconduct himself and such persons shall
not be again employed on the works without the permission of the Architect /Employer.
9. Access to work The Employer, the Architect and their respective representative shall at all
reasonable times have free access to the work executed by the Contractor and or to the
workshops, factories or other places where materials are lying or from which they are being
obtained and the Contractor shall give every facility to the Employer and/or the Architect and
their representatives that is necessary for inspections and examination and test of the materials
and workmanship. No person not authorized by the Employer or the Architect except the
representative of public authorities with proper identification shall be allowed on the works at any
time.
10. Assignment and sub-letting: The whole of the works included in the Contract shall be executed
by the Contractor and the Contractor shall not directly or indirectly transfer, assign or under-let
the Contract or any part or share thereof or any interest therein without the prior written consent
of the Employers. And no undertaking shall relieve the Contractor from the full and entire
responsibility of the Contract or from active superintendence of the works during their progress.
11. Addition, alteration, omissions etc.: No addition, alteration, omission or variation shall vitiate
this contract but in case the Architect thinks proper at any time during the progress of the works
to make any alterations in or additions to or omissions from the works or any alteration in the
kind or quality of the materials to be used therein and shall give notice thereof in writing under
his hand to the Contractor; the Contractor shall alter, add to or omit from as the case may be in
accordance with such notice but the Contractor shall not do any work extra to or make any
alterations or additions to or omissions from the works or any deviation from any of the
provisions of the Contract stipulation specification or Contract drawings without the previous
consent in writing of the Architect and the value of such extra alterations additions or omissions
shall in all cases be determined by the Architect and the same shall be added to, or deducted
from the Contract amount accordingly, as the case may be.
12. Schedule of Quantities: The schedule of quantities unless otherwise stated shall be deemed to
have been prepared in accordance with the standard method of measurement. Any error in
description or in quantity or in omission of items from the schedule of quantities shall not vitiate
this Contract but shall be rectified and the value thereof as ascertained under Clause 16 hereof,
shall be added to, or deducted, from the Contract amount (as the case may be) provided that no
rectification of errors, if any, shall be allowed in the Contractor’s schedule of rates.
13. Sufficiency of schedule of quantities: The Contractor shall be deemed to have satisfied himself
before tendering as to the correctness and sufficiency of his tender for the works and of the prices
stated in the Schedule of quantities and/or Specifications and /or the Schedule of rates and prices
![Page 27: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/27.jpg)
Page 27 of 91
which shall cover all his obligations under the Contract and all matters and things necessary for
the proper completion of the works.
14. Measurement of works: The Architect may from time to time intimate to the Contractor and the
Employer that he requires the works to be measured and the Contractor shall forthwith attend or
send a qualified agent to assist the Architect or the Architect’s representative or the assistant
engineer in taking such measurements and calculations and to furnish all particulars or to give all
assistance required by any of them. Should the Contractor not attend or neglect or omit to send
such agent then the measurement taken by the Architect or a person approved by him shall be
taken to be correct measurements of the works. Such measurements have been detailed in the
specifications. The Contractor or his agent may, at the time of measurement, take such notes and
measurements as he may require. All authorized extra works, omissions and all variations made
without the Architect’s knowledge but subsequently sanctioned by him in writing shall be
included in such measurements.
15. Prices for extras etc. ascertainment of: The Contractor, when authorized and when directed in
writing by the Architects with the approval of the Employer, may add to, omit from or vary the
works shown upon the drawings or described in the specification or included in the schedule of
quantities but the Contractor shall make no addition, omission or variation without such
authorization or direction. A verbal authority of direction by the Architects, if confirmed by them
in writing within seven days, be deemed to have been given in writing. No claim for an extra shall
be allowed unless it shall have been executed under provisions of clause 12 hereof or by the
authority of the Architects with the concurrence of the Employer as herein mentioned. Any such
extra is herein referred to as authorized extra shall be made in accordance with the following
provisions.
a) The net rates of prices in the original tender shall determine the valuation of the extra work where
such extra week is of similar character and executed under similar conditions as the work period
therein. Rates for all items wherever possible should be derived out of the rates given in the
priced schedule of quantities.
b) The net prices of the original tender shall determine the value of the items omitted provided if
omissions very conditions under which any remaining items or works are carried out of prices for
the same shall be valued under sub- clause ( c) hereof
c) Where the extra works are not of similar character and /or executed under similar conditions as
aforesaid or where the omissions very the conditions under which any remaining items or works
are carried out or if the amount of any omissions or additions relative to the amount of whole or
the contract works or to any part thereof shall be such that in the opinion of the Architect the net
rate or price contained in the priced schedule of quantities or tender or for any item of the works
involves loss or expenses beyond that reasonably contemplated by the Contractor or by reason of
such omission or addition rendered unreasonable or inapplicable the Architect shall fix such other
![Page 28: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/28.jpg)
Page 28 of 91
rate or price as in the circumstances he shall think reasonable and proper with the prior approval
in writing of the Employer.
d) It is clarified that for all authorized extra items where rates cannot be derived from tender ; the
Contractor shall submit rates supported by rate analysis worked out on the actual cost basis
plus 10% towards establishment charges, Contractor’s overhead and profit.
e) Where the extra work cannot be properly measured or valued; the Contractor shall be allowed day
work prices as the net rates stated in the tender or the priced schedule of quantities or if not so
stated then in accordance with the local day work rates and wages for the district; provided that in
either case vouchers specifying that daily time (and if required by the Architect, the workmen’s
names) and materials employed be delivered for verification to the Architect or his representative
at or before the end of the week following that in which the work has been executed.
The measurement and valuation in respect of the Contract shall be completed within the period of
final measurement stated in the appendix or if not stated then within two months of completion of
the work as defined in clause 20 hereof.
16. Unfixed materials when taken into account to be the property of the Employer : Wherein
any certificate ( of which the Contractor has received payment ) the Architect has included the
value of any unfixed materials intended for and / or placed on or adjacent to the works such
materials shall become the property of the Employer and they shall not be removed except for use
upon the works, without the written authority of the Architect. The Contractor shall be liable for
any loss of or damage to such materials.
17. Removal of improper work :The Architects shall during the progress of the works have power
to order in writing from time to time the removal from the works within such reasonable time or
any materials which in opinion of the Architect are not in accordance with the specifications or
the instructions of the Architect, the substitution of proper materials and the removal and proper
re- execution of any work executed with materials or workmanship not in accordance with the
drawings and specifications or instructions, and the Contractor shall forthwith carry out such
order at his own cost. In case of default on the part of the Contractor to carry out such order: the
Employer shall have the power to employ and pay other persons to carry out the same and all
expenses consequent thereon or incidental thereto as certified by the Architect shall be borne by
the Contractor or may be deducted by the Employer from any moneys due or that may become
due to the Contractor.
18. Defects after virtual completion : Any defect or shrinkage or settlement or other fault which
may appear within the defects liability period stated in the appendix hereto or if none stated, then
within twelve months after the virtual completion of the works arising in the opinion of the
Architect from materials or workmanship not in accordance with the Contract shall upon the
directions in writing of the Architect and within such reasonable time as shall be specified
therein be amended and made good by the Contractor at his own cost and in case of default the
![Page 29: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/29.jpg)
Page 29 of 91
Employer may employ and pay other persons to amend and made good such defects, shrinkage,
settlement or other faults and all damages, losses and expenses consequent thereon or incidental
thereto shall be made good and borne by the Contractor and such damages, losses and e3xpenses
shall be recoverable from him; the Employer, upon the Architect’s/ Consultant’s certificate in
writing, may in lieu of such amending and making good by the Contractor deduct, from any
moneys due to the Contractor or that may become due to the Contractor, a sum to be determined
by the Architect/ consultant equivalent to the cost of amending such work and in the event of the
amount retained under Clause 31 hereof being insufficient, recover the balance from the
Contractor together with any expenses the Employer may have incurred in connection therewith.
Should any defective work have been done or material supplied by any sub- contractor employed
on the works who has been nominated or approved by the Architect as provided in Clauses 11
and 21 hereof; the Contractor shall be liable to make good in the same manner as if such work or
material had been done or supplied by, the Contractor and been subject to the provisions of this
clause and clause 21 hereof. The Contractor shall remain under the provisions of this clause
notwithstanding the signing of any certificate or the passing of any accounts, by the Architect.
19. Certificate of virtual completion and defects liability period: The works shall not be
considered as completed until the Architect has certified in writing that they have been virtually
completed. The defects liability period shall commence from the date of such certificate.
20. Other persons employed by Employer: The Employer reserves the right to use premises and
any portions of the site for the execution of any work not included in this Contract which he may
desire whatsoever to have carried out by other persons and the Contractor shall allow all
reasonable facilities for the execution of such work but shall not be required to provide any plant
or material for the execution of such work except by special arrangement with the Employer, such
work shall be carried out in such manner as not to impede the progress of the works included in
the Contract and any damage or delay which may happen to or occasioned by, such work.
21. ALL RISK INSURANCE: The Contractor shall be responsible for all injury to persons, animals
and /or neglect of himself and /or any nominated sub-contractor and/or any employee of either,
whether such injury or damage arises from carelessness accident and /or any other cause whatever
in any connected with the carrying out of this Contract.
This clause shall be held to include inter alias any damage to buildings whether immediately
adjacent or otherwise and any damage to roads, streets, foot- paths, bridges or pathways as well
as all damage caused to the buildings and works forming the subject of this Contract by frost,
rain, wind or other inclemency of weather. The Contractor shall indemnify the Employer and h
old it harmless in respect of all and expenses arising from any such injury or damage to persons
or property as aforesaid and also in respect of any claim made in respect of injury or damage
under any Acts of any legislature or otherwise and also in respect of any award or compensation
for damages consequent upon such claim.
![Page 30: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/30.jpg)
Page 30 of 91
The Contractor shall re-instate all damage of every sort mentioned in this clause, so as to deliver
up the whole of the Contract works complete and perfect in every respect and so as to make good
or otherwise satisfy all claims for damage to the property of third parties.
The Contractor shall indemnify the Employer against all claims which may be made against the
Employer and /or Architect by any member of the public or other third party in respect of
anything which may arise in respect of the works or in consequence thereof and shall at his own
expense arrange to effect and maintain till the virtual completion of the Contract.
The Contractor shall also similarly indemnify the Employer and/or Employer and /or Architect
against all claims which may be made upon the employer and/or Architect whether under the
Workmen’s Compensation Act or any other statute in force during the currency of this Contract
or at Common Law in respect of any death or disability etc. of the affected persons including the
employee of the Contractor or any Sub-contractor and shall at his own expense effect and
maintain, until the virtual completion of the contract, with an approved policy of insurance in the
joint names of the Employer and the Contractor against such risks and deposit such policy or
policies with the Architect from time to time during the currency of the Contract.
The Contractor shall also be responsible for any liability, which may be excluded from the
insurance policies above referred to and also for all other damages to any persons, animal or
property arising out of an incidental to the negligent or defective carrying out of this Contract. He
shall also indemnify the Employer in respect of any costs, charges or expenses arising out of any
claim or proceedings and also in respect of any award of compensation or damages, arising there
from.
The Employer shall with the Concurrence of the Architect, be entitled to deduct the amount of
any damages and compensation, costs, charges and expenses arising or accruing from or in
respect of, any such claims or damage from any or all sums due or to become due to the
Contractor, without prejudice to the Employer’s other rights in respect thereof.
22. Fire insurance: a) The Contractor shall, within 14 days from the date of commencement of the
works at his cost and keep them insured until the virtual completion of the works insure the works
at his cost and keep them insured until the virtual completion of the works against loss or damage
by fire with an office to be approved by the Architect in the joint names of the Employer and the
Contractor ( the name of the former being placed first in the policy), for the full amount of the
Contract and for any further sum if called upon to do so by the Architect, the premium of such
further sum being allowed to the Contractor as an authorized extra. Such policy shall cover the
property of the Employer only and the Architects and surveyors fees for assessing the claim and
in connection with his service is generally in the reinstatement and shall not cover any property of
the Contractor or of any sub –contractor or employee. The Contractor shall deposit the policy and
receipts for the premiums with the Architect and surveyor’s fees for assessing the claim and in
connection with his services generally in the reinstatement and shall not cover any property of the
![Page 31: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/31.jpg)
Page 31 of 91
Contractor or of any sub-contractor or employee. The Contractor shall deposit the policy and
receipts for the premiums with the Architect. In default of the Contractor insuring as provided
above; the Employer, or the Architect on his behalf may so insure the works and may deduct the
premium paid from any moneys due or which may become due to the Contractor without
prejudice to the other rights of the Employer in respect of such default. In case it becomes
necessary to suspend the works the Contractor shall, as soon as the claim under the policy is
settled, or the works reinstated by the insurance office should they elect to do so, proceed with all
due diligence with the completion of the works in the same manner as though the fire had not
occurred and in all respect under the same conditions of Contract. The Contractor in case of
rebuilding or reinstatement after fire shall be entitled to such extension of time alone for
completion as the Architect deems fit.
b) The amount so due as aforesaid shall be the total value of the works duly executed and of the
Contract materials and goods delivered upon the site for use in the works up to and including a
date of the said Certificate less the amount to be re3tained by the Employer (as hereinafter
provided) and less any installments previously paid under this clause provided that such
certificate shall only include the value of the said materials and goods as and from… to time as
they are reasonably, properly and not prematurely brought upon the site and then only if properly
stored and /or protected against weather.
23. Date of commencement and completion: The Contractor shall be allowed admittance to the site
on the “date of commencement” stated in the appendix hereto or such later date as may be
specified by the Architect and he shall thereupon and forthwith begin the works and shall
regularly proceed. With and complete the same (except works such as painting or other
decorative work as the Architect may desire to delay) on or before the “date of completion” stated
in the Appendix subject nevertheless to the provision for extension of time hereinafter contained.
24. Damages for non-completion : If the Contractor fails to Complete the works by the date stated
in the appendix or within any extended time under clause 27 hereof and the Architect certifies in
writing that in his opinion, the same ought reasonably to have been completed the Contractor
shall pay the Employer the3 sum named in the appendix as liquidated damages for the period
during which the said works shall so remain incomplete and the “Employer may deduct such
damages from any moneys due to the Contractor.
25. Delay in Completion : If in the opinion of the Architect the works is delayed (a) by force
major or (b) by reason of any exceptionally inclement weather or (c) by reason or proceedings
taken or threatened by or dispute with adjoining or neighboring owners or public authorities
arising otherwise than through the Contractor’s own default or (d) by the works or delays of
other Contractors or tradesmen engaged or nominated by the Employer or the Architect and not
referred to in the schedule of quantities and or specification or (e) by reason of Architect’s
instructions as per Clause 2 hereof (f) by reason of civil commotion, local combination of
![Page 32: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/32.jpg)
Page 32 of 91
workmen or strike or lockout affecting any of the building trades or (g) in consequence of the
Contractor not having received in due time necessary instructions from the Architect for which he
shall have specifically applied in writing or (h) from other causes which the Architect may
certify as beyond the control of Contractor or (i) In the event, the value of the work exceeds
the value of the priced schedule of quantities owing to variation; the Architect may allow a fair
and reasonable extension of time for completion of the Contract works; in case of such strike or
lockout, the Contractor shall as soon as possible give written notice thereof to the Architect but
the Contractor shall as soon as possible give written notice thereof to the Architect but the
Contractor shall nevertheless constantly use his endeavors to prevent delay and shall do all that
may reasonably be required to the satisfaction of the Architect to proceed with work.
26. Failure of Contractor to comply with Architect’s instructions: If Contractor, after receipt of
written notice form the Architect requiring compliance within seven (07) days, fails to comply
with such further drawings and / or Architect’s instructions; the Employer may employ and pay
other persons to execute any such work whatsoever that may be necessary to give effect thereto,
and all costs incurred in connection therewith shall be recoverable from the Contractor by the
Employer on the certificate of the Architect as a debt or may be deducted by him from any
moneys due to the Contractor.
27. Termination of Contract by the Employer: If the Contractor being an individual partner or a
firm commits any act of insolvency or shall be adjudged an insolvent or being an incorporated
company shall have an order for compulsory winding up made against it or pass an effective
resolution for winding up, as the case may be, shall be unable within seven days after notice to
him requiring him to do so, to show to the reasonable satisfaction of the Architect that he is able
to carry out and fulfill the Contract and to give security, if so required by the Architect.
Or if the Contractor (whether an individual, firm or incorporated company) shall suffer execution
or other process of court attaching property to be issued against the Contractor.
Or shall suffer any payment under this contract to be attached by or on behalf of any of the
creditors of the Contractor.
