GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2019 - 2028 Projects Only SUBMITTED BY THE GOVERNOR TO THE LEGISLATURE AS A DRAFT FOR CONSIDERATION AND APPROVAL PURSUANT TO RSA 228:99 OF THE LAWS OF NEW HAMPSHIRE PROJECTS LISTED ALPHABETICALLY PREPARED BY THE NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION January 16, 2018

Upload: others

Post on 28-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

GOVERNOR’S

RECOMMENDATIONS FOR THE

TEN YEAR TRANSPORTATION IMPROVEMENT PLAN

2019 - 2028

Projects Only

SUBMITTED BY THE GOVERNOR TO THE

LEGISLATURE AS A DRAFT

FOR CONSIDERATION AND APPROVAL

PURSUANT TO

RSA 228:99 OF THE LAWS OF NEW HAMPSHIRE

PROJECTS LISTED ALPHABETICALLY

PREPARED BY THE NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION

January 16, 2018

Page 2: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

01/16/18

Draft TYP December Total = 1,853.03$ (in millions)

FAST ACT Estimated Revenue = 1,825.70$ (in millions)

27.31$ (in millions)

1,853.01$

Notes: CMAQ, HSIP, RecTrails, TAP Programs at FAST ACT funded levels (with exception of CMAQ at 75% in FY19-20 and 93% in FY21-28)

2019-2028 Draft Ten Year Plan

Federal Aid ProgramHSIP (100%) and CMAQ (75%) FY 2019-2020, CMAQ (93%) FY 2021-2028

Non-Federal Formula Revenue =

Total Federal Revenue =

$181.7$185.6 $186.4 $185.9 $186.4 $185.8 $185.5 $184.7 $185.9 $185.1

$100.00

$120.00

$140.00

$160.00

$180.00

$200.00

$220.00

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

Draft TYP - January 11, 2018 FAST ACT Target

Page 3: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

SAB 2 I-93 Debt

Service

TIFIA Pledged

Paving & Bridge

2019 181.71$ 5.74$ 20.72$ 22.30$ 8.77$ 1.35$ 19.90$ 3.34$ 11.43$ 275.25 34.80$ 14.30$ 2.10$ 29.33$ 31.10$ 386.88 10.3%

2020 185.56$ 5.89$ 25.09$ 22.43$ 10.72$ 1.86$ 22.75$ 2.45$ 15.43$ 292.18 44.20$ 12.30$ 0.60$ 29.76$ 52.98$ 432.01 11.5%

2021 186.43$ -$ 20.16$ 22.43$ 8.50$ 2.15$ 20.18$ -$ 4.44$ 264.29 46.35$ 13.20$ 0.60$ 29.46$ 25.92$ 379.81 10.1%

2022 185.94$ -$ -$ 22.43$ 10.92$ 2.20$ 19.95$ -$ 2.15$ 243.58 33.10$ 13.90$ 2.10$ 32.00$ 14.66$ 339.33 9.1%

2023 186.36$ -$ -$ 22.43$ 13.54$ 2.20$ 19.01$ -$ 1.43$ 244.97 50.60$ 14.40$ 0.60$ 30.82$ 27.78$ 369.17 9.9%

2024 185.78$ -$ -$ 22.43$ 8.50$ 2.20$ 21.48$ -$ 1.24$ 241.62 61.70$ 13.30$ 0.60$ 31.49$ 18.20$ 366.91 9.8%

2025 185.50$ -$ -$ 22.43$ 8.50$ 2.19$ 17.39$ -$ 2.95$ 238.96 52.00$ 13.60$ 2.10$ 34.23$ 20.40$ 361.29 9.6%

2026 184.74$ -$ -$ 22.43$ 8.50$ 23.41$ -$ -$ 0.55$ 239.63 57.60$ 13.80$ 0.60$ 33.60$ 23.36$ 368.59 9.8%

2027 185.86$ -$ -$ 22.43$ 8.50$ 23.41$ -$ -$ 0.19$ 240.38 51.80$ 14.10$ 0.60$ 39.16$ 21.54$ 367.59 9.8%

2028 185.15$ -$ -$ 22.43$ 8.50$ 23.41$ -$ -$ 1.77$ 241.25 61.40$ 14.40$ 2.10$ 34.19$ 20.18$ 373.52 10.0%

Program Total 1,853.03 11.64 65.96 224.13 94.94 84.36 140.66 5.79 41.60 2,522.10 493.55 137.30 12.00 324.03 256.11 3,745.10 100.0%

% of Total

Program73.5% 0.5% 2.6% 8.9% 3.8% 3.3% 5.6% 0.2% 1.6% 100.0%

Revenue 8 $1,853.01 $11.64 $65.96 $224.13 $325.57 $5.79 $41.60 2,528$ 493.55$ 137.30$ 12.00$ 324.03$ 256.11$ 3,750.69$

1,223.00$

Surplus/(Deficit) ($0.02) $0.00 $0.00 $0.00 $0.00 $0.00 5.59$ -$ -$ -$ -$ -$ 5.59$

Notes: 1. I-93 Payments based on GARVEE Bonds and Debt Service are Included

2. Betterment program maintained at current budget levels, SAB program includes local match and SAH program includes carryover from the State Aid Highway program

3. Total comprised from project matching costs Maine, Vermont, and other states

4. Figures include inflation

5. FHWA categories includes approximately $1.16 million annually to address railroad crossings

6. Self-funded FTA programs and projects are limited to available funds

7. Proposed Turnpike Capital program, and projects that may be constructed under current toll structure (no toll increase )

8. FHWA Revenue based on FAST Act anticipated apportionments through 2020 and level funded there after.

~ Dollars include indirect costs and inflation (2.55%) Dollars in Millions

SB367

DRAFT 2019-2028 Ten Year Plan

Total Program Dollars by FY

Highway and Bridge Other Modes

Highway Funded Non-Highway Funded

FY FHWA 1,4,5

TIFIA

Financing

I-93

Connecticut

River Bridge

GARVEEBetterment

2

Date 1-16-18

Transit 6 Airport

TYP FY

Total

% of Total

Program

$5.61

$2,527.69

SAH 2

Other 3

Matching

Funds

Sub TotalTurnpike

7

ImprovementTurnpike R&R Rail

5

$5.59

Page 4: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

01/16/18

FHWA

49%

TIFIA Financing( I-93)

< 1%CT River Bridge (GARVEE)

2%

Betterment

6%

SB367

9%

SAH

< 1%

Other Matching Funds

1%

Turnpike

Improvement

13%

Turnpike R&R

4%

Rail

< 1 %

Transit

9%

Airport

7%

DRAFT 2019-2028 Ten Year Plan

Share of Total Program Dollars by Program

Page 5: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

FISCAL

YEAR PAVEMENT BRIDGES

I-93

EXPANSION

MANDATED

FEDERAL

INDIVIDUAL

PROJECTS ROADSIDE RAIL TRANSIT AIRPORTS

DEBT

SERVICE

GRAND

TOTAL

2019 76.19 91.43 26.15 30.04 70.97 8.54 2.10 29.80 31.10 20.55 386.88

2020 74.85 110.66 26.88 31.74 73.63 8.26 0.60 29.76 52.98 22.66 432.01

2021 80.70 101.06 11.00 33.02 61.41 8.52 0.60 29.46 25.92 28.12 379.81

2022 78.53 62.42 16.50 32.47 64.19 8.52 2.10 32.00 14.66 27.96 339.33

2023 76.10 75.34 0.00 32.47 89.86 8.52 0.60 30.82 27.78 27.68 369.17

2024 75.04 57.54 0.00 32.47 115.68 8.52 0.60 31.49 18.20 27.37 366.91

2025 87.25 57.77 0.00 32.47 91.53 8.52 2.10 34.23 20.40 27.03 361.29

2026 82.28 62.89 0.00 32.12 91.71 10.52 0.60 33.60 23.36 31.51 368.59

2027 71.88 69.87 0.00 32.14 90.37 10.52 0.60 39.16 21.54 31.51 367.59

2028 72.18 74.34 0.00 32.14 93.62 13.27 2.10 34.19 20.18 31.51 373.52

Total 774.99 763.33 80.53 321.07 842.98 93.68 12.00 324.51 256.11 275.92 3745.10

% Grand

Total20.7% 20.4% 2.2% 8.6% 22.5% 2.5% 0.3% 8.7% 6.8% 7.4% 100.0%

~ Dollars include indirect costs and inflation (2.55%) 01/16/18

2019-2028 Ten Year Plan

All Funding

Page 6: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

01/16/18

PAVEMENT

21%

BRIDGES

20%

I-93

EXPANSION

2%

MANDATED

FEDERAL

9%

INDIVIDUAL

PROJECTS

23%

ROADSIDE

2%

RAIL

0.3%

TRANSIT

9%

AIRPORTS

7%

DEBT

SERVICE

7%

Draft 2019-2028 Ten Year Plan

Share of Total Dollars of Funding

Page 7: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 16

ALBANY (29597)

SHOULDER WIDENING AND PAVEMENT

RESURFACING TO ENABLE INSTALLATION OF

CENTERLINE RUMBLE STRIPS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,050,388Preliminary Engineering 2020 None-Highway

629,308Right of Way 2020 None-Highway

73,551Right of Way 2021 None-Highway

4,681,845Construction 2023 None-Highway

2,100,613Construction 2024 None-Highway

$8,948,205

$8,535,705

$8,535,705 $412,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 104

ALEXANDRIA (15937)

NH 104 250' WEST OF BERRY RD.

REHABILITATE/REPLACE A 66" X 84" CMP

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

225,610Construction 2019 CRDR *

$259,110

$225,610

$225,610 $33,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 1 of 232Includes inflation and indirects using program

Page 8: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 28

ALLENSTOWN (40362)

BRIDGE REHABILITATION, REDLISTED BRIDGE

CARRYING NH 28 OVER SUNCOOK RIVER (BR NO

107/098)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

102,550Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

157,748Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

2,156,935Construction 2021 Bridg-T1-2-Rehab-Rcn

$2,572,032

$2,417,232

$2,417,232 $154,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HILL ROAD OVER DARBY BROOK

ALSTEAD (40649)

BRIDGE REHABILITATION-HILL ROAD OVER DARBY

BROOK-BR. #159-134

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

43,139Preliminary Engineering 2021 SAB *

204,909Construction 2021 SAB *

$248,047

$248,047

$248,047 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 2 of 232Includes inflation and indirects using program

Page 9: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

DREWSVILLE ROAD OVER DARBY BROOK

ALSTEAD (40650)

BRIDGE REHABILITATION-DREWSVILLE ROAD

OVER DARBY BROOK-BR. #058/132

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

32,354Preliminary Engineering 2021 SAB *

150,985Construction 2021 SAB *

$183,339

$183,339

$183,339 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

COMSTOCK ROAD OVER DARBY BROOK

ALSTEAD (40661)

BRIDGE REPLACEMENT-COMSTOCK ROAD OVER

DARBY BROOK-BR. #046/141

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

132,716Preliminary Engineering 2022 SAB *

11,060Right of Way 2022 SAB *

884,775Construction 2022 SAB *

$1,028,550

$1,028,550

$1,028,550 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 3 of 232Includes inflation and indirects using program

Page 10: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 11

ALTON - GILFORD (40634)

PLANNING STUDY TO IDENTIFY PRIORITY NEEDS

FROM EAST OF MINGE COVE ROAD TO EAST OF

ELLACOYA PARK

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

250,000Other 2019 None-Highway

$250,000

$250,000

$250,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 11

ALTON (40624)

BRIDGE REHABILITATION FOR REDLIST BRIDGE

CARRYING NH 11 OVER MERRYMEETING RIVER

(BR NO 163/184)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

275,000Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

237,263Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

1,459,878Construction 2023 Bridg-T1-2-Rehab-Rcn

383,820Construction 2024 Bridg-T1-2-Rehab-Rcn

$2,355,961

$2,355,961

$2,355,961 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 4 of 232Includes inflation and indirects using program

Page 11: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

HORACE GREELEY ROAD

AMHERST (20231)

BRIDGE REPLACEMENT-HORACE GREELEY RD

OVER PULPIT BROOK-BR.#060/158

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

166,311Preliminary Engineering 2020 SAB *

5,258Right of Way 2020 SAB *

478,501Construction 2020 SAB *

$650,070

$650,070

$650,070 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MONT VERNON ROAD OVER CEASARS BROOK

AMHERST (40654)

BRIDGE REPLACEMENT-MONT VERNON ROAD

OVER CEASARS BROOK-BR. #112/071

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

121,657Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

884,775Construction 2022 SAB *

$1,011,961

$1,011,961

$1,011,961 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 5 of 232Includes inflation and indirects using program

Page 12: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

THORNTON FERRY ROAD OVER BEAVER BROOK

AMHERST (40657)

BRIDGE REPLACEMENT-THORNTON FERRY ROAD

OVER BEAVER BROOK-BR. #145/106

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

283,543Preliminary Engineering 2023 SAB *

5,671Right of Way 2023 SAB *

1,582,168Construction 2023 SAB *

$1,871,381

$1,871,381

$1,871,381 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 122

AMHERST (41413)

REHAB OF RED LIST BRIDGE CARRYING NH 122

(MAIN ST) OVER NH 101 IN THE TOWN OF

AMHERST (135/109)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

237,263Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

249,518Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

2,558,802Construction 2024 Bridg-T3-4-Rehab-Rcn

$3,045,582

$3,045,582

$3,045,582 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 6 of 232Includes inflation and indirects using program

Page 13: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 11

ANDOVER (20650)

REPLACE 5-SPAN BRIDGE CARRYING NH 11 OVER

NHRR(ABD).

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

3,239,083Construction 2020 Bridg-T1-2-Rehab-Rcn

$3,500,083

$3,239,083

$3,239,083 $261,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4

ANDOVER (40392)

US 4 OVER BLACKWATER RIVER REHABILITATION

OR REPLACEMENT.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

225,610Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

115,682Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

118,631Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

121,657Right of Way 2022 Bridg-T1-2-Rehab-Rcn

4,366,556Construction 2023 Bridg-T1-2-Rehab-Rcn

$5,231,936

$4,948,136

$4,948,136 $283,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 7 of 232Includes inflation and indirects using program

Page 14: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

LAWRENCE ROAD OVER BLACKWATER RIVER

ANDOVER (41407)

BRIDGE REPLACEMENT-LAWRENCE ROAD OVER

BLACKWATER RIVER-BR. #098/093

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

348,928Preliminary Engineering 2024 SAB *

5,815Right of Way 2024 SAB *

2,477,386Construction 2024 SAB *

$2,832,129

$2,832,129

$2,832,129 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CRAIG ROAD

ANTRIM (14942)

BRIDGE REPLACEMENT-CRAIG ROAD OVER

BROOK - 117/093 {RED LIST}

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

49,769Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

188,015Construction 2022 SAB *

$243,313

$243,313

$243,313 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 8 of 232Includes inflation and indirects using program

Page 15: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US ROUTE 3

ASHLAND - BRIDGEWATER (24904)

BRIDGE REHAB OF BRIDGE CARRYING US 3 NH25

OVER NHRR AND PEMIGEWASSET RIVER (BR NO

076/080)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

236,891Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

225,579Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

231,331Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

243,313Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

6,985,000Construction 2022 Bridg-T1-2-Rehab-Rcn

$7,937,114

$7,922,114

$7,922,114 $15,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAIN STREET, NH ROUTES 3 / 25

ASHLAND (41370)

RECONSTRUCT SIDEWALKS TO ADA COMPLIANCE

AND CONSTRUCT NEW SIDEWALKS ON MAIN

STREET US RTE 3/25

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

35,234Right of Way 2019 TA *

348,395Construction 2020 TA *

$454,084

$383,629

$383,629 $70,455Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 9 of 232Includes inflation and indirects using program

Page 16: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

GRIFFIN MILL ROAD OVER MAPLE FALLS BROOK

AUBURN (29316)

BRIDGE REHABILITATION-GRIFFIN MILL RD OVER

MAPLE FALLS BROOK-BR. #095/127

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

71,888Preliminary Engineering 2022 SAB *

11,060Right of Way 2022 SAB *

248,843Construction 2022 SAB *

$331,790

$331,790

$331,790 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HANNAH NUTTER ROAD

BARNSTEAD (16020)

BRIDGE REPLACEMENT-HANNAH NUTTER ROAD

OVER BIG RIVER-BR. #149/073

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

110,844Preliminary Engineering 2020 SAB *

5,258Right of Way 2020 SAB *

935,969Construction 2020 SAB *

$1,102,071

$1,052,071

$1,052,071 $50,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 10 of 232Includes inflation and indirects using program

Page 17: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 28

BARNSTEAD-ALTON (14121)

NH 28 RECONSTRUCTION OF INTERSECTION WITH

NORTH BARNSTEAD ROAD/NORTH ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,410,063Construction 2019 None-Highway

3,181,242Construction 2020 None-Highway

$6,554,325

$4,591,305

$4,591,305 $1,963,020Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US ROUTE 4

BARRINGTON (16402)

ROUTE 4 CULVERT REPLACEMENT JUST WEST OF

TOPAZ DRIVE

Route/Road

Scope

Program

ROADSIDE

TIER 3

Category

Strategy

578,408Construction 2020 CRDR *

$663,808

$578,408

$578,408 $85,400Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 11 of 232Includes inflation and indirects using program

Page 18: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

GREEN HILL RD OVER ISINGLASS RIVER

BARRINGTON (26722)

BRIDGE REHABILITATION-GREENHILL RD OVER

ISINGLASS RIVER-BR. #109/162

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

196,862Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

2,006,533Construction 2022 SAB *

$2,208,925

$2,208,925

$2,208,925 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MALLEGO ROAD OVER MALLEGO BROOK

BARRINGTON (41398)

BRIDGE REPLACEMENT-MALLEGO ROAD OVER

MALLEGO BROOK-BR. #139/116

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

133,315Preliminary Engineering 2019 SAB *

5,128Right of Way 2019 SAB *

528,133Construction 2019 SAB *

$666,575

$666,575

$666,575 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 12 of 232Includes inflation and indirects using program

Page 19: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

OLD CANAAN ROAD OVER SPRUCE BROOK

BARRINGTON (41410)

BRIDGE REPLACEMENT-OLD CANAAN ROAD OVER

SPRUCE BROOK-BR. #052/059

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

104,678Preliminary Engineering 2024 SAB *

5,815Right of Way 2024 SAB *

564,100Construction 2024 SAB *

$674,593

$674,593

$674,593 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US ROUTE 4

BARRINGTON (41415)

REHAB OR REPLACEMENT OF RED LIST BRIDGE

CARRYING US 4 OVER OYSTER RIVER IN THE

TOWN OF BARRINGTON

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

237,263Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

1,247,587Construction 2023 Bridg-T1-2-Rehab-Rcn

$1,484,850

$1,484,850

$1,484,850 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 13 of 232Includes inflation and indirects using program

Page 20: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-293 EB & WB

BEDFORD - MANCHESTER (40731)

BRIDGE PRESERVATION EFFORTS FOR THE

BRIDGES CARRYING I-293 EB & WB OVER

MERRIMACK RIVER

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

410,200Construction 2019 Bridg-HIB-Main-Pres

$5,933,700

$410,200

$410,200 $5,523,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

F.E. EVERETT TPK

BEDFORD - MERRIMACK (16100)

IMPROVEMENT TO BEDFORD MAINLINE TOLL

PLAZA TO INSTITUTE OPEN ROAD TOLLING (TPK

CAPITAL PROGRAM)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

2,900,000Construction 2019 TPK *

8,300,000Construction 2020 TPK *

4,100,000Construction 2021 TPK *

$19,681,000

$15,300,000

$15,300,000 $4,381,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 14 of 232Includes inflation and indirects using program

Page 21: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 101

BEDFORD (13692C)

BRIDGE REHAB OR REPLACEMENT OF BR NO

090/065 CARRYING NH 101 OVER PULPIT BROOK

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

603,683Construction 2019 Bridg-T1-2-Rehab-Rcn

793,364Construction 2020 Bridg-T1-2-Rehab-Rcn

823,203Construction 2021 Bridg-T1-2-Rehab-Rcn

129,520Construction 2022 Bridg-T1-2-Rehab-Rcn

$2,349,770

$2,349,770

$2,349,770 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CATESBY LANE

BEDFORD (21684)

BRIDGE REPLACEMENT-CATESBY LANE OVER

MCQUADE BROOK-BR. #102/098 (NEW)

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

94,649Preliminary Engineering 2020 SAB *

5,258Right of Way 2020 SAB *

531,083Construction 2020 SAB *

$630,990

$630,990

$630,990 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 15 of 232Includes inflation and indirects using program

Page 22: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BEALS RD OVER BABOOSIC BROOK

BEDFORD (24217)

BRIDGE REPLACEMENT-BEALS RD OVER

BABOOSIC BROOK-BR. #105-055

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

167,152Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

757,588Construction 2022 SAB *

$930,270

$930,270

$930,270 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3

BEDFORD (40664)

US 3 WIDENING FROM HAWTHORNE DRIVE NORTH

TO MANCHESTER AIRPORT ACCESS ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

563,286Preliminary Engineering 2023 None-Highway

278,149Right of Way 2025 None-Highway

4,698,424Construction 2026 None-Highway

$5,539,860

$5,539,860

$5,539,860 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 16 of 232Includes inflation and indirects using program

Page 23: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

CHURCH STREET

BELMONT (22872)

BRIDGE REHABILITATION-CHURCH ST OVER TIOGA

RIVER-BR. #103/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

26,291Preliminary Engineering 2020 SAB *

2,103Right of Way 2020 SAB *

99,907Construction 2020 SAB *

$128,301

$128,301

$128,301 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 140 AND MAIN STREET

BELMONT (40635)

IMPROVE INTERSECTION SAFETY AND

CONGESTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

28,920Preliminary Engineering 2021 None-Highway

29,658Preliminary Engineering 2022 None-Highway

30,414Right of Way 2023 None-Highway

543,745Construction 2025 None-Highway

$632,737

$632,737

$632,737 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 17 of 232Includes inflation and indirects using program

Page 24: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

S BENNINGTON ROAD

BENNINGTON (29486)

S. BENNINGTON RD OVER RUSSELL BROOK

BRIDGE REHAB OR REPLACEMENT

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

767,641Construction 2024 Bridg-T3-4-Rehab-Rcn

$1,016,818

$767,641

$767,641 $249,178Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAIN STREET AND RIVERSIDE DRIVE

BERLIN (41367)

CONST. MULTI-USE PATH ALONG ANDROSCOGGIN

RIVER FROM SERVICE CREDIT UNION HERITAGE

PARK TO 12TH ST.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

30,765Preliminary Engineering 2019 TA *

801,357Construction 2021 TA *

$932,298

$832,122

$832,122 $100,176Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 18 of 232Includes inflation and indirects using program

Page 25: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

KING ST

BOSCAWEN (41578)

MULTIMODAL AND SAFETY IMPROVEMENTS TO

KING STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

495,683Preliminary Engineering 2027 None-Highway

27,596Right of Way 2027 None-Highway

4,626,373Construction 2027 None-Highway

$5,149,652

$5,149,652

$5,149,652 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BOSTON EXPRESS

BOSTON - MANCHESTER (68093O)

BOSTON EXPRESS - OPERATING EXPENSES FOR

FE EVERETT TURNPIKE COMMUTER SERVICE.

ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

TIER 1

Category

Strategy

51,275Other 2019 FTA5307_NHDOT

52,583Other 2020 FTA5307_NHDOT

53,923Other 2021 FTA5307_NHDOT

55,298Other 2022 FTA5307_NHDOT

56,709Other 2023 FTA5307_NHDOT

58,155Other 2024 FTA5307_NHDOT

59,638Other 2025 FTA5307_NHDOT

61,158Other 2026 FTA5307_NHDOT

62,718Other 2027 FTA5307_NHDOT

64,317Other 2028 FTA5307_NHDOT

$1,323,378

$575,773

$575,773 $747,605Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 19 of 232Includes inflation and indirects using program

Page 26: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BOSTON EXPRESS

BOSTON-MANCHESTER (68093P)

BOSTON EXPRESS - OPERATING EXPENSES FOR

I93 COMMUTER SERVICE. ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

TIER 1

Category

Strategy

701,004Other 2021 FTA5307_NHDOT

718,879Other 2022 FTA5307_NHDOT

737,211Other 2023 FTA5307_NHDOT

756,010Other 2024 FTA5307_NHDOT

775,288Other 2025 FTA5307_NHDOT

795,058Other 2026 FTA5307_NHDOT

815,332Other 2027 FTA5307_NHDOT

836,123Other 2028 FTA5307_NHDOT

$6,134,904

$6,134,904

$6,134,904 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 20 of 232Includes inflation and indirects using program

Page 27: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

BOW - CONCORD (13742)

I-93 WIDENING FROM I-89 TO BETWEEN EXIT 15

AND 16

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,400,000Preliminary Engineering 2019 TPK *

1,453,905Preliminary Engineering 2021 TPK *

1,489,403Preliminary Engineering 2022 TPK *

1,986,583Preliminary Engineering 2023 TPK *

2,047,042Preliminary Engineering 2024 None-Highway

2,000,000Preliminary Engineering 2025 TPK *

1,508,830Preliminary Engineering 2025 None-Highway

2,018,224Preliminary Engineering 2026 None-Highway

496,095Right of Way 2021 TPK *

110,597Right of Way 2022 TPK *

113,417Right of Way 2023 TPK *

301,766Right of Way 2025 None-Highway

1,547,305Right of Way 2026 None-Highway

403,645Right of Way 2026 TPK *

4,952,958Construction 2024 Bridg-T1-2-Rehab-Rcn

5,189,405Construction 2025 Bridg-T1-2-Rehab-Rcn

16,996,355Construction 2026 TPK *

5,200,000Construction 2026 None-Highway

21,800,000Construction 2027 TPK *

9,934,503Construction 2027 None-Highway

31,400,000Construction 2028 TPK *

9,904,838Construction 2028 None-Highway

$329,723,635

$122,254,870

$122,254,870 $6,100,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$201,368,766

Page 21 of 232Includes inflation and indirects using program

Page 28: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

RIVER RD OVER BOW BOG BROOK

BOW (24224)

BRIDGE REPLACEMENT-RIVER RD OVER BOW BOG

BROOK-BR. #184/127

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

123,907Preliminary Engineering 2026 SAB *

989,541Construction 2026 SAB *

$1,113,448

$1,113,448

$1,113,448 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BIRCHDALE RD OVER WHITE BROOK

BOW (24225)

BRIDGE REPLACEMENT-BIRCHDALE RD OVER

WHITE BROOK-BR. #092/136

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

131,203Preliminary Engineering 2025 SAB *

5,964Right of Way 2025 SAB *

578,484Construction 2025 SAB *

$715,650

$715,650

$715,650 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 22 of 232Includes inflation and indirects using program

Page 29: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 3A

BOW (29641)

NH RTE 3A CORRIDOR SAFETY IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

115,682Preliminary Engineering 2020 None-Highway

520,567Right of Way 2020 None-Highway

3,424,302Construction 2022 None-Highway

$4,555,551

$4,060,551

$4,060,551 $495,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 104

BRISTOL (40636)

ROADWAY WIDENING AND SHOULDERS FOR

BIKE/PED TRAVEL FROM SCHOOL ST TO WEST OF

DANFORTH BROOK RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

115,682Preliminary Engineering 2021 None-Highway

148,000Preliminary Engineering 2023 None-Highway

129,377Right of Way 2023 None-Highway

2,507,979Construction 2026 None-Highway

$2,901,038

$2,901,038

$2,901,038 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 23 of 232Includes inflation and indirects using program

Page 30: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

LAKE STREET

BRISTOL (41579)

BIKE PED IMPROVEMENTS TO LAKE ST.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

280,098Preliminary Engineering 2027 None-Highway

13,798Right of Way 2027 None-Highway

2,507,082Construction 2027 None-Highway

$2,800,978

$2,800,978

$2,800,978 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 13

BROOKLINE (40662)

CONSTRUCT SOUTHBOUND LEFT TURN LANE

ONTO OLD MILFORD RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

11,281Preliminary Engineering 2020 None-Highway

11,568Preliminary Engineering 2021 None-Highway

12,166Right of Way 2023 None-Highway

228,732Construction 2026 None-Highway

$263,747

$263,747

$263,747 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 24 of 232Includes inflation and indirects using program

Page 31: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

SOUTH MAIN ST. , MASON ROAD

BROOKLINE (41364)

CONST. SIDEWALKS ON RTE 130, CONST 60 FOOT

PED BRIDGE OVER NISSITISSIT RIVER AND

SIDEWALK TO BEACH

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 4

Category

Strategy

651,193Construction 2019 TA *

$743,113

$651,193

$651,193 $91,920Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BOND STREET OVER NISSITISSIT RIVER

BROOKLINE (41408)

BRIDGE REHABILITATION-BOND STREET OVER

NISSITISSIT RIVER-BR. #088/074

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

93,047Preliminary Engineering 2024 SAB *

5,815Right of Way 2024 SAB *

412,898Construction 2024 SAB *

$511,760

$511,760

$511,760 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 25 of 232Includes inflation and indirects using program

Page 32: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

POTATO ROAD OVER INDIAN RIVER

CANAAN (41399)

BRIDGE REHABILITATION-POTATO ROAD OVER

INDIAN RIVER-BR. #147/055

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

97,423Preliminary Engineering 2019 SAB *

5,128Right of Way 2019 SAB *

533,260Construction 2019 SAB *

$635,810

$635,810

$635,810 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GRIST MILL HILL ROAD OVER INDIAN RIVER

CANAAN (41406)

BRIDGE REHABILITATION-GRIST MILL HILL ROAD

OVER INDIAN RIVER-BR. #172/070

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

107,746Preliminary Engineering 2023 SAB *

5,671Right of Way 2023 SAB *

453,668Construction 2023 SAB *

$567,085

$567,085

$567,085 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 26 of 232Includes inflation and indirects using program

Page 33: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH43/NH27/RAYMOND RD

CANDIA (41592)

SAFETY & OPERATIONAL IMPROVEMENTS ON NH

27; NH 43 & RAYMOND ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

424,493Preliminary Engineering 2028 None-Highway

141,498Right of Way 2028 None-Highway

5,546,709Construction 2028 None-Highway

$6,112,700

$6,112,700

$6,112,700 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

CART (60100A)

COOP. ALLIANCE FOR REG. TRANSPORTATION -

PREVENTATIVE MAINTENANCE (DERRY-SALEM

REGION)

Route/Road

Scope

Program

TRANSIT

TIER 6

Category

Strategy

98,704Other 2019 FTA5307

101,221Other 2020 FTA5307

103,802Other 2021 FTA5307

106,449Other 2022 FTA5307

109,164Other 2023 FTA5307

111,948Other 2024 FTA5307

114,802Other 2025 FTA5307

117,730Other 2026 FTA5307

120,732Other 2027 FTA5307

123,810Other 2028 FTA5307

$1,673,943

$1,108,363

$1,108,363 $565,580Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 27 of 232Includes inflation and indirects using program

Page 34: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

CART (60100B)

COOP. ALLIANCE FOR REG. TRANSPORTATION -

OPERATING ASSISTANCE (DERRY-SALEM REGION)

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

227,558Other 2019 FTA5307

233,361Other 2020 FTA5307

239,312Other 2021 FTA5307

245,414Other 2022 FTA5307

251,672Other 2023 FTA5307

258,090Other 2024 FTA5307

264,671Other 2025 FTA5307

271,420Other 2026 FTA5307

278,342Other 2027 FTA5307

285,439Other 2028 FTA5307

$4,766,382

$2,555,281

$2,555,281 $2,211,101Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 28 of 232Includes inflation and indirects using program

