gowanus canal pilot test program - jay cashman · gowanus canal pilot test program location:...

1
PROJECT HIGHLIGHTS Excavated / backfilled seven test pits and two areas of pre- clearing for a total of ~1,300 cubic yards. Installed, than extracted, seven pairs of 50- and 60-foot steel sheetpiles for a total of 2,251 square feet. Placed more than 100 tons of stone rip-rap to stabilize the embankment. Placed and finished 625 square feet of concrete within an active concrete plant. Utilized an odor suppressant foam and spray during excavation activities and on stockpiles, and disposed of MGP- contaminated soils at an owner-approved facility. Provided vibration, air, dust and noise monitoring. Installed environmental controls including silt fence and oil / silt boom. Demolished bulkhead and other concrete structures, and sized for disposal. CUSTOM SOLUTIONS When a high-powered vacuum truck could not clean out all of the soil in the sheet enclosures, Cashman collected the soil during sheet driving, Cashman designed a custom airliſt powerful enough to get 50 feet deep, yet small enough to fit in the 3-inch gap in the enclosure. Gowanus Canal Pilot Test Program Location: Brooklyn, NY Contractor: Cashman Dredging & Marine Contracting Company, LLC Contract Dates: Feb. 2014 - March 2014 Dollar Value: $1.1 million Awarding Authority / Owner: National Grid USA Service Co., Inc. Owner Contact / Details: Andrew Prophete 718.963.5412 Engineer: GEI Consultants, Inc. Engineer Contact / Details: Sean DiBartolo, P.E. 973.873.7115 Cashman was selected to perform this Pilot Study to evaluate different sheet pile designs and effects on infrastructure along the Gowanus Canal. T: 617-890-0600 | F: 617-890-0606 | 549 South Street, Quincy, MA 02169 | [email protected] BROOKLYN, NEW YORK

Upload: others

Post on 31-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gowanus Canal Pilot Test Program - Jay Cashman · Gowanus Canal Pilot Test Program Location: Brooklyn, NY Contractor: Cashman Dredging & Marine Contracting Company, LLC Contract Dates:

PROJECT HIGHLIGHTS

– Excavated / backfilled seven test pits and two areas of pre-clearing for a total of ~1,300 cubic yards.

– Installed, than extracted, seven pairs of 50- and 60-foot steel sheetpiles for a total of 2,251 square feet.

– Placed more than 100 tons of stone rip-rap to stabilize the embankment.

– Placed and finished 625 square feet of concrete within an active concrete plant.

– Utilized an odor suppressant foam and spray during excavation activities and on stockpiles, and disposed of MGP-contaminated soils at an owner-approved facility.

– Provided vibration, air, dust and noise monitoring. – Installed environmental controls including silt fence and oil /

silt boom. – Demolished bulkhead and other concrete structures, and sized

for disposal.

CUSTOM SOLUTIONS

– When a high-powered vacuum truck could not clean out all of the soil in the sheet enclosures, Cashman collected the soil during sheet driving,

– Cashman designed a custom airlift powerful enough to get 50 feet deep, yet small enough to fit in the 3-inch gap in the enclosure.

Gowanus Canal Pilot Test Program

Location: Brooklyn, NY

Contractor: Cashman Dredging & Marine Contracting Company, LLC

Contract Dates: Feb. 2014 - March 2014

Dollar Value: $1.1 million

Awarding Authority / Owner:

National Grid USA Service Co., Inc.

Owner Contact / Details:

Andrew Prophete718.963.5412

Engineer: GEI Consultants, Inc.

Engineer Contact / Details:

Sean DiBartolo, P.E.973.873.7115

Cashman was selected to perform this Pilot Study to evaluate different sheet pile designs and effects on infrastructure along the Gowanus Canal.

T: 617-890-0600 | F: 617-890-0606 | 549 South Street, Quincy, MA 02169 | [email protected]