Or shall assign or subject this Contract without the consent in writing of the Employer first had
and obtained.
Or shall charge or encumber this Contract or any payments due or which may become due to the
Contractor hereunder.
Or if the Architect certify in writing to the Employer that the Contractor,
i) Has abandoned the Contract, or (ii) Has failed to proceed with the works with such due
diligence and failed to make such due progress as would enable the works to be completed within
the time agreed upon. Or (iv) Has failed to remove materials from the site or to pull down and
replace work for 7 days after receiving from the Architect written notice that the said materials or
work were condemned and rejected by the Architect under these conditions, or (v) Has neglected
![Page 33: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/33.jpg)
Page 33 of 91
or failed persistently to observe and perform all or any of the acts, matters or things by this
Contract to be observed and performed by the Contractor for 7 days after written notice shall have
been given to the Contractor requiring the Contractor to observe or perform the sake; Then and in
any of the said cases, the Employer may, notwithstanding any previous waiver, after giving seven
days’ notice in writing to the Contractor the whole of which shall continue in force as fully as if
the Contract had not been so determined and as if the works subsequently executed by or on
behalf of the Contractor. And further the Employer by his agents or servants take possession of
the works and all plants, tools, scaffoldings, sheds, machinery system and other power utensils
and materials lying upon the premises or the adjoining land or roads and use the same as his own
property or may employ the same means of his own servants and workmen in varying on and
completing the works or by employing and other Contractor or other person or persons to
complete the works and the Contractor shall not in any way interrupt or do any act, mater or thing
to prevent or hinder such other Contractor or other person or persons employed to completing
and finishing or using the materials and plant for the works. When the works shall be completed
or as soon as thereafter, whichever convenient; the employer shall give a notice in writing to the
contractor, failing to do so within a period of 14 days after receipt thereof by him, the Employer
may sell the same by public auction and give credit to the Contractor for the net amount realized.
The Architect shall thereafter ascertain and certify in writing under his hand what ( if anything)
Shall be due or payable to, or by the Employer for the value of the said plant and materials so
taken in possession by the Employer and the Expenses or loss which the employer shall have
been put to in procuring me works to be completed and the amount which shall be certified shall
thereupon be paid by the Employer as the case may be and the certificate of the Architect shall
be final and conclusive between all the concerned parties.
28. Termination of Contract by contractor: If the payment of the amount payable by the
Employer under certificate of the Architect shall be in arrears and unpaid for 90 days from the
date of receipt of the Architects certificate in writing requiring payment of the amount by
Employer or if the Employer interferes with or obstructs the issue of any such certificate, or if the
Employer shall repudiate the Contract or if the works be stopped for three months under the order
the Architect or the employer or by any injunction or other order of any court of law then and in
any of the said cases the Contractor shall be at liberty to determine the Contract by notice in
writing to the Employer, through the Architect and he shall be entitled to recover from the
Employer, payment for all works executed and for any loss he may sustain upon any plant or
materials supplied or purchased or prepared for the purpose of the Contract. In arriving at the
amount of such payment the net weight contained in Contractor’s original tender shall be
followed or where the same may not apply then valuation shall be made in accordance with
Clause 16 hereof.
![Page 34: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/34.jpg)
Page 34 of 91
29. Certificates and payments: The Contractor shall be paid by the Employer from time to time by
installments in the Interim Certificates to be issued by the Architect/Consultant to the Contractor
on account of the works executed when in opinion of the Architect work to the approximate
value ( or less at the rescannable discretion of the Architect/Consultant) has been executed in
accordance with this Contract subject however to a retention of the percentage of such value
named in the Appendix hereto as retention percentage for Interim Certificate until the total
amount retained shall reach the sum named in the appendix as “ total Retention Money” after
which time the installments shall be up to the full value of the work subsequently so executed and
fixed in the building. The Architect/Consultant may in his discretion include the Interim
Certificate such amount, as he may consider proper on account of materials delivered upon the
site by Contractor for use in the works. And when the works have been virtually completed and
the Architect /Consultant shall have certified in writing that they have been completed; the
Contractor shall be paid by the Employer in accordance with the certificate to be issued by the
Architect the sum of money named in the Appendix as installment after virtual completion being
a part of the said total Retention Money. And the Contractor shall be entitled to the payment of
the final balance in accordance with the certificate to be issued in writing by the Architect at the
expiration of the period referred to as “ the defects liability period” in the appendix hereto from
the date of virtual completion or as soon as after the expiration of such period as the works shall
have been finally completed and all defects made good according to the true and intent and
meaning hereof which ever shall last happen provided always that the issue of any certificate by
the Architect during the progress of the works or at or after the completion shall not relieve the
Contractor from his liability under Clauses 2 and 19 nor relieve the Contractor of his inability in
cases of fraud, dishonesty, or fraudulent concealment relating to the works or materials or to any
matter dealt within the certificate and in case of all defects and insufficiencies in the works or the
material which a reasonable examination would not have disclosed. No certificate of the Architect
shall of itself be conclusive evidence that any works or materials to which it related are in
accordance with the Contract neither will the Contractor have a claim for any amounts which the
Architect might have certified in any Interim Bill and paid by the Employer and which might be
subsequently be discovered as not payable and in this respect the Employer’s decision shall be
final and binding.
The issue of Interim Certificate will always be treated as a form of advance payment towards the
work which ultimately will be accounted for while preparing the final bill for payment. It is also
made clear to the Contractor that the issue of the Interim Certificate does not mean that the
quantities, rates and workmanship of the work mentioned in the interim bill have been approved
and accepted by the Architect. The same will be considered as final and approved by the
Architect only when the final certificate is issued by the said Architect.
![Page 35: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/35.jpg)
Page 35 of 91
The Architect shall have power to withhold any certificate if the works or any part thereof is not
being carried out to his satisfaction. The Architect may by any certificate make any correction in
any previous certificate, which shall have been issued by him. No certificate of payment shall be
issued by the Architect if the Contractor fails to insure the works and keeps them insured till the
issue of the virtual completion certificate. Payments from the Architect’s / Consultant’s certificate
shall be made within the periods named in the Appendix as “period for honoring certificates”
after such certificates have been delivered to the Employer.
Payment Terms & Other Conditions:
No advance should be paid to the successful bidder.
Mode of Payment (Stage wise) is shown below:
i) 1st Stage : 30 % completion of the total work / delivery of the 50% : 30% payment
of the total items.
ii) 2nd Stage : 30 % completion of the total work / delivery of the : 30% payment
remaining 50% of the total items
iii) Final Stage : On completion of the total work as per contract : Balance payment
and raising Bills
Note: Storage and safe custody of all materials, equipments, machines etc. at site is the sole
responsibility of the contractor. Patent Office, Kolkata will not be responsible in any way for
loss, damages, theft etc. of the materials stored at site.
30. Materials to be finally determined by the Architect: The decision, opinion direction, certificate
(except for payment) with respect to all or any of the matters under clauses 2 (a), 2(b) 4,6,11, 18,
27 (a, b, c, d, f & g) hereof (which matters are herein referred to as the excepted matters) shall be
final and exclusive and binding on the parties hereto and shall be without appeal. Any other
decision, opinion direction, certificate or valuation of the Architect/ Consultant or any refusal of
the Architect to give any of the same shall be subject to the including right of arbitration and
review under clause 34 hereof in the same way in all respects (including the provisions as to
opening the reference) as if it were a decision of the Architect.
31. Settlement of dispute by arbitration: Except where otherwise provided in the contract, in case
any dispute or difference arise between the parties either during the progress or after the
completion or abandonment of the work as to the construct ruction of their contract or as to the
meaning of these specifications, designs, drawings and instructions herein before mentioned and
as to the quality of workmanship or materials used on the work or as to any other question, claim,
right, matter or thing whatsoever, in any way arising out of or as to any other question, claim ,
right, mater or thing whatsoever, in any way arising out of or relating to the contract, designs,
drawings, specifications, estimates, instructions, orders or those conditions or otherwise
concerning the works, or the execution, or failure to execute the same, then such dispute and
![Page 36: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/36.jpg)
Page 36 of 91
difference shall be and is hereby referenda the sole arbitration of The Controller General of
Patents, Designs and Trademarks (CGPDTM). Should he be for any reason unwilling or unable to
act as such arbitrator, such questions and disputes shall be referred to an arbitrator so appointed
had to or had not to deal with matter to which the contract relates and that in the course of his
duties he had expressed views on all or any of the matters in disputes or difference. The arbitrator
to whom the matter is originally being referred or vacating his office or being unable to act for
any reason such secretary as aforesaid at the time of such transfer, vacation of office or inability
to act shall appoint another person to act as arbitrator in accordance with the terms of contract.
Such person shall be entitled to proceed with the reference from the stage at such it was left by
his predecessor. It will also be a team of the contract that no person other than a person appointed
by The Controller General of Patents, Designs and Trademarks (CGPDTM), as aforesaid should
act as arbitrator and if for any reason that is not possible the matter is not to be referred to
arbitrator at all. In all cases the arbitrator shall give reasons of the award.
Such as aforesaid the provisions of the Indian Arbitration Act, 1940 or any statutory modification
or reenactment thereof and the rules there under and for the time being in force shall apply to the
arbitration proceedings under this clause. It shall also be a term or contract that the part invoking
the arbitrator shall specify the dispute referred to the arbitration under this clause together with
amount or amounts claimed. If any, in respect of each such dispute. It shall also be a term of
contract that if that contractors do / does not make any demand for arbitration in respect of any
claim in writing within 90 (ninety) days of receiving the intimation officially that the bill is ready
for payment, the claim of the contractors will be deemed to have been waived and absolutely
barred and The Controller General of Patents, Designs and Trademarks (CGPDTM), shall be
discharged and released of all liabilities under the contract in respect of those claims. The
Arbitrator may, from time to time with the consent of the parties, enlarge the time for making
award.
32. Right of technical scrutiny of final bill: The Employer shall have a right to cause a technical
examination of the works and the final bill of the Contractor including all supporting vouchers,
abstracts, etc., to be made at the time of payment of the final bill, if as a result of this examination
or otherwise any sum if found to have been overpaid or over certified it shall be lawful for the
Employer to recover the sum.
33. Employer entitled to recover compensation paid to workmen: If for any reason the Employers
is obliged, by virtue of the provisions of the Workmen’s Compensation Act, 1923or any statutory
modification or re-enactment thereof to pay compensation to a workmen employed by the
Contractor in execution of works, the Employer shall be entitled to recover from the Contractor
the amount of compensation so paid and without prejudice to the rights of the Employer shall be
entitled to recover from the Contractor the amount of compensation so paid, and without
prejudice to the rights of the Employer shall be at liberty to recover such amount or any part
![Page 37: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/37.jpg)
Page 37 of 91
thereof by deducting it from the security deposit or from any sum due by the Employer to the
contractor under this Contract or otherwise. The Employer shall not be bound to contest any
claim made against it under the said Act except on the written request of the Contractor and upon
his giving to the Employer full security and satisfaction of the Employer for all causes for which
the Employer might become liable in consequence of contesting such claim.
34. If at any time after the acceptance of the tender, the Employer shall, for any reasons whatsoever,
not require the whole or any part of the works to be carried out, the Architect shall give notice in
writing to the Contractor who shall have no claim to any payment of compensation or otherwise
whatsoever on account of any profit or advantage which he might have derived from the
execution of the whole works.
35. Right of Employer to terminate Contractor in the event of death of Contractor, if
individual: Without prejudice to any of the rights or remedies under this Contract if the
Contractor being an individual dies, the Employer shall have the option of terminating the
Contract without incurring any liability for such termination.
![Page 38: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/38.jpg)
Page 38 of 91
TECHNICAL SPECIFICATIONS
The scope of this section comprises the supply. erection testing and commissioning of Variable
Refrigerant Volume System conforming to these specifications and in accordance with the
requirements of Drawing and Schedule of Quantities.
1. OUTDOOR UNIT:
A. FEATURES Unit shall be air cooled, variable refrigerant flow air conditioner consisting of 20 HP / 24 HP /
28 HP outdoor unit (qty. as per given in tender BOQ) each equipped with min 2 Nos. Full
Inverter driven Scroll compressors and connected to multiple indoor units. Each indoor unit
having capability to Heat & Cool independently for the requirement of the rooms. All indoor
units shall be provided with isolation valves so that a particular unit can be isolated and removed
for servicing, while system keeps functioning in normal way.
It shall be possible to connect multiple indoor unit on one refrigerant circuit as indicated in
schedule of quantities. The indoor units on any circuit can be of different type and controlled
individually. Following type of indoor units (qty & capacity as per tender BOQ) shall be
connected to the system:
4-way cassette type with cordless remote. Compressor installed in outdoor unit shall be equipped with capacity control mechanism, and
capable of changing the rotating speed / mass flow rate of refrigerant by inverter driven
mechanism to follow variations in cooling & heating both option. Outdoor unit shall be suitable
for mix-match connection of all type of indoor units.
The refrigerant piping between indoor units and outdoor units shall be extended upto 100m with
maximum 50 m level difference without any oil traps. Oil recovery system shall be managed
without disturbance to normal operation cycle of the system / compressor.
Both indoor unit and outdoor unit shall be factory assembled, tested and filled with first charge
of refrigerant before delivery at site. The units should be capable to operate in ambient temp. of
48 Deg C (Technical catalogue should reflects the same data in support to that).
CEILING MOIUNTED DUCTABLE TYPE UNIT
Unit shall be suitable for ceiling mounted type. The unit shall include pre-filter, fansection & DX coil
section. The housing of unit shall be light weight powder coatedgalvanized steel. The unit shall have
high static fan for Ductable arrangement
HIGH WALL MOUNTED UNITS
The units shall be wall-mounted type. The unit includes pre filter, fan section &DX coil section. The
housing of unit shall be light weight powder coatedgalvanized steel. Unit shall have an attractive
external casing for supply and returnair. Out Door Unit:
The outdoor unit shall be factory assembled, weather proof casing constructed from heavy gauge
mild steel panels with powder coated finish.
All outdoor unit module shall have minimum two numbers of inverter scroll compressors.
EER/COP in cooling mode should be min 3.9at 35 Deg C DB Outdoor temp & 27 Deg C DB &
19 Deg C WB indoor condition with 100% load. (Equiv. pipe length 7.5m with zero level
difference.)
The unit shall be provided with microprocessor control panel.
![Page 39: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/39.jpg)
Page 39 of 91
Compressor The compressor shall be high efficiency scroll type (with R410A gas ) and capable for capacity
controlling .Each Outdoor unit should have two scroll compressors with inverter driven
which shall change the speed / refrigerant mass flow rate in accordance to the variation in
cooling load requirement. Refrigerant mass flow rate can be changed by inverter driven speed
modulation of compressor control system. System shall incorporate liquid sub-cooling
mechanism with liquid injection at intermediate pressure. All outdoor units shall have multiple steps of capacity control to meet load fluctuation and
indoor unit individual control. All parts of compressor shall be sufficiently lubricated. Forced
lubrication may also be employed.
Oil heater shall be provided in the compressor casing.
Heat Exchanger:
The Heat Exchanger shall be constructed with copper tubes mechanically bonded to aluminium
fins to form a cross fan coil and larger surface area.
The fins shall have anticorrosion treatment for Heat Exchanger Coil. The treatment shall be
suitable for areas of high pollution, moisture and salt laden air.
The unit shall be provided with necessary number of direct driven low noise level propeller type
fans arranged for vertical / horizontal discharge. Each fan shall have a safety guard.
Refrigerant Circuit:
The Refrigerant Circuit shall include a liquid receiver /accumulator, liquid & gas shut off valves
and a solenoid valve. All necessary safety devices shall be provided to ensure the safety
operation of the system.
Safety Devices: All necessary safety devices shall be provided to ensure safe operation of the system.
Following safety devices shall be part of the outdoor unit: high pressure switch, low pressure
switch, fuse, crankcase heater, fusible plug, over current protection for inverter, and short
recycling guard timer.
Piping:
All connections of Refrigerant piping shall be in high grade Copper of Refrigeration quality with
Eddy Current Testing and material test Certificates.
All connections, tees, reducers etc. shall be standard make fittings. Insulation of cold lines shall be carried out with Armaflex / K-Flex insulation sheets and tubes of
appropriate thickness so that condensation does not occur.
Oil Recovery System:
Unit shall be equipped with an oil recovery system to ensure stable operation with long
refrigerant piping.
System shall be designed for proper oil return to compressor along with the distribution of oil to
individual compressor.