Page 35: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

CART (60100C)

COOP. ALLIANCE FOR REG. TRANSPORTATION -

MOBILITY MGMT

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

126,586Other 2019 FTA5310

50,313Other 2019 FTA5307

129,814Other 2020 FTA5310

51,596Other 2020 FTA5307

133,124Other 2021 FTA5310

52,912Other 2021 FTA5307

136,519Other 2022 FTA5310

54,261Other 2022 FTA5307

140,000Other 2023 FTA5310

55,645Other 2023 FTA5307

143,570Other 2024 FTA5310

57,064Other 2024 FTA5307

147,231Other 2025 FTA5310

58,519Other 2025 FTA5307

150,985Other 2026 FTA5310

60,011Other 2026 FTA5307

154,835Other 2027 FTA5310

61,541Other 2027 FTA5307

158,784Other 2028 FTA5310

63,111Other 2028 FTA5307

$2,644,312

$1,986,417

$1,986,417 $657,895Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 29 of 232Includes inflation and indirects using program

Page 36: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

CART (60100D)

COOP. ALLIANCE FOR REG. TRANSPORTATION -

GENERAL & COMPREHENSIVE PLANNING.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

14,101Other 2019 FTA5307

14,460Other 2020 FTA5307

14,829Other 2021 FTA5307

15,207Other 2022 FTA5307

15,595Other 2023 FTA5307

15,993Other 2024 FTA5307

16,400Other 2025 FTA5307

16,819Other 2026 FTA5307

17,247Other 2027 FTA5307

17,687Other 2028 FTA5307

$276,278

$158,338

$158,338 $117,940Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 30 of 232Includes inflation and indirects using program

Page 37: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR REGIONAL

TRANSPORTATION (CART)

CART (60100E)

COOP. ALLIANCE FOR REG. TRANSPORTATION -

CAPITAL PROGRAM

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

59,419Other 2019 FTA5307

38,004Other 2019 FTA5339

35,261Other 2020 FTA5339

12,063Other 2020 FTA5307

53,923Other 2021 FTA5339

55,298Other 2022 FTA5339

55,298Other 2022 FTA5307

56,709Other 2023 FTA5339

56,709Other 2023 FTA5307

58,155Other 2024 FTA5339

58,155Other 2024 FTA5307

59,638Other 2025 FTA5339

59,638Other 2025 FTA5307

61,158Other 2026 FTA5339

61,158Other 2026 FTA5307

62,718Other 2027 FTA5339

62,718Other 2027 FTA5307

64,317Other 2028 FTA5339

64,317Other 2028 FTA5307

$1,536,695

$1,034,655

$1,034,655 $502,040Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 31 of 232Includes inflation and indirects using program

Page 38: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

WAUKEWAN ROAD

CENTER HARBOR - NEW HAMPTON (24579)

Waukewan Road Bridge Rehabilitation over Lake

Waukewan Inlet, Redlist Bridge 080/040

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

86,761Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

711,788Construction 2021 Bridg-T3-4-Rehab-Rcn

$1,134,050

$798,550

$798,550 $335,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 12

CHARLESTOWN (40667)

RECONSTRUCT OR REHABILITATE FROM NH 12A IN

SOUTHERN CHARLESTOWN TO ALMAR STREET

(APPROX 2.4 MILES)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

761,297Preliminary Engineering 2023 None-Highway

407,769Right of Way 2025 None-Highway

4,467,972Construction 2026 None-Highway

2,550,301Construction 2027 None-Highway

$8,187,339

$8,187,339

$8,187,339 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 32 of 232Includes inflation and indirects using program

Page 39: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 28 AND MAIN STREET

CHICHESTER (40631)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

145,988Preliminary Engineering 2022 None-Highway

76,764Right of Way 2024 None-Highway

1,338,266Construction 2025 None-Highway

$1,561,018

$1,561,018

$1,561,018 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US RTE 4 & KING RD

CHICHESTER (41577)

US RTE 4 AND KING ROAD IMPROVEMENT

PLANNING STUDY

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

200,000Other 2020 Other Fed Aid

$200,000

$200,000

$200,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 33 of 232Includes inflation and indirects using program

Page 40: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 12 & NH 103

CLAREMONT, NH - WEATHERSFIELD, VT (41467)

BRIDGE REHAB, BRIDGE CARRYING NH 12 & 103

OVER CONN RIVER BETWEEN CLAREMONT NH

AND WEATHERSFIELD VT

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

271,350Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

40,547Preliminary Engineering 2023 NON-PAR (Vermont)

166,962Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

24,948Preliminary Engineering 2024 NON-PAR (Vermont)

114,146Preliminary Engineering 2025 Bridg-T1-2-Rehab-Rcn

17,056Preliminary Engineering 2025 NON-PAR (Vermont)

437,282Construction 2026 NON-PAR (Vermont)

235,459Construction 2026 Bridg-T1-2-Rehab-Rcn

2,759,584Construction 2027 Bridg-T1-2-Rehab-Rcn

$4,067,335

$4,067,335

$4,067,335 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 12A

CLAREMONT (27691)

NH 12A, BRIDGE REHABILITATION CARRYING NH

12A OVER SUGAR RIVER, BR NO 072/127

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

205,100Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

3,317,905Construction 2022 Bridg-T3-4-Rehab-Rcn

3,402,511Construction 2023 Bridg-T3-4-Rehab-Rcn

$7,235,116

$6,925,516

$6,925,516 $309,600Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 34 of 232Includes inflation and indirects using program

Page 41: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

CLAREMONT MUNICIPAL AIRPORT

CLAREMONT (40577)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

170,917Other 2019 Airport Improvement

175,274Other 2020 Airport Improvement

466,965Other 2022 Airport Improvement

1,789,468Other 2023 Airport Improvement

1,159,215Other 2024 Airport Improvement

779,263Other 2025 Airport Improvement

203,861Other 2026 Airport Improvement

627,178Other 2027 Airport Improvement

169,797Other 2028 Airport Improvement

$5,541,940

$5,541,940

$5,541,940 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WASHINGTON STREET

CLAREMONT (41748)

TO LINK TEN TRAFFIC SIGNALS ON A TWO MILE

STRETCH OF WASHINGTON STREET.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

64,800Preliminary Engineering 2019 CMAQ *

10,255Right of Way 2020 CMAQ *

592,534Construction 2020 CMAQ *

$667,589

$667,589

$667,589 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 35 of 232Includes inflation and indirects using program

Page 42: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000A)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION - OPERATING ASSISTANCE.

ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

2,736,592Other 2019 FTA5307

2,879,841Other 2020 FTA5307

2,953,277Other 2021 FTA5307

3,028,586Other 2022 FTA5307

3,105,815Other 2023 FTA5307

3,185,013Other 2024 FTA5307

3,266,231Other 2025 FTA5307

3,349,520Other 2026 FTA5307

3,434,932Other 2027 FTA5307

3,522,523Other 2028 FTA5307

$42,062,405

$31,462,330

$31,462,330 $10,600,076Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 36 of 232Includes inflation and indirects using program

Page 43: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000B)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST) - PREVENTATIVE

MAINTENANCE.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

547,923Other 2019 FTA5307

561,895Other 2020 FTA5307

576,223Other 2021 FTA5307

590,917Other 2022 FTA5307

605,985Other 2023 FTA5307

621,438Other 2024 FTA5307

637,284Other 2025 FTA5307

653,535Other 2026 FTA5307

670,200Other 2027 FTA5307

687,290Other 2028 FTA5307

$9,069,383

$6,152,689

$6,152,689 $2,916,694Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 37 of 232Includes inflation and indirects using program

Page 44: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000C)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST) - MISCELLANEOUS

SUPPORT EQUIPMENT.

Route/Road

Scope

Program

TRANSIT

TIER 6

Category

Strategy

99,368Other 2019 FTA5307

103,816Other 2020 FTA5307

106,463Other 2021 FTA5307

109,178Other 2022 FTA5307

111,962Other 2023 FTA5307

114,817Other 2024 FTA5307

117,745Other 2025 FTA5307

120,747Other 2026 FTA5307

123,826Other 2027 FTA5307

126,984Other 2028 FTA5307

$1,899,490

$1,134,906

$1,134,906 $764,585Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 38 of 232Includes inflation and indirects using program

Page 45: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000D)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST) - BUS STATION

EQUIPMENT.

Route/Road

Scope

Program

TRANSIT

TIER 6

Category

Strategy

60,180Other 2019 FTA5307

59,801Other 2020 FTA5307

61,326Other 2021 FTA5307

62,890Other 2022 FTA5307

64,493Other 2023 FTA5307

66,138Other 2024 FTA5307

67,825Other 2025 FTA5307

69,554Other 2026 FTA5307

71,328Other 2027 FTA5307

73,147Other 2028 FTA5307

$969,081

$656,682

$656,682 $312,400Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 39 of 232Includes inflation and indirects using program

Page 46: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000E)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST) - GENERAL &

COMPREHENSIVE PLANNING.

Route/Road

Scope

Program

TRANSIT

TIER 6

Category

Strategy

87,376Other 2019 FTA5307

89,604Other 2020 FTA5307

91,889Other 2021 FTA5307

94,232Other 2022 FTA5307

96,635Other 2023 FTA5307

99,099Other 2024 FTA5307

101,626Other 2025 FTA5307

104,217Other 2026 FTA5307

106,875Other 2027 FTA5307

109,600Other 2028 FTA5307

$1,388,285

$981,152

$981,152 $407,132Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 40 of 232Includes inflation and indirects using program

Page 47: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000F)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST) - ADA OPERATIONS.

ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

TIER 6

Category

Strategy

283,332Other 2019 FTA5307

290,557Other 2020 FTA5307

297,967Other 2021 FTA5307

305,565Other 2022 FTA5307

313,357Other 2023 FTA5307

321,347Other 2024 FTA5307

329,541Other 2025 FTA5307

337,945Other 2026 FTA5307

346,562Other 2027 FTA5307

355,400Other 2028 FTA5307

$4,471,079

$3,181,573

$3,181,573 $1,289,506Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 41 of 232Includes inflation and indirects using program

Page 48: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000G)

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST) - CAPITAL PROGRAM.

Route/Road

Scope

Program

TRANSIT

TIER 6

Category

Strategy

172,430Other 2021 FTA5307

176,827Other 2022 FTA5307

181,336Other 2023 FTA5307

185,960Other 2024 FTA5307

190,702Other 2025 FTA5307

195,565Other 2026 FTA5307

200,552Other 2027 FTA5307

205,666Other 2028 FTA5307

$3,161,771

$1,509,035

$1,509,035 $1,652,735Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

COOPERATIVE ALLIANCE FOR SEACOAST

TRANSPORTATION (COAST)

COAST (60000H)

MOBILITY MANAGEMENT FOR COAST

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

44,774Other 2019 FTA5307

$133,624

$44,774

$44,774 $88,850Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 42 of 232Includes inflation and indirects using program

Page 49: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 3 / MAIN STREET

COLEBROOK (40640)

RECONSTRUCTION OF ABOUT 2700' OF US 3/MAIN

ST FROM SOUTH MAIN STREET TRAFFIC ISLAND

TO BEAVER BROOK

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

98,622Preliminary Engineering 2019 None-Highway

26,150Preliminary Engineering 2019 TA *

87,767Right of Way 2019 None-Highway

9,742Right of Way 2019 TA *

984,778Construction 2020 None-Highway

741,413Construction 2020 TA *

$2,082,973

$1,948,473

$1,948,473 $134,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HARVEY SWELL ROAD OVER EAST BRANCH

COLEBROOK (40651)

BRIDGE REHABILITATION-HARVEY SWELL ROAD

OVER EAST BRANCH-BR. #190/109

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

64,708Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

172,555Construction 2021 SAB *

$242,655

$242,655

$242,655 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 43 of 232Includes inflation and indirects using program

Page 50: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BEAR ROCK ROAD OVER WEST BRANCH (MOHAWK

RIVER)

COLEBROOK (40652)

BRIDGE REPLACEMENT-BEAR ROCK ROAD OVER

WEST BRANCH (MOHAWK RIVER) BR. #167/120

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

97,062Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

550,018Construction 2021 SAB *

$652,473

$652,473

$652,473 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PLEASANT STREET OVER MOHAWK RIVER

COLEBROOK (40655)

BRIDGE REHABILITATION-PLEASANT STREET

OVER MOHAWK RIVER-BR. #050/099

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

77,418Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

359,440Construction 2022 SAB *

$442,387

$442,387

$442,387 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 44 of 232Includes inflation and indirects using program

Page 51: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

COMMUTER/INTERCITY BUS REPLACEMENT (40284)

REPLACEMENT OF EXISTING STATE-OWNED

COACHES USED FOR COMMUTER AND INTERCITY

BUS.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

4,757,283Other 2019 CMAQ *

1,299,824Other 2021 CMAQ *

$15,355,104

$6,057,107

$6,057,107 $9,297,997Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

STICKNEY AVENUE

CONCORD (13742D)

REMOVAL OF STATE OWNED BUILDINGS AT

STICKNEY AVENUE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

167,738Preliminary Engineering 2020 None-Highway

474,294Right of Way 2020 None-Highway

$642,032

$642,032

$642,032 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 45 of 232Includes inflation and indirects using program

Page 52: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 13

CONCORD (29601)

IMPROVEMENTS AT I89 EXIT 2 NB AND SB RAMPS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

282,013Preliminary Engineering 2019 None-Highway

354,708Preliminary Engineering 2021 None-Highway

28,201Right of Way 2019 None-Highway

8,304Right of Way 2021 None-Highway

2,457,726Construction 2023 None-Highway

$3,130,952

$3,130,952

$3,130,952 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CONCORD MUNICIPAL AIRPORT

CONCORD (40565)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

1,408,384Other 2019 Airport Improvement

247,138Other 2020 Airport Improvement

245,651Other 2021 Airport Improvement

252,161Other 2022 Airport Improvement

428,465Other 2023 Airport Improvement

646,163Other 2024 Airport Improvement

1,325,278Other 2025 Airport Improvement

3,615,134Other 2026 Airport Improvement

3,707,320Other 2027 Airport Improvement

1,768,721Other 2028 Airport Improvement

$13,644,413

$13,644,413

$13,644,413 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 46 of 232Includes inflation and indirects using program

Page 53: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 9 (LOUDON RD) OVER MERRIMACK

RIVER

CONCORD (41212)

BRIDGE REHABILITATION-NH ROUTE 9 (LOUDON

RD) OVER MERRIMACK RIVER BR. #163/111

(SAB+MOBRR) RED LIST

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

6,083Right of Way 2022 SAB *

5,614,144Construction 2023 MOBRR *

3,697,469Construction 2024 MOBRR *

$9,762,695

$9,317,695

$9,317,695 $445,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ARFF TRAINING FACILITY

CONCORD (41411)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF ARFF TRAINING FACILITIES;

PLANNING STUDIES.

Route/Road

Scope

Program

AIRPORT

TIER 6

Category

Strategy

512,750Other 2019 Airport Improvement

52,583Other 2020 Airport Improvement

539,234Other 2021 Airport Improvement

378,056Other 2023 Airport Improvement

198,792Other 2025 Airport Improvement

209,060Other 2027 Airport Improvement

$1,890,475

$1,890,475

$1,890,475 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 47 of 232Includes inflation and indirects using program

Page 54: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93 NB & SB

CONCORD (41468)

ADDRESS PRIORITY BRIDGES CARRYING I-93 NB &

SB OVER MERRIMACK RIVER (136/117 & 136/116) IN

CONCORD

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

191,910Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

191,910Preliminary Engineering 2024 Bridg-HIB-Rehab-Rcn

196,804Preliminary Engineering 2025 Bridg-T1-2-Rehab-Rcn

196,804Preliminary Engineering 2025 Bridg-HIB-Rehab-Rcn

941,838Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

941,838Preliminary Engineering 2026 Bridg-HIB-Rehab-Rcn

689,896Preliminary Engineering 2027 Bridg-T1-2-Rehab-Rcn

689,896Preliminary Engineering 2027 Bridg-HIB-Rehab-Rcn

4,829,273Construction 2027 Bridg-T1-2-Rehab-Rcn

4,829,273Construction 2027 Bridg-HIB-Rehab-Rcn

9,197,350Construction 2028 Bridg-T1-2-Rehab-Rcn

9,197,350Construction 2028 Bridg-HIB-Rehab-Rcn

$32,094,139

$32,094,139

$32,094,139 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 48 of 232Includes inflation and indirects using program

Page 55: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

CONNECTICUT RIVER BRIDGES (40798)

GARVEE DEBT SERVICE FOR CONNECTICUT RIVER

BRIDGES

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

1,568,663Construction 2020 GARVEE Debt Service

8,109,375Construction 2021 GARVEE Debt Service

8,105,750Construction 2022 GARVEE Debt Service

8,108,875Construction 2023 GARVEE Debt Service

8,108,000Construction 2024 GARVEE Debt Service

8,107,500Construction 2025 GARVEE Debt Service

8,106,625Construction 2026 GARVEE Debt Service

8,104,625Construction 2027 GARVEE Debt Service

8,105,625Construction 2028 GARVEE Debt Service

$73,597,741

$66,425,038

$66,425,038 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$7,172,703

Phase Year Funding

NH 16

CONWAY (40018)

RECONSTRUCT NH 16 FROM OLYMPIC LANE EAST

0.60 MILES TO VILLAGE LANE - MULTI FUNDED

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,395,849Construction 2019 Other Fed Aid

702,211Construction 2019 SAH *

675,395Construction 2019 NON-PAR (other)

1,051,650Construction 2020 Other Fed Aid

$4,118,695

$3,825,105

$3,825,105 $293,590Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 49 of 232Includes inflation and indirects using program

Page 56: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH16, NH 113 AND NH 153

CONWAY (40638)

ROUNDABOUT IMPROVEMENTS TO NH 16

INCLUDING INTERSECTIONS OF NH 16/NH 153 AND

NH 16/NH 113

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

401,500Preliminary Engineering 2019 None-Highway

200,750Right of Way 2019 None-Highway

2,597,750Construction 2019 None-Highway

$3,200,000

$3,200,000

$3,200,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WASHINGTON STREET OVER SWIFT RIVER

CONWAY (41402)

BRIDGE REHABILITATION-WASHINGTON STREET

OVER SWIFT RIVER

BR. #164/063

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

141,771Preliminary Engineering 2023 SAB *

1,786,318Construction 2023 SAB *

$1,928,090

$1,928,090

$1,928,090 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 50 of 232Includes inflation and indirects using program

Page 57: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NA

CONWAY (41755)

CON NON-MOTORIZED 2.8MILE TRANSPORTATION

PATHWAY LOCATED IN A HEAVILY TRAFFICKED

SECTION ON CONWAY.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

148,020Preliminary Engineering 2019 CMAQ *

101,196Preliminary Engineering 2020 CMAQ *

1,333Right of Way 2020 CMAQ *

1,283,926Construction 2020 CMAQ *

$1,534,475

$1,534,475

$1,534,475 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4

DANBURY (16303)

REHABILITATE BRIDGE CARRYING US 4 OVER

NHRR - 156/104

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

2,544,994Construction 2019 Bridg-T1-2-Rehab-Rcn

$2,786,994

$2,544,994

$2,544,994 $242,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 51 of 232Includes inflation and indirects using program

Page 58: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 4

DANBURY (40395)

US 4 OVER SMITH RIVER BRIDGE REHABILITATION

OR REPLACEMENT

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

225,610Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

57,841Right of Way 2020 Bridg-T1-2-Rehab-Rcn

2,433,130Construction 2022 Bridg-T1-2-Rehab-Rcn

1,247,587Construction 2023 Bridg-T1-2-Rehab-Rcn

$4,077,688

$3,964,168

$3,964,168 $113,520Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 107

DEERFIELD (24477)

NH 107 OVER FREESE'S POND - REPLACE BRIDGE

NUMBER 137/116.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

1,134,170Construction 2022 Bridg-T3-4-Rehab-Rcn

$1,148,108

$1,134,170

$1,134,170 $13,937Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 52 of 232Includes inflation and indirects using program

Page 59: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

DERRY - LONDONDERRY (13065)

I-93 EXIT 4A - PRELIM., FINAL DESIGN, ROW &

CONSTRUCTION OF NEW INTERCHANGE AND

CONNECTING ROADWAY

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

48,144Preliminary Engineering 2019 Other Fed Aid

2,508,020Right of Way 2019 Other Fed Aid

8,800,000Right of Way 2020 Other Fed Aid

541,223Right of Way 2021 Other Fed Aid

910,646Right of Way 2022 Other Fed Aid

7,943,835Construction 2019 Other Fed Aid

2,407,223Construction 2019 NON-PAR (other)

10,458,777Construction 2021 Other Fed Aid

15,589,354Construction 2022 Other Fed Aid

$56,688,850

$49,207,222

$49,207,222 $7,481,628Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

DREW ROAD

DERRY (16118)

BRIDGE REPLACEMENT-DREW RD OVER DREW

BROOK-BR. #167/101-CULVERT REPLACED WITH

BRIDGE

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

235,141Construction 2019 SAB *

$312,841

$235,141

$235,141 $77,700Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 53 of 232Includes inflation and indirects using program

Page 60: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NORTH SHORE ROAD

DERRY (41400)

BRIDGE REPLACEMENT-NORTH SHORE RD OVER

TRIBUTARY I TO BEAVER LAKE OUTLET-BR.

#099/129

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

77,425Preliminary Engineering 2019 SAB *

1,026Right of Way 2019 SAB *

265,605Construction 2019 SAB *

$344,055

$344,055

$344,055 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 1 (16161G)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 1 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

2,312,515Construction 2019 Pave-T2-Resurf

1,501,008Construction 2019 Pave-T3-4-Resurf

$5,103,547

$3,813,522

$3,813,522 $1,290,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 54 of 232Includes inflation and indirects using program

Page 61: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

DISTRICT 2 (16162G)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 2 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

2,087,549Construction 2019 Pave-T3-4-Resurf

600,667Construction 2019 Pave-T2-Resurf

$3,558,241

$2,688,216

$2,688,216 $870,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 3 (16163G)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 3 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,673,648Construction 2019 Pave-T3-4-Resurf

78,827Construction 2019 Pave-T2-Resurf

$2,402,500

$1,752,475

$1,752,475 $650,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 3 (40933)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 3 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,703,819Construction 2019 Pave-T3-4-Resurf

$1,703,819

$1,703,819

$1,703,819 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 55 of 232Includes inflation and indirects using program

Page 62: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

DISTRICT 4 (16164G)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 4 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

4,678,155Construction 2019 Pave-T3-4-Resurf

$5,038,180

$4,678,155

$4,678,155 $360,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 4 (40934)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 4 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,643,851Construction 2019 Pave-T3-4-Resurf

$1,643,851

$1,643,851

$1,643,851 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

DISTRICT 5 (16165G)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 5 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

2,814,754Construction 2019 Pave-T3-4-Resurf

125,774Construction 2019 Pave-T2-Resurf

$4,270,554

$2,940,529

$2,940,529 $1,330,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 56 of 232Includes inflation and indirects using program

Page 63: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

DISTRICT 6 (16166G)

ROADWAY RESURFACING, VARIOUS LOCATIONS IN

DISTRICT 6 FOR CY 2018/FY 2019.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

2,454,283Construction 2019 Pave-T3-4-Resurf

95,221Construction 2019 Pave-T2-Resurf

$3,679,529

$2,549,504

$2,549,504 $1,130,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SPAULDING TURNPIKE

DOVER - ROCHESTER (29440)

IMPROVEMENTS TO DOVER & ROCHESTER TOLLS

PLAZAS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

800,000Preliminary Engineering 2019 TPK *

11,600,000Construction 2021 TPK *

13,200,000Construction 2022 TPK *

12,600,000Construction 2023 TPK *

$39,120,000

$38,200,000

$38,200,000 $920,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 57 of 232Includes inflation and indirects using program

Page 64: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 108

DOVER - SOMERSWORTH - ROCHESTER (29604)

NH RTE 108 - COMPLETE STREETS CONSISTENT

WITH IMPROVEMENTS UNDER U-3 ALTERNATIVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

451,220Preliminary Engineering 2019 None-Highway

1,330,338Right of Way 2020 None-Highway

5,852,526Construction 2023 None-Highway

3,001,125Construction 2024 None-Highway

$11,357,249

$10,635,209

$10,635,209 $722,040Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16 (SPAULDING TURNPIKE)

DOVER - SOMERSWORTH - ROCHESTER (40599)

UPDATE OF FEASIBILITY STUDY FOR

CONSTRUCTION OF EXIT 10 & EASTERLY

CONNECTION ALONG NH 16.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

2,000,000Preliminary Engineering 2022 TPK *

$2,000,000

$2,000,000

$2,000,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 58 of 232Includes inflation and indirects using program

Page 65: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

GULF ROAD

DOVER, NH - SOUTH BERWICK, MAINE (41433)

ADDRESS RED LIST BRIDGE CARRYING GULF

ROAD OVER SALMON FALLS RIVER BETWEEN

DOVER AND SOUTH BERWICK

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

127,940Preliminary Engineering 2024 NON-PAR (Maine)

127,940Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

67,274Preliminary Engineering 2026 NON-PAR (Maine)

67,274Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

137,979Preliminary Engineering 2027 NON-PAR (Maine)

137,979Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

1,768,721Construction 2028 NON-PAR (Maine)

1,768,721Construction 2028 Bridg-T3-4-Rehab-Rcn

$4,203,829

$4,203,829

$4,203,829 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RTE 155, RTE 108, BELLAMY RD. DALEY DR.

DURHAM RD

DOVER (41373)

IMP. EXIST. PATH FROM KNOX MARSH RD. TO

BELLAMY RD. CONSTRUCT NEW MULTI-USE PATH

FROM BELLAM

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

41,020Right of Way 2019 TA *

297,091Construction 2020 TA *

$458,731

$338,111

$338,111 $120,620Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 59 of 232Includes inflation and indirects using program

Page 66: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

RTE 108

DOVER (41746)

TRAFFIC SIGNAL IMPROVEMENTS AND

INSTALLATION OF A CAMERA SYSTEM TO

MONITOR TRAFFIC FLOW.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

20,000Preliminary Engineering 2019 CMAQ *

133,315Construction 2020 CMAQ *

$153,315

$153,315

$153,315 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16

DUMMER - CAMBRIDGE - ERROL (16304B)

WIDENING AND REHABILITATION WHERE NEEDED

FROM NH 110A IN DUMMER TO 0.2 MILES SOUTH

OF NH 26.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

3,300,000Construction 2020 None-Highway

$3,630,000

$3,300,000

$3,300,000 $330,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAIN STREET

DURHAM (UNH) (41369)

CONSTRUCT SIDEWALKS, CROSSWALKS,

LIGHTING, AND LANDSCAPING ALONG MAIN

STREET IN DURHAM ON UNH CAMPU

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

408,761Construction 2019 TA *

$471,693

$408,761

$408,761 $62,932Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 60 of 232Includes inflation and indirects using program

Page 67: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 4

DURHAM (16236)

BRIDGE REPLACEMENT, FOR BRIDGE CARRYING

US 4 OVER BUNKER CREEK (BR NO 145/116)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

4,512,200Construction 2019 Bridg-T1-2-Rehab-Rcn

$5,843,200

$4,512,200

$4,512,200 $1,331,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4 / NH 108

DURHAM (16254)

INTERSECTION IMPROVEMENTS AT THE US 4

RAMP INTERSECTION WITH NH 108. (PROJECT

SCOPE IS UNKNOWN)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

28,201Preliminary Engineering 2019 Other Fed Aid

28,201Right of Way 2019 Other Fed Aid

578,408Construction 2020 Other Fed Aid

$891,218

$634,810

$634,810 $256,408Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 61 of 232Includes inflation and indirects using program

Page 68: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BENNETT ROAD

DURHAM (41432)

ADDRESS THE RED LIST BRIDGE CARRYING

BENNETT ROAD OVER PAR IN THE TOWN OF

DURHAM (093/080)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

127,940Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

134,548Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

137,979Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

141,498Preliminary Engineering 2028 Bridg-T3-4-Rehab-Rcn

70,749Right of Way 2028 Bridg-T3-4-Rehab-Rcn

1,061,233Construction 2028 Bridg-T3-4-Rehab-Rcn

$1,673,947

$1,673,947

$1,673,947 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

UNH

DURHAM (41753)

TRANSIT FACILITY IMPROVEMENT AT THE

UNH-DURHAM RAIL STATION TO INCREASE

PASSENGER RIDERSHIP.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

60,000Preliminary Engineering 2019 CMAQ *

41,020Preliminary Engineering 2020 CMAQ *

46,148Right of Way 2020 CMAQ *

850,140Construction 2020 CMAQ *

$997,307

$997,307

$997,307 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 62 of 232Includes inflation and indirects using program

Page 69: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

POTTER ROAD OVER SNOW BROOK

EATON (41404)

BRIDGE REPLACEMENT-POTTER ROAD OVER

SNOW BROOK-BR. #058/130

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

90,734Preliminary Engineering 2023 SAB *

5,671Right of Way 2023 SAB *

391,289Construction 2023 SAB *

$487,693

$487,693

$487,693 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SHAKER BOULEVARD

ENFIELD (13592)

SHAKER BLVD OVER KNOX RIVER

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

61,158Preliminary Engineering 2026 SAB *

18,347Right of Way 2026 SAB *

287,444Construction 2026 SAB *

$366,950

$366,950

$366,950 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 63 of 232Includes inflation and indirects using program

Page 70: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 4

ENFIELD (40526)

ADD SHOULDERS, IMPROVE ALIGNMENT, AND

REMOVE CLEAR ZONE OBSTRUCTIONS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

289,204Preliminary Engineering 2020 None-Highway

304,141Preliminary Engineering 2022 None-Highway

182,485Right of Way 2022 None-Highway

93,569Right of Way 2023 None-Highway

6,121,383Construction 2024 None-Highway

$7,293,282

$6,990,782

$6,990,782 $302,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 125

EPPING (29608)

NH RTE 125 IMPROVEMENTS FROM NH 101 TO NH

87 - 2.6 MILES

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

676,830Preliminary Engineering 2019 None-Highway

124,936Preliminary Engineering 2020 None-Highway

451,220Right of Way 2019 None-Highway

264,546Right of Way 2021 None-Highway

9,380,290Construction 2022 None-Highway

$11,530,322

$10,897,822

$10,897,822 $632,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Improvements include signal coordinationComments

$0

Page 64 of 232Includes inflation and indirects using program

Page 71: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 111A

EXETER (40623)

BRIDGE REPLACEMENT TO ADDRESS RED LIST

BRIDGE CARRYING NH 111A OVER LITTLE RIVER

(BR NO 075/078)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

296,579Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

380,481Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

243,313Right of Way 2024 Bridg-T3-4-Rehab-Rcn

2,624,051Construction 2026 Bridg-T3-4-Rehab-Rcn

$3,544,424

$3,544,424

$3,544,424 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 27, NH 111A, WINTER ST, SPRING ST

EXETER (41372)

CONSTRUCT SIDEWALKS ON EPPING ROAD,

BRENTWOOD ROAD, WINTER STREET, AND

SPRING STREET

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

10,255Right of Way 2019 08-Funds

474,718Construction 2020 TA *

$577,067

$484,973

$484,973 $92,093Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 65 of 232Includes inflation and indirects using program