![Page 40: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/40.jpg)
Page 40 of 91
Indoor Units: Units shall be factory assembled, wired, piped and tested.
Units shall have DX coils with copper tubes and bonded aluminium fins for highly efficient heat
transfer.
Units shall have Centrifugal fans for adequate amount of Air circulation and low Noise.
Units shall have inlet filters, which are easily cleanable and replaceable.
All components of Units are easily accessible for connection, repairs and maintenance.
All units with Factory manufactured Units, Grills shall have auto swing feature for proper Air
distribution.
All unit shall be controlled by electronic Expansion Valves only. For cassette type IDU in built
drain pump is reqd.
All units mounted inside the ceiling shall have filters.
Visible indoor units shall have wireless remotes. Price of the same shall be included in cost of
unit by default.
All units shall have adequate insulation or Lining to avoid condensation.
Touch Screen Type Controllers for Indoor Units: All indoor units should be centrally/group controlled by Touch screen type Controller apart
from individual cordless remote. This controller should have BMS/Net connection facility for
future expansion.
Outdoor Units centralized monitor: All Outdoor units should be monitored by this system & it can display operating parameters &
error/protection code of outdoor unit.
B. COOLING COIL The coil shall be constructed from strong clean copper tubes bonded to aluminum fins suitably
spaced to ensure maximum heat transfer. The inlet of the coil shall be exceptional low to ensure
quiet operation.
C. ELECTRONIC REFRIGERATING CONTROL VALVE An electronic expansion valve shall be factory brazed to the inlet of the coil. It shall modulate the
refrigerant volume continuously in respond to load variations of the room. Thus, maintain a
precise constant temperature of +/-0.5 C.
D. EVAPORATOR FAN The evaporator fan shall be of the multi-blade type with its performance designed to match the
coil performance. The fan shall be statically and dynamically balanced to ensure low noise and
vibration free operations. It shall be driven by a permanently lubricated mother and shall operate
on 220 to 240 volts single phase 50 cycles.
E. CONTROL The system shall be microprocessor controlled to achieve precise room temperature control and
minimum power consumption. The controls system shall employ proportional-integral-
differential temperature control and shall have an accuracy of +/-0.5 C.
The control wiring is controlled by using 2-core cable, with non-polarity multiplex transmission
system (outdoor to outdoor, outdoor to indoor, indoor to indoor).
In addition, the checking function for connection error of wiring and piping must come standard
with the system.
![Page 41: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/41.jpg)
Page 41 of 91
Computerized control shall be used to maintain a correct room temperature with minimum power
consumption. Unit shall be equipped with automatic fan sped and its own 3 speed fan controllers,
thermostat, LCD indicators.
It also is equipped with a self- diagnosis circuit for easy and quick maintenance and service. It
shall also be able to indicate malfunction code displays.
F. SOFT START All condensing units should be soft-start at to ensure low starting current.
The compressor shall be to start at the minimum load and increased to the required power
(refrigerant volume) according to the actual load requirement.
A recycling guard timer shall be provided to prevent the compressor to restart again immediately
after it was stepped.
3. CENTRALIZED TYPE REMOTE (TOUCH SCREEN TYPE) CONTROLLER (Option
if specified in BOQ)
A multifunctional compact centralized controller shall be provided with the system.
The Graphic Controller must act as an advanced air-conditioning management system to give
complete control of VRV air-conditioning Equipment, It should have ease of use for the user
through its touch screen up to 7 inch display, icon display and color LCD display. The following
functions_
a) Starting; stopping of Air conditioner as a zone or group or individual unit.
Temperature settling for each indoor unit or zone.
c) Switching between temperature control modes, switching of fan speed and direction of
airflow, enabling/disabling of individual remote controller operation.
d) Monitoring of operation status such as operation mode & temperature setting of individual
indoor units, maintenance information, and troubleshooting information.
Display of air conditioner operation history.
f) Daily management automation through yearly schedule function with possibility of various
schedules.
The controller shall have wide screen user-friendly color LCD display and can be wired by a
non-polar 2-wire transmission cable to a distance of 1 km. away from indoor unit.
6. REFRIGERANT PIPING All refrigerant piping for the air conditioning system shall be constructed from soft seamless
upto 19.1mm and hard drawn copper refrigerant pipes for above 19.1mm with copper fittings and
silver-soldered joints.
All joints in copper piping shall be sweat joints using low temperature brazing and or silver
solder. Before joining any copper pipe or fittings, its interiors shall be thoroughly cleaned by
passing a clean cloth via wire or cable through its entire length the piping shall be continuously
kept clean of dirt etc. while constructing the joints through nitrogen bleeding at 1.0kgisqcm and
Subsequently; it shall be thoroughly blown out using nitrogen.
After the refrigerant piping installation has been completed, the refrigerant piping system shall
be pressure tested using nitrogen at pressure of 30Kg per socm. Pressure shall be maintained in
the system for 24 hours. The system shall then be evacuated to minimum vacuum if 700mm ha.
The air-conditioning system supplier shall be design sizes and erect proper interconnections of
the complete refrigerant circuit.The thickness of copper piping shall not be less than 20gauge for
pipes upto19.1mmand 18guage for bigger sizes
The suction line pipe size and the liquid line pipe size shall be selected according to the
manufacturers specified outside diameter. All refrigerant pipes shall be properly supportedand
anchored to the building structure using steel hangers, anchors, brackets and supports which shall
![Page 42: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/42.jpg)
Page 42 of 91
be fixed to the building structure by means of inserts or expansion shields of adequate size and
number to support the load imposed thereon,
Piping Length:-
Max. Actual piping length • 180 rmt
Max. Total piping length - 1000 rmt
Max. Level diff bet. ODU-IDLI - 90 rmt
Max. Level diff. bet IDUs • 40 rmt
Copper Pipe Specification:
• Copper tubes used shall be Deoxidize High Prospered copper (DHP Grade) With
Chemical composition of Copper = 99.9%, Phosphorous T 0.0015 to 0.040%.
• The tubes shall have 360-degree concentric wall thickness along their entire length
• Half hard copper tubes shall confirm to ASTM B75. /ASTM280 (C12200)lis H:3000
(C1220)/BS2871 part 3.
• Soft Copper tubes should conform to ASTM1368/,lis H:3000.
• The copper tubes must be super clean quality and low residual content, below permissible
levels of 0.038 g.m.
• Tubes shall be 100% Eddy Current tested.
• Use Tools and accessories fit for FR410A application.
To protect Nitrile rubber insulation of exposed copper piping from degrading due ultra violet
rays & atmospheric condition, it shall be covered polished coating with at least two coats of resin
and hardener above Nitrile rubber insulation.
Or
Same to be covered with M.S Type /G.I.Type protection tray.
Refrigerant Pipe Insulation The Copper pipes must be insulated only after pressure testing,The whole of the liquid and
suction refrigerant lines including all fittings, valves and strainer bodies, etc. Both suction and
liquid lines must be insulated , The Brazed f Weak spots must be insulated and covered by
adhesive tapes to avoid air pockets, shall be insulated with 19mm /13 mm thick elastomeric
Nitrile rubber as specified in BOQ.
Power cabling The system must be securely earthed,Armored copper cables are to be used for power
wiring.Each outdoor should have separate 3-Phase 400V Power Slotted GI Tray should be used
for cable supports.Power source for all indoor units must origin from single source,
8. TESTING & COMMISSIONING PROCEDURE FOR VRV SYSTEM WITH
REFRIGERANT R 410A
When installing equipment using R410A refrigerant, there are a number of standards that must
be met:
Ester oil is used for R410A It's important to work with absolute cleanliness
Brazing must be done with the use of Nitrogen (OFN)
The system must be evacuated thoroughly (triple evacuation)
A strength test in accordance with BS EN378 must be carried out The system must always be
charged in the liquid phase.
![Page 43: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/43.jpg)
Page 43 of 91
Pressure Testing After brazing the system has to be checked for any leakages and arrest the same , Complete leak
testing and proper evacuation is is must for non-condensable gases, and moisture in the systems
has to be removed. To avoid ill effect on the systems.
Pressure Testing
Visually inspect all the pipes for proper brazing, Attach a manifold valve and dry the nitrogen
gas cylinder to both suction and liquid ports of service valves.Use TEE connection for
connecting both liquid and suction service valves., Always pressurize both suction and liquid
side of piping systems. Pressurize the system in steps of 100,200,300,400 & 550psig, Check for
any leak in each step using soap bubbles, Pressure must be within 2psig after two hours.
Do a leaK test of all joints of the tubing any bubbles indicate a leak Wipe off the soap with clean
cloth. Keep the system pressurized for 12.24 Hours and check for any drop in Pressure.After
system is found to be free of leaks , release the nitrogen pressure.
II) UV Protection.
Exposed insulated pipes are prone to heavy weathering, They must be withstand summer
monsoon and winter, Providing UV Protection enhances its life manifold, UV coating must be
done bu a compound which is a specially formulated water based coating suitable for protection
of flexible thermal insulation materials against sunlight. To increase its resistance coating can be
further strengthened by sand witching a glass fiber mesh between two coats of rubber adhesive
over insulated pipes.
B. Evacuation To ensure problem-free operation of any air-conditioning system, it is crucial to carry out
thorough evacuation of the system. During the evacuation any moisture is removed from all of
the system components and the pipe work.
The importance of thorough evacuation in any refrigeration system in order to prevent the
following harmful effects:
Any non-condensable product left in the system can cause the pressure in the condenser to
increase and in turn, the compression temperature to rise.
Moisture will result in adverse reactions in the refrigerant circuit.
The polyester oils used in the R410A refrigeration systems are hydroscopic, which means that
they absorb moisture from the air.
To prevent chemical reactions in the system, any moisture must be removed at all costs. Oxygen
(air) reacts with the refrigeration unit oil and can lead to faults such as compressor failure.
To be able to remove moisture from the system it must be evaporated.
The pressure in the pipe work must be reduced to such an extent that the ambient
temperature is sufficient to evaporate the moisture.
Essential tips for good evacuation Before evacuating a system, it is essential to check for any potential leaks. Such leaks may be
discovered at brazed or flared joints. Evacuation can only start once the system has been properly
pressure tested and found to be completely leak proof.
Leak Testing in 3 steps
Step 1 3.0 bar (N2) - Test for a minimum of 3 minutes
Step 2 15.0 bar (N2) - Test for a minimum of 3 minutes
Step 3 33.3 bar (N2) - Test for a minimum of 24 hours (if using R410A)
Triple evacuation in 6 steps
Step 1 Evacuate the system to 10 'Tarr' from both service valves.
To measure the vacuum a 'Torr gauge' must be used at all times - do not use a system manifold
gauge
![Page 44: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/44.jpg)
Page 44 of 91
Step 2 Break the vacuum with OFN to 1 bar
Step 3 Evacuate to 5 'Toff'
Step 4 Repeat Steps 2
Step 5 Evacuate to the lowest pressure that the pump will achieve (2 `Torr' for 1 hour minimum)
Step 6 The rise test must then be carried out for a minimum of 30 minutes.
C. When using copper pipe work
D. The importance of correct brazing Brazed joints should only be made using Nitrogen (CFN) as without it carbon deposits are left on
the pipe surface. The carbon deposits are then washed off of the surface of the pipe when the
refrigerant is circulated and it then travels with the refrigerant. Carbon deposits can cause the
refrigerant and refrigeration unit oil to decompose, This is likely to result in operation defects
and warranty will become null and void.
Basic Brazing Process
E. Tools & Accessories
The right tools are required in to enable the refrigeration system to be properly evacuated and
dried.
These include R41 OA Manifold Gauges, Flaring Tool, Torque Wrench, Vacuum Pump,
Refrigerant Weighing Scales
A solid manifold gauge specifically used for R410A. Manifold gauges with sight
gauges should never be used due to the higher operating pressures, unless specified for use on
R41 OA.
Install all IDUs
Copper Tubes to be
stored with end
caps
Cut tubes as per
layout
Position all Refnets.
tubes a specified
Check that pipes
are not pinched
Put insulation over
tubes before
Braze all joints
Flush with nitrogen
before connecting
units
Connecting piping
to 1DUs, by brazing
or flaring
Pressure test Insulate joints
![Page 45: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/45.jpg)
Page 45 of 91
Nitrogen Pressure Gauge (up to 160 bar) A higher range Nitrogen Regulator must be used due to the higher-pressure testing requirements
when strength testing to conform with BS EN378.
Torr Gauge. A Torr gauge to be used to provide an accurate evacuation level required.
Vacuum Pump A Vacuum pump of sufficient quality and working order to be used to pull the correct vacuum to
negate any moisture being present in the system (pump oil needs to be regularly changed). The
refrigerant manifold gauges are not suitable for measuring vacuum,
Flaring A suitable Flaring tool to be used so as-not to compromise the integrity of the copper
when flared. Torque Spanners Torque spanners must be used at all times to tighten flares in
accordance with manufacturers guidelines. Oxygen free nitrogen for brazing
OFN to be used at all times during brazing to prevent oxidation within the copper pipe work.
Oxygen free nitrogen for strength and leak test
OFN to be used for strength and leak testing with the higher-pressure regulator, Refrigerant
charging weighing scales any additional refrigerant required for the installed system must be
weighed in the liquid phase using charging scales.
Suitable vacuum measuring gauges
To determine accurately the pressure in the system and whether the desired vacuum has been
attained, a vacuum or torr meter is indispensable. A professional evacuation requires such an
instrument.
To get the best from R41 DA Use the correct tools Adhering to BS EN378
Strength test to 1.3 x Ps (43 bar)
Leak test to 1.0 x Ps (33 bar)
Observe regulations (Health & Safety at work, pressure equipment etc )
Use correct copper pipe work with appropriate wall thickness
Follow good working practice at all times (Nitrogen brazing, proper .11,1 evacuation, etc_)
9. TECHNICAL DATA SHEET Following are the technical data sheets to be filled by vendor while quoting
INDOOR UNIT
Capacity
Country of origin
Type
Dimensions
Weight (Kgs)
IDU Power Consumption (Kw)
Noise level of IDU (Db)
In-built Drain pump?
OUTDOOR UNITS OF VRF SYSTEMS:
ODU DETAILS:
TOTAL TENDERED ODU HP (ACTUAL)
TOTAL QUOTED ODU HP(NOMINAL)
ODU HP
No. of ODUs of each HP
No. of Compressors per ODU
Make & model
![Page 46: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/46.jpg)
Page 46 of 91
Country of origin
Type
Dimensions
Weight (kgs)
Make of Compressors
Type of Compressors
No. of Variable capacity
Compressors per ODU
Guarantee on Compressors (years)
Type of Capacity Control
Type of refrigerant
ODU Power Consumption &
Delivered TR At 44 Deg C Ambient & 24
Deg C Room Temperature
ODU Delivered TR (per ODU) (Actual)
ODU Power Consumption (incl. Compressors
& fans) of each ODU at 44 DegC Ambient &
24 DegCRoom temperature (per ODU)
TOTAL ODU POWER COMSUMPTION
(INCL. COMPRESSORS & FANS) OF
ALL ODUs (IN KW)
TOTAL DELIVERED TR OF ALL ODUs
Specific Power Consumption at 44 Deg C
Ambient & 24 Deg C Room temp (Total kw of
ALL ODUs Divided By Delivered Total TR of
ALL ODUs)
Noise Level of ODU
COP
EER
TECHNICAL SPECIFICATIONS FOR CABINET FANS FOR VENTILATION SYSTEM
1.0 SCOPE
This specification covers the general design, materials, construction teatures,
manufacture, shop inspection and testing at manufacturer's works, delivery at site,
handling at site, erection testing, commissioning, performance testing and handing over
of Centrifugal Fans of Ventilation.
2.0 CODES AND STANDARDS
The design, materials, construction, manufacture, inspection, testing and performance of
centrifugal fans shall comply with all currently applicable statues, regulations and safety
codes in the locality where the equipment is to be installed. The equipment shall also
conform to the latest applicable Indian or equivalent standards. Other international
standards are also acceptable, if these are established to be equal or superior to the listed
standards. Nothing in this specification shall be construed to relieve the VENDOR /
CONTRACTOR of this responsibility.
3.0 CONSTRUCTION FEATURES
3.1 CASING
![Page 47: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/47.jpg)
Page 47 of 91
The casing shall be of welded construction, fabricated from heavy gauge material. It shall be
rigidly reinforced and supported by structural members. The seams shall be permanently sealed
air tight. Split casing shall be provided on larger sizes of fans as per manufacturing standard or if
specified in technical data sheets.
3.2 IMPELLER The impeller shall have die formed blades welded to the rim and back plate. Rim shall be spun to
have a smooth contour. Shaft sleeves shall be provided, if necessary. If required, intermediate
stiffening rings shall be provided. The impeller shall be statically and dynamically balanced.
3.3 GENERAL 3.3.1 Belt driven fans shall be provided with V belts, V-belt pulleys and beltguards.
3.3.2 Pulleys shall have minimum two (2) grooves to prevent start-up failure and premature
belt failure. Pulleys shall be statically and dynamically balanced. Belts shall have a
minimum service factor of 1.5.
3.3.3 Common base frame for belt driven fans shall be with adjustable rails for motors.
3.3.4 Bolts, nuts and washers used shall be of non-corrosive material and of superior quality.
3.3.5 Bearings shall have minimum life of 50,000 hours.
4.0 DRIVE MOTOR The motor shall be as per IS: 325 and with class "F" insulation, totally enclosed fan cooled,
horizontal induction foot mounted type and rated not to draw starting current more than 6
times normal running current. Fan motors shall be suitable for 415 volts, 50 cycles, 3-phase,
squirrel - cage, totally enclosed fan cooled with IP-55 protection. Motor shall be selected for
quite operation and the speed of the motor shall not exceed 1400 RPM. Drive to fan shall be
provided through belt-drive arrangement. Belts shall of the oil-resistant type. Fan motor
shall be suitable for variable speed by variable frequency drive application. . The motor shall
be capable of handling the required starting torque of the fan. Speed of motor shall be
compatible with the speed of the fan. The cooling fans shall be directly driven from motor
shaft. Motor situated outdoors or exposed to the weather shall be weather protected. Motors
shall be enclosed type and shall have dust tight construction with suitable means of
breathing and of drainage to prevent accumulation of water from condensation. Drain holes
shall exclude bodies greater than 6mm diameter.
All components shall be of adequate mechanical strength and robustness and shall be
constructed of metal unless otherwise approved. All motors shall be dynamically balanced.
The enclosure shall be designed to provide an effective sealing between the primary and
secondary air circuits. Motor winding shall be vacuum impregnated with heat and moisture
resistant varnish glass fiber insulated. Two independent earthing points shall be provided in
accordance with 1S:3043 on opposite sides of the motor for bolted connection. The cable
boxes and termination shall be designed to enable easy disconnection and replacement of
cables. (Motor should be part of scope with manufacturer & should not be supplied
separately by ACMV Contractor)
5.0 CENTRIFUGAL FAN
Fan contained within the cabinet shall be licensed to ear the AMCA Air and Sound Certified
rating seal. Fan shall be DIDW forward or backward curved with fan scroll, belt drive or
direct drive assembled within a cabinet. Cabinet shall be constructed of Galvanized Steel
material. Cabinet shall be "Panel Construction" assembled together by means of fasteners for
ese of dismantling for service and maintenance. Welded cabinets are not acceptable. Cabinet
shall be capable of taking on added acoustic insulation, if required to meet the acoustic noise
levels specified.
6.0 NOISE AND VIBRATION
![Page 48: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/48.jpg)
Page 48 of 91
Noise level produced by any rotating equipment individually or collectively shall not exceed
75 dB (A) measured at a distance of 1.5 meters from the source in any direction. The overall
vibration level shall be as per zones A and B of ISO 10816-1. Balance quality requirement
shall be G 6.3 conforming to ISO 1940/1.
7.0 PERFORMANCE GUARANTEES Performance parameters to be guarantee by the VENDOR / CONTRACTOR and tolerances
permitted shall be as indicated in specifications. Bidder shall confirm acceptance of these by
indicating values in data sheet attached along with the document. Fan or any portion thereof
is liable for rejection, if it fails to give any of the guaranteed performance parameters.
Bidder to note that all fan performance curves shall be AMCA certified. Contractor shall
also submit corrected performance curves for the fan considering the as installed condition
of the fan at site.
DATA TO BE FURNISHED BY THE VENDOR / CONTRACTOR AFTER THE
ISSUE OF PURCHASE ORDER / AWARD OF CONTRACT 1 Schedule of drawings and documents to be submitted for review, approval and
information with submission dates.
2. Quality Assurance Plan (OAP).
3. General arrangement and section drawing with all dimensions and complete part list with
codes and materials of construction. These drawings shall include all data indicated in
technical data sheets.
4. Foundation drawing with static and dynamic loads, unbalanced forces and moments, if
any, pocket details. etc.
5. Drawing showing fabrication and constructional details of the fan.
6. Fan rating chars or tables with selection marked.
7. Performance curves for fans with duty point marked (AMCA Certified, as well as
installed condition at site).
8. Torque-speed curve for fans.
9. Erection, operation and maintenance manual with lubrication schedule.
TECHNICAL DATA SHEET — DUCTING
Duct dimensionDescription As per Tender Offered by Firm 1 Item GI Ducts
2 Applicable Standard (GI Sheets) IS 277 (2003)
3 Applicable Standard (Ducting) IS 655 (2006)
4 Painting Both side factory painted
sheets if specified.
5 Zinc Coating 120 g/m2-
6 Hangers Threaded rod and bolted
angle brackets
7 Spacing 2000 mm
8 Thickness of sheet (mm) As per size of ducts and IS
655
9 Sizes of ducts As per drawing
The thickness of GI sheets shall be as given below for rectangular duct construction-Low
pressure system.
Supporting of Ducts
![Page 49: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/49.jpg)
Page 49 of 91
TECHNICAL SPECIFICATIONS OF DIFFUSERS, GRILLES, DISC VALVES AND
COLLAR DAMPERS, BUTTERFLY DAMPER & FLEXIBLE DUCT
1. DIFFUSERS
Construction:
• Frame and core: High quality extruded aluminum profile with 33 mm flange width.
• Damper frame and core: High quality extruded aluminum profile with natural aluminum finish.
Black matt finish as option.
• Optional diffuser frame: Stamped aluminum core.
Description: • The frame and blades are of high quality extruded aluminum profiled construction with the
advantages of corrosion resistance and rigidity.
• Diffusers shall be coned type with each cone manufactured by extruded aluminum louvered
profiles or one piece die formed aluminum construction - arranged in concentric cones to deflect
air equally in four directions.
• Louvered type core is fixed to the frame with aluminum pins loaded with steel springs. Core
can be easily removable and interchangeable to allow for maximum flexibility in installation,
maintenance and damper adjustment.
• Damper is fixed rigidly to the frame by aluminum rivets. Fixing by spring clips as option.
• Damper blades are separated from its frame by nylon bushes.
• Discharge air equally in four horizontal directions.
• Foam gasket is sealed around the back of the frame as option to avoid air leakage.
• Available in rectangular sizes as option. Suitable for flush mounting in lay in type ceiling.
2. GRILLES
Construction:
• Frame: High quality extruded aluminum profile with 30 mm flange width as standard. 12, 16,
24 mm flange widths are optional.
• Face bars: High quality aluminum profiles of <T, 15" - 1 way throw and 15° - 2 ways throw.
• Bar spacing; 12 mm as standard. 6 mm as option.
• Grille width: 50 mm to 300 mm with increments of 50 mm.
• Length: 1 meter as standard. Available from 0.2 mt to 5.8 nit in a single piece.
Description:
• Frame and face bars are of high quality extruded aluminum profiled construction with the
advantages of corrosion resistance and rigidity.
• Horizontal face bars with 0", 15°- 1 way throw and 15° - 2 way throw are fixed rigidly to the
frame with 8-mm pipes.
• For perfect unbroken appearance of continuous runs, alignment strips are provided with no
additional cost.
• Total structure is manufactured by mechanical assembly, assuring rigidity and to maintain
straight-line appearance.
LARGER SIDE
OF DUCT
mm
SUPPORTING
ANGLE mm
VERTICAL ROD
DIAMETER mm MAXIMUM SPACING
BETWEEN SUPPORTS mm
Up to 900 40x40x6 10 1500
901 to 1,500 50x50x6 10 1500
1,501 to 2,400 50x50x6 10 1500
2,401 and above 65x65x6 12 1500
![Page 50: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/50.jpg)
Page 50 of 91
3. DICS VALVE
Construction: •Frame and disc: Steel sheet construction
•Mounting rings: Galvanized sheet steel.
•Material Frame & Disc : Steel Sheet Construction
•Type of finish : Powder Coated
•Disc Valve Size 100 mm / 150 mm .
•Color: Standard Color available: Broken White. Half White. Pure White. Supply abased on
sample approval
Description •Frame and disc is made of high quality galvanized steel sheet construction with powder coat ing
to RAL colors.
•Disc is attached to the frame by threaded rod.
•Air flow can be adjusted by regulating the cone up or down (+A or.-A)
•Foam gasket is sealed around the back of the frame to avoid air leakage.
•These valves can be used for supply, exhaust and ventilation applications.
•Air master disc valves are best suited to air distribution systems handling relatively low air flow
rates within small circular duct work.
•Can be mounted in wall, ceiling or exposed air ducts with mounting rings.
•Recommended for exhaust of greasy and damp air in damp areas such as toilets, bathrooms and
kitchens.
Standard finishes: Steel sheet powder coated to RAL 9010 color. Flexibility of finishing is available as option.
COLLAR DAMPERS:
Construction:
•MATERIAL OF DAMPER : Aluminum
•FRAME: 1.2 MM (+1-0.1MM) Thick.
•Blades: 1.00 mm thick.
•- Type of Damper : Opposed Blade Type
•Finish: Black Powder Coated.
•Mounting: Diffuser/Grille Neck.
TECHNICAL SPECIFICATIONS OF ACOUSTIC INSULATION
1. ACOUSTIC INSULATION The scope of this section comprises the supply and application of insulation conforming to these
specifications.
•Material shall be engineered Nitrile Rubber open cell foam.
•The Random Incidence Sound Absorption Coefficients (RISACs) across the octave band
frequencies; tested as per ISO 354, and Noise Reduction Coefficients (NRCs) for the Acoustic
Insulation should be minimum as per the below chart:
Freq
(Hz)
125 250 500 1000 2000 4000 NRC
10 mm 0.03 0.04 0.14 0.40 0.88 1.00 0.40
15 mm 0.01 0.09 0.29 0.74 1.08 0.83 0.55
20 mm 0.04 0.13 0.40 0.90 1.04 0.90 0.60
25 mm 0.05 0.25 0.86 1.14 0.88 0.99 0.80
30 mm 0.07 0.32 0.99 1.16 0.93 1.08 0.85
50 mm 0.23 0.73 1.29 0.99 1.09 1.11 1.05
•The material should be fibre free.
•The density of the acoustic insulation should be minimum 140 Kg/m3
![Page 51: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/51.jpg)
Page 51 of 91
•The insulation should have Microbane.; Built-in Anti-Microbial Product Protection, and should
pass Fungi Resistance as per ASTM G 21 and Bacterial Resistance as per ASTM E 2180.
•The insulation should be non-eroding & should pass Air Erosion Resistance Test in accordance
to ASTM Standard C 1071-05 (section 12.7),
•The material should have a thermal conductivity not exceeding 0.047 W/m.K @ 20 Deg. C
•The material should withstand maximum surface temperature of +85°C and minimum surface
temperature of -20°C
• The material should confirm to Class 0 rating for surface spread of Flame in 1996.
• The acoustic insulation should be tested and approved by Sound Research Laboratories Ltd.,
U.K.
•Duct so identified and marked on Drawings and included in Schedule of Quantities shall be
provided with internal acoustic lining for a distance of minimum 6 meters (or 30% of the duct
length whichever is more)
Thickness of the insulation material shall be as specified for the individual application.
The insulation should be installed as per manufacturer's recommendation.
ACCESSORIES: Adhesive to adhere insulation to the inside walls of the duct shall be from the Insulation
manufacturer only.
INLINE FAN SPECIFICATIONS INLINE FANS shall be preferably be single inlet / double inlet centrifugal fan with forward
curved blades & external rotor motor. These fans shall be complete with casing, motor &
impeller.
CASING shall be constructed of GSS sheet metal construction. The casing shall be double skin
internally acoustically lined and constructed of Galvanized Steel. The fan shall be SISW (dia 100
to 160) /DIDW (dia 200 to 500) with forward curved impeller fitted with maintenance free
external rotor motor. Fans should have an outer casing of hot-rolled galvanized sheet steel
complying with EN 10142/10147. The sheet steel must have a layer of 20 pm of zinc for
protection against corrosion. Indication showing rotation arrow and make, model number and
duty conditions of the fan shall be mentioned on fan casing.
FAN Impellers should be backward curve/forward curved having aluminum blades. The
impellers should be press fitted directly onto the rotor of the external rotor motor. The motor and
impeller should be balanced dynamically in two planes in accordance with DIN ISO 1940.
MOTOR - Fan motor should be external rotor type motor with built in thermal contacts for
protecting against overheating. Compact in size and its construction should allow motor to be
cooled by transported air. Motor and impeller assembly should be mounted on a plate to facilitate
easy removal and servicing.
Fan should be speed controllable in five steps.
Noise level of fan should not be more than 40 dB(A) at 3 mtr distance.
Insulation — Fan should be thermally and acoustically insulated with 50mm layer of rockwool
with a surface liner which prevents the migration of fibers into the air stream.
Installation — Fan must be able to install in any position and must be provided with mounting
clamps to connect to duct.
All fans shall be selected for the lowest operating noise power levels. Capacity ratings, power
consumption, with operating points clearly indicated, shall be submitted and verified at the time
of testing and commissioning of the installation. All the technical data of fans should be
approved as per AMCA & ISO standards.
![Page 52: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/52.jpg)
Page 52 of 91
PROPELLER FANS o Propeller fans shall be direct-driven, three or four blade type, mounted on a steel
mounting plate with orifice ring.
o Mounting plate shall be of heavy gauge sheet steel construction, streamlined venture
inlet (reversed) for supply applications. The size shall suit the fan size.
o Fan blades shall be constructed of aluminium or steel. Fan hub shall be of heavy
welded steel construction with blades bolted to the hub. Fan blades and hub assembly
shall be statically and dynamically balanced at the factory.
o Motor shall be standard (easily replaceable) single phase, permanent split capacitor or
shaded pole for small sizes, totally enclosed with pre-lubricated sleeves or ball
bearings, designed for quiet operation with a maximum speed of 100 RPM fo fans of 3
cm. dia or larger and 1440 rpm for fans of 31 cm dia and smaller. Motors for larger fans
shall be suitable for 415±10% volts, 50 cycles, 3 phase, power supply. Motor shall be
suitable for either horizontal or vertical services, as indicated in drawing/schedule of
quantities.
o The following accessories may be required and provided with propeller fans, as
indicated in the tender specifications.
a) Wire guard on inlet side and bird screen at outlet.
b) Gravity operated louver shutters built into a steel frame.
c) Regulators for controlling fan speed for single phase fan motors.
PVC DRAIN PIPING:
Drain pipes carrying condensate water shall be insulated with 6 mm thick elastomeric nitille
rubber insulation.
For proper drainage of condensate, U Trap shall be provided in the drain piping (wherever
required). All pipe supports shall be of pre-fabricated & painted slotted angle supports, properly
installed with clamps etc.
Testing of drain pipes:
The drain system must be tested by purring water into the drain pan, it should be ensured that
water flows throws through pipeline in correct direction. There should be no leakage of water in
joints, these testing has to be made prior to finishing the false ceiling.
![Page 53: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/53.jpg)
Page 53 of 91
TECHNICAL SPECIFICATION FOR ELECTRICAL EQUIPMENT AND WIRING
1. GENERAL REQUIREMENT: The installation shall generally be carried out in conforming with the requirements of the
Indian Electricity Act, 1910 as amended up to date and the Indian Electricity Rules, 1956
framed there under, the relevant regulations of the Electric Supply Authority concerned,
and also with the specifications laid down in the Indian Standard I.S 732 – 1963 Code of
Practice (revised) for Electrical Wiring Installations (system voltage not exceeding 650
volts) and I.S 2309-1969 Code of Practice for the protection of Buildings and Allied
Structure against Lightning and IS 3043 – Indian code of Practice for Earthing.
2. MATERIALS: All materials, fittings, appliances, used in electrical installations, shall conform to Indian
Standard Specifications wherever these exist. A list of approved materials is attached
afterwards. Materials not included in the list shall be got approved by the Architects /
PMC / Architect /Owner prior to actual use.
3. Panels:
All Panels free standing, extensible type, compartmentalized cubicle type, bottom entry
panel made of 14 SWG (2.03 mm) CRCA MS sheet suitable for 415V, 50 HZ, AC, 3
phase and neutral system as per detailed specification of the panels.