Page 72: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

SOUTH NEW BOSTON ROAD

FRANCESTOWN (15765)

BRIDGE REPLACEMENT-SO. NEW BOSTON RD

OVER SO. BR. PISCATAQUOG RIVER; BR. #149/058

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

147,231Preliminary Engineering 2020 SAB *

5,258Right of Way 2020 SAB *

899,161Construction 2020 SAB *

$1,051,650

$1,051,650

$1,051,650 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

FRANCONIA - LITTLETON (40514)

PAVEMENT JOINT SOUTH OF EXIT 35 TO

PAVEMENT JOINT NORTH OF EXIT 42 INCLUDES

EXITS 35 THRU 42

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

121,657Preliminary Engineering 2022 4R

124,759Preliminary Engineering 2023 4R

127,940Preliminary Engineering 2024 4R

60,828Right of Way 2022 4R

62,379Right of Way 2023 4R

15,870,257Construction 2025 4R

10,704,823Construction 2026 4R

$27,072,643

$27,072,643

$27,072,643 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 66 of 232Includes inflation and indirects using program

Page 73: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 18

FRANCONIA (24497)

NH 18, SUPERSTRUCTURE REPLACEMENT FOR

BRIDGE CARRYING NH 18 OVER LAFAYETTE

BROOK (BR NO 089/099)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

3,118,969Construction 2023 Bridg-T3-4-Rehab-Rcn

$3,613,969

$3,118,969

$3,118,969 $495,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

LACONIA MUNICIPAL AIRPORT

GILFORD (40574)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

626,694Other 2019 Airport Improvement

934,800Other 2020 Airport Improvement

215,693Other 2021 Airport Improvement

1,212,598Other 2022 Airport Improvement

4,251,218Other 2023 Airport Improvement

1,615,405Other 2024 Airport Improvement

1,073,476Other 2025 Airport Improvement

679,536Other 2026 Airport Improvement

627,178Other 2027 Airport Improvement

$11,236,599

$11,236,599

$11,236,599 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 67 of 232Includes inflation and indirects using program

Page 74: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 3 AND NH 11

GILFORD (41502)

ADDRESS RED LIST BRIDGE CARRYING US 3 AND

NH 11 OVER US 3 AND NH 11 IN THE TOWN OF

GILFORD(114/066)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

249,518Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

127,940Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

1,968,039Construction 2025 Bridg-T1-2-Rehab-Rcn

$2,345,496

$2,345,496

$2,345,496 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

STAGE ROAD

GILMANTON (16232)

BRIDGE REPLACEMENT - STAGE RD OVER BROOK

BR #106/041

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

147,403Preliminary Engineering 2019 SAB *

1,026Right of Way 2019 SAB *

866,409Construction 2019 SAB *

$1,014,838

$1,014,838

$1,014,838 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 68 of 232Includes inflation and indirects using program

Page 75: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

CRYSTAL LAKE ROAD

GILMANTON (16234)

BRIDGE REPLACEMENT-CRYSTAL LAKE RD OVER

NELSON BROOK-BR. #174/094

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

126,198Preliminary Engineering 2020 SAB *

10,517Right of Way 2020 SAB *

652,023Construction 2020 SAB *

$788,738

$788,738

$788,738 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH121/DERRY RD/DEPOT RD

HAMPSTEAD (41717)

IMPROVE THE INTERSECTION OF NH121/DERRY

RD/DEPOT RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

240,000Preliminary Engineering 2028 None-Other

120,000Right of Way 2028 None-Other

2,040,000Construction 2028 None-Other

$2,400,000

$2,400,000

$2,400,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 69 of 232Includes inflation and indirects using program

Page 76: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

HAMPTON BRANCH RAIL CORRIDOR

HAMPTON - PORTSMOUTH (26485)

PURCHASE RAIL CORRIDOR FROM HAMPTON TO

PORTSMOUTH APPROXIMATELY 9.7 MILES AND

IMPROVE TRAIL SURFACE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

990,000Construction 2019 CMAQ *

$5,390,000

$990,000

$990,000 $4,400,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

OCEAN BOULEVARD

HAMPTON (40797)

IMPROVEMENTS TO OCEAN BOULEVARD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

216,903Preliminary Engineering 2019 Other Fed Aid

222,434Preliminary Engineering 2020 Other Fed Aid

228,106Preliminary Engineering 2021 Other Fed Aid

233,923Preliminary Engineering 2022 Other Fed Aid

319,850Right of Way 2023 Other Fed Aid

6,560,128Construction 2024 Other Fed Aid

$8,056,344

$7,781,344

$7,781,344 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

This project was combined with Hampton 29609 - adding $275,000 to PE in FY18Comments

$0

Page 70 of 232Includes inflation and indirects using program

Page 77: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-95 AND SPAULDING TURNPIKE

HAMPTON-NORTH HAMPTON-DOVER (41098)

EASTERN TPK RESURFACING: I-95 MM 4.4 TO 5.4

NB/SB; SPAULDING TPK MM 9.2 TO 12.7

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

3,589,250Construction 2019 TRR *

$3,599,250

$3,589,250

$3,589,250 $10,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SOUTH ROAD

HARRISVILLE (16114)

BRIDGE REPLACEMENT-SOUTH RD OVER

MINNEWAWA BROOK-BR. #061/060

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

691,272Construction 2019 SAB *

$804,789

$691,272

$691,272 $113,517Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 71 of 232Includes inflation and indirects using program

Page 78: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

DEAN MEMORIAL AIRPORT

HAVERHILL (41409)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

56,973Other 2019 Airport Improvement

58,425Other 2020 Airport Improvement

179,745Other 2021 Airport Improvement

176,955Other 2022 Airport Improvement

108,377Other 2023 Airport Improvement

129,232Other 2024 Airport Improvement

530,110Other 2025 Airport Improvement

430,554Other 2026 Airport Improvement

225,784Other 2027 Airport Improvement

2,829,954Other 2028 Airport Improvement

$4,726,109

$4,726,109

$4,726,109 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 202, NH 9, NH 127

HENNIKER - HOPKINTON (40633)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

91,291Preliminary Engineering 2022 None-Highway

47,658Right of Way 2024 None-Highway

837,234Construction 2025 None-Highway

$976,183

$976,183

$976,183 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 72 of 232Includes inflation and indirects using program

Page 79: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

WEST MAIN STREET / NH RTE 149

HILLSBOROUGH (41368)

CONSTRUCT APPROXIMATLY 4,600 FEET OF

SIDEWALK ALONG NH ROUTE 149

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 3

Category

Strategy

5,128Right of Way 2019 TA *

624,048Construction 2021 TA *

$715,902

$629,175

$629,175 $86,727Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 119

HINSDALE, NH - BRATTLEBORO, VT (12210C)

RECONSTRUCTION OF THE BRIDGES OVER THE

CONNECTICUT RIVER

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

9,024,400Construction 2019 Bridg-HIB-Rehab-Rcn

13,099,776Construction 2020 Bridg-HIB-Rehab-Rcn

8,118,740Construction 2020 NON-PAR (Vermont)

15,567,999Construction 2021 Bridg-HIB-Rehab-Rcn

$47,282,971

$45,810,916

$45,810,916 $1,472,055Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Funded with future GARVEE bondsComments

$0

Page 73 of 232Includes inflation and indirects using program

Page 80: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BRATTLEBORO ROAD

HINSDALE (41365)

CONSTRUCT SIDEWALKS ALONG BRATTLEBORO

ROAD.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 3

Category

Strategy

5,128Right of Way 2019 TA *

488,542Construction 2019 TA *

$565,841

$493,670

$493,670 $72,172Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 3A FROM COMMERCE RD NORTH TO GOONAN

RD

HOOKSETT (24862)

RECONSTRUCT AND WIDEN NH 3A FROM

COMMERCE ROAD NORTH TO GOONAN ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

189,297Preliminary Engineering 2020 SAH *

126,198Right of Way 2020 SAH *

946,485Construction 2020 SAH *

$1,261,980

$1,261,980

$1,261,980 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 74 of 232Includes inflation and indirects using program

Page 81: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 3 / NH 28

HOOKSETT (29611)

RECONSTRUCTION AND WIDENING FROM NH 27 /

WHITEHALL RD / MARTIN'S FERRY RD TO W ALICE

AVE / ALICE AVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

780,850Preliminary Engineering 2020 None-Highway

59,316Preliminary Engineering 2021 None-Highway

56,403Right of Way 2019 None-Highway

289,204Right of Way 2020 None-Highway

207,605Right of Way 2021 None-Highway

2,433,130Right of Way 2022 None-Highway

5,815,665Construction 2024 None-Highway

5,963,574Construction 2025 None-Highway

$16,155,747

$15,605,747

$15,605,747 $550,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 3A

HUDSON (41754)

CONSTRUCTING A THIRD SOUTHBOUND RIGHT

TURN LANE ON LOWELL RD/NH 3A

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

90,000Preliminary Engineering 2019 CMAQ *

61,530Preliminary Engineering 2020 CMAQ *

1,068,477Construction 2021 CMAQ *

360,208Construction 2022 CMAQ *

$1,580,215

$1,580,215

$1,580,215 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 75 of 232Includes inflation and indirects using program

Page 82: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 16

JACKSON (27709)

BRIDGE REPLACE/REHAB, FOR RED LIST BRIDGE

CARRYING NH 16 OVER ELLIS RIVER (BR NO

144/056)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

112,805Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

115,682Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

1,871,381Construction 2023 Bridg-T3-4-Rehab-Rcn

$2,658,888

$2,099,868

$2,099,868 $559,020Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VALLEY CROSS ROAD OVER WILDCAT BROOK

JACKSON (40808)

BRIDGE REHABILITATION-VALLEY CROSS RD OVER

WILDCAT BROOK-BR. #153/066

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

112,805Preliminary Engineering 2019 SAB *

5,128Right of Way 2019 SAB *

497,368Construction 2019 SAB *

$615,300

$615,300

$615,300 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 76 of 232Includes inflation and indirects using program

Page 83: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 202

JAFFREY (16307)

RECONFIGURE ''DOG-LEG'' INTERSECTION OF US

202, NH 124, AND NH 137

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

7,309,022Construction 2022 None-Highway

$9,255,142

$7,309,022

$7,309,022 $1,946,120Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NUTTING ROAD OVER CONTOOCOOK RIVER

JAFFREY (41401)

BRIDGE REHABILITATION-NUTTING ROAD OVER

CONTOOCOOK RIVER-BR. #159/094

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

107,847Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

614,726Construction 2021 SAB *

$727,965

$727,965

$727,965 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 77 of 232Includes inflation and indirects using program

Page 84: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 2

JEFFERSON - RANDOLPH (13602C)

IMPROVEMENTS FROM NH 115 TO

JEFFERSON/RANDOLPH TOWNLINE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

505,851Preliminary Engineering 2020 Other Fed Aid

518,751Preliminary Engineering 2021 Other Fed Aid

288,195Right of Way 2021 Other Fed Aid

295,544Right of Way 2022 Other Fed Aid

7,273,920Construction 2023 Other Fed Aid

$8,882,261

$8,882,261

$8,882,261 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 9/10/12/101

KEENE - SWANZEY (40100)

CONSTRUCTION OF FLOODPLAIN AND WETLAND

MITIGATION FOR THE KEENE-SWANZEY SERIES OF

PROJECTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

169,208Preliminary Engineering 2019 Other Fed Aid

112,805Right of Way 2019 Other Fed Aid

1,308,404Construction 2021 Other Fed Aid

$1,645,417

$1,590,417

$1,590,417 $55,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 78 of 232Includes inflation and indirects using program

Page 85: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

WINCHESTER STREET

KEENE (10309B)

RECONSTRUCTION FROM NH 101 ROUNDABOUT

NORTH TO PEARL ST/ISLAND ST INCLUDING KEY

RD INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

2,896,148Construction 2019 MUPCA*

2,197,855Construction 2020 MUPCA*

$5,736,003

$5,094,003

$5,094,003 $642,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

ROXBURY STREET

KEENE (15854)

BRIDGE REPLACEMENT-ROXBURY ST OVER

BEAVER BROOK-BR. #140/077

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

107,678Preliminary Engineering 2019 SAB *

10,255Right of Way 2019 SAB *

523,005Construction 2019 SAB *

$640,938

$640,938

$640,938 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 79 of 232Includes inflation and indirects using program

Page 86: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

DILLANT-HOPKINS AIRPORT

KEENE (40568)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

3,703,194Other 2019 Airport Improvement

491,471Other 2020 Airport Improvement

1,460,245Other 2021 Airport Improvement

61,934Other 2022 Airport Improvement

695,877Other 2023 Airport Improvement

193,849Other 2024 Airport Improvement

198,791Other 2025 Airport Improvement

679,537Other 2026 Airport Improvement

1,756,099Other 2027 Airport Improvement

929,025Other 2028 Airport Improvement

$10,170,022

$10,170,022

$10,170,022 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GEORGE STREET OVER BEAVER BROOK

KEENE (40653)

BRIDGE REPLACEMENT-GEORGE STREET OVER

BEAVER BROOK-BR. #142/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

127,186Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

630,402Construction 2022 SAB *

$763,118

$763,118

$763,118 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 80 of 232Includes inflation and indirects using program

Page 87: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 10 (WINCHESTER STREET)

KEENE (40666)

RECONSTRUCTION OF WINCHESTER STREET

FROM NH 101 TO SWANZEY TOWN LINE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

343,801Preliminary Engineering 2022 None-Highway

180,779Right of Way 2024 None-Highway

3,151,617Construction 2025 None-Highway

$3,676,198

$3,676,198

$3,676,198 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SWANZEY FACTORY RD/NH 101

KEENE (41590)

RECONSTRUCTION OF NH 101 FROM SWANZEY

FACTORY RD TO MARLBOROUGH TOWNLINE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

362,330Preliminary Engineering 2027 Other Fed Aid

181,165Right of Way 2027 Other Fed Aid

3,103,905Construction 2027 Other Fed Aid

$3,647,401

$3,647,401

$3,647,401 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Partially FundedComments

$0

Page 81 of 232Includes inflation and indirects using program

Page 88: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

CENTENARY AVENUE

LACONIA (24181)

BRIDGE REMOVAL, CARRYING CENTENARY

AVENUE OVER NH RR, BR. NO. 126/163, RED LIST

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

100,000Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

300,000Construction 2025 Bridg-T3-4-Rehab-Rcn

$400,000

$400,000

$400,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

ACADEMY STREET OVER DURKEE BROOK

LACONIA (26706)

BRIDGE REPLACEMENT-ACADEMY ST OVER

DURKEE BROOK-BR. #121/037

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

110,423Preliminary Engineering 2022 SAB *

10,517Right of Way 2022 SAB *

588,924Construction 2022 SAB *

$709,864

$709,864

$709,864 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 82 of 232Includes inflation and indirects using program

Page 89: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COURT STREET OVER DURKEE BROOK

LACONIA (40656)

BRIDGE REPLACEMENT-COURT STREET OVER

DURKEE BROOK-BR. #113/036

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

149,306Preliminary Engineering 2020 SAB *

44,239Right of Way 2020 SAB *

691,230Construction 2020 SAB *

$884,775

$884,775

$884,775 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3 AND NH 11

LACONIA (41469)

ADDRESS BRIDGE CARRYING US 3 AND NH 11

OVER MILE HILL ROAD IN THE CITY OF LACONIA

(121/028)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

374,276Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

269,096Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

67,274Right of Way 2026 Bridg-T1-2-Rehab-Rcn

3,449,480Construction 2027 Bridg-T1-2-Rehab-Rcn

$4,160,127

$4,160,127

$4,160,127 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 83 of 232Includes inflation and indirects using program

Page 90: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 2

LANCASTER, NH - GUILDHALL, VT (16155)

BRIDGE REPLACEMENT, US 2 OVER CONNECTICUT

RIVER (ROGER'S RANGER'S BRIDGE)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

4,102,000Construction 2019 Bridg-T1-2-Rehab-Rcn

1,845,900Construction 2019 NON-PAR (Vermont)

4,416,931Construction 2020 Bridg-T1-2-Rehab-Rcn

$12,026,231

$10,364,831

$10,364,831 $1,661,400Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89 NB & SB

LEBANON, NH - HARTFORD, VT (16148)

SUPERSTRUCTURE REPLACE & WIDENING, I-89 NB

& SB OVER CONNECTICUT RIVER (BR NO 044/103 &

044/104)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 1

Category

Strategy

11,690,700Construction 2019 Bridg-T1-2-Rehab-Rcn

3,691,800Construction 2019 NON-PAR (Vermont)

11,988,813Construction 2020 Bridg-T1-2-Rehab-Rcn

3,785,941Construction 2020 NON-PAR (Vermont)

4,589,957Construction 2021 Bridg-T1-2-Rehab-Rcn

1,449,460Construction 2021 NON-PAR (Vermont)

$40,051,898

$37,196,671

$37,196,671 $2,855,228Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Funded with future GARVEE bondsComments

$0

Page 84 of 232Includes inflation and indirects using program

Page 91: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 12A

LEBANON (13558A)

NH 12A BRIDGE REPLACEMENT OVER B&M RR

BRIDGE# 062/117 (MOBRR-221)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

25,638Right of Way 2019 MOBRR *

26,291Right of Way 2020 MOBRR *

4,206,601Construction 2020 MOBRR *

3,235,402Construction 2021 MOBRR *

$8,158,932

$7,493,932

$7,493,932 $665,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 10

LEBANON (15717)

NH 10 REPLACEMENT OF 3'X4' CONCRETE BOX

CULVERT

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

403,278Construction 2019 CRDR *

$591,955

$403,278

$403,278 $188,677Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 85 of 232Includes inflation and indirects using program

Page 92: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TRUES BROOK RD OVER BLOODS BROOK

LEBANON (24221)

BRIDGE REPLACEMENT-TRUES BROOK RD OVER

BLOODS BROOK-BR. #066/059

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

204,604Preliminary Engineering 2022 SAB *

16,590Right of Way 2022 SAB *

1,338,222Construction 2022 SAB *

$1,559,415

$1,559,415

$1,559,415 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 120 PARKING LOT, PED OVER NHRR (ABD)

LEBANON (24222)

BRIDGE REHABILITATION NH 120 PARKING LOT,

PED OVER NHRR (ABD)-BR. #121/117

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

113,417Preliminary Engineering 2023 SAB *

5,671Right of Way 2023 SAB *

578,427Construction 2023 SAB *

$697,515

$697,515

$697,515 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 86 of 232Includes inflation and indirects using program

Page 93: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MASCOMA STREET

LEBANON (25821)

BRIDGE REHABILIATATION, FOR REDLIST BRIDGE

CARRYING MASCOMA STREET OVER I-89 (BR NO

103/116)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

4,990,350Construction 2023 Bridg-T3-4-Rehab-Rcn

$5,266,450

$4,990,350

$4,990,350 $276,100Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I89

LEBANON (29612)

EXIT 18 / NH 120 IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

282,013Preliminary Engineering 2019 None-Highway

118,631Preliminary Engineering 2021 None-Highway

919,393Right of Way 2021 None-Highway

3,048,650Construction 2023 None-Highway

$4,671,187

$4,368,687

$4,368,687 $302,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 87 of 232Includes inflation and indirects using program

Page 94: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

LEBANON MUNICIPAL AIRPORT

LEBANON (40564)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

2,256,100Other 2019 Airport Improvement

13,671,453Other 2020 Airport Improvement

5,176,643Other 2021 Airport Improvement

4,423,873Other 2022 Airport Improvement

4,536,682Other 2023 Airport Improvement

3,274,103Other 2024 Airport Improvement

1,325,278Other 2025 Airport Improvement

1,359,073Other 2026 Airport Improvement

1,393,729Other 2027 Airport Improvement

1,429,269Other 2028 Airport Improvement

$38,846,205

$38,846,205

$38,846,205 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 4 (MECHANIC ST)

LEBANON (40794)

RECONSTRUCT MECHANIC ST / HIGH ST /

MASCOMA ST INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

113,580Right of Way 2019 Other Fed Aid

2,635,000Construction 2020 Other Fed Aid

$3,048,580

$2,748,580

$2,748,580 $300,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 88 of 232Includes inflation and indirects using program

Page 95: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-89 NB & SB

LEBANON (41191)

REHAB OF THE I-89 NB & SB OVER US 4 & NH 10

BRIDGES AND PRESERVATION EFFORTS FOR THE

MASCOMA RIVER

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 1

Category

Strategy

5,640Right of Way 2019 Bridg-T1-2-Rehab-Rcn

4,000,000Construction 2020 Bridg-T1-2-Rehab-Rcn

3,592,410Construction 2021 Bridg-T1-2-Rehab-Rcn

1,186,314Construction 2021 4R

$9,389,364

$8,784,364

$8,784,364 $605,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

LAHAYE DRIVE

LEBANON (41366)

CONSTRUCT BICYCLE AND PEDESTRIAN

IMPROVEMENTS ALONG LAHAYE DR FROM NH RTE

120 TO MOUNT SUPPORT RD

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

33,842Preliminary Engineering 2019 TA *

10,255Right of Way 2019 TA *

715,122Construction 2020 TA *

$882,099

$759,219

$759,219 $122,880Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 89 of 232Includes inflation and indirects using program

Page 96: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 125

LEE (41322)

BRIDGE REPLACEMENT OF CULVERT CARRYING

NH 125 OVER LITTLE RIVER BR NO 073/084

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

237,263Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

18,248Right of Way 2022 Bridg-T1-2-Rehab-Rcn

1,871,381Construction 2023 Bridg-T1-2-Rehab-Rcn

$2,346,893

$2,126,893

$2,126,893 $220,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 18

LITTLETON, NH - WATERFORD, VT (27711)

DECK REPLACEMENT AND PAINTING OF RED LIST

BRIDGE CARRYING NH 118 OVER CONNECTICUT

RIVER (109/134)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

102,550Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

54,146Preliminary Engineering 2019 NON-PAR (Vermont)

127,881Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

55,527Preliminary Engineering 2020 NON-PAR (Vermont)

107,847Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

56,943Preliminary Engineering 2021 NON-PAR (Vermont)

110,597Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

58,395Preliminary Engineering 2022 NON-PAR (Vermont)

129,749Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

59,884Preliminary Engineering 2023 NON-PAR (Vermont)

3,180,668Construction 2025 Bridg-T3-4-Rehab-Rcn

1,590,334Construction 2025 NON-PAR (Vermont)

$5,634,522

$5,634,522

$5,634,522 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 90 of 232Includes inflation and indirects using program

Page 97: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

COTTAGE STREET, MILL STREET, SOUTH STREET,

MEADOW STREET

LITTLETON (41362)

CONST SIDEWALKS ALONG COTTAGE ST, MILL ST,

SOUTH ST, MEADOW ST, MT. EUSTIS RD,

BRONSON ST

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

34,867Preliminary Engineering 2019 TA *

905,913Construction 2021 TA *

$1,104,780

$940,780

$940,780 $164,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH28/NH128

LONDONDERRY (41593)

SAFETY & OPERATIONAL IMPROVEMENTS AT THE

INTERSECTION OF NH 28./NH 128

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

70,749Preliminary Engineering 2028 None-Highway

70,749Right of Way 2028 None-Highway

1,273,479Construction 2028 None-Highway

$1,414,977

$1,414,977

$1,414,977 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 91 of 232Includes inflation and indirects using program

Page 98: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 28/STONEHENGE ROAD

LONDONDERRY (41715)

OPERATIONAL AND CAPACITY IMPROVEMENTS AT

THE INTERSECTION OF NH 28 & STONEHENGE RD.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

55,000Preliminary Engineering 2019 NON-PAR (other)

55,000Preliminary Engineering 2019 None-Highway

100,000Right of Way 2019 NON-PAR (other)

100,000Right of Way 2019 None-Highway

700,000Construction 2020 NON-PAR (other)

700,000Construction 2020 None-Highway

$1,710,000

$1,710,000

$1,710,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Town to provide 50% matchComments

$0

Phase Year Funding

NH RTE 106

LOUDON - CANTERBURY (29613A)

NH RTE 106 ROADWAY WIDENING (3.6 MI, PHASE II)

FROM SOUCOOK ROAD, LOUDON TO AMES ROAD,

CANTERBURY

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,060,367Right of Way 2019 None-Highway

1,735,223Construction 2020 None-Highway

5,338,413Construction 2021 None-Highway

$8,574,003

$8,134,003

$8,134,003 $440,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 92 of 232Includes inflation and indirects using program

Page 99: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 106 AND SOUTH VILLAGE ROAD

LOUDON (40632)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

55,000Preliminary Engineering 2019 None-Highway

56,403Preliminary Engineering 2020 None-Highway

59,316Preliminary Engineering 2022 None-Highway

63,970Right of Way 2024 None-Highway

1,115,222Construction 2025 None-Highway

$1,349,910

$1,349,910

$1,349,910 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

EAST THETFORD ROAD

LYME, NH - THETFORD, VT (14460)

BRIDGE REHAB, FOR RED LIST BRIDGE CARRYING

EAST THETFORD ROAD OVER THE CONN. RIVER

(BR NO 053/112)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

2,000,000Construction 2021 Bridg-T3-4-Rehab-Rcn

2,927,089Construction 2022 Bridg-T3-4-Rehab-Rcn

497,686Construction 2022 NON-PAR (Vermont)

$6,241,744

$5,424,774

$5,424,774 $816,970Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 93 of 232Includes inflation and indirects using program

Page 100: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NHRR

LYNDEBOROUGH (41435)

ADDRESS RED LIST BRIDGE CARRYING NHRR

OVER GLASS FACTORY ROAD IN THE TOWN OF

LYNDEBOROUGH (108/070)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 6

Category

Strategy

134,548Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

137,979Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

1,414,977Construction 2028 Bridg-T3-4-Rehab-Rcn

$1,687,504

$1,687,504

$1,687,504 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NUTE ROAD OVER BELLAMY RIVER

MADBURY (24226)

BRIDGE REPLACEMENT-NUTE RD OVER BELLAMY

RIVER-BR. #056/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

124,024Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

668,650Construction 2021 SAB *

$798,066

$798,066

$798,066 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 94 of 232Includes inflation and indirects using program

Page 101: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MADBURY RD

MADBURY (41596)

PLANNING STUDY TO IDENTIFY POTENTIAL

INTERSECTION SAFETY IMPROVEMENTS TO THE

NH 155/MADBURY ROAD/TO

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

707,488Preliminary Engineering 2028 None-Highway

$707,488

$707,488

$707,488 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 3 (ELM STREET)

MANCHESTER (15837)

BRIDGE REHABILITATION-US 3 (ELM ST) OVER

B&MRR-BR. #144/075

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

97,853Preliminary Engineering 2026 SAB *

30,579Right of Way 2026 SAB *

850,100Construction 2026 SAB *

$978,533

$978,533

$978,533 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 95 of 232Includes inflation and indirects using program

Page 102: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-293 / FEE TPK

MANCHESTER (16099)

PRELIMINARY ENGINEERING & ROW FOR

RECONSTRUCTION OF THE F.E. EEVERETT

TURNPIKE AT EXITS 6 AND 7

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

2,500,000Preliminary Engineering 2019 TPK *

2,000,000Preliminary Engineering 2022 TPK *

1,400,000Preliminary Engineering 2023 TPK *

4,000,000Right of Way 2023 TPK *

6,200,000Right of Way 2024 TPK *

$20,500,000

$16,100,000

$16,100,000 $4,400,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RECONSTRUCT AND WIDENING OF EXIT 6

(AMOSKEAG)

MANCHESTER (16099A)

RECONSTRUCT AND WIDEN OF EXIT 6

(AMOSKEAG) IN MANCHESTER.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

8,700,000Construction 2026 TPK *

30,000,000Construction 2027 TPK *

30,000,000Construction 2028 TPK *

$98,700,000

$68,700,000

$68,700,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$30,000,000

Page 96 of 232Includes inflation and indirects using program

Page 103: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

EXIT 7 FEE TURNPIKE

MANCHESTER (16099B)

RECONSTRUCT EXIT 7

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

16,200,000Construction 2024 TPK *

24,000,000Construction 2025 TPK *

12,000,000Construction 2026 TPK *

$52,200,000

$52,200,000

$52,200,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SALMON STREET WB OVER RD, BMRR,

MARRIMACK RIVER AND RAMP

MANCHESTER (24206)

BRIDGE REHAB-SALMON ST WB OVER RD, BMRR,

MERRIMACK RIVER, RAMP-BR. #106/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

97,062Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

463,741Construction 2021 SAB *

$566,195

$566,195

$566,195 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 97 of 232Includes inflation and indirects using program

Page 104: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

RAMP E (CANAL ST) OVER BMRR

MANCHESTER (24211)

BRIDGE REHAB-RAMP E (CANAL STREET) OVER

BMRR-BR #107/071

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

80,885Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

372,071Construction 2021 SAB *

$458,349

$458,349

$458,349 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SAMON ST EB OVER RD, BMRR, MERRIMACK RIVER

AND RAMP

MANCHESTER (24212)

SALMON ST EB OVER RD, BMRR, MERRIMACK

RIVER, RAMP-BR #107/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

113,239Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

566,195Construction 2021 SAB *

$684,827

$684,827

$684,827 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 98 of 232Includes inflation and indirects using program

Page 105: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

REHAB QUEEN CITY BRIDGE OVER I-293, BMRR &

MERRIMACK RIVER

MANCHESTER (28336)

BRIDGE REHABILITATION-QUEEN CITY BR. OVER

I-293, BMRR & MERRIMACK RIVER-BR. #151/065

(MOBRR)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

661,448Preliminary Engineering 2019 SAB *

5,258Right of Way 2020 SAB *

1,455,931Construction 2021 MOBRR *

4,976,857Construction 2022 MOBRR *

$7,099,494

$7,099,494

$7,099,494 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RAIL TRAIL

MANCHESTER (40428)

CONSTRUCT MULTI-USE PATH ALONG BAKER ST,

BROWN AVE, DUBISZ ST, AND SUNDIAL AVE.

(14-25TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

697,576Construction 2019 TA *

$829,846

$697,576

$697,576 $132,270Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 99 of 232Includes inflation and indirects using program

Page 106: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER-BOSTON REGIONAL AIRPORT

MANCHESTER (40563)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

18,459,000Other 2019 Airport Improvement

17,878,054Other 2020 Airport Improvement

5,392,337Other 2021 Airport Improvement

4,866,260Other 2022 Airport Improvement

6,124,520Other 2023 Airport Improvement

3,876,972Other 2024 Airport Improvement

3,975,835Other 2025 Airport Improvement

4,077,220Other 2026 Airport Improvement

4,181,189Other 2027 Airport Improvement

4,287,808Other 2028 Airport Improvement

$73,119,196

$73,119,196

$73,119,196 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RAIL TRAIL

MANCHESTER (41361)

CONST. RAIL TRAIL ALONG ABANDONED

RAILROAD BED FROM MAMMOTH ROAD TO LAKE

SHORE AVENUE

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

23,587Preliminary Engineering 2019 TA *

30,765Right of Way 2019 08-Funds

922,554Construction 2021 TA *

$1,124,979

$976,906

$976,906 $148,073Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 100 of 232Includes inflation and indirects using program

Page 107: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

HUSE ROAD

MANCHESTER (41414)

REHAB RED LIST BRIDGE CARRYING HUSE ROAD

OVER I-293 AND NH ROUTE 101 (176/106)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

187,138Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

191,910Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

1,312,026Construction 2025 Bridg-T3-4-Rehab-Rcn

2,018,224Construction 2026 Bridg-T3-4-Rehab-Rcn

$3,709,297

$3,709,297

$3,709,297 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93 SB

MANCHESTER (41475)

ADDRESS BRIDGE CARRYING I-93 SB OVER

STEVENS POND IN THE CITY OF MANCHESTER

(124/119)

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

191,910Preliminary Engineering 2024 Bridg-HIB-Rehab-Rcn

131,203Preliminary Engineering 2025 Bridg-HIB-Rehab-Rcn

1,009,112Preliminary Engineering 2026 Bridg-HIB-Rehab-Rcn

689,896Preliminary Engineering 2027 Bridg-HIB-Rehab-Rcn

6,898,961Construction 2027 Bridg-HIB-Rehab-Rcn

7,074,884Construction 2028 Bridg-HIB-Rehab-Rcn

$15,995,965

$15,995,965

$15,995,965 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 101 of 232Includes inflation and indirects using program

Page 108: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-293

MANCHESTER (41594)

OPERATIONAL IMPROVEMENTS AT THE I-293 EXIT

1 INTERCHANGE (SOUTH WILLOW ST.)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

212,247Preliminary Engineering 2028 None-Highway

70,749Right of Way 2028 None-Highway

1,839,470Construction 2028 None-Highway

$2,122,465

$2,122,465

$2,122,465 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GRANITE ST & SOUTH WILLOW ST

MANCHESTER (41747)

IMPLEMENT AN ADAPTIVE SIGNAL CONTROL

SYSTEM ON GRANITE ST &UPGRADE SO. WILLOW

ST.SIGNAL PERFORMANCE

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

165,000Preliminary Engineering 2019 CMAQ *

112,805Preliminary Engineering 2020 CMAQ *

1,288,272Construction 2021 CMAQ *

$1,566,077

$1,566,077

$1,566,077 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 102 of 232Includes inflation and indirects using program

Page 109: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200A)

MANCHESTER TRANSIT AUTHORITY (MTA) -

OPERATING ASSISTANCE FOR FIXED ROUTE

TRANSIT SERVICE.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

2,186,766Other 2019 FTA5307

2,242,528Other 2020 FTA5307

2,299,713Other 2021 FTA5307

2,358,356Other 2022 FTA5307

2,418,494Other 2023 FTA5307

2,480,165Other 2024 FTA5307

2,543,410Other 2025 FTA5307

2,608,266Other 2026 FTA5307

2,674,777Other 2027 FTA5307

2,742,984Other 2028 FTA5307

$33,265,138

$24,555,459

$24,555,459 $8,709,678Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 103 of 232Includes inflation and indirects using program

Page 110: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200B)

MANCHESTER TRANSIT AUTHORITY (MTA) -

OPERATING ASSISTANCE FOR CAPITAL

MAINTENANCE OF TRANSIT FLEET.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

627,430Other 2019 FTA5307

643,429Other 2020 FTA5307

659,837Other 2021 FTA5307

676,662Other 2022 FTA5307

693,917Other 2023 FTA5307

711,612Other 2024 FTA5307

729,758Other 2025 FTA5307

748,367Other 2026 FTA5307

767,200Other 2027 FTA5307

786,763Other 2028 FTA5307

$9,358,209

$7,044,975

$7,044,975 $2,313,234Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200C)

MANCHESTER TRANSIT AUTHORITY (MTA) -

REPLACEMENT BUSES.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

1,115,624Other 2019 FTA5307

951,423Other 2020 FTA5307

$3,925,362

$2,067,047

$2,067,047 $1,858,315Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 104 of 232Includes inflation and indirects using program

Page 111: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200D)

MANCHESTER TRANSIT AUTHORITY (MTA) -

OPERATING ASSISTANCE FOR ADA PARATRANSIT

SERVICE.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

566,153Other 2019 FTA5307

580,590Other 2020 FTA5307

595,395Other 2021 FTA5307

610,577Other 2022 FTA5307

626,147Other 2023 FTA5307

642,114Other 2024 FTA5307

658,488Other 2025 FTA5307

675,279Other 2026 FTA5307

692,499Other 2027 FTA5307

710,158Other 2028 FTA5307

$8,036,216

$6,357,400

$6,357,400 $1,678,816Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 105 of 232Includes inflation and indirects using program

Page 112: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200E)

MANCHESTER TRANSIT AUTHORITY (MTA) -

REPLACEMENT OF ADA PARATRANSIT VANS. FTA

SECTION 5307 FUNDS.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

147,473Other 2019 FTA5307

151,234Other 2020 FTA5307

155,090Other 2021 FTA5307

159,045Other 2022 FTA5307

163,101Other 2023 FTA5307

167,260Other 2024 FTA5307

171,525Other 2025 FTA5307

175,899Other 2026 FTA5307

180,384Other 2027 FTA5307

184,984Other 2028 FTA5307

$2,296,207

$1,655,993

$1,655,993 $640,214Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200F)

MANCHESTER TRANSIT AUTHORITY (MTA) -

REPLACEMENT OF TRANSIT SERVICE VEHICLES.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

136,715Other 2020 FTA5307

$166,715

$136,715

$136,715 $30,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 106 of 232Includes inflation and indirects using program

Page 113: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER TRANSIT AUTHORITY (MTA)

MANCHESTER (60200G)

MANCHESTER TRANSIT AUTHORITY (MTA) -

MISCELLANEOUS CAPITAL FOR PUBLIC

TRANSPORTATION.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

139,799Other 2019 FTA5307

143,364Other 2020 FTA5307

147,020Other 2021 FTA5307

150,769Other 2022 FTA5307

154,614Other 2023 FTA5307

158,556Other 2024 FTA5307

162,599Other 2025 FTA5307

166,746Other 2026 FTA5307

$1,746,475

$1,223,467

$1,223,467 $523,008Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 10, NH 123

MARLOW (40088)

NH 10 & NH 123 OVER ASHUELOT RIVER -REPAIR

OR REPLACE BRIDGE

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

145,593Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

16,590Right of Way 2022 Bridg-T3-4-Rehab-Rcn

1,013,838Construction 2025 Bridg-T3-4-Rehab-Rcn

$1,176,021

$1,176,021

$1,176,021 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 107 of 232Includes inflation and indirects using program

Page 114: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US ROUTE 3

MEREDITH (41483)

ADDRESS BRIDGE CARRYING US ROUTE 3 OVER

MAPLE STREET AND NHRR IN THE TOWN OF

MEREDITH (184/138)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

561,414Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

127,940Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

269,096Preliminary Engineering 2025 Bridg-T1-2-Rehab-Rcn

277,674Preliminary Engineering 2026 Bridg-T1-2-Rehab-Rcn

67,274Right of Way 2026 Bridg-T1-2-Rehab-Rcn

8,489,861Construction 2027 Bridg-T1-2-Rehab-Rcn

$9,793,260

$9,793,260

$9,793,260 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 101A

MERRIMACK (10136D)

WIDEN 101A FROM BOSTON POST RD TO CONT.

BLVD & SAFETY IMPR. AT CRAFTSMAN LANE /

BOSTON POST RD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

507,623Right of Way 2019 Other Fed Aid

1,735,223Construction 2020 Other Fed Aid

2,372,628Construction 2021 Other Fed Aid

$6,375,474

$4,615,474

$4,615,474 $1,760,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 108 of 232Includes inflation and indirects using program

Page 115: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 3 OVER BABOOSIC BROOK

MERRIMACK (29174)

BRIDGE REPLACEMENT-US 3 OVER BABOOSIC

BROOK-BR. # 118/135

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

215,492Preliminary Engineering 2023 SAB *

11,342Right of Way 2023 SAB *

3,538,612Construction 2023 SAB *

$3,765,446

$3,765,446

$3,765,446 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MULTI-USE PATH

MERRIMACK (40300)

CONSTRUCT MULTI-USE PATH IN THE TOWN OF

MERRIMACK FOR APPROXIMATLY 2,500LF.

(14-15TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

497,368Construction 2019 TA *

$564,610

$497,368

$497,368 $67,242Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 109 of 232Includes inflation and indirects using program

Page 116: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

DANIEL WEBSTER HIGHWAY AND WODBURY ST.

MERRIMACK (41371)

CONSTRUCT SIDEWALKS ALONG DANIEL

WEBSTER HIGHWAY, AND WOODBURY STREET

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

20,510Preliminary Engineering 2019 TA *

20,510Right of Way 2019 TA *

573,149Construction 2020 TA *

$721,889

$614,169

$614,169 $107,720Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

DW HIGHWAY

MERRIMACK (41588)

SAFETY & CAPACITY IMPROVEMENTS TO THE

US3/WIRE ROAD INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

96,585Preliminary Engineering 2027 None-Highway

13,798Right of Way 2027 None-Highway

1,041,743Construction 2027 None-Highway

$1,152,126

$1,152,126

$1,152,126 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 110 of 232Includes inflation and indirects using program

Page 117: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BERLIN REGIONAL AIRPORT

MILAN (40576)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

398,806Other 2019 Airport Improvement

399,377Other 2022 Airport Improvement

1,855,390Other 2025 Airport Improvement

836,238Other 2027 Airport Improvement

214,391Other 2028 Airport Improvement

$3,704,202

$3,704,202

$3,704,202 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BRIDGE STREET

MILFORD (41587)

REHABILITATION OF THE SWING BRIDGE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

63,000Preliminary Engineering 2020 None-Highway

6,560Right of Way 2025 None-Highway

662,601Construction 2025 None-Highway

$732,161

$732,161

$732,161 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 111 of 232Includes inflation and indirects using program

Page 118: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TOWNHOUSE ROAD OVER NORTHEAST POND

MILTON (40658)

BRIDGE REPLACEMENT-TOWNHOUSE ROAD OVER

NORTHEAST POND-BR. #168/152

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

78,874Preliminary Engineering 2020 SAB *

78,874Preliminary Engineering 2020 NON-PAR (other)

10,517Right of Way 2020 SAB *

10,517Right of Way 2020 NON-PAR (other)

646,765Construction 2020 SAB *

646,765Construction 2020 NON-PAR (other)

$1,472,310

$1,472,310

$1,472,310 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 25 AND LAKE SHORE ROAD

MOULTONBOROUGH (40639)

SAFETY IMPROVEMENTS FROM JUST WEST OF

LAKE SHORE DRIVE (W) TO JUST EAST OF LAKE

SHORE DRIVE (E)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

28,201Preliminary Engineering 2020 None-Highway

27,185Preliminary Engineering 2021 None-Highway

59,003Preliminary Engineering 2022 None-Highway

263,992Preliminary Engineering 2023 None-Highway

31,025Right of Way 2023 None-Highway

540,883Construction 2025 None-Highway

$950,289

$950,289

$950,289 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 112 of 232Includes inflation and indirects using program

Page 119: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

WHITTIER HIGHWAY

MOULTONBOROUGH (41580)

COMPLETE STREETS IMPROVEMENTS TO

MOLTONBOROUGH CENTRAL VILLAGE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

137,979Preliminary Engineering 2027 None-Highway

13,798Right of Way 2027 None-Highway

1,357,026Construction 2027 None-Highway

$1,508,803

$1,508,803

$1,508,803 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SHERIDAN RD AND NH 25

MOULTONBOROUGH (41581)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

64,867Preliminary Engineering 2027 None-Highway

6,727Right of Way 2027 None-Highway

583,806Construction 2027 None-Highway

$655,401

$655,401

$655,401 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 113 of 232Includes inflation and indirects using program

Page 120: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

F.E. EVERETT TURNPIKE

NASHUA - CONCORD (29408)

INTELLIGENT TRANSPORTATION SYSTEM (ITS)

DEPLOYMENT ON F.E. EVERETT TURNPIKE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

1,400,000Construction 2019 TPK *

$4,690,947

$1,400,000

$1,400,000 $3,290,947Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

F. E. EVERETT TURNPIKE

NASHUA - MERRIMACK - BEDFORD - MANCHESTER (13761)

F.E.E.TURNPIKE WIDENING OF 2-LANE SECTIONS

FROM EXIT 8 (NASHUA) TO NORTH OF I-293

(MANCHESTER)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

3,500,000Preliminary Engineering 2019 TPK *

3,000,000Preliminary Engineering 2020 TPK *

1,000,000Preliminary Engineering 2021 TPK *

300,000Right of Way 2019 TPK *

2,500,000Right of Way 2020 TPK *

4,000,000Right of Way 2021 TPK *

11,400,000Construction 2022 TPK *

30,500,000Construction 2023 TPK *

39,300,000Construction 2024 TPK *

26,000,000Construction 2025 TPK *

19,500,000Construction 2026 TPK *

$146,000,000

$141,000,000

$141,000,000 $5,000,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 114 of 232Includes inflation and indirects using program

Page 121: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH CAPITOL CORRIDOR

NASHUA (40818)

DESIGN AND FINANCIAL PLAN FOR RAIL

EXPANSION FROM NASHUA TO CONCORD.

CONCORD CAPITOL STUDY.

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

2,000,000Other 2019 FTA5307_NHDOT

2,000,001Other 2020 FTA5307_NHDOT

$4,000,001

$4,000,001

$4,000,001 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 101A

NASHUA (10136A)

WIDENING OF NH 101A FROM SUNAPEE STREET

TO BLACKSTONE DRIVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

525,888Preliminary Engineering 2019 Other Fed Aid

3,064,572Right of Way 2024 Other Fed Aid

4,625,250Construction 2025 Other Fed Aid

589,441Construction 2025 NON-PAR (other)

$9,910,000

$8,805,151

$8,805,151 $1,104,850Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 115 of 232Includes inflation and indirects using program

Page 122: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 101A

NASHUA (10136B)

PHASE II, WIDENING AND IMPROVEMENTS FROM

SOMERSET PKWY TO SUNAPEE ST & BLACKSTONE

DR TO CELINA AVE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

3,804,169Right of Way 2021 Other Fed Aid

6,942,546Construction 2026 Other Fed Aid

$12,456,963

$10,746,716

$10,746,716 $1,710,247Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

EAST HOLLIS STREET

NASHUA (16314)

INTERSECTION IMPROVEMENTS AT EAST HOLLIS

ST AND BRIDGE ST FROM C ST TO THE HUDSON

TOWN LINE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

3,058,035Construction 2020 Other Fed Aid

$3,881,675

$3,058,035

$3,058,035 $823,640Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 116 of 232Includes inflation and indirects using program

Page 123: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BOIRE FIELD

NASHUA (40561)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

341,833Other 2019 Airport Improvement

1,051,650Other 2020 Airport Improvement

359,489Other 2021 Airport Improvement

663,581Other 2022 Airport Improvement

7,156,615Other 2023 Airport Improvement

387,697Other 2024 Airport Improvement

1,073,476Other 2025 Airport Improvement

4,892,663Other 2026 Airport Improvement

857,144Other 2027 Airport Improvement

6,431,713Other 2028 Airport Improvement

$23,215,861

$23,215,861

$23,215,861 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

EAST HOLLIS ST

NASHUA (40660)

IMPROVEMENTS ALONG EAST HOLLIS STREET

FROM MAIN STREET EAST TO PROPOSED

ROUNDABOUT

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

444,046Preliminary Engineering 2022 None-Highway

233,491Right of Way 2024 None-Highway

4,070,560Construction 2025 None-Highway

$4,748,097

$4,748,097

$4,748,097 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 117 of 232Includes inflation and indirects using program

Page 124: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

DW HIGHWAY

NASHUA (41585)

DW HIGHWAY PEDESTRIAN SAFETY

IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

24,146Preliminary Engineering 2027 None-Highway

6,899Right of Way 2027 None-Highway

451,882Construction 2027 None-Highway

$482,927

$482,927

$482,927 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WALNUT ST/CHESTNUT ST/CENTRAL ST

NASHUA (41586)

SAFETY, CAPACITY AND MULTIMODAL ACCESS

IMPROVEMENTS TO THE WALNUT STREET OVAL

INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

281,478Preliminary Engineering 2027 None-Highway

68,990Right of Way 2027 None-Highway

2,464,309Construction 2027 None-Highway

$2,814,776

$2,814,776

$2,814,776 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 118 of 232Includes inflation and indirects using program

Page 125: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

HERRITAGE RAIL TRAIL EAST

NASHUA (41742)

CONSTRUCT THE HERITAGE RAIL TRAIL EAST

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

78,240Preliminary Engineering 2019 CMAQ *

53,490Preliminary Engineering 2020 CMAQ *

994,017Construction 2020 CMAQ *

$1,125,747

$1,125,747

$1,125,747 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NASHUA TRANSIT SYSTEM (NTS)

NASHUA (60900A)

NASHUA TRANSIT SYSTEM- CAPITAL PREVENTIVE

MAINT, CAPITAL PLANNING & ADA OPERATIONS.

ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

998,384Other 2019 FTA5307

1,035,888Other 2020 FTA5307

1,074,801Other 2021 FTA5307

1,115,175Other 2022 FTA5307

1,157,067Other 2023 FTA5307

1,200,532Other 2024 FTA5307

1,245,629Other 2025 FTA5307

1,292,420Other 2026 FTA5307

1,340,970Other 2027 FTA5307

1,391,343Other 2028 FTA5307

$14,759,254

$11,852,208

$11,852,208 $2,907,045Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 119 of 232Includes inflation and indirects using program

Page 126: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NASHUA TRANSIT SYSTEM (NTS)

NASHUA (60900B)

NASHUA TRANSIT SYSTEM (NTS) - OPERATING

ASSISTANCE. ANNUAL PROJECT.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

1,702,330Other 2019 FTA5307

1,745,739Other 2020 FTA5307

1,790,256Other 2021 FTA5307

1,835,907Other 2022 FTA5307

1,882,723Other 2023 FTA5307

1,930,732Other 2024 FTA5307

1,979,966Other 2025 FTA5307

2,030,455Other 2026 FTA5307

2,082,232Other 2027 FTA5307

2,135,329Other 2028 FTA5307

$26,139,919

$19,115,669

$19,115,669 $7,024,249Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NASHUA TRANSIT SYSTEM (NTS)

NASHUA (60900C)

NASHUA TRANSIT SYSTEM (NTS)-FLEET

REPLACEMENT. ANNUAL PROJECT USING FTA

5307 AND/OR FTA 5339 FUNDS.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

135,586Other 2019 FTA5307

1,842,909Other 2022 FTA5307

2,043,999Other 2025 FTA5307

704,252Other 2026 FTA5307

5,713,299Other 2027 FTA5307

$17,101,118

$10,440,046

$10,440,046 $6,661,072Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 120 of 232Includes inflation and indirects using program

Page 127: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

F. E. EVERETT TURNPIKE

NASHUA-MERRIMACK (41097)

CENTRAL TURNPIKE RESURFACING: FEET MM 5.6

TO 9.1, EXIT 10 AND 11 RAMPS

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

3,589,250Construction 2019 TRR *

$3,599,250

$3,589,250

$3,589,250 $10,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

GREGG MILL ROAD

NEW BOSTON (14771)

BRIDGE REPLACEMENT GREGG MILL RD OVER

SOUTH BRANCH PISCATAQUOG RIVER - BR.

#132/138

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

134,548Preliminary Engineering 2026 SAB *

6,116Right of Way 2026 SAB *

807,289Construction 2026 SAB *

$947,953

$947,953

$947,953 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 121 of 232Includes inflation and indirects using program

Page 128: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 13

NEW BOSTON (27729)

CULVERT REPLACEMENT FOR RED LIST BRIDGE

CARRYING NH 13 OVER COCHRANE BROOK (BR NO

122/120)

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

170,126Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

232,618Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

1,192,751Construction 2025 Bridg-T3-4-Rehab-Rcn

$1,595,495

$1,595,495

$1,595,495 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 1B

NEW CASTLE - RYE (16127)

BRIDGE REPLACE, SINGLE LEAF BASCULE BRIDGE,

NH 1B OVER LITTLE HARBOR (RED LIST) BR NO

066/071

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

4,510,000Construction 2019 Bridg-HIB-Rehab-Rcn

4,399,395Construction 2020 Bridg-HIB-Rehab-Rcn

$16,973,605

$8,909,395

$8,909,395 $8,064,210Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 122 of 232Includes inflation and indirects using program

Page 129: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 1A & 1B

NEW CASTLE-RYE (41713)

BICYCLE AND PEDESTRAIN SAFETY

ACCOMMODATIONSON NH 1A & 1B.

Route/Road

Scope

Program

ROADSIDE

TIER 2

Category

Strategy

280,000Preliminary Engineering 2028 None-Other

140,000Right of Way 2028 None-Other

2,380,000Construction 2028 None-Other

$2,800,000

$2,800,000

$2,800,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SMITH CROSSING

NEW HAMPTON (25365)

REMOVAL OF BRIDGE CARRYING SMITH

CROSSING OVER NH RAILROAD (240/104) (RED

LIST)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 6

Category

Strategy

28,201Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

57,841Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

29,658Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

328,006Construction 2025 Bridg-T3-4-Rehab-Rcn

$443,706

$443,706

$443,706 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 123 of 232Includes inflation and indirects using program

Page 130: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-89

NEW LONDON (41219)

RESURFACING FROM EXIT 11 NORTH TO 12A

INCLUDING THE RAMPS AT EXIT 11 AND 12.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

902,440Construction 2019 Pave-T1-Resurf

$2,116,048

$902,440

$902,440 $1,213,608Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 108

NEWFIELDS - NEWMARKET (28393)

BRIDGE REHABILITATIONS OVER BMRR BRIDGE

NUMBERS 127/081 & 125/054

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

2,965,785Construction 2021 Bridg-T1-2-Rehab-Rcn

3,041,413Construction 2022 Bridg-T1-2-Rehab-Rcn

$6,128,198

$6,007,198

$6,007,198 $121,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 124 of 232Includes inflation and indirects using program

Page 131: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 16, US 4 & SPAULDING TURNPIKE

NEWINGTON - DOVER (11238Q)

RECONSTRUCT SPAULDING TPK FROM LBB TO

DOVER TOLL BOOTH & EXIT 6 INTERCHANGE

(INCL. NEW SOUNDWALLS)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

15,544,921Construction 2019 TPK *

14,804,027Construction 2020 TPK *

9,569,361Construction 2021 TPK *

$68,364,091

$39,918,309

$39,918,309 $28,445,782Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SPAULDING TURNPIKE / LITTLE BAY BRIDGES

NEWINGTON - DOVER (11238S)

GENERAL SULLIVAN BRIDGE REHABILITATION

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

5,800,000Construction 2019 TPK *

12,093,978Construction 2020 TPK *

10,711,898Construction 2021 TPK *

2,900,000Construction 2022 TPK *

$31,505,876

$31,505,876

$31,505,876 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 125 of 232Includes inflation and indirects using program

Page 132: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 16 (SPAULDING TURNPIKE)

NEWINGTON (11238U)

HIGHWAY AND BRIDGE MAINTENANCE FACILITY

CONSTRUCTION BETWEEN EXIT 3 AND 4 ALONG

NH 16 BARELL

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

550,000Preliminary Engineering 2019 TPK *

3,501,995Construction 2020 TPK *

3,418,741Construction 2021 TPK *

$7,470,737

$7,470,737

$7,470,737 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SAND HILL ROAD

NEWPORT (20006)

SAND HILL ROAD OVER BROOK - BR. #154/129 -

BRIDGE REPLACEMENT

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

18,459Preliminary Engineering 2019 SAB *

2,051Right of Way 2019 SAB *

82,040Construction 2019 SAB *

$102,550

$102,550

$102,550 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 126 of 232Includes inflation and indirects using program

Page 133: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 108

NEWTON (29617)

IMPROVEMENTS TO ROWE'S CORNER (MAPLE

AVE, AMESBURY RD)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

169,208Preliminary Engineering 2019 None-Highway

912,424Construction 2022 None-Highway

$1,219,131

$1,081,631

$1,081,631 $137,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

POND STREET

NEWTON (41436)

ADDRESS THE RED LIST BRIDGE CARRYING POND

STREET OVER PAR IN THE TOWN OF NEWTON

(064/107)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

91,242Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

31,190Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

131,203Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

1,379,792Construction 2028 Bridg-T3-4-Rehab-Rcn

$1,633,427

$1,633,427

$1,633,427 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 127 of 232Includes inflation and indirects using program

Page 134: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US ROUTE 1

NORTH HAMPTON (24457)

REPLACE BRIDGE CARRYING US 1 OVER BOSTON

& MAINE RR (REDLIST BR NO 148/132)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

225,610Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

86,761Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

5,338,413Construction 2021 Bridg-T1-2-Rehab-Rcn

$6,711,624

$5,650,784

$5,650,784 $1,060,840Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

SANDOGARDY POND ROAD

NORTHFIELD (29756)

RECONSTRUCT AND RECLASSIFY SANDOGARDY

POND ROAD FROM NH 132 SOUTH 2.24 MILES TO

CANTERBURY TOWN LINE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

1,230,600Construction 2019 SAH *

$2,690,600

$1,230,600

$1,230,600 $1,460,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 128 of 232Includes inflation and indirects using program

Page 135: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BOW LAKE ROAD

NORTHWOOD (41397)

BRIDGE REPLACEMENT-BOW LAKE RD OVER

SHELBURNE BROOK-

BR. #195/113

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

102,550Preliminary Engineering 2019 SAB *

5,128Right of Way 2019 SAB *

461,475Construction 2019 SAB *

$569,153

$569,153

$569,153 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

RT 4 & 152

NORTHWOOD-NOTTINGHAM (41595)

INTERSECTION SAFETY IMPROVEMENTS TO THE

US 4/NH 152 INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

353,744Preliminary Engineering 2028 None-Highway

141,498Right of Way 2028 None-Highway

3,749,689Construction 2028 None-Highway

$4,244,931

$4,244,931

$4,244,931 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 129 of 232Includes inflation and indirects using program

Page 136: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 152

NOTTINGHAM (40612)

BRIDGE REHAB OR REPLACE OF THE RED LIST

BRIDGE CARRYING NH 152 OVER NORTH RIVER

(BR NO 141/127)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

205,100Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

157,748Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

55,298Right of Way 2022 Bridg-T3-4-Rehab-Rcn

872,319Construction 2024 Bridg-T3-4-Rehab-Rcn

$1,290,465

$1,290,465

$1,290,465 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 25A

ORFORD (40366)

BRIDGE REPLACEMENT IS ANTICPATED FOR THE

BRIDGE CARRYING NH ROUTE 25A OVER

BRACKETT BROOK (217/112)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

112,805Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

115,682Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

2,372,628Construction 2021 Bridg-T3-4-Rehab-Rcn

$2,876,115

$2,601,115

$2,601,115 $275,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 130 of 232Includes inflation and indirects using program

Page 137: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

ARCHERTOWN ROAD

ORFORD (41151)

BRIDGE REPLACEMENT -ARCHERTOWN ROAD

OVER JACOBS BROOK-BR. NO. 080/120

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

161,770Preliminary Engineering 2021 SAB *

10,785Right of Way 2021 SAB *

1,164,745Construction 2021 SAB *

$1,337,299

$1,337,299

$1,337,299 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 25A

ORFORD (41390)

BRIDGE REHAB OR REPLACEMENT OF THE

BRIDGE CARRYING NH ROUTE 25A OVER BAKER

POND BROOK (219/112)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

118,631Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

243,313Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

19,191Right of Way 2024 Bridg-T3-4-Rehab-Rcn

1,345,482Construction 2026 Bridg-T3-4-Rehab-Rcn

$1,726,618

$1,726,618

$1,726,618 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 131 of 232Includes inflation and indirects using program

Page 138: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 16

OSSIPEE (10431)

PAVEMENT REHABILITATION ALONG NH 16 FROM

NH 28 NORTHERLY 1.1 MILES.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

56,403Preliminary Engineering 2019 None-Highway

56,403Right of Way 2019 None-Highway

3,158,540Construction 2019 None-Highway

$4,880,784

$3,271,345

$3,271,345 $1,609,439Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 16, NH 25, NH 41

OSSIPEE (13910)

INTERSECTION IMPROVEMENTS AT NH 41 WITH NH

16 INCLUDING NH 25.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

1,692,075Construction 2019 None-Highway

$2,434,575

$1,692,075

$1,692,075 $742,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 132 of 232Includes inflation and indirects using program

Page 139: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 16 / NH 25

OSSIPEE (14749)

NH 16/NH 25; REPLACE THREE RED LIST BRIDGES,

137/299, 137/297, 152/268 & RESURFACE APPROX

3.2 MILES.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

2,256,100Construction 2019 Bridg-T1-2-Rehab-Rcn

4,732,426Construction 2020 Bridg-T1-2-Rehab-Rcn

1,677,382Construction 2020 Pave-T2-Rehab

1,720,155Construction 2021 Pave-T2-Rehab

$17,652,318

$10,386,064

$10,386,064 $7,266,255Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAIN STREET

PELHAM (16145)

MAIN ST OVER BEAVER BROOK - BR

REPLACEMENT (BR. NO. 110/090) AND CULV

REPLACEMENT (BR. NO. 111/090)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

112,805Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

80,977Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

77,110Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

69,952Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

26,199Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

51,704Right of Way 2022 Bridg-T3-4-Rehab-Rcn

2,064,190Construction 2023 Bridg-T3-4-Rehab-Rcn

$2,574,950

$2,482,939

$2,482,939 $92,012Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 133 of 232Includes inflation and indirects using program

Page 140: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

WILLOW STREET OVER BEAVER BROOK

PELHAM (26762)

BRIDGE REPLACEMENT-WILLOW ST OVER BEAVER

BROOK-BR. #105/069

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

291,647Preliminary Engineering 2020 SAB *

9,553Preliminary Engineering 2020 NON-PAR (other)

21,033Right of Way 2020 SAB *

2,065,415Construction 2020 SAB *

87,806Construction 2020 NON-PAR (other)

$2,475,454

$2,475,454

$2,475,454 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MAMMOUTH RD/SHERBURNE RD

PELHAM (41589)

SAFETY AND CAPACITY IMPROVEMENTS TO THE

NH 128/SHERBURNE ROAD INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

137,979Preliminary Engineering 2027 None-Highway

27,596Right of Way 2027 None-Highway

1,352,196Construction 2027 None-Highway

$1,517,771

$1,517,771

$1,517,771 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 134 of 232Includes inflation and indirects using program

Page 141: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 128 & SHERBURNE RD

PELHAM (41751)

INTERSECTION IMPROVEMENTS AT THE

INTERSECTION OF NH128 & SHERBURNE RD AND

MAMMOTH & NH111A

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

180,000Preliminary Engineering 2019 CMAQ *

123,060Preliminary Engineering 2020 CMAQ *

153,825Right of Way 2020 CMAQ *

1,630,058Construction 2021 CMAQ *

$2,086,943

$2,086,943

$2,086,943 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 202

PETERBOROUGH (14772A)

RECONSTRUCT US ROUTE 202 @ MAIN STREET

INTERSECTION INCLUDING BOULDER RETAINING

WALL STABILIZATION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

3,589,250Construction 2019 Other Fed Aid

$4,129,583

$3,589,250

$3,589,250 $540,333Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 135 of 232Includes inflation and indirects using program

Page 142: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MAIN STREET

PETERBOROUGH (14933)

MAIN STREET BRIDGE REPLACEMENT OVER

CONTOOCOOK RIVER - 092/089 {RED LIST}

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

4,399,362Construction 2019 MOBRR *

525,825Construction 2020 MOBRR *

$5,470,187

$4,925,187

$4,925,187 $545,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

US 202 / NH 101

PETERBOROUGH (15879)