4. MCB Distribution Boards: These totally enclosed metal clad type, factory fabricated Distribution Boards with
hinged lids shall be in accordance with I.S 13032 – 1991. The enclosures shall be welded
construction and fabricated from rust proofed sheet steel and finished with powder paint
coated and have provision for flush mounting on wall and have earthing terminals. The
DBs shall be provided with MCBs, MCB ISOLATORS, etc. Busbar, Neutral link, Earth
bar and DIN Rail.
5. MCB/ MCCB: Breaking Capacity – 10kA, C/D Curves, Low watt loss, Class 3 energy limitation,
suitable for -25 deg c to +55 deg c ambient temperature, Confirms to IS/IEC60898 –
1:2002.
The MCCBs shall conform to the latest applicable standards (IEC: 13947-4-2)
MCCBs in AC circuits shall be of TP/TPN/FP construction arranged for simultaneous
manual closing and opening. All MCCB’s must be of current limiting time with trip time
on s/c currents > 10 ms. Operating mechanism shall be quick-make, quick-break and trip-
free type. The ON, OFF and TRIP positions of the MCCB shall be clearly indicated and
visible to the operator. Operating handle for operating MCCBs from door of board shall
be provided for all MCCBs.
6a. SWITCHES – MODULAR: All switches for lights, fans TV / Telephone and plug sockets shall be modular type along
with MS Box with accessories..
6b. SWITCHES – PIANO KEY: Modular type switches for lights, fans and plug points shall be along with Modular Box
with Modular Plate and accessories.
7. AUTO CHANGEOVER CUM CURRENT LIMITER: The Changeover Cum Current Limiter shall allow unrestricted (metered) supply from
mains. On receiving generator power, it shall connect the line (generally unmetered) to
each flat and start monitoring its load. The generator current allotment shall be factory set
and sealed in each unit. Whenever the load current exceeds limit continuously, the unit
shall disrupt supply for 14 seconds as a warning and then automatically restore it. This
will repeat till overload exists. On resumption of mains, it shall again automatically
changeover.
![Page 54: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/54.jpg)
Page 54 of 91
8. CABLES AND CONDUCTORS: All cables shall be XLPE type,(above 6 sq.mm) 1.1kV grade and conform to Indian
Standard:7098. Conductors of all cables except for flexible cables, shall be of aluminum,
unless specified otherwise.
9. CABLE JOINTING: All cable joints shall be carried out by experienced and Licensed jointers under strict
supervision. Electro plated brass cable glands, aluminum/tinned copper cable sockets
and approved jointing materials must be used. The price for cable jointing and finishing
the ends of the cable shall include all materials and shall also provide for tools and plants
for the work. The cable armoring is to be properly terminated. All cable accessories and
other associated materials shall conform to Indian Standard Specification where
applicable. Proper earthing of cable glands and armoured shall be included in the job.
10. CABLE LAYING AND TERMINATION:
Cable tag should be provided both inside and outside of the panels and equipment.
Provide it 30 meters intervals. Cable should be tied with PVC tie belt at 600mm vertical
and 1000 mm horizontal. Cable glands shall be 1.1KV grade double compression type
and made to tin plated heavy-duty brass casting and machine finished.
11. CABLE TRAY: 1. Ladder Type:
MS Ladder Type Cable Tray made out of 2 nos. 40x40x6 MS angle runner in 2 sides
of the ladder and 25x6 MS Flat cross wise alternately 2 Nos. and 1 no. in approx. 300
mm interval including one coat of finished painting over 2-coats primer suspended
from ceiling with MS flat/rod or fixed on wall with MS bracket. Refer Drawing.
2. Perforated Type:
Made of 1.6/2.0 mm thick GI perforated sheet width available of 75/150/300/600 mm
and 2.5 mtrs long, suspended from ceiling with MS flat/rod or fixed on wall with MS
bracket.
12. WIRES: All PVC insulated wire shall be 1.1 kV grade, Fire Retardant (FR) conforming to IS 694 :
1990, single core, unsheathed with flexible Bright Annealed Multi strand Bare Copper
conductor. The colour shall be Red, Yellow and Blue for phases, Black for neutral and
Green for earth. Manufacturer’s name and size of wire shall be printed on each wire as
per relevant IS.
13. INSTALLATION OF SWITCH BOARD, SUBMAINS, DISTRIBUTION WIRING
TO INDIVIDUAL POINTS: The exact positions of all main switch board and all runs of mains and submain, and
distribution wirings to individual points including the exact position of all light fittings
and switch boards shall be first marked and approved by the PMC / Architect before
actual commencement of the work.
Installation height of the electrical equipments shall be intimated separately..
14. TESTING OF INSTALLATION Before a completed installation is put into service, the following tests shall be carried out
by the Contractor in presence of the PMC / Architect.
a) Polarity of Switches
It must be ensured by test that all single pole switches have been fitted on the live
side of the circuits they control.
b) Insulation Test
i) By applying a 500 volt megger between earth and the whole system of
conductors or any section thereof, with all fuses in place and all switches
closed, all lamps in position or both poles of installation otherwise
electrically connected together: The result in mega ohm shall not be less
![Page 55: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/55.jpg)
Page 55 of 91
than 50 divided by the number of points on the circuit, and should not be
less than 1 meg ohm.
ii) Between all conductors connected to one phase and all such connectors
connected to the neutral or to the other phase connectors of the supply after
removing all metallic connections between the two poles of the installation
and switching on all switches. The insulation resistance shall be as in (i)
above.
c) Earth continuity Test:
The earth continuity conductor including metal conduits, and metal sheaths of
cables in all cases shall be tested for electrical continuity. Electrical resistance of
the above along with the earthing lead, measured from the connection with the
earth electrode to any point in the earth continuity conductor in the completed
installation shall not exceed one ohm.
d) Earth Resistance Test:
To ensure effectiveness of installation earth, the value of earth resistance shall be
within 5 ohm for installation capacity up to 5 KW and one ohm for installation of
higher capacity.
The completed work will be taken over only if the results obtained in above tests are
within the limits mentioned above, and in accordance with I.E Rules.
On completion of the installation work, a certificate shall be furnished by the Contractor,
countersigned by the certified supervisor under whose direct supervision the installation
was carried out. This certificate shall be in a prescribed form as required by the local
Electric Supply Authority. The installation shall not be considered as completed unless
the installation is got inspected and passed by the Electrical Inspector, Directorate of
Electricity, The Contractor shall have to take all initiatives and follow up the matter at his
own cost for early approval of the installation for permanent energy station of the
installation from the Directorate of Electricity. No extra amount will be paid on this
account. However, statutory fees, if any, will be reimbursed to the Contractor on
production of documentary evidences / official money receipts.
15. SPECIAL SPECIFICATIONS: a) Before procuring all electrical equipments. Sample approval should be taken from
PMC / Architect and get approved.
b) Before execution of any portion of conduit work for wiring, a neat proper layout
should be made out by the Contractor and got approved from the PMC /
Architect. For this purpose Contractor is advised to get acquainted with the
layout drawings of the PMC / Architect.
c) While laying the conduits for concealed wiring in the ceiling or in the beams &
columns and before casting the Contractor must ensure that all the inlets and both
ends of the conduits are plugged by means of dead end socket so that no foreign
matter can enter the conduits and choke them.
d) Damaged to any fitting during erection and before handing over the installation by
Contractor shall be set right or replaced by the Contractor at his own cost.
f) Caution Board of proper size wherever required, shall be provided, as per I.E.E.
regulations for which no extra payment will be admissible.
g) Any repairs done to wall etc. should match with the surrounding surface
otherwise same will be got done through Building Contractor at the cost of the
Electrical Contractor.
h) Earthing installation shall be done in the presence of PMC / Architect or his
representative.
![Page 56: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/56.jpg)
Page 56 of 91
i) The installations should not be energized without adequate earthing.
j) The MCB box and change over switch at Metering space shall be provided with
neat lettering in block letters with paint for identification of the flats as per
instruction of PMC / Architect
k) Completion Drawings
The Contractor shall be required to submit along with final bill, the under noted
drawings in soft copy along with three hard copies.
1. Plan (as per architectural drawing) of typical/ground floor of each building
(not less than 1:100 metric scale) showing:-
i) Location of all equipments with the numbers
ii) Single Line Diagram showing specification of MCB, wires and circuit
wise distribution. Position of lightning conductors and route of
horizontal and vertical conductor.
iii) Position of Earthing Stations for light and power and Lightning
Conductor Installation.
iv) The Drawing Name Plate shall be as per instruction of Authority.
The drawings shall be very neatly drawn with Auto Cad and submitted properly.
TECHNICAL SPECIFICATION FOR CONDUIT WIRING SYSTEM
1. Type and size of Conduit: All rigid conduit pipe shall be push fit type. Adhesive shall be applied before jointing two
pipes.
These are to be used in lift shaft, machine room & basement. Minimum size shall be 20
mm. dia.
2. Accessories: Accessories and conduit shall be of same make.
3. Conduit Joints: In long distance straight runs of conduit inspection type couplers are to be provided at
reasonable intervals.
4. Fixing of Conduits: Conduit pipes shall be fixed by heavy gauge saddles, secured to wall / ceiling by screws
driven into wood plugs or rawl plugs or phil plugs at an interval of not more than 76cm.
apart for vertical run and 60 cm. apart for horizontal run; but on other side of couplers or
bend of similar fittings – saddle shall be fixed at a distance of 30cm. from the centre of
such fittings.
5. Bends in Conduits: All necessary bends in the system including diversion shall be done by bending the pipes,
or by inserting suitable inspection type bends, elbows or similar fittings, or by fixing
PVC inspection boxes whichever is most suitable.
6. Outlets: All outlets for fittings, switches etc. shall be fixed on boxes of suitable metal for either
surface mounting system or flush mounting system. In case of welded mild steel sheet
box the wall thickness shall not be less than 16 gauge. Except where otherwise stated
3mm. thick insulated laminated sheets shall be fixed on the front with screws. Where
conduits are terminated special care shall be taken for securely fixing conduits to outlets
so as to prevent any possibility of damages to cables when drawn. Proper sealing
materials shall be used while terminating conduits with the boxes.
![Page 57: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/57.jpg)
Page 57 of 91
7. Cables to be used: Unless stated otherwise only single core PVC insulated cables of approved manufacturers
shall be used for wiring in conduit system. The number of single core cables drawn in
one conduit shall not be greater than maximum set out in Table-II of Indian Standard (I.S
732-1963) Code of Practice (revised) for electrical wiring installation (system voltage not
exceeding 650 volts).
8. Looping in system: Distribution wiring in conduit to light, fan plug points etc. shall be done in looping
system. In this system no joints or connections shall be made anywhere of the system
except at terminating points such as at terminals of switches, ceiling roses, etc. and in
case of socket outlets at the socket terminals.
9. Earthing continuity wires: All three pin 6 Amps plug points should be provided with earthing attachment by 1 no.
1.0 sq.mm. PVC insulated copper wire for concealed / wiring, unless specified otherwise.
Three/ five pin 16 Amps power plug point should be provided with earthing attachment
by 1 no. / 1.5 sq.mm. / 2.5 sq.mm. PVC insulated copper wire for concealed / surface
wiring, unless specified otherwise.
TECHNICAL SPECIFICATION FOR CONCEALED WIRING SYSTEM 1. Concealed wiring system shall comply with all requirements for surface conduit wiring
system as specified above and in addition conform to the requirements specified below:
2. Making of Chase: The chase in the brick wall shall be neatly made by machine and be of ample dimensions
to permit the conduit to be fixed in the manner desired.
3. Fixing of conduit in chase: The conduit pipes shall be fixed by means of staples, J-Hooks or by means of saddles not
more than 60cm. apart. Fixing of standard bends or elbows shall be avoided as far as
pipes with a long radius which will permit easy drawing in of conductors. All threaded
joints of metallic conduits shall be treated with some approved preservative to secure
protection against rust.
4. Inspection Boxes: Suitable inspection boxes shall be provided when necessary to permit periodical
inspection and to facilitate removal of wires. These shall be mounted flush with wall /
ceiling.
For longer runs of conduit involving more than one bend, one inspection box / draw-in
box shall be used after one bend.
5. Types of accessories to be used: All outlets such as switches, socket outlets, shall be flush mounting type with MS boxes
with a cover of approved insulating materials. The switches and other outlets shall be
mounted inside such boxes as would be approved. The metal box shall be efficiently
earthed with conduit by means of earthing attachment with suitable size of PVC insulated
copper wires, running inside the conduit.
6. Conduits i) PVC / Polythene – Medium gauge pipes of reputed make having 3mm. wall
thickness shall be used.
For roof slabs – These shall be pre-laid during casting of floor/roof slab. No. of
wires drawn through the same shall not exceed the number of specified I.S Code.
For vertical drops in wall to switch boards – Minimum size shall be 13mm bore
through which not more 2 Nos. 1/1.40 and G.I earth wire shall be drawn.
ii) Maximum Capacity of conduits for drawing in of PVC insulated cables shall be as
follows:
![Page 58: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/58.jpg)
Page 58 of 91
TABLE-I
Nominal cross
Sectional area
of conductor
in sqmm.
20mm. 25mm. 32mm. 38mm. 51mm. 64mm.
B B B B B B
1.50 4 8 12 -- -- --
2.50 3 6 10 -- -- --
4.00 2 5 8 -- -- --
6.00 -- 4 7 -- -- --
10.00 -- 3 5 6 -- --
16.00 -- 2 3 5 7 8
25.00 -- -- 2 3 6 7
35.00 -- -- -- 2 5 6
50.00 -- -- -- -- 3 5
70.00 -- -- -- -- 3 4
Note : 1. The above tables shows the maximum capacity of conduits for a simultaneous
drawing in of cables.
2. Conduit sizes are the nominal external diameters.
7. Fish Wire – 18 SWG G.I wire shall be used and it shall protrude the conduit ends by 9
inches.
8. Conduit laying in floor/roof slabs before casting:
PVC conduit / Polythene pipe shall be laid straight as far as practicable and properly
placed including binding with the steel reinforcement rods with 22 SWG G.I wire so that
proper positions of conduits are maintained.
While laying the conduits for concealed wiring in the ceiling or in the beams and
columns and before casting, the Contractor shall ensure that both ends of the conduit are
plugged by means of dead-end socket or otherwise so that any foreign matter cannot enter
the conduit and choke them.
All precaution must be taken while laying the conduits on the slabs, R.C walls, columns
etc. and the Contractor shall rectify at his own cost if any defects are found during
process of drawing cables through the concealed pre laid conduits.
Each PVC / polythene conduit shall be provided with protruding length of not less than 9
inches on free end of the conduits.
All ceiling outlets shall be terminated in a round C.I / G.I circular box/deep box to suit
standard size ceiling rose or / and rectangular C.I / M.S junction box or Fan Hook Box as
the case may be.
It will be mandatory for the Contractor to get the layouts approved by the PMC /
Architect when the conduits are laid and bound to steel reinforcement rods, before he can
release the work for casting of floor/roof.
9. Connector Boxes, Draw-in-Boxes; Junction Boxes: These shall be constructed from 16 SWG M.S sheet and have M.S cover. Minimum size
for connector boxes is 6” x 4” and for Draw-in-Boxes 4” x 4”..
10. Fan Hook Boxes: These shall be 100mm. (4”) dia. x 75mm. (3”) deep, constructed from 16 SWG M.S
sheet, and provided with one 12mm. dia. M.S rod 300mm. (12” long).
![Page 59: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/59.jpg)
Page 59 of 91
11. Painting: All surface mounted switch boards, connector boxes & draw-in-boxes and other C.I. /
M.S. accessories shall be painted with two coats of anti-rust paint in addition to other
painting instruction given elsewhere.
TECHNICAL SPECIFICATION FOR CABLE INSTALLATIONS
1. General: All Medium Voltage and Low Voltage XLPE insulated and cables shall conform to IS
1554 Part-I-1988 and of 1,100 volt grade.
Old and used cables must not be used for installation. Only one make of cable shall be
used. All cables brought to site must be tested and got approved by the PMC / Architect
before these can be laid. The cables shall be dispatched to site on wooden drums with
ends sealed. Exact lengths shall be determined by the Contractor after measurement at
site.
The underground installation of cables shall be generally conforming to I.S 1255-1967,
Code of Practice for installation and maintenance of underground cables.