BRIDGE REPLACEMENT AND WIDENING FOR TCP,

US 202 & NH 101 OVER CONTOOCOOK RIVER (RED

LIST)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

2,313,631Construction 2020 Bridg-T1-2-Rehab-Rcn

2,372,628Construction 2021 Bridg-T1-2-Rehab-Rcn

$5,648,348

$4,686,259

$4,686,259 $962,089Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 136 of 232Includes inflation and indirects using program

Page 143: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US ROUTE 202 AND NH ROUTE 123

PETERBOROUGH (27712)

BRIDGE REPLACEMENT OF BRIDGE CARRYING US

202 AND NH 123 OVER CONTOOCOOK RIVER

(108/116)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

169,208Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

231,363Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

237,263Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

243,313Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

124,759Preliminary Engineering 2023 Bridg-T1-2-Rehab-Rcn

127,940Preliminary Engineering 2024 Bridg-T1-2-Rehab-Rcn

243,313Right of Way 2022 Bridg-T1-2-Rehab-Rcn

6,560,128Construction 2025 Bridg-T1-2-Rehab-Rcn

$7,937,287

$7,937,287

$7,937,287 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 137 of 232Includes inflation and indirects using program

Page 144: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 125

PLAISTOW - KINGSTON (10044E)

RECONSTRUCT NH 125: ANTICIPATED 3 LANES,

FROM SOUTH OF TOWN LINE NORTHERLY

APPROX 1.8 MI

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

28,201Preliminary Engineering 2019 Other Fed Aid

28,920Preliminary Engineering 2020 Other Fed Aid

29,658Preliminary Engineering 2021 Other Fed Aid

30,414Preliminary Engineering 2022 Other Fed Aid

1,833,081Right of Way 2019 Other Fed Aid

28,920Right of Way 2020 Other Fed Aid

29,658Right of Way 2021 Other Fed Aid

30,414Right of Way 2022 Other Fed Aid

10,234,203Construction 2023 Other Fed Aid

8,120,452Construction 2024 Other Fed Aid

$23,000,922

$20,393,922

$20,393,922 $2,607,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 121A / MAIN STREET

PLAISTOW (40641)

TRAFFIC CALMING AND SAFETY IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 3

Category

Strategy

56,403Preliminary Engineering 2020 None-Highway

46,273Preliminary Engineering 2021 None-Highway

54,745Right of Way 2023 None-Highway

1,003,700Construction 2025 None-Highway

$1,161,120

$1,161,120

$1,161,120 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 138 of 232Includes inflation and indirects using program

Page 145: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 125

PLAISTOW (40645)

SIGNAL COORDINATION AND CONTROL ALONG

CORRIDOR FROM MASS S/L TO OLD COUNTY

ROAD

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

100,680Preliminary Engineering 2023 None-Highway

52,743Right of Way 2025 None-Highway

922,328Construction 2026 None-Highway

$1,075,752

$1,075,752

$1,075,752 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HIGHLAND ST

PLYMOUTH (41583)

RECONSTRUCTION & INTERSECTION

IMPOROVEMENTS TO HIGHLAND STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

77,868Preliminary Engineering 2022 None-Highway

12,476Right of Way 2024 None-Highway

1,346,720Construction 2025 None-Highway

$1,437,064

$1,437,064

$1,437,064 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 139 of 232Includes inflation and indirects using program

Page 146: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 1 BYPASS

PORTSMOUTH, NH - KITTERY, ME (15731)

BRIDGE REPLACEMENT, US 1 BYPASS OVER

PISCATAQUA RIVER (SARAH MILDRED LONG

BRIDGE) (RED LIST)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

6,204,275Right of Way 2019 Bridg-HIB-Rehab-Rcn

$214,541,710

$6,204,275

$6,204,275 $208,337,435Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-95

PORTSMOUTH, NH - KITTERY, ME (16189)

REHABILITATION OF BRIDGE OVER PISCATAQUA

RIVER (HIGH LEVEL BRIDGE)

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

5,700,000Construction 2019 TRR *

5,700,000Construction 2020 TRR *

1,800,000Construction 2021 TRR *

$25,508,025

$13,200,000

$13,200,000 $12,308,025Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 140 of 232Includes inflation and indirects using program

Page 147: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US 1

PORTSMOUTH (29640)

US RTE 1 IMPROVEMENTS (1 MI.) FROM

CONSTITUTION DR TO WILSON RD AND FROM

OCEAN RD TO WHITE CEDAR DR

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

564,025Preliminary Engineering 2019 None-Highway

313,497Preliminary Engineering 2020 None-Highway

564,025Right of Way 2019 None-Highway

1,459,901Right of Way 2020 None-Highway

4,965,238Construction 2022 None-Highway

$8,361,685

$7,866,685

$7,866,685 $495,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

PORTSMOUTH INTERNATIONAL AIRPORT

PORTSMOUTH (40562)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

2,142,795Other 2019 Airport Improvement

16,195,414Other 2020 Airport Improvement

11,970,987Other 2021 Airport Improvement

1,228,853Other 2022 Airport Improvement

1,260,189Other 2023 Airport Improvement

5,815,459Other 2024 Airport Improvement

5,963,753Other 2025 Airport Improvement

7,033,203Other 2026 Airport Improvement

6,271,782Other 2027 Airport Improvement

900,440Other 2028 Airport Improvement

$58,782,876

$58,782,876

$58,782,876 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 141 of 232Includes inflation and indirects using program

Page 148: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MAPLEWOOD AVENUE

PORTSMOUTH (40642)

COMPLETE STREETS IMPROVEMENTS ON

MAPLEWOOD AVENUE FROM CONGRESS STREET

TO VAUGHAN STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

33,841Preliminary Engineering 2020 None-Highway

32,969Preliminary Engineering 2021 None-Highway

35,585Right of Way 2023 None-Highway

652,405Construction 2025 None-Highway

$754,800

$754,800

$754,800 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

MARKET STREET - RR

PORTSMOUTH (40644)

RAILROAD CROSSING UPGRADE ON MARKET

STREET

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

86,084Preliminary Engineering 2023 None-Highway

45,265Right of Way 2025 None-Highway

789,125Construction 2026 None-Highway

$920,474

$920,474

$920,474 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 142 of 232Includes inflation and indirects using program

Page 149: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NA

PORTSMOUTH (41752)

ADD A MULTI-USE PATH FOR BIKE/PEDALONG

ELWYN RD EXTENDING FROM RT1 TO HARDING

RD.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

45,000Preliminary Engineering 2019 CMAQ *

30,765Preliminary Engineering 2020 CMAQ *

76,913Right of Way 2020 CMAQ *

871,675Construction 2020 CMAQ *

$1,024,353

$1,024,353

$1,024,353 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WHIPPLE HILL RD OVER ROARING BROOK

RICHMOND (29055)

BRIDGE REPLACEMENT-WHIPPLE HILL RD OVER

ROARING BROOK-BR. #065/083

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

217,581Preliminary Engineering 2021 SAB *

5,392Right of Way 2021 SAB *

1,227,565Construction 2021 SAB *

$1,450,539

$1,450,539

$1,450,539 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 143 of 232Includes inflation and indirects using program

Page 150: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TULLY BROOK RD OVER TULLY BROOK

RICHMOND (29056)

BRIDGE REHAB-TULLY BROOK RD OVER TULLY

BROOK-BR. #155/066

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

107,832Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

605,518Construction 2022 SAB *

$718,879

$718,879

$718,879 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

WELLINGTON RD

RINDGE (22652)

BRIDGE REPLACEMENT-WELLINGTON ROAD OVER

CONVERSEVILLE BROOK-BR. #154/069

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

110,423Preliminary Engineering 2020 SAB *

10,517Right of Way 2020 SAB *

646,765Construction 2020 SAB *

$767,705

$767,705

$767,705 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 144 of 232Includes inflation and indirects using program

Page 151: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

SKYHAVEN AIRPORT

ROCHESTER (40575)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

398,806Other 2019 Airport Improvement

1,752,751Other 2020 Airport Improvement

95,864Other 2021 Airport Improvement

368,656Other 2022 Airport Improvement

630,095Other 2023 Airport Improvement

323,081Other 2024 Airport Improvement

1,325,278Other 2025 Airport Improvement

203,861Other 2026 Airport Improvement

313,589Other 2027 Airport Improvement

385,903Other 2028 Airport Improvement

$5,797,884

$5,797,884

$5,797,884 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 125 AND LOWELL STREET

ROCHESTER (40647)

INTERSECTION SAFETY IMPROVEMENTS AT THIS 5

WAY INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

199,614Preliminary Engineering 2023 None-Highway

104,962Right of Way 2025 None-Highway

1,829,856Construction 2026 None-Highway

$2,134,432

$2,134,432

$2,134,432 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 145 of 232Includes inflation and indirects using program

Page 152: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BUFFALO ROAD OVER BROOK

RUMNEY (27162)

BRIDGE REPLACEMENT-BUFFALO RD OVER

BROOK-BR. #093/082

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

88,477Preliminary Engineering 2022 SAB *

5,530Right of Way 2022 SAB *

403,678Construction 2022 SAB *

$497,686

$497,686

$497,686 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (10418L)

IMPLEMENT AND PROVIDE OPERATIONAL

SUPPORT FOR EXPANDED COMMUTER BUS

SERVICE

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

743,488Other 2019 FTA5307_NHDOT

762,446Other 2020 FTA5307_NHDOT

$19,183,177

$1,505,934

$1,505,934 $17,677,243Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 146 of 232Includes inflation and indirects using program

Page 153: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (10418T)

CORRIDOR SERVICE PATROL (SALEM TO

MANCHESTER)

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

95,884Other 2019 Other Fed Aid

11,568Other 2020 Other Fed Aid

$1,100,305

$107,452

$107,452 $992,852Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (10418X)

FINAL DESIGN (PE) AND ROW FOR I-93 SALEM TO

MANCHESTER CORRIDOR POST SEPTEMBER 4,

2014

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

27,876Other 2019 Other Fed Aid

1,538Other 2019 NON-PAR (dot)

$7,015,278

$29,415

$29,415 $6,985,863Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 147 of 232Includes inflation and indirects using program

Page 154: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (13933A)

MAINLINE, STATE LINE TO EXIT 1 NB & SB

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

4,060,980Construction 2019 Other Fed Aid

11,105,427Construction 2020 Other Fed Aid

$15,166,407

$15,166,407

$15,166,407 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633)

DEBT SERVICE PROJECT FOR I-93 CAPACITY

IMPROVEMENTS - NORTHERN PROJECTS

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

1,348,693Construction 2019 SB367-4-CENTS

1,864,483Construction 2020 SB367-4-CENTS

2,147,107Construction 2021 SB367-4-CENTS

2,195,000Construction 2022 SB367-4-CENTS

2,195,000Construction 2023 SB367-4-CENTS

2,197,986Construction 2024 SB367-4-CENTS

2,192,014Construction 2025 SB367-4-CENTS

23,405,706Construction 2026 SB367-4-CENTS

23,405,706Construction 2027 SB367-4-CENTS

23,405,706Construction 2028 SB367-4-CENTS

$226,110,017

$84,357,401

$84,357,401 $1,318,380Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$140,434,236

Page 148 of 232Includes inflation and indirects using program

Page 155: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633B)

NB & SB MAINLINE, WEIGH STATION TO KENDALL

POND RD (WINDHAM & DERRY)

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

698,744Construction 2019 Other Fed Aid

$54,700,254

$698,744

$698,744 $54,001,510Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633D)

EXIT 4 INTERCHANGE, NB & SB MAINLINE & NH 102

APPROACH WORK

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

1,430,249Construction 2019 Other Fed Aid

885,680Construction 2020 Other Fed Aid

$67,539,766

$2,315,929

$2,315,929 $65,223,837Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633H)

I-93 NB & SB MAINLINE RECONSTRUCTION, EXIT 5

TO I-293 SPLIT (LONDONDERRY & MANCHESTER)

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

426,990Construction 2019 Other Fed Aid

$49,107,877

$426,990

$426,990 $48,680,887Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 149 of 232Includes inflation and indirects using program

Page 156: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633I)

NB & SB MAINLINE BETWEEN EXITS 4 AND 5

(LONDONDERRY)

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

575,152Construction 2019 Other Fed Aid

$36,677,690

$575,152

$575,152 $36,102,538Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (14633J)

EXIT 1 TO EXIT 5 - CONSTRUCT 4TH LANE

NORTHBOUND AND SOUTHBOUND

Route/Road

Scope

Program

I-93 EXPANSION

TIER 1

Category

Strategy

5,744,917Construction 2019 TIFIA

177,345Construction 2019 Other Fed Aid

5,891,413Construction 2020 TIFIA

181,868Construction 2020 Other Fed Aid

$11,995,543

$11,995,543

$11,995,543 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 150 of 232Includes inflation and indirects using program

Page 157: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800A)

MAINLINE, EXIT 1-STA 1130 & NH38 (SALEM),

BRIDGES 073/063 & 077/063 BOTH RED LIST-DEBT

SERV 13933D

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

852,759Construction 2019 GARVEE Debt Service

560,448Construction 2019 RZED

2,486,558Construction 2020 GARVEE Debt Service

560,448Construction 2020 RZED

6,410,959Construction 2021 GARVEE Debt Service

539,572Construction 2021 RZED

6,406,313Construction 2022 GARVEE Debt Service

464,358Construction 2022 RZED

6,396,934Construction 2023 GARVEE Debt Service

362,483Construction 2023 RZED

6,370,041Construction 2024 GARVEE Debt Service

269,079Construction 2024 RZED

6,368,631Construction 2025 GARVEE Debt Service

139,025Construction 2025 RZED

$49,772,025

$38,187,608

$38,187,608 $11,584,417Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 151 of 232Includes inflation and indirects using program

Page 158: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800B)

I-93 EXIT 5 INTERCHANGE RECONSTRUCTION

(LONDONDERRY) - DEBT SERVICE PROJECT

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

927,885Construction 2019 GARVEE Debt Service

609,822Construction 2019 RZED

2,705,617Construction 2020 GARVEE Debt Service

609,822Construction 2020 RZED

6,975,745Construction 2021 GARVEE Debt Service

587,107Construction 2021 RZED

6,970,689Construction 2022 GARVEE Debt Service

505,267Construction 2022 RZED

6,960,485Construction 2023 GARVEE Debt Service

394,417Construction 2023 RZED

6,931,223Construction 2024 GARVEE Debt Service

292,784Construction 2024 RZED

6,929,688Construction 2025 GARVEE Debt Service

151,272Construction 2025 RZED

$56,387,198

$41,551,822

$41,551,822 $14,835,377Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 152 of 232Includes inflation and indirects using program

Page 159: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800C)

EXIT 3 AREA, PROJECT INITIATED TO TRACK

GARVEE BOND DEBT SERVICE ATTRIBUTABLE TO

THE 13933N PROJECT

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

315,986Construction 2019 GARVEE Debt Service

207,672Construction 2019 RZED

921,384Construction 2020 GARVEE Debt Service

207,672Construction 2020 RZED

2,375,555Construction 2021 GARVEE Debt Service

199,936Construction 2021 RZED

2,373,833Construction 2022 GARVEE Debt Service

172,066Construction 2022 RZED

2,370,358Construction 2023 GARVEE Debt Service

134,317Construction 2023 RZED

2,360,393Construction 2024 GARVEE Debt Service

99,706Construction 2024 RZED

2,359,871Construction 2025 GARVEE Debt Service

51,515Construction 2025 RZED

$18,268,809

$14,150,265

$14,150,265 $4,118,544Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800D)

I-93 EXIT 3 AREA - RECONSTRUCT SB ML, NH111 &

SB ON RAMP (WINDHAM) - DEBT SERVICE

PROJECT FOR 13933I

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

4,260,140Construction 2019 GARVEE-12

3,109,511Construction 2020 GARVEE-12

$36,315,703

$7,369,651

$7,369,651 $28,946,052Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 153 of 232Includes inflation and indirects using program

Page 160: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800E)

I-93 EXIT 2 INTERCHANGE RECONSTRUCTION &

PELHAM RD - DEBT SERVICE PROJECT FOR 13933E

(SALEM)

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

5,729,434Construction 2019 GARVEE-12

4,181,961Construction 2020 GARVEE-12

$46,258,268

$9,911,396

$9,911,396 $36,346,873Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 154 of 232Includes inflation and indirects using program

Page 161: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800F)

I-93 EXIT 3 AREA -NB ML CONNECTIONS, NB

RAMPS & NH 111A RELOCATION - DEBT SERVICE

PROJECT FOR 13933H

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

4,090,193Construction 2019 GARVEE-12

95,554Construction 2019 GARVEE-11

62,800Construction 2019 RZED

2,985,465Construction 2020 GARVEE-12

278,625Construction 2020 GARVEE-11

62,800Construction 2020 RZED

718,363Construction 2021 GARVEE-11

60,460Construction 2021 RZED

717,842Construction 2022 GARVEE-11

52,032Construction 2022 RZED

716,792Construction 2023 GARVEE-11

40,617Construction 2023 RZED

713,778Construction 2024 GARVEE-11

30,151Construction 2024 RZED

713,620Construction 2025 GARVEE-11

15,579Construction 2025 RZED

$35,721,206

$11,354,670

$11,354,670 $24,366,536Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 155 of 232Includes inflation and indirects using program

Page 162: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-93

SALEM TO MANCHESTER (14800H)

FINAL DESIGN SERVICES FOR PE & ROW - DEBT

SERVICE FOR 10418V

Route/Road

Scope

Program

DEBT SERVICE

TIER 1

Category

Strategy

1,278,980Preliminary Engineering 2019 GARVEE-12

957,343Preliminary Engineering 2020 GARVEE-12

214,592Right of Way 2019 GARVEE-12

160,626Right of Way 2020 GARVEE-12

$11,621,433

$2,611,541

$2,611,541 $9,009,892Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 28

SALEM (12334)

RECONSTRUCT DEPOT INTERSECTION NH28

(BROADWAY) AND NH 97 (MAIN STREET) ADD

TURN LANES ON NH28 MUPCA

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 5

Category

Strategy

2,563,750Construction 2019 MUPCA*

162,561Construction 2019 Ear-NH072

564,025Construction 2020 Other Fed Aid

$10,175,335

$3,290,336

$3,290,336 $6,885,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 156 of 232Includes inflation and indirects using program

Page 163: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

SOUTH POLICY STREET

SALEM (15989)

BRIDGE REPLACEMENT- SOUTH POLICY ST OVER

PORCUPINE BROOK - BR #083/062

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

5,128Right of Way 2019 SAB *

613,612Construction 2019 SAB *

30,186Construction 2019 NON-PAR (other)

$752,442

$648,925

$648,925 $103,517Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BLUFF STREET EXT

SALEM (20228)

BRIDGE REPLACEMENT - BLUFF ST EXT OVER

WIDOW HARRIS BROOK - BR. #116/116

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

15,775Right of Way 2020 SAB *

686,938Construction 2020 SAB *

$842,918

$702,713

$702,713 $140,205Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 157 of 232Includes inflation and indirects using program

Page 164: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MANCHESTER & LAWRENCE RAIL LINE

SALEM (41750)

ADD .3 MILES TO SALEM BIKE-PED CORRIDOR

WHICH RUNS ALONG ABANDONED MANCHESTER &

LAWRENCE RAIL LINE.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

145,000Preliminary Engineering 2019 CMAQ *

51,275Right of Way 2020 CMAQ *

671,703Construction 2020 CMAQ *

$867,978

$867,978

$867,978 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-93

SANBORNTON-ASHLAND (41328)

PAVEMENT PRESERVATION WITH ASSOCIATED

EVALUATIONS OF DRAINAGE AND GUARDRAIL I-93

MM 61 TO 75.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

8,996,199Construction 2019 Pave-T1-Resurf

1,927,950Construction 2019 GRR *

1,898,218Construction 2020 Pave-T1-Resurf

751,930Construction 2020 GRR *

$13,914,857

$13,574,297

$13,574,297 $340,560Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 158 of 232Includes inflation and indirects using program

Page 165: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

PHILLIPS ROAD OVER EXETER RIVER

SANDOWN (41412)

BRIDGE REPLACEMENT-PHILLIPS ROAD OVER

EXETER RIVER-BR. #093/109

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

101,384Preliminary Engineering 2025 SAB *

5,964Right of Way 2025 SAB *

620,230Construction 2025 SAB *

$727,578

$727,578

$727,578 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 1A

SEABROOK - HAMPTON (15904)

Reconstruction of the bridge over Hampton River-

[BRPPI*6601]

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

225,610Preliminary Engineering 2019 Bridg-HIB-Rehab-Rcn

889,736Preliminary Engineering 2021 Bridg-HIB-Rehab-Rcn

304,141Preliminary Engineering 2022 Bridg-HIB-Rehab-Rcn

311,897Preliminary Engineering 2023 Bridg-HIB-Rehab-Rcn

593,157Right of Way 2021 Bridg-HIB-Rehab-Rcn

6,000,000Construction 2023 Bridg-HIB-Rehab-Rcn

9,300,000Construction 2024 Bridg-HIB-Rehab-Rcn

8,055,465Construction 2025 Bridg-HIB-Rehab-Rcn

13,454,823Construction 2026 Bridg-HIB-Rehab-Rcn

$39,912,247

$39,134,829

$39,134,829 $777,418Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 159 of 232Includes inflation and indirects using program

Page 166: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

US1

SEABROOK (41712)

CAPACITY IMPROVEMENTS ON US 1 BETWEEN

NEW ZEALAND ROAD AND THE HAMPTON FALLS

TOWN LINE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

150,000Preliminary Engineering 2019 NON-PAR (other)

150,000Preliminary Engineering 2019 None-Other

100,000Right of Way 2020 NON-PAR (other)

100,000Right of Way 2020 None-Other

1,150,000Construction 2021 NON-PAR (other)

1,150,000Construction 2021 None-Other

$2,800,000

$2,800,000

$2,800,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

Town to provide 50% matchComments

$0

Phase Year Funding

US ROUTE 2

SHELBURNE (40363)

BRIDGE REHABILITATION OF RED LIST BRIDGE

CARRYING US ROUTE 2 OVER PEA BROOK (BR NO

049/089)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

153,825Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

52,583Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

107,847Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

1,658,952Construction 2022 Bridg-T1-2-Rehab-Rcn

$1,973,207

$1,973,207

$1,973,207 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 160 of 232Includes inflation and indirects using program

Page 167: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NORTH ROAD

SHELBURNE (40551)

BRIDGE REHABILITATION OF THE BRIDGE

CARRYING NORTH ROAD OVER ANDROSCOGGIN

RIVER (BR NO 075/113)

Route/Road

Scope

Program

BRIDGES

TIER 4

Category

Strategy

282,013Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

231,363Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

255,880Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

262,405Preliminary Engineering 2025 Bridg-T3-4-Rehab-Rcn

4,440,092Construction 2026 Bridg-T3-4-Rehab-Rcn

$5,471,753

$5,471,753

$5,471,753 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 9 (HIGH STREET), BLACKWATER RD, INDIGO

HILL RD

SOMERSWORTH (40646)

INTERSECTION SAFETY IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

112,805Preliminary Engineering 2020 None-Highway

156,170Preliminary Engineering 2021 None-Highway

142,946Right of Way 2023 None-Highway

2,555,603Construction 2025 None-Highway

$2,967,525

$2,967,525

$2,967,525 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 161 of 232Includes inflation and indirects using program

Page 168: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

PORTIONS ON HIGH STREET, MEMORIAL DRIVE,

CEMETERY RD.

SOMERSWORTH (41363)

CONST SIDEWALKS ON HIGH ST, MEMORIAL DR,

CEMETERY RD, UPGRADE CROSSWALK ACROSS

HIGH ST, CONST PATH

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 5

Category

Strategy

20,510Preliminary Engineering 2019 TA *

30,765Right of Way 2019 TA *

916,513Construction 2020 TA *

$1,085,508

$967,788

$967,788 $117,720Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HIGHT STREET / ROUTE 108

SOMERSWORTH (41741)

SIGNAL OPTIMIZATION ON HIGH STREET / ROUTE

108 CORRIDOR

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

48,150Preliminary Engineering 2019 CMAQ *

32,919Preliminary Engineering 2020 CMAQ *

697,699Construction 2020 CMAQ *

$778,767

$778,767

$778,767 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 162 of 232Includes inflation and indirects using program

Page 169: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

GEORGES MILLS ROAD

SPRINGFIELD (20509)

GEORGES MILLS ROAD OVER STAR LAKE OUTLET

AT INT. OF FISHER CORNER RD - REPLACE TWIN 5'

DIA. CULVERTS

Route/Road

Scope

Program

BRIDGES

TIER 4

Category

Strategy

751,930Construction 2020 Bridg-T3-4-Rehab-Rcn

$941,486

$751,930

$751,930 $189,556Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATE CAPITAL BUDGET MATCH (69009)

STATE MATCHING CAPITAL FUNDS - TRANSIT

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

470,331Other 2019 NON-PAR (other)

$1,370,331

$470,331

$470,331 $900,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BLUE STAR (I-95), F.E. EVERETT & SPAULDING

TURNPIKE

STATEWIDE GUARDRAIL REPAIR (41337)

CENTRAL & EASTERN TURNPIKE

GUARDRAIL/FENCE REPAIR OR NEW

INSTALLATION AS NEEDED.

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

107,093Construction 2019 NON-PAR (other)

$215,284

$107,093

$107,093 $108,190Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 163 of 232Includes inflation and indirects using program

Page 170: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATEWIDE PLANNING

STATEWIDE RPC UPWP CONTRACTS 2018-2019 (41375A)

SFY 2018-2019 UNIFIED PLANNING WORK

PROGRAM (UPWP) CONTRACTS WITH 9 RPCS

(7/1/17-6/30/19)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

2,199,698State Planning Research 2019 SPR1

$8,771,978

$2,199,698

$2,199,698 $6,572,280Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

STATEWIDE PLANNING

STATEWIDE SPR PART 1 PROGRAM, 2018-2019 (41375)

NHDOT SPR PART 1 PROGRAM FOR SFY 2018-2019

FOR NHDOT MANAGED ACTIVITIES (NO RPC

CONTRACTS)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

851,678State Planning Research 2019 SPR1

$3,396,330

$851,678

$851,678 $2,544,652Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-95, NH 16, US 3, FEET, I-293 AND I-93

STATEWIDE STRIPING (TURNPIKES) (41099)

STATEWIDE STRIPING

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

379,435Construction 2019 TRR *

$384,435

$379,435

$379,435 $5,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 164 of 232Includes inflation and indirects using program

Page 171: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-95, NH 16, FEET, I-293 AND I-93

STATEWIDE TOLL SERVICES-HNTB (40479)

ON-CALL TOLL SYSTEM SERVICE

AGREEMENT-HNTB

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

102,550Preliminary Engineering 2019 None-Other

$652,550

$102,550

$102,550 $550,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE, RED LIST BRIDGES (40817)

TO REHABILITATE AND RECONSTRUCT STATE RED

LIST BRIDGES

Route/Road

Scope

Program

RED LIST BRIDGES

ALL TIERS

Category

Strategy

413,938Preliminary Engineering 2027 Other Fed Aid

424,493Preliminary Engineering 2028 Other Fed Aid

68,990Right of Way 2027 Other Fed Aid

70,749Right of Way 2028 Other Fed Aid

4,945,714Construction 2027 Other Fed Aid

4,871,912Construction 2028 Other Fed Aid

$10,795,796

$10,795,796

$10,795,796 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 165 of 232Includes inflation and indirects using program

Page 172: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

DISTRICT 1 HORIZONTAL CURVES

STATEWIDE (28134)

HORIZONTAL CURVE SIGNING PROJECT - TWO

LANE ROADS IN D1

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

225,610Preliminary Engineering 2019 HSIP *

694,089Construction 2020 HSIP *

$919,699

$919,699

$919,699 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

DISTRICT 6 HORIZONTAL CURVES (URBAN)

STATEWIDE (28139)

HORIZONTAL CURVE SIGNING PROJECT - TWO

LANE URBAN ROADS IN D6

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

394,818Construction 2019 HSIP *

$559,818

$394,818

$394,818 $165,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 166 of 232Includes inflation and indirects using program

Page 173: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATEWIDE

STATEWIDE (40581)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

112,805Other 2019 Airport Improvement

116,850Other 2020 Airport Improvement

161,770Other 2021 Airport Improvement

165,895Other 2022 Airport Improvement

170,126Other 2023 Airport Improvement

775,395Other 2024 Airport Improvement

178,913Other 2025 Airport Improvement

183,475Other 2026 Airport Improvement

188,153Other 2027 Airport Improvement

192,951Other 2028 Airport Improvement

$2,246,333

$2,246,333

$2,246,333 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE (40841)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

22,561Preliminary Engineering 2019 HSIP *

541,464Construction 2019 HSIP *

$564,025

$564,025

$564,025 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 167 of 232Includes inflation and indirects using program

Page 174: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

STATEWIDE (40842)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

23,136Preliminary Engineering 2020 HSIP *

555,271Construction 2020 HSIP *

$578,408

$578,408

$578,408 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE (40843)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

23,726Preliminary Engineering 2021 HSIP *

569,431Construction 2021 HSIP *

$593,157

$593,157

$593,157 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 168 of 232Includes inflation and indirects using program

Page 175: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

STATEWIDE (40844)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

24,331Preliminary Engineering 2022 HSIP *

583,951Construction 2022 HSIP *

$608,283

$608,283

$608,283 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

VARIOUS

STATEWIDE (40845)

INSTALLATION OF CENTERLINE AND SHOULDER

RUMBLE STRIPES ALONG STATE ROADWAYS.

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

24,952Preliminary Engineering 2023 HSIP *

598,842Construction 2023 HSIP *

$623,794

$623,794

$623,794 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89 AND NH 101 CRACKSEAL 2019

STATEWIDE (41327)

CRACK SEAL FULL WIDTH I-89 MM 36.3 TO 43.6, NH

MM 101 102.1 TO 109.4 AND MM 124.6 TO 132.4.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

987,044Construction 2019 Pave-T1-Resurf

$1,072,184

$987,044

$987,044 $85,140Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 169 of 232Includes inflation and indirects using program

Page 176: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

STATEWIDE (41756)

EVALUATE 61+ TRAFFIC CONTROL SIGNALS AND

DEVELOP&IMPLEMENT SIGNAL TIMINGS TO

IMPROVE TRAFFIC FLOW

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 2

Category

Strategy

120,000Preliminary Engineering 2019 CMAQ *

82,040Preliminary Engineering 2020 CMAQ *

102,550Right of Way 2020 CMAQ *

$304,590

$304,590

$304,590 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 170 of 232Includes inflation and indirects using program

Page 177: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

STATEWIDE (WLDFL)

NATIVE WILDFLOWER AND LILAC PLANTINGS.

STATEWIDE

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

10,000Preliminary Engineering 2019 NON-PAR (other)

10,000Preliminary Engineering 2020 NON-PAR (other)

10,000Preliminary Engineering 2021 NON-PAR (other)

10,000Preliminary Engineering 2022 NON-PAR (other)

10,000Preliminary Engineering 2023 NON-PAR (other)

10,000Preliminary Engineering 2024 NON-PAR (other)

10,000Preliminary Engineering 2025 NON-PAR (other)

10,000Preliminary Engineering 2026 NON-PAR (other)

10,000Preliminary Engineering 2027 NON-PAR (other)

40,000Construction 2019 NON-PAR (other)

40,000Construction 2020 NON-PAR (other)

40,000Construction 2021 NON-PAR (other)

40,000Construction 2022 NON-PAR (other)

40,000Construction 2023 NON-PAR (other)

40,000Construction 2024 NON-PAR (other)

40,000Construction 2025 NON-PAR (other)

40,000Construction 2026 NON-PAR (other)

40,000Construction 2027 NON-PAR (other)

$550,000

$450,000

$450,000 $100,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 171 of 232Includes inflation and indirects using program

Page 178: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

HUCKINS ROAD

STRAFFORD (14790)

BRIDGE REPLACEMENT

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

56,403Preliminary Engineering 2019 SAB *

5,128Right of Way 2019 SAB *

251,248Construction 2019 SAB *

$312,778

$312,778

$312,778 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH108/BUNKER HILL AVENUE

STRATHAM (41711)

SIGNALIZATION, TURN LANES AND INTERSECTION

REALIGNMENT AT THE NH108/ BUNKER HILL

INTERSECTION.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

130,000Preliminary Engineering 2028 None-Other

65,000Right of Way 2028 None-Other

1,105,000Construction 2028 None-Other

$1,300,000

$1,300,000

$1,300,000 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 172 of 232Includes inflation and indirects using program

Page 179: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 12

SURRY (41470)

ADDRESS BRIDGE CARRYING NH 12 OVER NHRR

(ABD) IN THE TOWN OF SURRY (082/040)

Route/Road

Scope

Program

BRIDGES

TIER 2

Category

Strategy

177,947Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

935,691Construction 2023 Bridg-T1-2-Rehab-Rcn

$1,113,638

$1,113,638

$1,113,638 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

I-89

SUTTON - NEW LONDON (40511)

PAVEMENT JOINT NORTH OF EXIT 10 TO

PAVEMENT JOINT AT EXIT 11. INCLUDES EXIT 11

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

177,947Preliminary Engineering 2021 4R

121,657Preliminary Engineering 2022 4R

59,316Right of Way 2021 4R

60,828Right of Way 2022 4R

3,742,762Construction 2023 4R

3,838,203Construction 2024 4R

$8,000,713

$8,000,713

$8,000,713 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 173 of 232Includes inflation and indirects using program

Page 180: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-89 NB

SUTTON (41466)

BRIDGE REHAB, BRIDGE CARRYING I-89 NB OVER

NH 114 IN THE TOWN OF SUTTON (109/145)

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

237,263Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

121,657Preliminary Engineering 2022 Bridg-T1-2-Rehab-Rcn

1,871,381Construction 2023 Bridg-T1-2-Rehab-Rcn

$2,230,301

$2,230,301

$2,230,301 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 32

SWANZEY (27692)

BRIDGE REPLACEMENT, BRIDGE CARRYING NH 32

OVER MARTIN BROOK, 149/072

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

102,550Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

105,165Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

1,437,759Construction 2022 Bridg-T3-4-Rehab-Rcn

$1,800,274

$1,645,474

$1,645,474 $154,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 174 of 232Includes inflation and indirects using program

Page 181: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 32

SWANZEY (40485)

STUDY AND IMPLEMENT RECOMMENDATIONS OF

2013 ROAD SAFETY AUDIT

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 3

Category

Strategy

902,440Construction 2019 HSIP *

$1,078,440

$902,440

$902,440 $176,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

CHRISTIAN HILL ROAD OVER NHRR

SWANZEY (41403)

BRIDGE REPLACEMENT-CHRISTIAN HILL ROAD

OVER NHRR-BR. #098/122

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

215,492Preliminary Engineering 2023 SAB *

56,709Right of Way 2023 SAB *

1,542,472Construction 2023 SAB *

$1,814,673

$1,814,673

$1,814,673 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 175 of 232Includes inflation and indirects using program

Page 182: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 113A

TAMWORTH (41434)

ADDRESS RED LIST BRIDGE CARRYING NH 113A

OVER SWIFT RIVER IN THE TOWN OF TAMWORTH

(061/091)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

237,263Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

639,700Construction 2024 Bridg-T3-4-Rehab-Rcn

656,013Construction 2025 Bridg-T3-4-Rehab-Rcn

$1,532,976

$1,532,976

$1,532,976 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 49

THORNTON (40613)

DECK REPLACEMENT AND SCOUR PROTECTION

FOR THE BRIDGE CARRYING NH 49 OVER MAD

RIVER (BR NO 239/152)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

256,375Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

210,330Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

215,693Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

4,652,367Construction 2024 Bridg-T3-4-Rehab-Rcn

$5,334,766

$5,334,766

$5,334,766 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 176 of 232Includes inflation and indirects using program

Page 183: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

CALEF HILL ROAD

TILTON (29753)

RECONSTRUCT AND RE-CLASSIFY CALEF HILL

ROAD FROM CLARK ROAD NORTH 1.97 MILES TO

SANBORNTON TOWN LINE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 4

Category

Strategy

256,375Preliminary Engineering 2019 SAH *

1,153,688Construction 2019 SAH *

1,183,107Construction 2020 SAH *

$2,593,169

$2,593,169

$2,593,169 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 12

TROY (40370)

BRIDGE REPLACEMENT OF BRIDGE CARRYING NH

12 OVER S BRANCH ASHUELOT RIVER (BR NO

089/114)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

256,375Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

315,495Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

107,847Right of Way 2021 Bridg-T1-2-Rehab-Rcn

3,235,402Construction 2021 Bridg-T1-2-Rehab-Rcn

$4,327,919

$3,915,119

$3,915,119 $412,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 177 of 232Includes inflation and indirects using program

Page 184: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH ROUTE 12

TROY (40371)

BRIDGE REPLACEMENT OF THE BRIDGE (BR NO

096/091) CARRYING NH ROUTE 12 OVER NHRR

(ABD)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 2

Category

Strategy

282,013Preliminary Engineering 2019 Bridg-T1-2-Rehab-Rcn

289,204Preliminary Engineering 2020 Bridg-T1-2-Rehab-Rcn

118,631Preliminary Engineering 2021 Bridg-T1-2-Rehab-Rcn

4,745,256Construction 2021 Bridg-T1-2-Rehab-Rcn

$5,883,904

$5,435,104

$5,435,104 $448,800Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH RTAP PROGRAM

VARIOUS (68090J)

5311 FUNDS: NH RURAL TRANSIT ASSISTANCE

PROGRAM (NHRTAP)

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

71,785Other 2019 FTA5311

76,377Other 2020 FTA5311

$351,362

$148,162

$148,162 $203,200Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 178 of 232Includes inflation and indirects using program

Page 185: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 12

WALPOLE - CHARLESTOWN (14747)

FROM NORTH WALPOLE RECONST TO NH 12A IN

CHARLESTOWN, ADD SHOULDERS, IMPROVE

DRAINAGE, RELOCATE RR

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

5,696,653Construction 2019 Other Fed Aid

2,313,631Construction 2020 Other Fed Aid

$23,430,852

$8,010,283

$8,010,283 $15,420,569Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

BRIDGE STREET

WALPOLE, NH - ROCKINGHAM, VT (41720)

VILAS BRIDGE REHABILITATION OVER THE

CONNECTICUT RIVER.

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 4

Category

Strategy

3,449,480Construction 2028 Bridg-T3-4-Rehab-Rcn

$6,898,960

$3,449,480

$3,449,480 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

50% Funding needed from other sourcesComments

$3,449,480

Page 179 of 232Includes inflation and indirects using program

Page 186: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-89

WARNER - SUTTON (15747)

PAVEMENT REHABILITATION FROM EXIT 9 TO EXIT

10 (7 MILES)

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

169,208Preliminary Engineering 2019 4R

115,682Preliminary Engineering 2020 4R

56,403Right of Way 2019 4R

28,920Right of Way 2020 4R

9,490,513Construction 2021 4R

6,487,942Construction 2022 4R

$16,348,666

$16,348,666

$16,348,666 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 127

WARNER (15907)

NH 127 OVER WARNER RIVER - BRIDGE

REPLACEMENT

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

1,995,165Construction 2021 Bridg-T3-4-Rehab-Rcn

$2,232,765

$1,995,165

$1,995,165 $237,600Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 180 of 232Includes inflation and indirects using program

Page 187: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

I-89

WARNER (40512)

PAVEMENT JOINT SOUTH OF EXIT 8 TO PAVEMENT

JOINT NORTH OF EXIT 9 INCLUDES EXITS 8 AND 9

Route/Road

Scope

Program

INTERSTATE MAINTENANCE

TIER 1

Category

Strategy

4,512,200Construction 2019 Pave-T1-Rehab

4,627,261Construction 2020 Pave-T1-Rehab

$9,579,461

$9,139,461

$9,139,461 $440,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 103

WARNER (40622)

DECK REPLACEMENT FOR THE RED LIST BRIDGE

CARRYING NH 103 OVER I-89 NB (BR NO 202/136)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

262,913Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

1,134,170Construction 2023 Bridg-T3-4-Rehab-Rcn

$1,397,083

$1,397,083

$1,397,083 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 181 of 232Includes inflation and indirects using program

Page 188: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

LULL ROAD OVER PEACOCK BROOK

WEARE (14338)

BRIDGE REPLACEMENT-LULL RD OVER PEACOCK

BROOK - BR. #082/045

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

116,309Preliminary Engineering 2024 SAB *

5,815Right of Way 2024 SAB *

220,987Construction 2024 SAB *

$343,112

$343,112

$343,112 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 77

WEARE (41471)

ADDRESS BRIDGE CARRYING NH 77 OVER CANAL 2

CHOATE BROOK IN THE TOWN OF WEARE

(159/178)

Route/Road

Scope

Program

BRIDGES

TIER 4

Category

Strategy

121,657Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

127,940Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

134,548Preliminary Engineering 2026 Bridg-T3-4-Rehab-Rcn

275,958Preliminary Engineering 2027 Bridg-T3-4-Rehab-Rcn

3,537,442Construction 2028 Bridg-T3-4-Rehab-Rcn

$4,197,545

$4,197,545

$4,197,545 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 182 of 232Includes inflation and indirects using program

Page 189: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

CLOTHESPIN BRIDGE ROAD OVER BLACKWATER

RIVER

WEBSTER (40810)

BRIDGE REPLACEMENT-CLOTHESPIN BRIDGE

ROAD OVER BLACKWATER RIVER-BR. #121/103

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

260,859Preliminary Engineering 2023 SAB *

17,013Right of Way 2023 SAB *

1,814,673Construction 2023 SAB *

$2,092,544

$2,092,544

$2,092,544 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 127

WEBSTER (41429)

ADDRESS RED LIST BRIDGE CARRYING NH 127

OVER BLACKWATER RIVER IN THE TOWN OF

WEBSTER (099/123)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

148,289Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

343,087Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

255,880Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

131,203Right of Way 2025 Bridg-T3-4-Rehab-Rcn

3,936,077Construction 2026 Bridg-T3-4-Rehab-Rcn

$4,814,536

$4,814,536

$4,814,536 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 183 of 232Includes inflation and indirects using program

Page 190: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

FRESCOLN ROAD OVER ROCKY BRANCH

WENTWORTH (40648)

BRIDGE REPLACEMENT-FRESCOLN ROAD OVER

ROCKY BRANCH-BR. #108/070

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

126,198Preliminary Engineering 2020 SAB *

10,517Right of Way 2020 SAB *

673,056Construction 2020 SAB *

$809,771

$809,771

$809,771 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

HAZEN ROAD

WHITEFIELD (16025)

BRIDGE REHABILITATION-HAZEN RD OVER JOHNS

RIVER-BR. #159/098

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

25,638Preliminary Engineering 2019 SAB *

5,128Right of Way 2019 SAB *

148,698Construction 2019 SAB *

$179,463

$179,463

$179,463 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 184 of 232Includes inflation and indirects using program

Page 191: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

MT. WASHINGTON REGIONAL AIRPORT

WHITEFIELD (40578)

PRESERVATION, MODERNIZATION, AND/OR

EXPANSION OF AIRPORT FACILITIES; PLANNING

STUDIES.

Route/Road

Scope

Program

AIRPORT

ALL TIERS

Category

Strategy

512,750Other 2019 Airport Improvement

350,550Other 2020 Airport Improvement

119,830Other 2021 Airport Improvement

368,657Other 2022 Airport Improvement

252,038Other 2023 Airport Improvement

596,375Other 2025 Airport Improvement

348,433Other 2027 Airport Improvement

643,171Other 2028 Airport Improvement

$3,191,803

$3,191,803

$3,191,803 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

LANCASTER RD

WHITEFIELD (41582)

ROADWAY RECON & SAFETY IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

186,272Preliminary Engineering 2027 None-Highway

6,899Right of Way 2027 None-Highway

3,532,268Construction 2027 None-Highway

$3,725,439

$3,725,439

$3,725,439 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 185 of 232Includes inflation and indirects using program

Page 192: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 101

WILTON - MILFORD - AMHERST - BEDFORD (13692D)

TRAFFIC AND SAFETY IMPROVEMENTS

CONSISTENT WITH THE INTENT OF THE 2002

CORRIDOR STUDY

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 1

Category

Strategy

676,830Preliminary Engineering 2019 Other Fed Aid

225,170Right of Way 2019 Other Fed Aid

2,481,710Construction 2020 Other Fed Aid

4,500,011Construction 2021 Other Fed Aid

$8,763,721

$7,883,721

$7,883,721 $880,000Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

OLD COUNTY FARM ROAD

WILTON (15768)

BRIDGE REPLACEMENT-OLD COUNTY FARM RD

OVER BLOOD BROOK-BR. #060/118

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

53,674Preliminary Engineering 2025 SAB *

5,964Right of Way 2025 SAB *

202,768Construction 2025 SAB *

$262,405

$262,405

$262,405 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 186 of 232Includes inflation and indirects using program

Page 193: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STAGE COACH ROAD

WILTON (26201)

BRIDGE REPLACEMENT-STAGE COACH RD OVER

BURTON POND-BR. #086/142

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 5

Category

Strategy

42,060Preliminary Engineering 2021 SAB *

7,010Right of Way 2021 SAB *

182,261Construction 2021 SAB *

$231,331

$231,331

$231,331 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 111

WINDHAM (40663)

NH 111 CORRIDOR ENGINEERING STUDY FROM

WALL ST INTERSECTION TO LOWELL RD /

HARDWOOD RD INTERSECTION

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

318,124Other 2020 None-Highway

$318,124

$318,124

$318,124 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 187 of 232Includes inflation and indirects using program

Page 194: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NH 28 AND ROULSTON ROAD

WINDHAM (40665)

INTERSECTION IMPROVEMENTS

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

21,833Preliminary Engineering 2023 None-Highway

11,480Right of Way 2025 None-Highway

200,141Construction 2026 None-Highway

$233,454

$233,454

$233,454 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH 28

WOLFEBORO (29615)

IMPROVEMENTS FROM NH 109 TO ALTON TOWN

LINE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 2

Category

Strategy

520,567Preliminary Engineering 2020 None-Highway

608,283Right of Way 2022 None-Highway

8,925,412Construction 2024 None-Highway

$10,521,761

$10,054,261

$10,054,261 $467,500Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 188 of 232Includes inflation and indirects using program

Page 195: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

PLEASANT VALLEY ROAD OVER HEATH BROOK

WOLFEBORO (40617)

BRIDGE REPLACEMENT-PLEASANT VALLEY ROAD

OVER HEATH BROOK-BR. #116/072

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

140,664Preliminary Engineering 2026 SAB *

12,232Right of Way 2026 SAB *

913,705Construction 2026 SAB *

$1,066,601

$1,066,601

$1,066,601 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Phase Year Funding

NH ROUTE 175

WOODSTOCK (27713)

BRIDGE REHAB OF BRIDGE CARRYING NH 175

OVER PEMIGEWASSET RIVER (177/148)

Route/Road

Scope

Program

RED LIST BRIDGES

TIER 3

Category

Strategy

153,825Preliminary Engineering 2019 Bridg-T3-4-Rehab-Rcn

210,330Preliminary Engineering 2020 Bridg-T3-4-Rehab-Rcn

107,847Preliminary Engineering 2021 Bridg-T3-4-Rehab-Rcn

221,194Preliminary Engineering 2022 Bridg-T3-4-Rehab-Rcn

113,417Preliminary Engineering 2023 Bridg-T3-4-Rehab-Rcn

232,618Preliminary Engineering 2024 Bridg-T3-4-Rehab-Rcn

3,489,275Construction 2024 Bridg-T3-4-Rehab-Rcn

$4,528,506

$4,528,506

$4,528,506 $0Previous Funding

Current TYP Funding

Total Project Cost

Future Funding Required

Total

NoneComments

$0

Page 189 of 232Includes inflation and indirects using program

Page 196: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

NATIONAL SUMMER TRANSPORTATION INSTITUTE

PROGRAM (STATEWIDE PROGRAMMATIC) (NSTI)

PROGRAMMATIC PROJECT AS A COOPERATIVE

PROJECT AGREEMENT (CPA) WITH THE

UNIVERSITY OF NEW HAMPSHIRE.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

20,000Other 2019 NSTI

20,000Other 2020 NSTI

20,000Other 2021 NSTI

20,000Other 2022 NSTI

20,000Other 2023 NSTI

20,000Other 2024 NSTI

20,000Other 2025 NSTI

20,000Other 2026 NSTI

20,000Other 2027 NSTI

20,000Other 2028 NSTI

Total 200,000.00

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (ADA)

UPGRADES TO SIDE WALKS, CURB RAMPS, AND

SIGNALS TO BE COMPLIANT WITH ADA LAWS.

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

200,000Construction 2019 ADA-Trans

200,000Construction 2020 ADA-Trans

200,000Construction 2021 ADA-Trans

200,000Construction 2022 ADA-Trans

200,000Construction 2023 ADA-Trans

200,000Construction 2024 ADA-Trans

200,000Construction 2025 ADA-Trans

200,000Construction 2026 ADA-Trans

200,000Construction 2027 ADA-Trans

200,000Construction 2028 ADA-Trans

Total 2,000,000.00

NoneComments

Page 190 of 232Includes inflation and indirects using program

Page 197: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-BMT-BD)

PRESERVATION OF STATE OWNED BRIDGES

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

1,500,000Construction 2019 BET-BMT-BD

1,500,000Construction 2020 BET-BMT-BD

1,500,000Construction 2021 BET-BMT-BD

1,500,000Construction 2022 BET-BMT-BD

1,500,000Construction 2023 BET-BMT-BD

1,500,000Construction 2024 BET-BMT-BD

1,500,000Construction 2025 BET-BMT-BD

1,500,000Construction 2026 BET-BMT-BD

1,500,000Construction 2027 BET-BMT-BD

1,500,000Construction 2028 BET-BMT-BD

Total 15,000,000.00

NoneComments

Phase Year Funding

VARIOUS BRIDGE SITE STATEWIDE

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-BMT-HQ)

STATEWIDE BETTERMENT PROGRAM FOR BRIDGE

PRESERVATION, REHABILITATION AND

RECONSTRUCTION

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

750,000Construction 2019 BET-BMT-HQ

750,000Construction 2020 BET-BMT-HQ

750,000Construction 2021 BET-BMT-HQ

750,000Construction 2022 BET-BMT-HQ

750,000Construction 2023 BET-BMT-HQ

750,000Construction 2024 BET-BMT-HQ

750,000Construction 2025 BET-BMT-HQ

750,000Construction 2026 BET-BMT-HQ

750,000Construction 2027 BET-BMT-HQ

750,000Construction 2028 BET-BMT-HQ

Total 7,500,000.00

NoneComments

Page 191 of 232Includes inflation and indirects using program

Page 198: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

ALL STATE HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-DRG-HQ)

INCLUDES DRAINAGE STRUCTURE REPAIR OR

REPLACEMENT ON ALL STATE HIGHWAYS.

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

500,000Construction 2019 BET-DRG-HQ

500,000Construction 2020 BET-DRG-HQ

500,000Construction 2021 BET-DRG-HQ

500,000Construction 2022 BET-DRG-HQ

500,000Construction 2023 BET-DRG-HQ

500,000Construction 2024 BET-DRG-HQ

500,000Construction 2025 BET-DRG-HQ

500,000Construction 2026 BET-DRG-HQ

500,000Construction 2027 BET-DRG-HQ

500,000Construction 2028 BET-DRG-HQ

Total 5,000,000.00

NoneComments

Phase Year Funding

BETTERMENT

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-FA-HQ)

WORK THAT IS TO BE COMPLETED BY MEANS OF

FORCE ACCOUNT INCLUDING SMALL

EMERGENCIES & UNPLANNED WORK

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

1,200,000Construction 2019 BET-FA-HQ

1,200,000Construction 2020 BET-FA-HQ

1,200,000Construction 2021 BET-FA-HQ

1,200,000Construction 2022 BET-FA-HQ

1,200,000Construction 2023 BET-FA-HQ

1,200,000Construction 2024 BET-FA-HQ

1,200,000Construction 2025 BET-FA-HQ

1,200,000Construction 2026 BET-FA-HQ

1,200,000Construction 2027 BET-FA-HQ

1,200,000Construction 2028 BET-FA-HQ

Total 12,000,000.00

NoneComments

Page 192 of 232Includes inflation and indirects using program

Page 199: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATE HIGHWAYS IN D1

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-1)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FISCAL YEAR AND

FROST HEAVE DAMAGE

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2019 BET-RL-1

400,000Construction 2020 BET-RL-1

400,000Construction 2021 BET-RL-1

400,000Construction 2022 BET-RL-1

400,000Construction 2023 BET-RL-1

400,000Construction 2024 BET-RL-1

400,000Construction 2025 BET-RL-1

400,000Construction 2026 BET-RL-1

400,000Construction 2027 BET-RL-1

400,000Construction 2028 BET-RL-1

Total 4,000,000.00

NoneComments

Phase Year Funding

STATE HIGHWAYS IN D2

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-2)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2019 BET-RL-2

400,000Construction 2020 BET-RL-2

400,000Construction 2021 BET-RL-2

400,000Construction 2022 BET-RL-2

400,000Construction 2023 BET-RL-2

400,000Construction 2024 BET-RL-2

400,000Construction 2025 BET-RL-2

400,000Construction 2026 BET-RL-2

400,000Construction 2027 BET-RL-2

400,000Construction 2028 BET-RL-2

Total 4,000,000.00

NoneComments

Page 193 of 232Includes inflation and indirects using program

Page 200: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATE HIGHWAYS IN D3

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-3)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D3

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2019 BET-RL-3

400,000Construction 2020 BET-RL-3

400,000Construction 2021 BET-RL-3

400,000Construction 2022 BET-RL-3

400,000Construction 2023 BET-RL-3

400,000Construction 2024 BET-RL-3

400,000Construction 2025 BET-RL-3

400,000Construction 2026 BET-RL-3

400,000Construction 2027 BET-RL-3

400,000Construction 2028 BET-RL-3

Total 4,000,000.00

NoneComments

Phase Year Funding

STATE HIGHWAYS IN D4

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-4)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D4

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2019 BET-RL-4

400,000Construction 2020 BET-RL-4

400,000Construction 2021 BET-RL-4

400,000Construction 2022 BET-RL-4

400,000Construction 2023 BET-RL-4

400,000Construction 2024 BET-RL-4

400,000Construction 2025 BET-RL-4

400,000Construction 2026 BET-RL-4

400,000Construction 2027 BET-RL-4

400,000Construction 2028 BET-RL-4

Total 4,000,000.00

NoneComments

Page 194 of 232Includes inflation and indirects using program

Page 201: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATE HIGHWAYS IN D5

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-5)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D 5

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2019 BET-RL-5

400,000Construction 2020 BET-RL-5

400,000Construction 2021 BET-RL-5

400,000Construction 2022 BET-RL-5

400,000Construction 2023 BET-RL-5

400,000Construction 2024 BET-RL-5

400,000Construction 2025 BET-RL-5

400,000Construction 2026 BET-RL-5

400,000Construction 2027 BET-RL-5

400,000Construction 2028 BET-RL-5

Total 4,000,000.00

NoneComments

Phase Year Funding

STATE HIGHWAYS IN D6

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-RL-6)

PAVEMENT LEVELING OF HIGHWAYS IN ADVANCE

OF RESURFACING THE NEXT FY AND FROST

HEAVE DAMAGE IN D6

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

400,000Construction 2019 BET-RL-6

400,000Construction 2020 BET-RL-6

400,000Construction 2021 BET-RL-6

400,000Construction 2022 BET-RL-6

400,000Construction 2023 BET-RL-6

400,000Construction 2024 BET-RL-6

400,000Construction 2025 BET-RL-6

400,000Construction 2026 BET-RL-6

400,000Construction 2027 BET-RL-6

400,000Construction 2028 BET-RL-6

Total 4,000,000.00

NoneComments

Page 195 of 232Includes inflation and indirects using program

Page 202: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

INTERSECTIONS ON STATE HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-SEU-HQ)

UPGRADING CAPABILITY, MODERNIZING, &

TOADDRESS ADDED PHASING OF TRAFFIC SIGNAL

EQUIP. STATEWIDE

Route/Road

Scope

Program

ROADSIDE

TIER 1

Category

Strategy

100,000Construction 2019 BET-SEU-HQ

100,000Construction 2020 BET-SEU-HQ

100,000Construction 2021 BET-SEU-HQ

100,000Construction 2022 BET-SEU-HQ

100,000Construction 2023 BET-SEU-HQ

100,000Construction 2024 BET-SEU-HQ

100,000Construction 2025 BET-SEU-HQ

100,000Construction 2026 BET-SEU-HQ

100,000Construction 2027 BET-SEU-HQ

100,000Construction 2028 BET-SEU-HQ

Total 1,000,000.00

NoneComments

Phase Year Funding

STATEWIDE HWYS & BRIDGES IN ALL DISTRICTS

PROGRAM (STATEWIDE PROGRAMMATIC) (BET-STAL-HQ)

VARIOUS REPAIR PROJECTS THAT ARE

APPROVED THAT DO NOT ORIGINATE IN ANY

OTHER PLANNED BET PROGRAM.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

2,500,000Construction 2019 BET-STAL-HQ

2,500,000Construction 2020 BET-STAL-HQ

2,500,000Construction 2021 BET-STAL-HQ

2,500,000Construction 2022 BET-STAL-HQ

2,500,000Construction 2023 BET-STAL-HQ

2,500,000Construction 2024 BET-STAL-HQ

2,500,000Construction 2025 BET-STAL-HQ

2,500,000Construction 2026 BET-STAL-HQ

2,500,000Construction 2027 BET-STAL-HQ

2,500,000Construction 2028 BET-STAL-HQ

Total 25,000,000.00

NoneComments

Page 196 of 232Includes inflation and indirects using program

Page 203: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (BRDG-HIB-M&P)

MAINTENANCE AND PRESERVATION EFFORTS FOR

HIGH INVESTMENT BRIDGES

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

100,000Preliminary Engineering 2019 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2020 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2021 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2022 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2023 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2024 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2025 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2026 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2027 Bridg-HIB-Main-Pres

100,000Preliminary Engineering 2028 Bridg-HIB-Main-Pres

20,000Right of Way 2019 Bridg-HIB-Main-Pres

20,000Right of Way 2020 Bridg-HIB-Main-Pres

20,000Right of Way 2021 Bridg-HIB-Main-Pres

20,000Right of Way 2022 Bridg-HIB-Main-Pres

20,000Right of Way 2023 Bridg-HIB-Main-Pres

20,000Right of Way 2024 Bridg-HIB-Main-Pres

20,000Right of Way 2025 Bridg-HIB-Main-Pres

20,000Right of Way 2026 Bridg-HIB-Main-Pres

20,000Right of Way 2027 Bridg-HIB-Main-Pres

20,000Right of Way 2028 Bridg-HIB-Main-Pres

2,389,800Construction 2019 Bridg-HIB-Main-Pres

2,800,000Construction 2020 Bridg-HIB-Main-Pres

2,800,000Construction 2021 Bridg-HIB-Main-Pres

2,800,000Construction 2022 Bridg-HIB-Main-Pres

2,800,000Construction 2023 Bridg-HIB-Main-Pres

2,800,000Construction 2024 Bridg-HIB-Main-Pres

2,800,000Construction 2025 Bridg-HIB-Main-Pres

2,800,000Construction 2026 Bridg-HIB-Main-Pres

2,800,000Construction 2027 Bridg-HIB-Main-Pres

2,800,000Construction 2028 Bridg-HIB-Main-Pres

Total 28,789,800.00

NoneComments

Page 197 of 232Includes inflation and indirects using program

Page 204: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 1-2 BRIDGES

PROGRAM (STATEWIDE PROGRAMMATIC) (BRDG-T1/2-M&P)

MAINTENANCE & PRESERVATION OF TIER 1 & 2

BRIDGES.

Route/Road

Scope

Program

BRIDGES

TIER 1

Category

Strategy

550,000Preliminary Engineering 2019 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2020 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2021 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2022 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2023 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2024 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2025 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2026 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2027 Bridg-T1-2-Main-Pres

100,000Preliminary Engineering 2028 Bridg-T1-2-Main-Pres

25,000Right of Way 2019 Bridg-T1-2-Main-Pres

25,000Right of Way 2020 Bridg-T1-2-Main-Pres

25,000Right of Way 2021 Bridg-T1-2-Main-Pres

25,000Right of Way 2022 Bridg-T1-2-Main-Pres

25,000Right of Way 2023 Bridg-T1-2-Main-Pres

25,000Right of Way 2024 Bridg-T1-2-Main-Pres

25,000Right of Way 2025 Bridg-T1-2-Main-Pres

25,000Right of Way 2026 Bridg-T1-2-Main-Pres

25,000Right of Way 2027 Bridg-T1-2-Main-Pres

25,000Right of Way 2028 Bridg-T1-2-Main-Pres

7,550,000Construction 2019 Bridg-T1-2-Main-Pres

8,000,000Construction 2020 Bridg-T1-2-Main-Pres

8,000,000Construction 2021 Bridg-T1-2-Main-Pres

8,000,000Construction 2022 Bridg-T1-2-Main-Pres

8,000,000Construction 2023 Bridg-T1-2-Main-Pres

8,000,000Construction 2024 Bridg-T1-2-Main-Pres

8,000,000Construction 2025 Bridg-T1-2-Main-Pres

8,000,000Construction 2026 Bridg-T1-2-Main-Pres

8,000,000Construction 2027 Bridg-T1-2-Main-Pres

8,000,000Construction 2028 Bridg-T1-2-Main-Pres

Total 81,250,000.00

NoneComments

Page 198 of 232Includes inflation and indirects using program

Page 205: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 3-4 BRIDGES

PROGRAM (STATEWIDE PROGRAMMATIC) (BRDG-T3/4-M&P)

MAINTENANCE AND PRESERVATION OF TIER 3 & 4

BRIDGES.