2. Laying of Cables: a) Direct in Ground
Trenches shall be 750mm. deep (minimum) for LT cables from ground level and
trenching work shall include all pumping and bailing out water. These trenches shall be
wide enough to accommodate all the cables with brick separations as per the
requirements specified in the relevant I.S.
When more than one multi-core cable is to be laid in the same trench, a minimum
horizontal inter-axial spacing between cables will be as per relevant I.S.
After excavation of the trench of proper size, the bottom of the trench shall be dressed
and leveled and filled with a 75mm. layer of fine sand. The cable shall then be laid with
bricks on both sides of the cable continuously. After having the space within the bricks,
filled and packed up to a level of 75mm. (3”) above top of cable with fine sand, the top
layer of bricks shall be placed side by side in continuous series as protective cover. Total
No. of bricks required being 16 per meter run. The remainder of the trench shall be filled
with riddled soil, well rammed and watered to a level of 75mm. (3”) above surrounding
ground level. The ground level surface of the whole trench route shall be restored
properly after completion of cable laying.
b) Inside Building
Cables shall be laid on walls/ceiling/structure, unless specified otherwise, with M.S
brackets and suitable clamps or over claw type aluminum cleats fixed on M.S brackets,
spaced not more than 450mm. apart. G.I. Bolts of suitable sizes are to be grouted on the
wall properly for fixing the brackets.
c) Minimum bending radius permissible is 12D for MV cables and 20D for HV cables.
At joints and terminations, the individual core of multi-core cables should never be bent
so that the radius is less than 15 times the diameter over the insulation.
No cable jointing is allowed between two terminal points.
3. Cable Jointing: All cable joints shall be carried out by experienced and Licensed jointers under strict
supervision. Electro plated brass cable glands, aluminum/tinned copper cable sockets
and approved jointing materials must be used. The price for cable jointing and finishing
the ends of the cable shall include all materials and shall also provide for tools and plants
![Page 60: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/60.jpg)
Page 60 of 91
for the work. The cable armoring is to be properly terminated. All cable accessories and
other associated materials shall conform to Indian Standard Specification where
applicable. Proper earthing of cable glands and armoured shall be included in the job..
4. Testing of Cables: All cables shall be tested for insulation resistance with megger – 5,000V constant
pressure megger insulation tester for HT cable and 1,000 V constant pressure megger for
MV cables, before installation.
After installation and end termination, the cables shall be again subjected to the above
test. Insulation value for MV cables 1.0 meg ohm.
5. Testing of Installation: Before the completed installation is put into service or handed over to Owner, the
installation is to be subjected to the above tests to the satisfaction of the PMC / Architect.
The completed work will be taken over only if the results are acceptable to the Architect /
Owner.
TECHNICAL SPECIFICATION FOR EARTHING INSTALLATIONS The installation shall generally conform to IS 3043 – Indian Standard Code of Practice
for Earthing, as amended up to date.
1. Earthing: a) Pipe Electrode
The earthing electrode shall be galvanized steel pipe of Class B medium quality – 50mm.
(2”) dia. bore and 3.04M. (10’) long. A hole shall be provided at 100mm. (4”) from the
top end to receive a 13mm. (1/2”) dia galvanized bolt and the bottom end shall be chisel
cut for easy penetration into soil.
A suitable trench shall be excavated about 0.45m. (1’-6”) deep and the pipe electrode
driven to an average depth of 3.35m. (11’-0”) below ground level. Top end of the
electrode shall be at an average depth of 0.30m. (1’) below the ground surface.
One no. 6 SWG G.I wire (unless otherwise specified) shall be connected securely on the
properly cleaned surface at the top end of pipe electrode by means of 1 100mm. (4”) long
x 13mm. (1/2”) dia. G.I bolt nut and double washers. The earth lead conductor shall be
protected mechanically be means of a continuous length of G.I pipe (Class A) having
13mm. (1/2”) inside diameter up to a height of 060m. (2”) above ground and the same
shall be completely filled with bitumen compound and topped up to overflowing.
b) Plate Electrode
Where plate electrode for earthing is to be employed, the size of the plate shall not be less
than 0.6x0.6m.x 6.3mm. for G.I plate in thickness and 0.6m. x 0.6m. x 3.15mm. thickness
in case of copper plate.
The plate shall have a drilled hole 14mm. dia. at the centre. The G.I flat of no. 50x6mm.
(1 no. 25x6mm. G.I flat for lightning conductor installation) should be connected to the
plate by means of a 65mm. long 12mm. dia galv. bolt, double nuts using double galv.
washers. In case of copper plate copper flat of not less than 32mm. x 6mm. shall be used
as the earth lead. The flat shall first be fastened on one side of the plate, leaving adequate
length of flat, which shall be taken over to the other side i.e. to the earth bus-bar,
switchboard, pole, continuous earth wire for G.H line, service bracket, lightning arrestor
or the object to be earthed and be fastened as per the details of IS:3043-1987. No joint on
the earth lead conductor is permitted. Every care be taken to ensure that the ends of the
wire/flats have been securely clamped by the bolt on cleaned surface of the plate and
established a good electrical contract.
The plate shall be buried vertically at a minimum of 2.5m. below the ground level for
sandy soil and 2m. below the ground level for normal soil. In order to place the same at
the prescribed depth, the dimension of pit to be excavated shall be 0.9m. x 0.9m. x 3m.
![Page 61: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/61.jpg)
Page 61 of 91
deep. The C.I plate shall be placed in position by the Contractor only after the inspection
of excavated pit and approval is obtained from the Architect /Engineer.
After placing the plate the earth lead conductor shall be protected by means of a
continuous length of G.I. pipe (Class B) having 50mm. dia. bore or route depending upon
the size of the lead, right from the plate up to a height of 0.60m. (2’) above ground level.
The whole length of pipe shall be fill with bituminous compound of approved make and
brand. The molten compound shall be poured from the top end the pipe and topped upto
overflowing.
2. Masonry Inspection pit: The inspection pit for the earth station shall be approx 0.56m. x 0.56m. (1’-10” x 1’-10”)
outside dimensions and approx 0.45m. (1’-6”) deep when completed, having 5” thick
cement brick work with 1st class bricks in cement mortar (6:1) both inside and outside
plastered 19mm. (3/4”) thick and neatly cemented 1.60mm. (1/16”) thick, both inside,
outside and top. The opening on top shall be provided with a C.I ring with lockable cover
fixed flush with ground surface.
All the excavations shall be duly back filled, dressed and rammed.
3. Location for Earth Electrodes: Electrodes shall be buried at least 2m. (6’-6”) away from the building pole or object to be
earthed. However, earthing electrodes for L.C installations should be as close to the
down conductors as possible.
Electrodes, when installed in parallel, shall not be placed less than 2m. *6’-6”) apart and
preferably placed at distances greater than their lengths.
4. Earth Bus-bar: a) Galvanised M.S Flat:
The Bus-bar shall be of suitable size and length, as specified in the Schedule of Items,
heavily galvanized and having adequate number of drilled and tapped holes 30mm. apart,
complete with G.I bolts, nuts, washers for securely connecting the earth leads and earth
continuity conductors. The bus-bar shall be fixed on wall, having clearance of 6mm. from
wall with spacing insulators with at least the numbers 13mm. (1/2”) G.I rag bolts spaced
about 0.46m. (1’-6”) apart.
b) Copper Flats:
To be used, as specified, in the Schedule of Items, where earthing requirements are more
stringent. Brass, bolts, nuts washers shall be used for connections.
5. Value of Earth Resistance: In case of installations where the load does not exceed 5 KW the resistance to earth shall
on no account exceed 5 ohms. Where the load exceeds 5 KW the resistance shall not
exceed 1 ohm.
For sub-stations, the value is 1 ohm.
For L.C installations, the value is 1 ohm.
![Page 62: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/62.jpg)
Page 62 of 91
TECHNICAL SPECIFICATION FOR PASSIVE/ACTIVE LIGHTINING ARRESTOR
TECHNICAL SPECIFICATION FOR PASSIVE CONDUCTOR PROTECTOR
Specifications The installation shall conform to I.S : 2309-1969 as amended up to date.
1. Conductor for L.C. System: It shall be GI flat conforming to B.S 728/1961 unless specified otherwise.
2. Air Terminals: Air terminal shall be constructed of 15mm. N.B (Class-B ) medium quality G.I. pipe 1500
mm. long with a screwed G.I. solid conical cap 100mm. long ( overall ) on top and shall have
a screwed galvanized M.S. flange 75mm. dia. x 6mm. thick at bottom end with five point
discharge point and shall be grouted on the parapet, roof, etc. with rag bolts in cement mortar
unless specified otherwise.
3. Conductors on Parapet: The conductors shall be coursed along ridges, parapets, edges of the flat roof, over flat roof
where necessary in such a way as to joint each air terminals to the rest. The conductors shall
be fixed securely with proper saddles spaced not more than 2 ft. (0.6m.) apart.
4. Vertical Down Conductors: These conductors, direct from test point shall be connected to parapet conductors or air
terminals and shall be coursed through shortest possible routes without abrupt turns or
kinks. While passing through cornices, these shall pass through G.I pipe (Class B)
having adequate bore. These conductor shall be fixed securely with proper saddles
spaced not more than 2’ fit. (0.6m.) apart.
5. Protection against Damage and Corrosion: No upturns are permitted and any bend necessary shall have a permissible radius. The
end of G.I pipe protections on wall shall be properly sealed with bitumen compound to
prevent corrosion.
6. Metallic Objects near Conductors: The Conductors shall be so laid as to maintain a separation distance exceeding 2m. (6’-6”)
between (a) any electric conductor running in parallel, (b) metallic objects, viz. iron girders,
water tanks, iron stair case, water/gas pipes inside or by the side of the building.
All the external metallic objects viz. water tanks, gutters, rain water down pipes, water mains,
etc. shall be bonded to the nearest conductor by means of a short tail.
7. Joints & Bonds: All joints between conductors shall be made after cleaning and tinning the ends of conductors
to be joined, binding them together for about 100mm. (4”) with No. 14 SWG G.I wire and
then welding.
Joint between Air Terminals and conductors shall be made with proper lugs duly fixed to
conductors and bolts, nuts, washers etc.
Bonding shall be as short as possible. All joints & Bends are to be mechanically and
electrically sound.
8. Earthing Stations: Similar to installation earths as specified elsewhere. Minimum number of earth station is
two.
9. Installation Tests: After completion of works the ohm resistance of LC installation complete with air terminals
(without earth connection) shall be measured from the highest point and this shall be a
fraction of one ohm.
The resistance to earth of individual earth stations shall be tested by earth testing megger and
must not exceed 1.0 ohms.
The above tests shall be made in the presence of the representative of the PMC / Architect
and the results recorded.
![Page 63: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/63.jpg)
Page 63 of 91
TECHNICAL SPECIFICATION FOR ACTIVE CONDUCTOR PROTECTOR
(ESE TYPE LİGHTNİNG PROTECTOR)
1. The active conductor should be ESE (Early Streamer Emission) type certified by High
Volt Test Lab for 8/20 wave form at over 100kA.
2. As well as tested by CPRI Bangalore, India as per their available capacity.
3. The active conductor should derive the energy from the electrostatic field intensity
variations that is formed in the air, for which no extra energy source like wind energy,
solar energy or kinetic energy that is created by the vibrations are required. The inner
structure should not consist of either coils or condensers which could be flammable or
explosive during the discharge nor should it use Piezo crystals that might be broken
during the discharge or vibration.
4. The active conductor should be made from special materials to prevent the system from
chemical corrosion.
5. The conductor should have a protection mechanism that prevents any internal damage
due to the lightning discharge.
6. The active conductor should be designed as compact and small (weight below 3kg) to
maintain installation and transportation advantage.
7. The Basic Model of the Air terminal should have Protection Radius of 79m at 5 meter
clear height above highest structure. Data on other ranges if required shall be furnished
on case to case basis.
8. It should be approved from Ministry of Defense / Naval / costal surveillance dept. & to
have executed at least 3 Defense / Airport/costal surveillance projects in India.
![Page 64: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/64.jpg)
Page 64 of 91
LIST OF APPROVED MATERIALS FOR HVAC (1st, 3
rd & 5
th Floors) AND
ELECTRICAL WORKS (Ground to Top Floor) :-
The Contractor shall use materials in their works subject to inspection prior to dispatch, by Owner or his
authorized representative of any materials, as deemed necessary in accordance with the following list. All
materials not otherwise specified shall be in accordance with the latest Indian Standard Specification,
where such exists and prior approval of Owner / Architect. The Contractor shall be bound to offer sample
of materials, which are claimed to be conforming to I.S. Specifications, for testing at an approved Test
Laboratory.
Contractor shall purchase all materials from the makers or their authorized stockiest only. Necessary
documentary evidences must be produced to the Owner or their authorized representative on demand.
Contractor shall be bound to supply items of any make of the items as per the choice of the Owner /
Architect.
SL.NO. ITEMS APPROVED MAKES
1. VRF UNITS CARRIER / TOSHIBA / MITSUBISHI
2. Ducted / Cassette / Hi Wall Units CARRIER / TOSHIBA / MITSUBISHI
3. GSS Sheet SAIL / TATA / BHUSAN
4. Accoustic Insulation K-Flex / Armacell / A-Flex / Supreme
5. Copper Pipe RAJCO / Maxflow / Mandev
6. Pipe Insulation K-Flex / Armacell / A-Flex / Supreme
7. Adhesive Pidilite Duct King
8. Grill / Diffuser / Damper / Disc Valve Premier / Dynacraft / Systemair / Raja-MR
Ent
9. Cable Polycab / Havels / RR / Mescab / Gloster
10. Fibre Glass Rigid Board UP Twiga
11. Cable Tray Daga Power / Patni / Shivangana /
Equivalent
12. PVC Pipe & Fittings Supreme / Hanuman / Arrow
13. Conduit Polycab / Polypipe / Jiolite / AKG
14. Tube axial Fan / Centrifugal Fan / Propeller
Fan Sarla / SystemAir / Blowtech
15. Contactor & Thermal O/L relay with
B / I Spp. Feature L&T / Schneider / ABB
16. Ammeter & Voltmeter AE / Rishab
17. INDICATING LAMPS/PUSH BUTTONS TECHNIK / VAISHNO / ABB /
SCHNEIDER
18. MCCB / MCB / ISOLATORS L&T / Schneider / Seimens/Havells/ABB
19. Selector Switch Kaycee / Unique
20. LT PANEL BOARDS
ZENITH CONTROLS /CPRI APPROVED /
SYSTEM SYNDICATE / ELECTRO
ALLIED PRODUCTS
![Page 65: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/65.jpg)
Page 65 of 91
SL.NO. ITEMS APPROVED MAKES
21. 1.1 KV grade XLPE insulated copper
cable /Al. armoured cable.(ISI marked)
KEI / Polycab / Havell’s /RR/ Gloster /
Mescab
22. Modular Type Switch, Socket etc. Northwest / Crabtree/ MK / Legrand /
Havells
23. WEATHER PROOF SWITCHES &
SOCKETS
CLIPSAL / C & S GEWISS / HENSEL
24. INDUSTRIAL SOCKET OUTLET
(METAL CLAD)
INDO-ASIAN / LEGRAND / BCH
25. INDUSTRIAL SOCKET OUTLETS
(THERMO PLASTIC MOULDED &
SOCKET)
C & S GEWISS / HENSEL / GERARD /
BALLS / SCHNEIDER
26. PVC CONDUIT &ACCESSORIES GI BHARAT/SUPREME / KK
INDUSTRIES
27. PERFORATED CABLE TRAYS ELCON / PROFAB / PATNI /
EQUIVALENT
28. CABLE GLANDS - DOUBLE
COMPRESSION TYPE
DOWELL / COMET / HMI /
GRINDWELL
29. CABLE LUGS DOWELL / MULTI / UMA
30. FRLS PVC CONDUITS &
ACCESSORIES (HEAVY DUTY
ONLY)
VIP / NATIONAL / NELCO
31. FRLS SWITCHES FINOLEX / RR KABEL / POWER
FLEX / RAJNIGANDHA / ESBEE
![Page 66: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/66.jpg)
Page 66 of 91
SAFETY CODE
1. There shall be maintained First aid appliance including adequate supply of sterilized dressings
and cotton wool in a readily accessible place on site.
2. An injured person shall be taken to the public hospital without loss of time in cases where the
injury necessitates hospitalization. If a person, employed by the Contractor is found to be
suffering from any contagious disease; he/she shall be immediately removed from the site so as to
prevent the other working staff from getting infected with the disease.
3. Suitable strong scaffolds with adequate handrails should be provided for workmen for all works
that cannot be done from ground.