Route/Road

Scope

Program

BRIDGES

TIER 3

Category

Strategy

100,000Preliminary Engineering 2019 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2020 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2021 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2022 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2023 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2024 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2025 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2026 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2027 Bridg-T3-4-Main-Pres

50,000Preliminary Engineering 2028 Bridg-T3-4-Main-Pres

10,000Right of Way 2019 Bridg-T3-4-Main-Pres

10,000Right of Way 2020 Bridg-T3-4-Main-Pres

10,000Right of Way 2021 Bridg-T3-4-Main-Pres

10,000Right of Way 2022 Bridg-T3-4-Main-Pres

10,000Right of Way 2023 Bridg-T3-4-Main-Pres

10,000Right of Way 2024 Bridg-T3-4-Main-Pres

10,000Right of Way 2025 Bridg-T3-4-Main-Pres

10,000Right of Way 2026 Bridg-T3-4-Main-Pres

10,000Right of Way 2027 Bridg-T3-4-Main-Pres

10,000Right of Way 2028 Bridg-T3-4-Main-Pres

3,500,000Construction 2019 Bridg-T3-4-Main-Pres

3,500,000Construction 2020 Bridg-T3-4-Main-Pres

3,500,000Construction 2021 Bridg-T3-4-Main-Pres

3,500,000Construction 2022 Bridg-T3-4-Main-Pres

3,500,000Construction 2023 Bridg-T3-4-Main-Pres

3,500,000Construction 2024 Bridg-T3-4-Main-Pres

3,500,000Construction 2025 Bridg-T3-4-Main-Pres

3,500,000Construction 2026 Bridg-T3-4-Main-Pres

3,500,000Construction 2027 Bridg-T3-4-Main-Pres

3,500,000Construction 2028 Bridg-T3-4-Main-Pres

Total 35,650,000.00

NoneComments

Page 199 of 232Includes inflation and indirects using program

Page 206: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CBI)

COMPLEX BRIDGE INSPECTION (PARENT)

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

250,000Other 2019 CBI *

250,000Other 2020 CBI *

250,000Other 2021 CBI *

250,000Other 2022 CBI *

250,000Other 2023 CBI *

250,000Other 2024 CBI *

250,000Other 2025 CBI *

250,000Other 2026 CBI *

250,000Other 2027 CBI *

250,000Other 2028 CBI *

Total 2,500,000.00

NoneComments

Page 200 of 232Includes inflation and indirects using program

Page 207: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CMAQ)

CONGESTION MITIGATION AND AIR

QUALITY(CMAQ) PROJECTS MUST BE IN

NON-ATTAIN AREAS (ANNUAL PROJECT)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

399,904Preliminary Engineering 2019 CMAQ *

223,699Preliminary Engineering 2020 CMAQ *

250,000Preliminary Engineering 2021 CMAQ *

250,000Preliminary Engineering 2022 CMAQ *

250,000Preliminary Engineering 2023 CMAQ *

250,000Preliminary Engineering 2024 CMAQ *

250,000Preliminary Engineering 2025 CMAQ *

250,000Preliminary Engineering 2026 CMAQ *

250,000Preliminary Engineering 2027 CMAQ *

250,000Preliminary Engineering 2028 CMAQ *

0Right of Way 2020 CMAQ *

100,000Right of Way 2022 CMAQ *

100,000Right of Way 2023 CMAQ *

100,000Right of Way 2024 CMAQ *

100,000Right of Way 2025 CMAQ *

100,000Right of Way 2026 CMAQ *

100,000Right of Way 2027 CMAQ *

100,000Right of Way 2028 CMAQ *

424,517Construction 2019 CMAQ *

240,176Construction 2020 CMAQ *

2,918,445Construction 2021 CMAQ *

5,046,701Construction 2022 CMAQ *

5,406,909Construction 2023 CMAQ *

5,406,909Construction 2024 CMAQ *

5,406,909Construction 2025 CMAQ *

5,406,909Construction 2026 CMAQ *

5,406,909Construction 2027 CMAQ *

5,406,909Construction 2028 CMAQ *

465,200Other 2019 CMAQ *

727,673Other 2020 CMAQ *

2,001,834Other 2021 CMAQ *

4,700,000Other 2022 CMAQ *

4,700,000Other 2023 CMAQ *

4,700,000Other 2024 CMAQ *

Page 201 of 232Includes inflation and indirects using program

Page 208: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

4,700,000Other 2025 CMAQ *

4,700,000Other 2026 CMAQ *

4,700,000Other 2027 CMAQ *

4,700,000Other 2028 CMAQ *

Total 80,489,603.00

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CORRST)

CORRIDOR STUDIES STATEWIDE

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

700,000Other 2021 CORRST

700,000Other 2022 CORRST

700,000Other 2023 CORRST

700,000Other 2024 CORRST

700,000Other 2025 CORRST

700,000Other 2026 CORRST

700,000Other 2027 CORRST

700,000Other 2028 CORRST

Total 5,600,000.00

NoneComments

Page 202 of 232Includes inflation and indirects using program

Page 209: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (CRDR)

CULVERT REPLACEMENT/REHABILITATION &

DRAINAGE REPAIRS (ANNUAL PROJECT)

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

100,000Preliminary Engineering 2019 CRDR *

100,000Preliminary Engineering 2020 CRDR *

100,000Preliminary Engineering 2021 CRDR *

100,000Preliminary Engineering 2022 CRDR *

100,000Preliminary Engineering 2023 CRDR *

100,000Preliminary Engineering 2024 CRDR *

100,000Preliminary Engineering 2025 CRDR *

200,000Preliminary Engineering 2026 CRDR *

200,000Preliminary Engineering 2027 CRDR *

200,000Preliminary Engineering 2028 CRDR *

25,000Right of Way 2019 CRDR *

25,000Right of Way 2020 CRDR *

25,000Right of Way 2021 CRDR *

25,000Right of Way 2022 CRDR *

25,000Right of Way 2023 CRDR *

25,000Right of Way 2024 CRDR *

30,000Right of Way 2025 CRDR *

30,000Right of Way 2026 CRDR *

30,000Right of Way 2027 CRDR *

30,000Right of Way 2028 CRDR *

1,111,112Construction 2019 CRDR *

1,291,592Construction 2020 CRDR *

1,870,000Construction 2021 CRDR *

1,870,000Construction 2022 CRDR *

1,870,000Construction 2023 CRDR *

1,870,000Construction 2024 CRDR *

1,870,000Construction 2025 CRDR *

3,765,000Construction 2026 CRDR *

3,765,000Construction 2027 CRDR *

3,765,000Construction 2028 CRDR *

5,000Other 2019 CRDR *

5,000Other 2020 CRDR *

5,000Other 2021 CRDR *

5,000Other 2022 CRDR *

Page 203 of 232Includes inflation and indirects using program

Page 210: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

5,000Other 2023 CRDR *

5,000Other 2024 CRDR *

5,000Other 2025 CRDR *

5,000Other 2026 CRDR *

5,000Other 2027 CRDR *

5,000Other 2028 CRDR *

Total 24,667,704.00

NoneComments

Phase Year Funding

DISADVANTAGED BUSINESS ENTERPRISE

PROGRAM (STATEWIDE PROGRAMMATIC) (DBE)

IN HOUSE ADMINISTRATION OF THE FHWA

SUPPORTIVE PROGRAM: "DBE COMPLIANCE

MONITORING (ANNUAL PROGRAM)

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

65,000Other 2019 DBE

65,000Other 2020 DBE

65,000Other 2021 DBE

65,000Other 2022 DBE

65,000Other 2023 DBE

65,000Other 2024 DBE

65,000Other 2025 DBE

65,000Other 2026 DBE

65,000Other 2027 DBE

65,000Other 2028 DBE

Total 650,000.00

NoneComments

Page 204 of 232Includes inflation and indirects using program

Page 211: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FLAP)

IMPROVING TRANSPORTATION FACILITIES THAT

ACCESS FEDERAL LANDS WITHIN NH {FLAP}

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

50,000Preliminary Engineering 2019 FLAP

50,000Preliminary Engineering 2020 FLAP

50,000Preliminary Engineering 2021 FLAP

50,000Preliminary Engineering 2022 FLAP

50,000Preliminary Engineering 2023 FLAP

50,000Preliminary Engineering 2024 FLAP

50,000Preliminary Engineering 2025 FLAP

25,000Right of Way 2019 FLAP

25,000Right of Way 2020 FLAP

25,000Right of Way 2021 FLAP

25,000Right of Way 2022 FLAP

25,000Right of Way 2023 FLAP

25,000Right of Way 2024 FLAP

25,000Right of Way 2025 FLAP

275,000Construction 2019 FLAP

275,000Construction 2020 FLAP

275,000Construction 2021 FLAP

275,000Construction 2022 FLAP

275,000Construction 2023 FLAP

275,000Construction 2024 FLAP

275,000Construction 2025 FLAP

Total 2,450,000.00

NoneComments

Page 205 of 232Includes inflation and indirects using program

Page 212: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

BOSTON URBANIZED AREA (UZA)

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5307)

BOSTON URBANIZED AREA (UZA) FTA SECTION

5307 APPORTIONED FUNDS FOR NHDOT TRANSIT

PROJECTS.

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

717,506Other 2019 FTA5307_NHDOT

767,484Other 2020 FTA5307_NHDOT

2,899,237Other 2021 FTA5307_NHDOT

2,953,069Other 2022 FTA5307_NHDOT

3,007,873Other 2023 FTA5307_NHDOT

3,063,664Other 2024 FTA5307_NHDOT

3,120,459Other 2025 FTA5307_NHDOT

3,178,276Other 2026 FTA5307_NHDOT

3,237,132Other 2027 FTA5307_NHDOT

3,297,046Other 2028 FTA5307_NHDOT

Total 26,241,746.00

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5310)

CAPITAL, MOBILITY MGMT, AND OPERATING FOR

SENIORS & INDIVIDUALS W/ DISABILITIES - FTA

5310 PROGRAM

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

2,359,217Other 2019 FTA5310

2,385,705Other 2020 FTA5310

2,412,705Other 2021 FTA5310

2,440,227Other 2022 FTA5310

2,468,281Other 2023 FTA5310

2,496,877Other 2024 FTA5310

2,526,025Other 2025 FTA5310

2,555,736Other 2026 FTA5310

2,586,020Other 2027 FTA5310

2,616,888Other 2028 FTA5310

Total 24,847,681.00

NoneComments

Page 206 of 232Includes inflation and indirects using program

Page 213: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5311)

NONURBANIZED AREA (RURAL) FORMULA

PROGRAM - FTA SECTION 5311 PROGRAM

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

8,227,369Other 2019 FTA5311

8,388,760Other 2020 FTA5311

8,634,440Other 2021 FTA5311

8,807,129Other 2022 FTA5311

8,983,271Other 2023 FTA5311

9,162,937Other 2024 FTA5311

9,346,196Other 2025 FTA5311

9,533,120Other 2026 FTA5311

9,723,782Other 2027 FTA5311

9,918,258Other 2028 FTA5311

Total 90,725,262.00

NoneComments

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (FTA5339)

CAPITAL BUS AND BUS FACILITIES - FTA 5339

PROGRAM FOR STATEWIDE PUBLIC

TRANSPORTATION

Route/Road

Scope

Program

TRANSIT

ALL TIERS

Category

Strategy

3,065,751Other 2019 FTA5339

3,130,569Other 2020 FTA5339

3,175,224Other 2021 FTA5339

3,238,432Other 2022 FTA5339

3,302,895Other 2023 FTA5339

3,368,641Other 2024 FTA5339

3,435,694Other 2025 FTA5339

3,504,081Other 2026 FTA5339

3,573,826Other 2027 FTA5339

3,644,958Other 2028 FTA5339

Total 33,440,071.00

NoneComments

Page 207 of 232Includes inflation and indirects using program

Page 214: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (GRR)

GUARDRAIL REPLACEMENT [FEDERAL AID

GUARDRAIL IMPROVEMENT PROGRAM] (ANNUAL

PROJECT)

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

150,000Preliminary Engineering 2019 GRR *

150,000Preliminary Engineering 2020 GRR *

150,000Preliminary Engineering 2021 GRR *

150,000Preliminary Engineering 2022 GRR *

150,000Preliminary Engineering 2023 GRR *

150,000Preliminary Engineering 2024 GRR *

150,000Preliminary Engineering 2025 GRR *

150,000Preliminary Engineering 2026 GRR *

150,000Preliminary Engineering 2027 GRR *

150,000Preliminary Engineering 2028 GRR *

5,000Right of Way 2019 GRR *

5,000Right of Way 2020 GRR *

5,000Right of Way 2021 GRR *

5,000Right of Way 2022 GRR *

5,000Right of Way 2023 GRR *

5,000Right of Way 2024 GRR *

5,000Right of Way 2025 GRR *

5,000Right of Way 2026 GRR *

5,000Right of Way 2027 GRR *

5,000Right of Way 2028 GRR *

0Construction 2019 GRR *

875,120Construction 2020 GRR *

1,880,000Construction 2021 GRR *

1,880,000Construction 2022 GRR *

1,880,000Construction 2023 GRR *

1,880,000Construction 2024 GRR *

1,880,000Construction 2025 GRR *

1,880,000Construction 2026 GRR *

1,880,000Construction 2027 GRR *

1,880,000Construction 2028 GRR *

Total 17,465,120.00

NoneComments

Page 208 of 232Includes inflation and indirects using program

Page 215: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

HAZARD MATERIAL REVIEW

PROGRAM (STATEWIDE PROGRAMMATIC) (HAZMAT)

HAZARD MATERIAL REVIEW FOR POST

CONSTRUCTION OBLIGATIONS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

36,300Other 2019 HAZMAT

36,300Other 2020 HAZMAT

36,300Other 2021 HAZMAT

36,300Other 2022 HAZMAT

36,300Other 2023 HAZMAT

36,300Other 2024 HAZMAT

36,300Other 2025 HAZMAT

36,300Other 2026 HAZMAT

36,300Other 2027 HAZMAT

36,300Other 2028 HAZMAT

Total 363,000.00

NoneComments

Page 209 of 232Includes inflation and indirects using program

Page 216: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (HSIP)

HIGHWAY SAFETY IMPROVEMENT PROGRAM

(HSIP)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

251,829Preliminary Engineering 2019 HSIP *

476,864Preliminary Engineering 2020 HSIP *

726,274Preliminary Engineering 2021 HSIP *

475,669Preliminary Engineering 2022 HSIP *

475,048Preliminary Engineering 2023 HSIP *

500,000Preliminary Engineering 2024 HSIP *

500,000Preliminary Engineering 2025 HSIP *

500,000Preliminary Engineering 2026 HSIP *

500,000Preliminary Engineering 2027 HSIP *

500,000Preliminary Engineering 2028 HSIP *

150,000Right of Way 2019 HSIP *

150,000Right of Way 2020 HSIP *

150,000Right of Way 2021 HSIP *

150,000Right of Way 2022 HSIP *

150,000Right of Way 2023 HSIP *

150,000Right of Way 2024 HSIP *

150,000Right of Way 2025 HSIP *

150,000Right of Way 2026 HSIP *

150,000Right of Way 2027 HSIP *

150,000Right of Way 2028 HSIP *

7,023,430Construction 2019 HSIP *

7,809,721Construction 2020 HSIP *

8,239,650Construction 2021 HSIP *

8,475,130Construction 2022 HSIP *

8,460,239Construction 2023 HSIP *

9,059,081Construction 2024 HSIP *

9,059,081Construction 2025 HSIP *

9,059,081Construction 2026 HSIP *

9,059,081Construction 2027 HSIP *

9,059,081Construction 2028 HSIP *

200,000Other 2019 HSIP *

200,000Other 2020 HSIP *

200,000Other 2021 HSIP *

200,000Other 2022 HSIP *

Page 210 of 232Includes inflation and indirects using program

Page 217: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

200,000Other 2023 HSIP *

200,000Other 2024 HSIP *

200,000Other 2025 HSIP *

200,000Other 2026 HSIP *

200,000Other 2027 HSIP *

200,000Other 2028 HSIP *

Total 93,709,259.00

NoneComments

Phase Year Funding

LOCAL TECHONOLGY ASSISTANCE PROGRAM

PROGRAM (STATEWIDE PROGRAMMATIC) (LTAP)

LOCAL TECHONOLGY ASSISTANCE PROGRAM

(LTAP) ADMINISTERED BY THE TECHNOLOGY

TRANSFER CENTER @ UNH

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

150,000State Planning Research 2019 LTAP

150,000State Planning Research 2020 LTAP

150,000State Planning Research 2021 LTAP

150,000State Planning Research 2022 LTAP

150,000State Planning Research 2023 LTAP

150,000State Planning Research 2024 LTAP

150,000State Planning Research 2025 LTAP

150,000State Planning Research 2026 LTAP

150,000State Planning Research 2027 LTAP

150,000State Planning Research 2028 LTAP

Total 1,500,000.00

NoneComments

Page 211 of 232Includes inflation and indirects using program

Page 218: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (MOBRR)

MUNICIPAL OWNED BRIDGE REHABILITATION &

REPLACEMENT PROJECTS (MOBRR PROGRAM)

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

100,000Preliminary Engineering 2019 MOBRR *

100,000Preliminary Engineering 2020 MOBRR *

100,000Preliminary Engineering 2021 MOBRR *

100,000Preliminary Engineering 2022 MOBRR *

100,000Preliminary Engineering 2023 MOBRR *

100,000Preliminary Engineering 2024 MOBRR *

100,000Preliminary Engineering 2025 MOBRR *

100,000Preliminary Engineering 2026 MOBRR *

100,000Preliminary Engineering 2027 MOBRR *

100,000Preliminary Engineering 2028 MOBRR *

0Right of Way 2019 MOBRR *

0Right of Way 2020 MOBRR *

25,000Right of Way 2021 MOBRR *

25,000Right of Way 2022 MOBRR *

25,000Right of Way 2023 MOBRR *

25,000Right of Way 2024 MOBRR *

25,000Right of Way 2025 MOBRR *

25,000Right of Way 2026 MOBRR *

25,000Right of Way 2027 MOBRR *

25,000Right of Way 2028 MOBRR *

0Construction 2019 MOBRR *

0Construction 2020 MOBRR *

0Construction 2021 MOBRR *

1,106Construction 2022 MOBRR *

0Construction 2023 MOBRR *

1,916,675Construction 2024 MOBRR *

4,500,000Construction 2025 MOBRR *

4,500,000Construction 2026 MOBRR *

4,500,000Construction 2027 MOBRR *

4,500,000Construction 2028 MOBRR *

Total 21,117,781.00

NoneComments

Page 212 of 232Includes inflation and indirects using program

Page 219: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

OJT/SS

PROGRAM (STATEWIDE PROGRAMMATIC) (OJT/SS)

ON THE JOB TRAINING FOR MINORITY AND

WOMEN TO REACH JOURNEYMAN STATUS IN THE

CONSTRUCTION INDUSTRY.

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

30,000Other 2019 OJT/SS

30,000Other 2020 OJT/SS

30,000Other 2021 OJT/SS

30,000Other 2022 OJT/SS

30,000Other 2023 OJT/SS

30,000Other 2024 OJT/SS

30,000Other 2025 OJT/SS

30,000Other 2026 OJT/SS

30,000Other 2027 OJT/SS

30,000Other 2028 OJT/SS

Total 300,000.00

NoneComments

Page 213 of 232Includes inflation and indirects using program

Page 220: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 1 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T1-RESURF)

RESURFACE TIER 1 HIGHWAYS

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 1

Category

Strategy

150,000Preliminary Engineering 2019 Pave-T1-Resurf

150,000Preliminary Engineering 2020 Pave-T1-Resurf

150,000Preliminary Engineering 2021 Pave-T1-Resurf

150,000Preliminary Engineering 2022 Pave-T1-Resurf

150,000Preliminary Engineering 2023 Pave-T1-Resurf

150,000Preliminary Engineering 2024 Pave-T1-Resurf

150,000Preliminary Engineering 2025 Pave-T1-Resurf

150,000Preliminary Engineering 2026 Pave-T1-Resurf

150,000Preliminary Engineering 2027 Pave-T1-Resurf

150,000Preliminary Engineering 2028 Pave-T1-Resurf

1,114,318Construction 2019 Pave-T1-Resurf

10,601,782Construction 2020 Pave-T1-Resurf

12,500,000Construction 2021 Pave-T1-Resurf

12,500,000Construction 2022 Pave-T1-Resurf

12,500,000Construction 2023 Pave-T1-Resurf

12,500,000Construction 2024 Pave-T1-Resurf

12,500,000Construction 2025 Pave-T1-Resurf

12,500,000Construction 2026 Pave-T1-Resurf

12,500,000Construction 2027 Pave-T1-Resurf

12,500,000Construction 2028 Pave-T1-Resurf

Total 113,216,100.00

NoneComments

Page 214 of 232Includes inflation and indirects using program

Page 221: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 2 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T2-REHAB)

REHAB OF TIER 2 ROADS.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

822,618Construction 2020 Pave-T2-Rehab

779,845Construction 2021 Pave-T2-Rehab

2,500,000Construction 2022 Pave-T2-Rehab

2,500,000Construction 2023 Pave-T2-Rehab

2,500,000Construction 2024 Pave-T2-Rehab

2,500,000Construction 2025 Pave-T2-Rehab

2,500,000Construction 2026 Pave-T2-Rehab

2,500,000Construction 2027 Pave-T2-Rehab

2,500,000Construction 2028 Pave-T2-Rehab

Total 19,102,463.00

NoneComments

Page 215 of 232Includes inflation and indirects using program

Page 222: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 2 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T2-RESURF)

RESURFACING TIER 2 ROADWAYS

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 2

Category

Strategy

300,000Preliminary Engineering 2019 Pave-T2-Resurf

300,000Preliminary Engineering 2020 Pave-T2-Resurf

300,000Preliminary Engineering 2021 Pave-T2-Resurf

300,000Preliminary Engineering 2022 Pave-T2-Resurf

300,000Preliminary Engineering 2023 Pave-T2-Resurf

300,000Preliminary Engineering 2024 Pave-T2-Resurf

300,000Preliminary Engineering 2025 Pave-T2-Resurf

300,000Preliminary Engineering 2026 Pave-T2-Resurf

300,000Preliminary Engineering 2027 Pave-T2-Resurf

300,000Preliminary Engineering 2028 Pave-T2-Resurf

50,000Right of Way 2019 Pave-T2-Resurf

50,000Right of Way 2020 Pave-T2-Resurf

50,000Right of Way 2021 Pave-T2-Resurf

50,000Right of Way 2022 Pave-T2-Resurf

50,000Right of Way 2023 Pave-T2-Resurf

50,000Right of Way 2024 Pave-T2-Resurf

50,000Right of Way 2025 Pave-T2-Resurf

50,000Right of Way 2026 Pave-T2-Resurf

50,000Right of Way 2027 Pave-T2-Resurf

50,000Right of Way 2028 Pave-T2-Resurf

17,436,996Construction 2019 Pave-T2-Resurf

20,650,000Construction 2020 Pave-T2-Resurf

20,650,000Construction 2021 Pave-T2-Resurf

20,650,000Construction 2022 Pave-T2-Resurf

20,650,000Construction 2023 Pave-T2-Resurf

20,650,000Construction 2024 Pave-T2-Resurf

20,650,000Construction 2025 Pave-T2-Resurf

20,650,000Construction 2026 Pave-T2-Resurf

20,650,000Construction 2027 Pave-T2-Resurf

20,650,000Construction 2028 Pave-T2-Resurf

Total 206,786,996.00

NoneComments

Page 216 of 232Includes inflation and indirects using program

Page 223: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 3-4 ROADS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T3/4-REHAB)

REHAB OF TIER 3 & 4 ROADS.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 3

Category

Strategy

1,375,000Construction 2020 Pave-T3-4-Rehab

1,375,000Construction 2021 Pave-T3-4-Rehab

1,375,000Construction 2022 Pave-T3-4-Rehab

1,375,000Construction 2023 Pave-T3-4-Rehab

1,375,000Construction 2024 Pave-T3-4-Rehab

1,375,000Construction 2025 Pave-T3-4-Rehab

1,375,000Construction 2026 Pave-T3-4-Rehab

1,375,000Construction 2027 Pave-T3-4-Rehab

1,375,000Construction 2028 Pave-T3-4-Rehab

Total 12,375,000.00

NoneComments

Page 217 of 232Includes inflation and indirects using program

Page 224: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TIER 3/4 HIGHWAYS

PROGRAM (STATEWIDE PROGRAMMATIC) (PAVE-T3/4-RESUR)

RESURFACING TIER 3 AND 4 ROADWAYS.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

TIER 3

Category

Strategy

205,000Preliminary Engineering 2026 Pave-T3-4-Resurf

205,000Preliminary Engineering 2027 Pave-T3-4-Resurf

205,000Preliminary Engineering 2028 Pave-T3-4-Resurf

35,000Right of Way 2026 Pave-T3-4-Resurf

35,000Right of Way 2027 Pave-T3-4-Resurf

35,000Right of Way 2028 Pave-T3-4-Resurf

542,933Construction 2019 Pave-T3-4-Resurf

15,350,000Construction 2020 Pave-T3-4-Resurf

15,350,000Construction 2021 Pave-T3-4-Resurf

15,350,000Construction 2022 Pave-T3-4-Resurf

15,350,000Construction 2023 Pave-T3-4-Resurf

15,350,000Construction 2024 Pave-T3-4-Resurf

15,350,000Construction 2025 Pave-T3-4-Resurf

15,110,000Construction 2026 Pave-T3-4-Resurf

15,110,000Construction 2027 Pave-T3-4-Resurf

15,110,000Construction 2028 Pave-T3-4-Resurf

Total 138,692,933.00

NoneComments

Page 218 of 232Includes inflation and indirects using program

Page 225: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (PVMRK)

STATEWIDE PAVEMENT MARKING ANNUAL

PROJECT

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

5,000Preliminary Engineering 2019 12223 *

5,000Preliminary Engineering 2020 12223 *

5,000Preliminary Engineering 2021 12223 *

5,000Preliminary Engineering 2022 12223 *

5,000Preliminary Engineering 2023 12223 *

5,000Preliminary Engineering 2024 12223 *

5,000Preliminary Engineering 2025 12223 *

5,000Preliminary Engineering 2026 12223 *

5,000Preliminary Engineering 2027 12223 *

5,000Preliminary Engineering 2028 12223 *

3,095,000Construction 2019 12223 *

3,095,000Construction 2020 12223 *

3,095,000Construction 2021 12223 *

3,095,000Construction 2022 12223 *

3,095,000Construction 2023 12223 *

3,095,000Construction 2024 12223 *

3,095,000Construction 2025 12223 *

3,095,000Construction 2026 12223 *

3,095,000Construction 2027 12223 *

3,095,000Construction 2028 12223 *

Total 31,000,000.00

NoneComments

Page 219 of 232Includes inflation and indirects using program

Page 226: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (RCTRL)

RECREATIONAL TRAILS FUND ACT- PROJECTS

SELECTED ANNUALLY

Route/Road

Scope

Program

MANDATED FEDERAL

TIER 6

Category

Strategy

1,562,500Other 2019 RECTRAILS

1,562,500Other 2020 RECTRAILS

1,562,500Other 2021 RECTRAILS

1,562,500Other 2022 RECTRAILS

1,562,500Other 2023 RECTRAILS

1,562,500Other 2024 RECTRAILS

1,562,500Other 2025 RECTRAILS

1,562,500Other 2026 RECTRAILS

1,562,500Other 2027 RECTRAILS

1,562,500Other 2028 RECTRAILS

Total 15,625,000.00

NoneComments

Page 220 of 232Includes inflation and indirects using program

Page 227: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATEWIDE RAILROAD CROSSINGS

PROGRAM (STATEWIDE PROGRAMMATIC) (RRRCS)

RECONSTRUCTION OF CROSSINGS, SIGNALS, &

RELATED WORK (ANNUAL PROJECT)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

50,000Preliminary Engineering 2019 RR-RCS *

50,000Preliminary Engineering 2020 RR-RCS *

50,000Preliminary Engineering 2021 RR-RCS *

50,000Preliminary Engineering 2022 RR-RCS *

50,000Preliminary Engineering 2023 RR-RCS *

50,000Preliminary Engineering 2024 RR-RCS *

50,000Preliminary Engineering 2025 RR-RCS *

50,000Preliminary Engineering 2026 RR-RCS *

75,000Preliminary Engineering 2027 RR-RCS *

75,000Preliminary Engineering 2028 RR-RCS *

5,000Right of Way 2019 RR-RCS *

5,000Right of Way 2020 RR-RCS *

5,000Right of Way 2021 RR-RCS *

5,000Right of Way 2022 RR-RCS *

5,000Right of Way 2023 RR-RCS *

5,000Right of Way 2024 RR-RCS *

5,000Right of Way 2025 RR-RCS *

5,000Right of Way 2026 RR-RCS *

5,000Right of Way 2027 RR-RCS *

5,000Right of Way 2028 RR-RCS *

1,100,000Construction 2019 RR-RCS *

1,100,000Construction 2020 RR-RCS *

1,100,000Construction 2021 RR-RCS *

1,100,000Construction 2022 RR-RCS *

1,100,000Construction 2023 RR-RCS *

1,100,000Construction 2024 RR-RCS *

1,100,000Construction 2025 RR-RCS *

1,100,000Construction 2026 RR-RCS *

1,100,000Construction 2027 RR-RCS *

1,100,000Construction 2028 RR-RCS *

5,000Other 2019 RR-RCS *

5,000Other 2020 RR-RCS *

5,000Other 2021 RR-RCS *

5,000Other 2022 RR-RCS *

Page 221 of 232Includes inflation and indirects using program

Page 228: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

5,000Other 2023 RR-RCS *

5,000Other 2024 RR-RCS *

5,000Other 2025 RR-RCS *

5,000Other 2026 RR-RCS *

5,000Other 2027 RR-RCS *

5,000Other 2028 RR-RCS *

Total 11,650,000.00

NoneComments

Phase Year Funding

STATEWIDE RAILROAD LINES

PROGRAM (STATEWIDE PROGRAMMATIC) (RR-REVOLV)

RAILROAD REVOLVING LOAN

Route/Road

Scope

Program

RAIL

ALL TIERS

Category

Strategy

1,500,000Construction 2019 RR-REVOLV

1,500,000Construction 2022 RR-REVOLV

1,500,000Construction 2025 RR-REVOLV

1,500,000Construction 2028 RR-REVOLV

Total 6,000,000.00

NoneComments

Page 222 of 232Includes inflation and indirects using program

Page 229: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATE-OWNED RAILROAD LINES

PROGRAM (STATEWIDE PROGRAMMATIC) (RR-RSA)

PERFORM CONSTRUCTION & MAINTENANCE ON

THE STATE-OWNED RAILROAD LINES PER RSA

228:60

Route/Road

Scope

Program

RAIL

TIER 2

Category

Strategy

50,000Preliminary Engineering 2019 RR-RSA-Funds

50,000Preliminary Engineering 2020 RR-RSA-Funds

50,000Preliminary Engineering 2021 RR-RSA-Funds

50,000Preliminary Engineering 2022 RR-RSA-Funds

50,000Preliminary Engineering 2023 RR-RSA-Funds

50,000Preliminary Engineering 2024 RR-RSA-Funds

50,000Preliminary Engineering 2025 RR-RSA-Funds

50,000Preliminary Engineering 2026 RR-RSA-Funds

50,000Preliminary Engineering 2027 RR-RSA-Funds

50,000Preliminary Engineering 2028 RR-RSA-Funds

450,000Construction 2019 RR-RSA-Funds

450,000Construction 2020 RR-RSA-Funds

450,000Construction 2021 RR-RSA-Funds

450,000Construction 2022 RR-RSA-Funds

450,000Construction 2023 RR-RSA-Funds

450,000Construction 2024 RR-RSA-Funds

450,000Construction 2025 RR-RSA-Funds

450,000Construction 2026 RR-RSA-Funds

450,000Construction 2027 RR-RSA-Funds

450,000Construction 2028 RR-RSA-Funds

100,000Other 2019 RR-RSA-Funds

100,000Other 2020 RR-RSA-Funds

100,000Other 2021 RR-RSA-Funds

100,000Other 2022 RR-RSA-Funds

100,000Other 2023 RR-RSA-Funds

100,000Other 2024 RR-RSA-Funds

100,000Other 2025 RR-RSA-Funds

100,000Other 2026 RR-RSA-Funds

100,000Other 2027 RR-RSA-Funds

100,000Other 2028 RR-RSA-Funds

Total 6,000,000.00

NoneComments

Page 223 of 232Includes inflation and indirects using program

Page 230: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (SAB)