4. No portable single ladder shall be over 4 meters in length /height. The width between the side
rails shall not be less than 30cm (clear) and the distance between two adjacent rungs shall be
engaged for holding the ladder.
5. The excavated material shall not be placed within 1.5 meters of edge of he trench or half of the
depth of trench whichever is more. All trenches and excavations shall be provided with necessary
shoring, strutting fencing and lighting.
6. Every opening in the floor of a building or in a working platform is provided with suitable means
to prevent the fall of persons or materials by providing suitable fencing or railing whose
minimum height shall be one meter.
7. No floor/ roof or other part of the structure shall be so overloaded with debris or materials so as to
render it unsafe.
8. Workers employed on mixing and handling materials such as asphalt, cement mortar or concrete
and lime mortar shall be provided with protective footwear and rubber hand gloves.
9. Those who are engaged in welding works should be provided with welder’s protective eye-
shields and gloves.
10. No paint containing lead or lead products shall be used except in the form of paste or ready-to-use
paint.
11. Suitable facemasks shall be supplied for use by workers when the paint is applied in the form or
spray of surface having lead paint dry rubbed and scrapped.
12. Overalls shall be supplied by the contractor to the painters and adequate facilities shall be
provided to enable the working painters to be during the periods of cessation of work.
13. Contractor shall provide safety belts to all the workers, craftsman supervisors and engineers who
are engaged in working on any external face or openings above ground floor level similarly
helmets shall be provided subject to head injuries.
14. Hoisting machines & tackle used in the works including the attachments, anchorage and supports
shall be in perfect condition.
![Page 67: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/67.jpg)
Page 67 of 91
15. The ropes used in hoisting or lowering material or as means of suspension shall be of durable
quality and adequate strength and free from defects.
16. Efficient safeguards for any electrical installation, which are already energized during
construction, should be provided for workers.
17. When workers are employed in sewers and manholes, which are in use the contractor shall ensure
that the manhole covers are opened and are ventilated at least for an hour before the workers are
allowed to get in the manholes so opened shall be cordoned of with suitable railings and provided
with warning signals or boards to prevent accident to the public
18. Safety provisions should be brought to the notice of all concerned by display on a notice board at
a prominent place at work spot. The person responsible for the compliance of the safety code is
named therein by the contractor.
19. To ensure effective enforcement of the rules and regulations relating to safety precautions the
arrangements made by the contractor shall be open to inspection by the labour officer, engineers
of the dept. or their representatives.
![Page 68: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/68.jpg)
Page 68 of 91
TENDER DRAWINGS:-
![Page 69: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/69.jpg)
Page 69 of 91
![Page 70: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/70.jpg)
Page 70 of 91
![Page 71: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/71.jpg)
Page 71 of 91
TENDER FORM:-
Form –A
GENERAL INFORMATION
1. Name of Applicant / Company
2. Address for correspondence
3. Contact Person: Telephone
Nos. Fax Nos.
Mobile
4. Type of Organization: a) An individual
b) A proprietary firm
c) A firm in partnership
(Attach copy of Partnership) d) A Limited Company
(Attach copy of Article of Association) e) Any other (mention the type)
5. Place and Year of Incorporation
6.
Name of Proprietor / Director / Partners
in the organization and their status along with
their qualifications.
7. PAN & GST Nos.
8.
Registration (Attached Copy)
9. Documents in support of the turn over for
past 3 (three) consecutive years ending on
either March 31, 2016 or March 31, 2017.
10. Any other Information
[SIGNATURE OF APPLICANT]
![Page 72: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/72.jpg)
Page 72 of 91
Form—B
Details of Office Space and Machineries:
S.
No.
Criteria Details
1. Office Space (Sqm)
2 Details of Machineries
3. Any others
[SIGNATURE O FAPPLICANT]
Form–C
Details of works completed during the last 3 years (Details to be furnished in the following format)
S.No. Name of work
Scope of Services
Value of Construction
Date of start/ completion
Name &
Address of the
client
Remarks
[SIGNATURE OF APPLICANT]
Form –D
Details of on-going works
(Details to be furnished in the following format)
S.No. Name of work
Scope of Services
Value of Construction
Date of Start / %completion
Name &
Address of
the client
Remarks
Note: The following documents are to be enclosed for each of the above work: i) Copy of Award letter
ii) Other relevant documentary evidence, if any.
[SIGNATURE OF APPLICANT]
![Page 73: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/73.jpg)
Page 73 of 91
Form –E
Turn over for past three years:
S. No. Financial Year Turn Over
1 2013-2014 / 2014-2015
2 2014-2015 / 2015-2016
3 2015-2016 / 2016-2017
Note:
In addition to the above the applicant has to submit the following documents/ Information: 1. Copy of IT Returns
2. Copy of valid GST Number.
3. Copy of PAN/ TAN card.
4. Copy of registration with other organization.
5. Details of litigations, if any.
6. Other relevant details, if any
Seal and Signature of Applicant
![Page 74: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/74.jpg)
Page 74 of 91
Form –F
A F F I D A V I T
Affidavit of …………………………….S/o ……………..……..R/o…………..…………...
I, the deponent above named do here by solemnly affirm and declare a under:
1. That I am the Partner / Authorized signatory of M/s……………………….. having its Office
at……………………...
2. That the information / documents/ Experience certificates submitted by M/s. ………………………. along with this" Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th floors) and Allied Electrical works (Ground to Top Floor) for Intellectual Property Office, Bouddhik Sampada Bhawan, Salt Lake, Kolkata – 700 091 are genuine and true and nothing has been concealed.
3. I shall have no objection in case Patent Office verifies them from issuing authority (ies). I shall
also have no objection in providing the original copy of the document(s), in case CGPDTM demand so for verification.
4. I hereby confirm that in case, any document, information and/or certificate submitted by me
found to be incorrect/false/fabricated, Patent Office at its discretion may disqualify/reject my application for prequalification out rightly and also debar me M/s………………………….. from participating in any future tenders / PQ.
DEPONENT
I, …………………………….the Partner / Authorized signatory of……………………, do hereby confirm that the contents of the above Affidavit are true to my knowledge and nothing has been concealed there from and that no part of it is false.
Verified at Kolkata this ……….day of…………..2018.
DEPONENT
Form –G
Checklist for Institution
Sl.
No.
Name of the Particulars
Documents Required Attached
(Yes/No)
1. Proof of the registration of the organization Copy of Registration Certificate
2. Proof of PAN & GST Copy of Certificate
3. Organization average annual turnover for past
three consecutive Financial years [( 2013-2014,
2014-2015, 2015-2016) OR [( 2014-2015, 2015-
2016, 2016-2017)]
Copy of Supporting Documents
4. Credentials Work Order / Completion
Certificate (if any)
5. IT Returns for last 3 (three) years[( 2013-2014,
2014-2015, 2015-2016) OR [( 2014-2015, 2015-
2016, 2016-2017)]
Copies to be submitted
![Page 75: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/75.jpg)
Page 75 of 91
Form – H
DECLARATION
(on letter head of Company)
I / We hereby declare that I / We have read and understood the Terms and Conditions of the
contract, Specifications, Drawings and Schedule of Quantities etc. and hereby agree to abide by
them. In token thereof, I / We have signed below and at the end of the Schedule of Quantities,
failing which the tender is liable to be rejected.
I / We understand that our Tender will not be considered if the rates for items are not written
both in FIGURES and WORDS.
I / We hereby confirm that only the relevant entries asked for, have been made within the Tender
documents issued to us. I / We also confirm that in the event of any entry in this Tender
document other than the relevant entry or condition shall make this Tender invalid.
SIGNATURE OF TENDERER
WITH SEAL AND ADDRESS
Place: ………………..….
Date: …………………….
![Page 76: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/76.jpg)
Page 76 of 91
Form – I
Format of Inspection Certificate
This is to certify that Sri………………………………………………..……………………….of M/s.
................……………………………………………………………………have inspected the site on
………………… in connection with the work of Execution of Wooden and Glass Interior Work of
Cabins, Supply and Erection of Modular Furniture Including Installation of Electrical Switches;
Networking Switches; Supply and Fixing of Networking Terminals Including Integration with Existing
LAN.
Signature of the Officer of the Patent Office Seal and Signature of Applicant Date: Place:
![Page 77: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/77.jpg)
Page 77 of 91
GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY
The Patent Office at Bouddhik Sampada Bhawan, CP – 2, Sector – V, Saltlake, Kolkata – 700 091
TENDER DOCUMENT: PART – II (FINANCIAL BID)
SUPPLY, INSTALLATION, TESTING & COMMISSIONING
OF
FULL VRF AIR CONDITIONING UNIT (1ST, 3RD & 5TH FLOORS)
AND ALLIED ELECTRICAL WORKS (GROUND TO TOP FLOORS)
FOR
INTELLECTUAL PROPERTY OFFICE,
BOUDDHIK SAMPADA BHAWAN, SALT LAKE,
KOLKATA – 700 091
Name & Address of Tenderer: __________________________
__________________________
__________________________
![Page 78: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/78.jpg)
Page 78 of 91
FORM OF BID
Name of Work:-
Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning Unit (1st, 3rd & 5th
floors) and Allied Electrical works (Ground to Top Floors) for Intellectual Property Office, Bouddhik
Sampada Bhawan, Salt Lake, Kolkata – 700 091
To,
The Controller General of Patents,
Design and Trademarks
Bouddhik Sampada Bhawan,
CP – 2, Sector – V, Salt Lake
Kolkata - 700091
Respected Sir,
1. In accordance with the Conditions of Contract, Specifications, Drawings and Bill of
Quantities (BoQ) etc. for execution of the above named works, we the undersigned offer
to construct and install such works and remedy any defect therein in conformity with the
aforesaid contract documents quoted by us for different items included in the sheet
named “Price Schedule” of Financial Bid (Part-II) (Rate to be quoted) The total amount
of Bill of Quantities being the Contract Price comes to
Rs…………………………….……………(Rupees………………………………………
…..….……………………………….only).
2. We undertake, if our tender is accepted, to commence the works as stipulated in Clauses
of General Conditions of Contract, after the receipt of the notice to commence work and
to complete the whole of the works comprised in the Contract within the time stated in
Clause.
3. We agree to abide by this Bid and it shall remain binding upon us and may be accepted at
any time before the expiration of validity as per sub-cause: [Bid Validity (Bids shall
remain valid for a period of 270 (Two Hundred Seventy) days from the last date of
receiving the tenders].
4. Unless and until a formal Agreement is prepared and executed, this Bid, together with
your written acceptance thereof, shall constitute a binding Contract between us.
5. We understand that you are not bound to accept the lowest or any bid you may receive.
Dated this…………….day of……………………..…………2018
Signature………………………………..….………………………..………….……..in the
capacity of………………..……………………….duly authorized to sign bids for and on
behalf of ……………………………..……………………………………………..(in block
letters or typed)
Address:………………………………………………………….…………………….
Witness………………………………………………………………………………..
Address:………………………………………………………………….…………….
Occupation…………………………………………………………………………..
![Page 79: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/79.jpg)
Page 79 of 91
“Price Schedule” of Financial Bid (Part-II):-
This BOQ template must not be modified / replaced by the bidder and the same should be submitted after filling the relevant column,
else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder's Name and Value only
Bidder’s Name:……………………………………………………………………………………….………………
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF FULL VRF AIR CONDITIONING UNIT (1ST,
3RD & 5TH FLOORS) AND ALLIED ELECTRICAL WORKS (GROUND TO TOP FLOORS) FOR
INTELLECTUAL PROPERTY OFFICE, BOUDDHIK SAMPADA BHAWAN, SALT LAKE, KOLKATA – 700
091
SL.
No.
Description of Works Qty Unit Rate (Rs.)
inclusive of all taxes, fees,
levies, etc.
Amount (Rs.)
inclusive of all taxes, fees, levies,
etc.
HVAC
PART A (HIGH SIDE)
1.0 Outdoor Units (The compressor shall be
highly efficient inverter Scroll type.
Supply of Variable Refrigerant Flow System
Comprising of All Inverter Scroll
compressors, with R-410 A Refrigerant with
COP @100% load & at 35 Deg C DB / 24
Deg C WB ambient condition, and 27 Deg C
DB / 19Deg C WB Indoor Temperature
should be min 3.9. Cooling mode operating
range -5 Deg C to 48 Deg C. Having Indoor
Duct able type units and designed for the
following capacity: (min 2 Nos. inverter
compressors)
i)
20 HP
4
Nos.
ii)
24 HP
2
Nos.
iii)
28 HP
2
Nos.
2.0 Indoor Units
Supplying of VRF indoor units which will
make the entire system as complete and
functional and prove the practical results as
per the design guidelines.
A VRF Ducted Unit ( Hi static )
i)
10 HP
15
Nos.
ii) 7.0 HP 1 Nos.
B HI-Wall
i) 2.0 HP 4 Nos.
ii) 2.5 HP 12 Nos.
iii) 1.25 HP 3 Nos.
C Cassette
i) 4.0 HP 2 Nos.
![Page 80: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/80.jpg)
Page 80 of 91
3.0 REF NET Joints
Supplying of Refnet joints which will make
the entire system as complete and functional
and prove the practical results as per the
design guidelines with all lead and lifts, all
levels - Imported fittings Refnet –joints.
32
Nos.
TOTAL PART A (HIGH SIDE) Rs. =
PART B (LOW SIDE)
1.0 Installing, Testing and Commissioning of
Variable Refrigerant Flow System
Comprising of All Inverter Scroll
compressors, with R-410 A Refrigerant with
COP @100% load & at 35 Deg C DB /24
Deg C WB ambient condition, and 27 Deg C
DB /19Deg C WB Indoor Temperature
should be min 3.9. Cooling mode operating
range -5 Deg C to 48 Deg C. Having Indoor
Duct able type units and designed for the
following capacity: (min 2 Nos. inverter
compressors )
i) 20 HP 4 Nos.
ii) 24 HP 2 Nos.
iii) 28 HP 2 Nos.
2.0 Indoor Units
Installing, Testing and Commissioning of
VRF indoor units which will make the entire
system as complete and functional and prove
the practical results as per the design
guidelines.
A VRF Ducted Unit (Hi static )
i) 10 HP 15 Nos.
ii) 7.0 HP 1 Nos.
B HI-Wall
i) 2.0 HP 4 Nos.
ii) 2.5 HP 12 Nos.
iii) 1.25 HP 3 Nos.
C Cassette
i) 4.0 HP 2 Nos.
3.0 Supplying Installing, Testing and
Commissioning Corded Remote.
12
Nos.
4.0 Refrigerant Piping
![Page 81: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/81.jpg)
Page 81 of 91
Supplying, Installing, Testing and
Commissioning of Refrigerant piping which
will make the entire system as complete and
functional and prove the practical results as
per the design guidelines with all lead and
lifts, all levels - Refrigerant Piping. The
piping quantities shall be as follows:
Interconnecting copper refrigerant pipe work
duly insulated with elastomeric nitrile rubber
type tubular insulation between indoor &
outdoor units as per specifications. All piping
inside the room shall be properly supported
with hanger and all external piping shall run
in covered cable tray.
a) 41.3 mm (insulation = 19 mm thick) 35 RMT
b) 38.1 mm (insulation = 19 mm thick) 50 RMT
c) 34.9 mm (insulation = 19 mm thick) 56 RMT
d) 31.8 mm (insulation = 19 mm thick) 58 RMT
e) 28.6 mm (insulation = 19 mm thick) 200 RMT
f) 22.2 mm (insulation = 19 mm thick) 217 RMT
g) 19.1 mm (insulation = 19 mm thick) 177 RMT
h) 15.9 mm (insulation = 13 mm thick) 217 RMT
i) 12.7 mm (insulation = 13 mm thick) 163 RMT
j) 9.5 mm (insulation = 13 mm thick) 130 RMT
k) 6.4 mm (insulation = 13 mm thick) 105 RMT
5.0 PVC Drain Piping
Supplying, Erecting, Installing, Testing and
Commissioning of PVC drain piping which
will make the entire system as complete and
functional and prove the practical results as
per the design guidelines with all lead and
lifts, all levels - PVC drain piping complete
with fittings, supports and insulated with 6
mm thick closed cell elastomeric nitrile
rubber insulation.
a) 25 mm dia 138 RMT
b) 32 mm dia 171 RMT
c) 40 mm dia 65 RMT
6.0 REF NET JOINTS
Installing, Testing and Commissioning of
Refnet joints which will make the entire
system as complete and functional and prove
the practical results as per the design
guidelines with all lead and lifts, all levels -
Imported fittings Refnet –joints.