STATE AID BRIDGE PROGRAMMATIC PROJECT

Route/Road

Scope

Program

BRIDGES

TIER 5

Category

Strategy

0Preliminary Engineering 2019 SAB *

0Preliminary Engineering 2020 SAB *

93,269Preliminary Engineering 2021 SAB *

38,883Preliminary Engineering 2022 SAB *

0Preliminary Engineering 2023 SAB *

612,038Preliminary Engineering 2024 SAB *

988,740Preliminary Engineering 2025 SAB *

716,869Preliminary Engineering 2026 SAB *

1,275,000Preliminary Engineering 2027 SAB *

1,275,000Preliminary Engineering 2028 SAB *

374,751Right of Way 2019 SAB *

132,304Right of Way 2020 SAB *

364,067Right of Way 2021 SAB *

325,453Right of Way 2022 SAB *

317,254Right of Way 2023 SAB *

401,738Right of Way 2024 SAB *

407,109Right of Way 2025 SAB *

357,726Right of Way 2026 SAB *

425,000Right of Way 2027 SAB *

425,000Right of Way 2028 SAB *

1,102,737Construction 2019 SAB *

0Construction 2020 SAB *

461,578Construction 2021 SAB *

102,306Construction 2022 SAB *

0Construction 2023 SAB *

3,124,630Construction 2024 SAB *

5,398,518Construction 2025 SAB *

2,951,920Construction 2026 SAB *

6,800,000Construction 2027 SAB *

6,800,000Construction 2028 SAB *

Total 35,271,890.00

NoneComments

Page 224 of 232Includes inflation and indirects using program

Page 231: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

STATE PLANNING & RESEARCH

PROGRAM (STATEWIDE PROGRAMMATIC) (SPR1)

STATE PLANNING & RESEARCH - PLANNING

ACTIVITIES COORDINATED BY NHDOT TO MEET

FEDERAL REGULATIONS

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

1,548,625State Planning Research 2019 SPR1

4,600,000State Planning Research 2020 SPR1

4,600,000State Planning Research 2021 SPR1

4,600,000State Planning Research 2022 SPR1

4,600,000State Planning Research 2023 SPR1

4,600,000State Planning Research 2024 SPR1

4,600,000State Planning Research 2025 SPR1

4,600,000State Planning Research 2026 SPR1

4,600,000State Planning Research 2027 SPR1

4,600,000State Planning Research 2028 SPR1

Total 42,948,625.00

NoneComments

Phase Year Funding

STATE PLANNING & RESEARCH

PROGRAM (STATEWIDE PROGRAMMATIC) (SPR2)

STATE PLANNING & RESEARCH - PART #2

"RESEARCH"

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

967,010State Planning Research 2019 SPR2

990,220State Planning Research 2020 SPR2

990,220State Planning Research 2021 SPR2

990,220State Planning Research 2022 SPR2

990,220State Planning Research 2023 SPR2

990,220State Planning Research 2024 SPR2

990,220State Planning Research 2025 SPR2

990,220State Planning Research 2026 SPR2

990,220State Planning Research 2027 SPR2

990,220State Planning Research 2028 SPR2

Total 9,878,990.00

NoneComments

Page 225 of 232Includes inflation and indirects using program

Page 232: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (TA)

TRANSPORTATION ALTERNATIVES PROGRAM

(TAP)

Route/Road

Scope

Program

MANDATED FEDERAL

ALL TIERS

Category

Strategy

60,292Preliminary Engineering 2019 TA *

315,950Preliminary Engineering 2020 TA *

315,950Preliminary Engineering 2021 TA *

315,950Preliminary Engineering 2022 TA *

315,950Preliminary Engineering 2023 TA *

315,950Preliminary Engineering 2024 TA *

315,950Preliminary Engineering 2025 TA *

315,950Preliminary Engineering 2026 TA *

315,950Preliminary Engineering 2027 TA *

315,950Preliminary Engineering 2028 TA *

0Right of Way 2019 TA *

127,650Right of Way 2020 TA *

127,650Right of Way 2021 TA *

127,650Right of Way 2022 TA *

127,650Right of Way 2023 TA *

127,650Right of Way 2024 TA *

127,650Right of Way 2025 TA *

127,650Right of Way 2026 TA *

127,650Right of Way 2027 TA *

127,650Right of Way 2028 TA *

0Construction 2019 TA *

0Construction 2020 TA *

0Construction 2021 TA *

2,698,400Construction 2022 TA *

2,698,400Construction 2023 TA *

2,698,500Construction 2024 TA *

2,698,400Construction 2025 TA *

2,698,400Construction 2026 TA *

2,698,400Construction 2027 TA *

2,698,400Construction 2028 TA *

50,000Other 2019 TA *

50,000Other 2020 TA *

50,000Other 2021 TA *

50,000Other 2022 TA *

Page 226 of 232Includes inflation and indirects using program

Page 233: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

50,000Other 2023 TA *

50,000Other 2024 TA *

50,000Other 2025 TA *

50,000Other 2026 TA *

50,000Other 2027 TA *

50,000Other 2028 TA *

Total 23,441,592.00

NoneComments

Phase Year Funding

TURNPIKES

PROGRAM (STATEWIDE PROGRAMMATIC) (TPK-R&R)

TURNPIKE RENEWAL & REHABILITATION

PROGRAM ON THE FEET, BLUE STAR &

SPAULDING TURNPIKES.

Route/Road

Scope

Program

PRESERVATION & MAINTENANCE

ALL TIERS

Category

Strategy

1,042,065Construction 2019 TRR *

6,600,000Construction 2020 TRR *

11,400,000Construction 2021 TRR *

13,900,000Construction 2022 TRR *

14,400,000Construction 2023 TRR *

13,300,000Construction 2024 TRR *

13,600,000Construction 2025 TRR *

13,800,000Construction 2026 TRR *

14,100,000Construction 2027 TRR *

14,400,000Construction 2028 TRR *

Total 116,542,065.00

NoneComments

Page 227 of 232Includes inflation and indirects using program

Page 234: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TRANSPORTATION AND CIVIL ENGINEERING

PROGRAM

PROGRAM (STATEWIDE PROGRAMMATIC) (TRAC)

IMPLEMENT AND PARTICIPATE IN AASHTO TRAC

PROGRAM IN LOCAL HIGH SCHOOLS.

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

22,000Other 2019 TRAC

22,000Other 2020 TRAC

22,000Other 2021 TRAC

22,000Other 2022 TRAC

22,000Other 2023 TRAC

22,000Other 2024 TRAC

22,000Other 2025 TRAC

22,000Other 2026 TRAC

22,000Other 2027 TRAC

22,000Other 2028 TRAC

Total 220,000.00

NoneComments

Phase Year Funding

TRAINING

PROGRAM (STATEWIDE PROGRAMMATIC) (TRAIN)

ANNUAL TRAINING PROGRAM (ANNUAL PROJECT)

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

200,000Other 2019 TRAIN

200,000Other 2020 TRAIN

200,000Other 2021 TRAIN

200,000Other 2022 TRAIN

200,000Other 2023 TRAIN

200,000Other 2024 TRAIN

200,000Other 2025 TRAIN

200,000Other 2026 TRAIN

200,000Other 2027 TRAIN

200,000Other 2028 TRAIN

Total 2,000,000.00

NoneComments

Page 228 of 232Includes inflation and indirects using program

Page 235: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (TRCK-WGHT-SFTY)

TRUCK WEIGHT SAFETY INSPECTION &

MAINTENANCE PROGRAM

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

ALL TIERS

Category

Strategy

100,000Other 2019 TRCK-WGHT-SFTY

100,000Other 2020 TRCK-WGHT-SFTY

100,000Other 2021 TRCK-WGHT-SFTY

100,000Other 2022 TRCK-WGHT-SFTY

100,000Other 2023 TRCK-WGHT-SFTY

100,000Other 2024 TRCK-WGHT-SFTY

100,000Other 2025 TRCK-WGHT-SFTY

100,000Other 2026 TRCK-WGHT-SFTY

100,000Other 2027 TRCK-WGHT-SFTY

100,000Other 2028 TRCK-WGHT-SFTY

Total 1,000,000.00

NoneComments

Page 229 of 232Includes inflation and indirects using program

Page 236: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

TRANSPORTATION SYSTEMS MANAGEMENT AND

OPERATIONS

PROGRAM (STATEWIDE PROGRAMMATIC) (TSMO)

STATEWIDE TRANSPORTATION SYSTEMS

MANAGEMENT AND OPERATIONS, ITS

TECHNOLOGIES, TRAVELER INFO

Route/Road

Scope

Program

INDIVIDUAL PROJECTS

TIER 6

Category

Strategy

75,000Construction 2019 TSMO

75,000Construction 2020 TSMO

75,000Construction 2021 TSMO

75,000Construction 2022 TSMO

75,000Construction 2023 TSMO

75,000Construction 2024 TSMO

75,000Construction 2025 TSMO

75,000Construction 2026 TSMO

75,000Construction 2027 TSMO

75,000Construction 2028 TSMO

275,000Other 2019 TSMO

275,000Other 2020 TSMO

275,000Other 2021 TSMO

275,000Other 2022 TSMO

275,000Other 2023 TSMO

275,000Other 2024 TSMO

275,000Other 2025 TSMO

275,000Other 2026 TSMO

275,000Other 2027 TSMO

275,000Other 2028 TSMO

Total 3,500,000.00

NoneComments

Page 230 of 232Includes inflation and indirects using program

Page 237: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (UBI)

UNDERWATER BRIDGE INSPECTION (ANNUAL

PROJECT)

Route/Road

Scope

Program

BRIDGES

ALL TIERS

Category

Strategy

60,000Other 2019 UBI *

60,000Other 2020 UBI *

50,000Other 2021 UBI *

50,000Other 2022 UBI *

60,000Other 2023 UBI *

60,000Other 2024 UBI *

60,000Other 2025 UBI *

60,000Other 2026 UBI *

60,000Other 2027 UBI *

60,000Other 2028 UBI *

Total 580,000.00

NoneComments

Page 231 of 232Includes inflation and indirects using program

Page 238: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Ten Year Plan

Pending Approval

1/16/2018

2019 - 2028

Phase Year Funding

VARIOUS

PROGRAM (STATEWIDE PROGRAMMATIC) (USSS)

PROJECT TO UPDATE SIGNING ON STATE SYSTEM

Route/Road

Scope

Program

ROADSIDE

ALL TIERS

Category

Strategy

30,000Preliminary Engineering 2019 USSS *

30,000Preliminary Engineering 2020 USSS *

30,000Preliminary Engineering 2021 USSS *

30,000Preliminary Engineering 2022 USSS *

30,000Preliminary Engineering 2023 USSS *

30,000Preliminary Engineering 2024 USSS *

30,000Preliminary Engineering 2025 USSS *

30,000Preliminary Engineering 2026 USSS *

30,000Preliminary Engineering 2027 USSS *

30,000Preliminary Engineering 2028 USSS *

500,000Construction 2019 USSS *

500,000Construction 2020 USSS *

500,000Construction 2021 USSS *

500,000Construction 2022 USSS *

500,000Construction 2023 USSS *

500,000Construction 2024 USSS *

500,000Construction 2025 USSS *

500,000Construction 2026 USSS *

500,000Construction 2027 USSS *

500,000Construction 2028 USSS *

Total 5,300,000.00

NoneComments

Page 232 of 232Includes inflation and indirects using program

Page 239: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Rail-Trail Prioritization & Improved Network Connectivity

Prepared by staff of: Department of Transportation &

Department of Natural & Cultural Resources

Page 240: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Im

?{

?}

Aa

Ij

Kp

?}

Im

!"c$

Im

?u

Cl

Aÿ

!"b$

Ij

?v

?{

Kq

?y

?z

A

Ai

?}

Aÿ

?

Ad

?

?}

%&f(

Kp

Ij

?{

?t

?

Kq

?

?{

Ae

Ii

Kp

Aj

?{

Ig

?}

?

UrV

Ij

AäCg

?

Ij

?y

?t

?v

Ij

%&d(

?

?{

?

Ij

Ij

?w

Kp

?{

?

?

?y

Ij

?y

?}

?

?}

Kq

Ij

Im

Af

Ab

?

!"$

Kq

Ae

Aj

?y

UrV

UsV

?¿

?y

?{

Ij

Að Cß

Ij

Im

Im

Kp

Ig

Ii

?v

Kq

?}

Ae

UsV

?}

!"b$

Ii

?v

?

?{

?

?

?y Im

Ah

Ij

?

!"a$

?y

?}

Ad

Ao

?x

?

Ij

Ij

Kp

UsV

?v

?

!"c$

?{

Kq

?{

?

?

?y

Ac

?{

Ij

!"b$

Ij

UrV?½

Ae

!"a$

AÔ ?v

?

?y

Kp

Af

%&e(

Cl

?

Ashuelot Rail Trail

Monadnock Rail Trail

Greenville-Mason Rail Trail

Upper Coos Rail Trail

Warren Rail Trail

Woodsville Rail Trail

Windham Rail Trail

Winnipesaukee River Trail

WOW Trail

Heads Pond Trail

Heritage Trail

Northern Rail Trail

Presidential Rail Trail

Fort HillCheshire Rail Trail

Cheshire Rail Trail

Rockingham Rail Trail

Ammonoosuc Rail Trail

Sugar River Trail

Fremont Rail Trail

Hillsborough Rail Trail

Salem Rail Trail

Industrial Heritage Trail

Cotton Valley Rail Trail

Goffstown Rail Trail

Profile Rail Trail

Nashua Rail Trail

Granite Town Rail Trail

Londonderry Rail Trail

Lilac City Greenway

Mast Yard

Dover Rail Trail

Derry Rail Trail

Piscataquog Trail

Potanipo Rail Trail

Farmington Rail Trail

Pondicherry Rail Trail

Tower Hill Pond Rail Trail

Warner Rail Trail

2

1

3

PITTSBURG

LINCOLN

ALTON

MILAN

LYME

ERROL

ALBANY

STARK

SANDWICH

BERLIN

OSSIPEE

WEARE

CONWAY

BETHLEHEM

BARTLETT

BATH JACKSON

ODELL

CANAAN

STRATFORD

CONCORD

HILL

WARNERUNITY

GILFORD

BOW

SUCCESS

COLUMBIA

BENTON

CHATHAM

DIXVILLE

FRANCONIA

ORFORD

WARREN

KEENE

DUMMER

LOUDON

LIVERMORE

LEE

CARROLL

SUTTON

CAMPTON

MEREDITH

DERRY

TAMWORTH

RINDGE

ENFIELD

HANOVER

GILMANTON

LITTLETON

RUMNEY

EPSOM

ANTRIM

STODDARD

HAVERHILL

GROTON

DEERFIELD

CLARKSVILLE

PLAINFIELD

CORNISH

SWANZEY

HOLLIS

JAFFREY

WOLFEBORO

THORNTON

WOODSTOCK

MADISON

GRAFTON

HENNIKER

ALSTEAD

LEBANON

CAMBRIDGE

NEWPORT

LANCASTER

RANDOLPHJEFFERSON

STRAFFORD

LYMAN

ANDOVER

WINCHESTER

DOVER

CANDIA

SHELBURNE

DUBLIN

MILLSFIELD

DANBURY

SALEM

NASHUA

HOPKINTON

FREEDOM

EASTON

PIERMONT

ACWORTH

NEWBURY

EATON

WILMOT

MOULTONBOROUGH

BARNSTEAD

CROYDON

BARRINGTON

LISBON

ROCHESTER

GORHAM

SALISBURY

BEANS PURCHASE

AMHERST

SANBORNTON

CLAREMONT

DALTON

EPPING

WASHINGTON

ALEXANDRIA

RICHMOND

DEERING

AUBURN

EFFINGHAM

BEDFORD

HOOKSETT

SPRINGFIELD

WILTON

BELMONT

MASON

PELHAM

CANTERBURY

DORCHESTER

COLEBROOK

BRADFORD

RYE

TROY

NEW BOSTON

WENTWORTH

HANCOCK

LANDAFF

CHESTERFIELD

WATERVILLE VALLEY

LEMPSTER

LACONIA

MARLOW

WEBSTER

RAYMOND

FITZWILLIAM

GOFFSTOWN

NELSON

MILFORD

DURHAMHILLSBOROUGH

TEMPLE

FARMINGTON

MERRIMACK

CHESTER

STEWARTSTOWN

ORANGE

HOLDERNESS

GOSHEN

PLYMOUTH

BRISTOL

EXETER

DUNBARTON

GRANTHAM

NEW IPSWICH

SURRY

NORTHFIELD

NORTHWOOD

HEBRON

GILSUM

PITTSFIELD

SULLIVAN

NEW LONDON

SHARON

FREMONT

TILTON

HARRISVILLE

MILTON

WAKEFIELD

WALPOLE

TUFTONBORO

HUDSON

NEW DURHAMFRANKLIN

WHITEFIELD

WINDHAM

LONDONDERRY

MONROE

SUNAPEE

KILKENNY

NEW HAMPTON

MANCHESTER

CHARLESTOWN

HINSDALE

PETERBOROUGH

BOSCAWEN

WESTMORELAND

GREENFIELD

PEMBROKE

KINGSTON

FRANCESTOWN

NORTHUMBERLAND

BROOKFIELD

LYNDEBOROUGH

BROOKLINE

ELLSWORTH

LANGDON

DIXS GRANT

CHICHESTER

SECOND COLLEGE GRANT

MIDDLETON

ALLENSTOWN

BRIDGEWATER

SUGAR HILL

HAMPTON

STRATHAM

SANDOWN

LITCHFIELD

MARLBOROUGH

BRENTWOOD

ASHLAND

ROXBURYDANVILLE

MADBURY

PORTSMOUTH

SARGENTS PURCHASE

HAMPSTEADMONT VERNONNEWTON

ATKINSON

HARTS LOCATION

NEWMARKET

GREENLAND

LOW - BURBANKS GRANT

PLAISTOW

NEWINGTON

CENTER HARBOR

KENSINGTON

WINDSOR

BENNINGTON

SEABROOK

CUTTS GRANT

NORTH HAMPTON

HAMPTON FALLS

WENTWORTHS LOCATION

BEANS GRANT

NEWFIELDS

SOMERSWORTH

GREENVILLE

ROLLINSFORD

THOMPSON - MESERVES PURCHASE

ATKINSON - GILMANTON ACADEMY GRANT

HADLEYS PURCHASE

CRAWFORDS PURCHASE

GREENS GRANT

PINKHAMS GRANT

MARTINS LOCATION

ERVINGS LOCATION

NEW CASTLE

HALES LOCATION

CHANDLERS PURCHASE

31

2

4

4

Updated: 01-09-18

Pr ior i ty Ra i l Tra i l Pro jects on Rai lPr ior i ty Ra i l Tra i l Pro jects on Rai lCorr idors in NHCorr idors in NH

¥0 10 205

Miles

PrivateOWNERSHIP/ PRIORITY

StatePriority Ranking

State Owned Priority Projects

Privately Owned Priority Projects

Page 241: GOVERNOR’S RECOMMENDATIONS FOR THE TEN YEAR … › dot › org › projectdevelopment › planning › typ › ...Jan 16, 2018  · fiscal year pavement bridges i-93 expansion mandated

Prio

rityLo

catio

n D

escrip

tion

(RR

Co

rrido

r)A

pp

rox

ima

te

Len

gth

(mile

s)

*T

rail C

on

structio

n

Co

st

**

An

nu

al R

ou

tine

Ma

inte

na

nce

Co

stN

ote

s

Co

ntin

uo

us tra

il len

gth

up

on

com

ple

tion

(mile

s)

1Lo

nd

on

de

rry Ph

ase

V: H

arve

y Ro

ad

- Ma

mm

oth

Ro

ad

(Ma

nch

este

r & La

wre

nce

RR

)

Ra

ilroa

d co

rrido

r from

Ma

mm

oth

Ro

ad

to

Ha

rvey R

oa

d1

.1

23

1,0

00

$

5,5

00

$

4.5

2W

ind

ha

m (W

orce

ster-N

ash

ua

-Po

rtlan

d R

R)

Ra

ilroa

d co

rrido

r from

Win

dh

am

Gre

en

wa

y (I-

93

) to W

ind

ha

m D

ep

ot

0.5

1

76

,00

0$

2

,50

0$

1

2.0

3Se

ab

roo

k - Ha

mp

ton

(Ha

mp

ton

Bra

nch

RR

)H

am

pto

n B

ran

ch R

R fro

m N

H 2

86

to D

rake

side

Ro

ad

(inclu

din

g th

rou

gh

the

ma

rsh)

4.6

3

,53

3,0

00

$

23

,00

0$

Th

is inclu

de

s mo

re co

stly seg

me

nts a

nd

infra

structu

re in

clud

ing

a 1

.4-m

ile se

gm

en

t

thro

ug

h th

e H

am

pto

n M

arsh

, a p

ed

estria

n

brid

ge

ove

r Wa

lton

Ro

ad

, an

d a

n u

nd

erp

ass fo

r

Bre

me

r Lan

e.

13

.8

4R

aym

on

d tu

nn

el (P

ortsm

ou

th B

ran

ch)*

Po

rtsmo

uth

Bra

nch

RR

@ O

nw

ay La

ke R

oa

d

Un

de

rpa

ss 1

00

fee

t 4

00

,00

0$

1

,00

0$

Th

is wo

uld

be

to a

dd

a 2

0'x1

2' b

ox cu

lvert o

n

the

Po

rtsmo

uth

Bra

nch

to re

pla

ce a

6' ste

el

culve

rt. Ro

cking

ha

m R

ail-T

rail is 2

8 m

iles lo

ng

,

bu

t its fun

ction

al ca

pa

city an

d u

se is b

roke

n in

two

at th

is loca

tion

in R

aym

on

d.

28

.0

Prio

rityLo

catio

n D

escrip

tion

(RR

Co

rrido

r)A

pp

roxim

ate

Len

gth

(mile

s)

*T

rail C

on

structio

n

Co

st

**

An

nu

al R

ou

tine

Ma

inte

na

nce

Co

stN

ote

sC

on

tinu

ou

s trail le

ng

th

up

on

com

ple

tion

(mile

s)

1C

on

cord

- Bo

scaw

en

(Pa

n A

m-o

wn

ed

No

rthe

rn

Ra

ilroa

d)

Pa

n A

m-o

wn

ed

No

rthe

rn R

ailro

ad

from

Ho

rsesh

oe

Po

nd

Ro

ad

in C

on

cord

to R

iver R

oa

d

term

inu

s of N

orth

ern

Ra

il Tra

il in B

osca

we

n

6.3

5

41

,00

0$

3

1,5

00

$

Co

sts do

no

t inclu

de

Acq

uisitio

n co

sts6

9.0

2H

am

pto

n - P

ortsm

ou

th (P

an

Am

-ow

ne

d

Ha

mp

ton

Bra

nch

Ra

ilroa

d)

Pa

n A

m-o

wn

ed

Ha

mp

ton

Bra

nch

Ra

ilroa

d fro

m

Dra

kesid

e R

oa

d in

Ha

mp

ton

to B

arb

erry La

ne

in

Po

rtsmo

uth

9.2

1

,86

0,0

00

$

46

,00

0$

C

osts d

o n

ot in

clud

e A

cqu

isition

costs

13

.8

3H

oo

ksett - G

arvin

Falls R

oa

d C

on

cord

(Priva

tely-

ow

ne

d / u

tility com

pa

ny)

District C

ou

rt off M

errim

ack Stre

et in

Ho

okse

tt

to G

arvin

s Falls R

oa

d in

Co

nco

rd5

.2

1,2

11

,00

0$

2

6,0

00

$

Ea

sem

en

ts ne

ed

to b

e a

cqu

ired

from

priva

te

pro

pe

rty ow

ne

rs (inclu

din

g p

ub

lic utility

com

pa

ny)

5.2

4W

ind

ha

m (T

ow

n-o

wn

ed

po

rtion

of W

orce

ster-

Na

shu

a-P

ortla

nd

RR

)

To

wn

-ow

ne

d p

ortio

n o

f Wo

rceste

r-Na

shu

a-

Po

rtlan

d R

R (W

ind

ha

m G

ree

nw

ay)

3.5

7

65

,00

0$

1

7,5

00

$

No

ea

sem

en

t or a

cqu

isition

cost is a

ssum

ed

as

To

wn

ow

ns p

rop

erty

12

.0

Assu

mp

tion

s:

1T

rail C

on

structio

n co

st estim

ate

s for:

Fun

ction

al h

ard

pa

ck trail co

nstru

ction

inclu

din

g p

erm

itting

, en

gin

ee

ring

, an

d w

he

re a

pp

licab

le, tie

& ra

il rem

ova

l

2A

nn

ua

l Ro

utin

e M

ain

ten

an

ce co

st pe

r mile

$5

,00

0

3

Fun

din

g

De

dica

ted

staffin

g (p

roje

ct ma

na

ge

me

nt)

Imp

ed

ime

nts to

imp

lem

en

ting

the

be

low

con

ne

ction

s:

Prio

rity ra

il-trail p

roje

cts & g

ap

s on

state

-ow

ne

d ra

ilroa

d co

rrido

rs

No

tes o

n N

etw

ork

Co

nn

ectiv

ity

Wo

uld

link th

e M

an

che

ster A

irpo

rt to th

e ra

il trail co

nn

ectin

g to

the

Exit 5

Pa

rk & R

ide

/

bu

s statio

n a

nd

furth

er co

nn

ectin

g to

the

Gra

nite

State

Ra

il Tra

il/ Lon

do

nd

erry R

ail T

rail

sou

th to

Ro

cking

ha

m R

oa

d w

he

re a

n o

n ro

ad

or tra

il sectio

n is n

ee

de

d to

con

ne

ct to th

e

trails to

the

sou

th (D

erry, W

ind

ha

m, a

nd

Sale

m).

Th

is wo

uld

con

ne

ct the

Win

dh

am

Gre

en

wa

y (see

Win

dh

am

, Priva

tely-o

wn

ed

Prio

rity

Pro

ject #

4) to

the

Gra

nite

State

Ra

il Tra

il/ Win

dh

am

Ra

il Tra

il pro

vidin

g 8

mile

s of

ad

ditio

na

l trail. A

n o

n-ro

ad

con

ne

ction

at W

ind

ha

m D

ep

ot a

lso le

ad

s to th

e R

ockin

gh

am

Ra

il Tra

il (see

Ra

ymo

nd

tun

ne

l, State

-ow

ne

d P

riority P

roje

ct #4

)

Wh

en

com

bin

ed

with

the

Pa

n A

m-o

wn

ed

sectio

n o

f the

Ha

mp

ton

Bra

nch

Ra

ilroa

d

Co

rrido

r (Priva

tely-o

wn

ed

Prio

rity Pro

ject #

2), a

tota

l of 1

3.8

mile

s of tra

il is rea

lized

. Th

is

wo

uld

be

pa

rt of th

e U

S Ea

st Co

ast G

ree

nw

ay.

Th

is wo

uld

con

ne

ct the

13

mile

ea

stern

trail se

gm

en

t to th

e 1

5 m

ile w

este

rn tra

il seg

me

nt.

Ra

il-Tra

il Prio

ritizatio

n &

Imp

rov

ed

Ne

two

rk C

on

ne

ctivity

Pre

pa

red

by

staff o

f: De

pa

rtme

nt o

f Tra

nsp

orta

tion

& D

ep

artm

en

t of N

atu

ral &

Cu

ltura

l Re

sou

rces

Ro

utin

e M

ain

ten

an

ce in

clud

es ta

sks such

as m

ain

tain

ing

& re

pa

iring

fen

cing

, kee

pin

g cu

lverts &

ditch

es cle

ar, tra

il surfa

ce re

pa

irs (filling

cracks, sm

all p

atch

ing

,

po

tho

le re

pa

irs), clea

ring

trail su

rface

(bru

sh, d

eb

ris, tree

s), an

d m

ino

r wa

sho

ut re

pa

ir. Th

is do

es n

ot in

clud

e ca

tastro

ph

ic failu

res o

r lifecycle

costs, su

ch a

s ma

jor

wa

sho

uts, cu

lvert re

pla

cem

en

ts, an

d tra

il resu

rfacin

g/re

pa

ving

.

* O

the

r sug

ge

stion

:

Pu

rsue

an

am

icab

le se

ttlem

en

t for C

am

p Se

-Sa-M

a-C

a p

rop

erty h

eirs in

Ra

ymo

nd

, ne

ar O

nw

ay La

ke. T

he

re is a

curre

nt p

ub

lic restrictio

n fo

r no

n-m

oto

rized

use

in th

e sp

ring

, sum

me

r & fa

ll an

d th

is seve

rs

the

Ro

cking

ha

m R

ail-T

rail. T

his is in

close

pro

ximity to

the

pro

po

sed

Ra

ymo

nd

tun

ne

l, State

-Ow

ne

d P

riority P

roje

ct #4

.

Prio

rity rail-tra

il pro

jects &

ga

ps o

n p

rivate

pro

pe

rty or p

rivate

railro

ad

corrid

ors

No

tes o

n N

etw

ork C

on

ne

ctivity

Th

is wo

uld

con

ne

ct the

No

rthe

rn R

ail T

rail in

Bo

scaw

en

to H

orse

sho

e P

on

d in

Co

nco

rd

(with

in 3

/4 m

ile o

f do

wn

tow

n). A

n o

n-ro

ad

seg

me

nt is n

ee

de

d to

con

ne

ct to th

e

Me

rrima

ck Rive

r Gre

en

wa

y (in d

esig

n) o

r to co

nn

ect fu

rthe

r sou

th to

Ga

rvin Fa

lls Ro

ad

(See

Ho

okse

tt - Ga

rvin Fa

lls Ro

ad

Co

nco

rd, P

rivate

ly-ow

ne

d P

riority P

roje

ct #3

)

Wh

en

com

bin

ed

with

the

State

-ow

ne

d se

ction

of th

e H

am

pto

n B

ran

ch R

ailro

ad

Co

rrido

r

(State

-ow

ne

d P

riority P

roje

ct #3

), a to

tal o

f 13

.8 m

iles o

f trail co

uld

be

rea

lized

. Th

is

wo

uld

be

pa

rt of th

e U

S Ea

st Co

ast G

ree

nw

ay

Th

is wo

uld

pro

vide

a n

ee

de

d se

ction

of th

e G

ran

ite Sta

te R

ail T

rail th

at w

ou

ld lin

k on

roa

d

con

ne

ction

s from

Co

nco

rd th

rou

gh

Sun

coo

k to H

oo

ksett w

ith th

e g

oa

l of u

ltima

tely

con

ne

cting

to M

an

che

ster.

Th

is trail co

mb

ine

d w

ith Sta

te-o

wn

ed

Prio

rity Pro

ject #

2 w

ill con

ne

ct to th

e G

ran

ite Sta

te

Ra

il Tra

il/ Win

dh

am

Ra

il Tra

il pro

vidin

g 8

mile

s of a

dd

ition

al tra

il. An

on

-roa

d co

nn

ectio

n

at W

ind

ha

m D

ep

ot a

lso le

ad

s to th

e R

ockin

gh

am

Ra

il Tra

il (see

Ra

ymo

nd

tun

ne

l, State

-

ow

ne

d P

riority P

roje

ct #4

)