32
Nos.
7.0 CONTROL CUM TRANSMISSION
WIRING
![Page 82: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/82.jpg)
Page 82 of 91
Supplying, Erecting, Installing, Testing and
Commissioning of Control wiring which will
make the entire system as complete and
functional and prove the practical results as
per the design guidelines with all lead and
lifts, all levels - Power wiring for fixing
control cum trans-mission wiring thru PVC
Conduit between indoor and outdoor unit.
a) 3 C x 1.5 Sq mm Shielded Cu Cable 1172 RMT
8.0 SHEET METAL DUCTING
Supplying, Installing, Testing and
Commissioning of GSS ducts for
modification & mouth connection which will
make the entire system as complete and
functional and prove the practical results as
per the design guidelines with all lead and
lifts, all levels - GSS Ducting as per tender
specifications. The work shall include all
ancillary items like supports, clamps, anchor
fasteners, etc.
a) (24G) Ducting 144 Sqm.
b) (22G) Ducting 37 Sqm.
9.0 Supply, Installation, testing &
Commissioning of fire retardent, double
layer canvas connections minimum 6" length
suitable dimensions as per Duct sizes at both
inlet & outlet of all AHU's, CSU's,
Ventilation Units etc.
16
Nos.
10.0 Al. Powder coated grilles
Supplying, Installing, Testing and
Commissioning of Al. powder coated grilles
which will make the entire system as
complete and functional and prove the
practical results as per the design guidelines
with all lead and lifts, all levels - Powder
Coated Extruded Aluminium Grills with End
Flanges.
1.7
Sqm.
11.0 Diffusers
Supplying, Installing, Testing and
Commissioning of Diffuser which will make
the entire system as complete and functional
and prove the practical results as per the
design guidelines with all lead and lifts, all
levels -Powder coated, extruded aluminium,
diffusers.
1.2
Sqm.
12.0 COLLAR DAMPER
Supplying, Installing, Testing and
Commissioning of Collar dampers which
will make the entire system as complete and
functional and prove the practical results as
per the design with all lead and lifts, all
levels -Collar Damper of opposed blade type
made out of GI and matt black finish.
1.75
Sqm.
![Page 83: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/83.jpg)
Page 83 of 91
13.0 Volume Control Dampers
Supplying, Installing, Testing and
Commissioning of Volume Control Dampers
which will make the entire system as
complete and functional and prove the
practical results as per the design guidelines
with all lead and lifts, all levels.
1.2
Sqm.
14.0 FIRE DAMPERS
Supply, installation, testing and
commissioning of fire damper of suitable
gauge as per specifications, standards and
approved drawing (for supply air duct) to be
integrated with the fire safety system and to
switch off the AHU. Fusible Link type. Price
of Fusible link to be included in the quoted
price. ( Fire Dampers will be installed at each
AHU supply and return air path)
2.75
Sqm.
15.0 Acoustic insulation
Supplying, Installing, Testing and
Commissioning of acoustic insulation which
will make the entire system as complete and
functional and prove the practical results as
per the design guidelines with all lead and
lifts, all levels - acoustic insulation inside
ducting with fiberglass rigid board of
density 48 kg/cu.m finished with 28G
perforated aluminium sheet with bolts
nuts GI washers as per specification & as
required.
96
Sqm.
16.0 M.S. Structure / Work
Supplying, Installing, Testing and
Commissioning of MS structure work which
will make the entire system as complete and
functional and prove the practical results as
per the design guidelines with all lead and
lifts,- M.S. plate / channels etc. for fixing
different equipments as per instruction of
Consultant/Engineer - in - charge. Inclusive
of 2 coats of red oxide paint and black finish
as per standards to avoid rusting of MS steel.
0.78
M.T.
17.0 Miscellaneous Items
Supplying, Installing, Testing and
Commissioning which will make the entire
system as complete and functional and prove
the practical results as per the design
guidelines with all lead and lifts,- perforated
type cable tray, Prefabricated - cable trays -
made out of 2 mm thick galvised sheet.
Rate shall include necessary angle iron
support and M10 full threaded down rods,
M10 anchor fasteners etc., complete.
Maximum height of suspension shall not
exceed 500mm. The support shall be
provided at every 1 Mtr.
a) Size of Cable Tray :200 mm x 50 mm 93 Rmt.
![Page 84: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/84.jpg)
Page 84 of 91
b) Size of Cable Tray :300 mm x 50 mm 69 Rmt.
c) Size of Cable Tray :150 mm x 50 mm 65 Rmt.
18.0 Modification & rectification of False ceiling
for the purpose of installation of ceiling
mounted cassette type indoor units including
making good the false ceiling as per the
existing design & pattern of false ceiling (
including repairing / patch up works,
finishing with 12.5 mm gypsum board with 1
coat of Primier & 2 coats of paint etc.)
700
Sqft.
19.0 Scaffolding, Lifting & Shifting of ODUs &
IDUs L.S
20.0 Charges for Trap Door made of Aluminium
Channel & Particle Board for IDU
Maintenance
16
Nos.
21.0 Minor Civil Work L.S
22.0 Supply & Charging Refrigerant- R 410A 93 Kg.
23.0 Dismantling of old units & pipes L.S
TOTAL PART B (LOW SIDE) Rs. =
PART C (ELECTRICAL)
For each floor there will be two separate
PDB. One for VRF ODU SITC and other
for all IDUs complete with MCCB
ammeter, Voltmeter.
Supply installation, testing and
commissioning of Low voltage switchgears,
free standing, extensible type,
compartmentalised cubicle type, top / bottom
entry panel made of 14 SWG (2.03 mm)
CRCA MS sheet suitable for 415V, 50 HZ,
AC, 3 phase and neutral system having the
following features :
Panel shall be designed to ensure that the
weight of the components is adequately
supported without deformation or loss in
alignment.
The doors of the cubicle shall be fitted with
neoprene gaskets with fastener’s for proper
compression of the gaskets.
Panel shall be multitier compartmentalised
cubicle type, extensible on either side and
shall be treated with all anticorrosive process
before painting with two coats of zinc
chromate printer and final approved shade of
enamel paint.
Bus bars shall be of continuous rated
electrolytic grade Copper adequate for
specified rated continuous and short circuit
current covered by proper graded heat
shrinkable PVC sleeves (colour coded). Bus
bars shall be supported by suitable
![Page 85: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/85.jpg)
Page 85 of 91
DMC/SMC or compatable insulator supports.
High tensile bolts and springs washers are to
be provided on all bus bars and suitable
drilled holes for connection joints. The bus
bars shall have a through fault withstand
capacity of 50kA RMS symmetrical for one
second. The interconnections between the
bus bars and circuit breakers shall be made
by continuous rated Cu strips suitably
covered by proper graded heat shrinkable
colour coded PVC sleeves. The earth busbar
shall run through the length of the panel and
terminated at two ends.
All control wiring in the panel shall be
carried out with 1.1 kV grade single core
PVC insulated copper conductors of
minimum 2.5 sq mm cross-section for
potential circuits and CT circuits, Wiring
should be neatly bunched, adequately
supported, properly routed and finally
crimped. Wires are to be identified by
numbered ferules at either end. Terminal
blocks used are of clamp type with barriered
terminals and are to be numbered.
Adequate cabling space should be available
in the panel with cable supports, cable alleys,
etc. Provision for top/ bottom entry and
termination of required number of A2XFY
cable shall be provided. The position of
control switches, push buttons, levers, etc
requiring manual operation shall be at a
height not exceeding 1850 mm from the
finished floor level. The rate shall also
include providing and fixing space heater
with thermostat control temperature
controller including connecting the same
with the system with all other accessories viz
sockets, ets required. The panel shall also be
provided with cubicle illumination lamps as
per requirement including connecting the
same within the panel with all other
accessories required.
The panel shall also comprise of necessary
meters, CTs, protection MCBs/HRC fuses,
indication lamps relays, lifting bolts, label
inscriptions (metallic engraved identification
tags) describing the rating of the breakers,
bus couplers, designation of the feeders etc
including all other accessories, complete as
per IE rules and regulations conforming to
relevant IS . The rate shall include necessary
cutting chases, and mending good damages
during installation. The panel shall have the
following major components.
Note: All MCCBs should have Thermal
Magnetic releases.
1.0 PDB-1 at Gr. FLR for VRF ODU Unit
Incoming
1 no. 250A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
![Page 86: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/86.jpg)
Page 86 of 91
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos. protection fuses.
1 set of (0-250A) Ammeter, Accuracy Class
1.0 with 3 nos. 250/5A CTs and Ammeter
selector switch.
Bus bars
400A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
4 nos. of 100A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
Complete board as stated above 1 Set
2.0 PDB-3 at 1st. FLR for VRF ODU Unit
Incoming
1 no. 315A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos. protection fuses.
1 set of (0-300A) Ammeter, Accuracy Class
1.0 with 3 nos. 300/5A CTs and Ammeter
selector switch.
Bus bars
400A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
5 nos of 100A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
Complete board as stated above 1 Set
3.0 PDB-5 at 2nd FLR for VRF ODU Unit
Incoming
1 no of 400A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
![Page 87: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/87.jpg)
Page 87 of 91
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos. protection fuses.
1 set of (0-400A) Ammeter, Accuracy Class
1.0 with 3 nos. 400/5A CTs and Ammeter
selector switch.
Bus bars
500A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
5 nos of 100A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
Complete board as stated above 1 Set
4.0 PDB-7 at 3rd FLR for VRF ODU Unit,
PDB-9 at 4th FLR for VRF ODU Unit,
PDB-11 at 5th FLR for VRF ODU Unit.
Incoming
1 no of 200A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos.
1 set of (0-200A) Ammeter, Accuracy Class
1.0 with 3 nos. 200/5A CTs and Ammeter
selector switch.
Bus bars
300A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
3 nos of 100A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
Complete board as stated above 3 Sets
5.0 PDB-2 at Gr. FLR for VRF IDU Unit
1 no of 100A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos. protection fuses.
![Page 88: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/88.jpg)
Page 88 of 91
1 set of (0-100A) Ammeter, Accuracy Class
1.0 with 3 nos. 100/5A CTs and Ammeter
selector switch.
Bus bars
150A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
17 nos. (10-20)A, DP, MCB, 10 kA, C -
Curve.
Complete board as stated above 1 Set
6.0 PDB-6 at 2nd FLR for VRF IDU Unit
Incoming
1 no of 100A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos. protection fuses.
1 set of (0-100A) Ammeter, Accuracy Class
1.0 with 3 nos. 100/5A CTs and Ammeter
selector switch.
Bus bars
150A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
23 nos. (10-20)A, DP, MCB, 10 kA, C -
Curve.
Complete board as stated above 1 Set
7.0 PDB-4 at 1st. FLR for VRF IDU Unit,
PDB-8 at 3rd FLR for VRF IDU Unit
Incoming
1 no of 63A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos. protection fuses.
1 set of (0-60A) Ammeter, Accuracy Class
1.0 with 3 nos. 100/5A CTs and Ammeter
selector switch.
Bus bars
100A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
12 nos. (10-20)A, DP, MCB, 10 kA, C -
Curve.
![Page 89: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/89.jpg)
Page 89 of 91
Complete board as stated above 2 Sets
8.0 PDB-10 at 4th FLR for VRF IDU Unit
Incoming
1 no of 63A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos.
1 set of (0-60A) Ammeter, Accuracy Class
1.0 with 3 nos. 100/5A CTs and Ammeter
selector switch.
Bus bars
100A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
14 nos. (10-20)A, DP, MCB, 10 kA, C -
Curve.
Complete board as stated above 1 Set
9.0 PDB-12 at 5th FLR for VRF IDU Unit
Incoming
1 no of 63A, TP&N MCCB, 36kA with
Thermal Magnetic Release with rotary drive
kit including door interlock, defeat and
padlocking facility having overload and short
circuit protection.
1 set of (0-500V) Voltmeter, accuracy class
1.0 with Voltmeter Selector Switch and
indicating lamp with 3 nos.
1 set of (0-60A) Ammeter, Accuracy Class
1.0 with 3 nos. 100/5A CTs and Ammeter
selector switch.
Bus bars
100A, TPN, Cu Bus bar with 100% Neutral
as that of Phases, of suitable size with
insulation sleeves.
Outgoing
16 nos. (10-20)A, DP, MCB, 10 kA, C -
Curve.
Complete board as stated above 1 Set
10.0 1.1 KV GRADE PVC INSULATED
COPPER CABLES
Supplying, Installing, Testing and
Commissioning which will make the entire
system as complete and functional and prove
the practical results as per the design
guidelines with all lead and lifts,- 1.1 KV
![Page 90: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/90.jpg)
Page 90 of 91
Grade PVC insulated Copper conductor
(YWY / YFY) Copper armoured power
cables as per specification. The rates quoted
shall be for laying in trays.
a) 3C x 2.5 sq.mm 1260 Rmt.
b) End Termination 45 Nos.
c) 3C x 4 sq.mm 925 Rmt.
d) End Termination 37 Nos.
e) 4C x 4 sq.mm 150 Rmt.
f) End Termination 10 Nos.
g) 4C x 10 sq.mm 200 Rmt.
h) End Termination 6 Nos.
i) 4C x 16 sq.mm 450 Rmt.
j) End Termination 11 Nos.
11.0 L.T.POWER CABLE TERMINATION
Supply and making cable termination
complete with double compressed brass
gland, lugs, brass ring & rubber ring for dust
& moisture proof entry of XLPE/PVC
armoured cables as below :
a) 3 1/2 x 50 sq. mm XLPE Al. Cable 70 Rmt.
b) End Termination 6 Nos.
c) 3 1/2 x 95 sq. mm XLPE Al. Cable 170 Rmt.
d) End Termination 4 Nos.
e) 3 1/2 x 150 sq. mm XLPE Al. Cable 100 Rmt.
f) End Termination 2 Nos.
g) 3 1/2 x 300 sq. mm XLPE Al. Cable 65 Rmt.
h) End Termination 2 Nos.
12.0 COMMERCIAL MODULAR TYPE
WITH WHITE FACE PLATE:
Supplying, Installing, Testing and
Commissioning which will make the entire
system as complete and functional and prove
the practical results as per the design
guidelines provided by the Sub-Consultants -
HVAC] with all lead and lifts, power points
by providing following switches / sockets
mounted on suitable size anti-corrosive
coated Metal boxes fixed flush/surface on to
![Page 91: GOVERNMENT OF INDIA MINISTRY OF COMMERCE & INDUSTRY … · 2018-01-16 · Kolkata – 700 091 0.1 Name of Work : Supply, Installation, Testing & Commissioning of Full VRF Air Conditioning](https://reader034.vdocument.in/reader034/viewer/2022050523/5fa6715d306b9269e17bdd5c/html5/thumbnails/91.jpg)
Page 91 of 91
the wall with all fixing and wiring
accessories.
a) 6/16 Amps, 3/5--pin single phase universal
socket with 16 Amps single pole switch with
indicating lamp.
50 Nos.
b) 20Amps, 3-pin (230V) single phase
industrial socket with plug top, controlled by
20 Amps DP MCB. Plug top included in
supply scope.
35 Nos.
c) 63Amps, 5-pin (440V) Three phase industrial
sockets with plug top, controlled by 32 Amps
FP MCB Outdoor IP 65 Thermoplastic type
.Plug top included in supply scope.
4 Nos.
d) 100Amps, 5-pin(440V) single phase
industrial socket with plug top, controlled by
63 Amps FP MCB Outdoor IP 65
Thermoplastic type. Plug top included in
supply scope.
20 Nos.
13.0 Miscellaneous Items
Supplying, Installing, Testing and
Commissioning which will make the entire
system as complete and functional and prove
the practical results as per the design
guidelines provided by the Sub-Consultants -
HVAC] with all lead and lifts,- Perforated -
cable trays - made out of 2 mm thick
galvised sheet. Rate shall include necessary
angle iron support and M10 full threaded
down rods, M10 anchor fasteners etc.,
complete. Maximum height of suspension
shall not exceed 500mm. The support shall
be provided at every 1 Mtr.
a) Size of Cable Tray :300 mm x 50 mm 100 Rmt.
b) Size of Cable Tray :150 mm x 50 mm 150 Rmt.
TOTAL PART C (ELECTRICAL) Rs. =
TOTAL PART(A)+(B)+(C)[(HVAC HIGH SIDE+HVAC LOW SIDE+ELECTRICALS)] Rs.=
Rupees in Words:……………………………………………………………………………………………………………..………..
Place:
Date: ___________________________
Seal with Signature of Bidder