Page 1: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 2: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 3: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 4: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 5: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 6: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 7: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 8: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 9: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 10: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 11: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 12: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 13: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 14: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 15: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 16: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 17: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 18: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 19: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 20: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 21: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 22: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 23: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 24: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 25: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 26: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 27: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 28: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 29: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-I

Page 30: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 31: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 32: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 33: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 34: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 35: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-IA

COMPLIANCE OF EXISTING ENVIRONNENT CLEARANCE

SR. NO.

CONDITIONS REMARKS

2. The Ministry of Environment and Forests has examined your application. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village: Jolwa, Tal.: Palsana, Dist.: Surat in Gujarat. Production capacity of Polyester Chips will increase from 3,92,600 MTPA to 5,45,600 MTPA fully drawn yarn from 19,900 MTPA to 23,000 MTPA. The Ministry has earlier accorded Environmental Clearance for the existing capacity on 7th April, 2008. The production capacity of polyester oriented yarn will be same as 90,600 MTPA. Capacity of by-products Degraded Polymers (Oligomer) will increase from 27 MTPA to 39 MTPA. The Captive Power generation of existing and proposed plant will be 6.74 MW x 2 Nos., 8.4 MW x 1 No. and 18 MW x 1 No.; 10.5 MW x 1 No. respectively. Out of total proposed polyester chips, 23,000 MTPA will be produced by using the existing manufacturing facilities. Similarly, 3,100 MTPA of fully drawn yarn will be produced by using the existing manufacturing facilities. No eco-sensitive areas are located within 10 km radius of the plant. The proposed expansion will be within the existing unit having land area of 20 acres. Cost of the project is 13,275.00 lacs.

We have received Consent to Establish (NOC) from the board vide GPCB letter no.: CTE/SRT-2079/23006, dated: 13/10/’09 and we have already obtained expansion of CC&A from the board for Polyester Chips & PFY (POY & FDY). Moreover, we have received CC&A from the board for Coal based Power Plant (18 MW).

3. It is noted that the water requirement will increase from 7,153 m3/d to 8,828 m3/s which will be sourced from the ground water source. The waste water generation will be 3,523.8 m3/day. The domestic effluent will be disposed through septic tank followed by soak pit. The industrial waste water will be treated in the modified effluent treatment plant. The company has existing effluent treatment plant for primary, secondary involving two stage activated sludge process and tertiary treatment facility. The company will provide additional primary and secondary treatment to the existing treatment facility for treatment of additional effluent. The final treated effluent as per the prescribed norms of GPCB/CPCB will be sent to Kadodara Khadi through own existing pipeline that finally meets the Arabian Sea.

We will use water from existing bore wells. For additional water requirement, we have already obtained permission from Irrigation department to take water for industrial use, having capacity of 1,438 Kl/Day. The final treated effluent will be sent to Kadodara Khadi as per prescribed norms of GPCB.

4. Power requirement will be met through Captive Power Plant. One coal based boiler 90 TPH of capacity, one fuel oil fired thermic fluid heating system of 40 Kl cal/capacity and one FO engine has been installed. Fuel for the boiler would be 288-360 MTPD of imported/Indian coal and 78 TPD of furnace oil for fuel oil engine and heat transfer fluid system (3 heaters). About 0.34 MTPD of lubricant oil will be used as fuel.

We have already obtained expansion of CC&A from the board.

5. To control the particulate emissions from the coal fired boiler, electrostatic precipitators with stack height of 90 meter is proposed. Stack height of 60 meter is proposed for FO engine and stack height of 52 meter for Heat Transfer Fluid (common stack for 3 heaters) for dispersion of gaseous emission. To control the fugitive emission, all process pumps, reactors and treatment vessels would have mechanical seals. To strip off gases, stripper columns and off gas treatment tower will be provided. Fly ash conveyers from ESP hopper to silos would be totally enclosed.

Adequate stack height has been provided for Coal

based power plant

6. Solid waste generation will be in the form of lubricant oil (1,050 MT/Year existing and 0.5 MT/Year, proposed) and HFO sludge (1.2 MT/Year, proposed) will be sold MoEF authorized reprocessors. Catalyst drum lot or additive drum (220 Nos./Month, existing and 140 Nos./Month, proposed) and PP liner lot (150 kg/month, existing and 4.5 MT/M, proposed) will be sold to GPCB authorized vendors. ETP

We will send our total hazardous/solid waste to TSDF of M/s. NEPL, Naroda.

Discarded containers will

Page 36: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

sludge (10.55 MT/M existing and 2.5 MT/M proposed) will be disposed at M/s. NEPL (Naroda Enviro Projects Ltd.). Polymer waste (5.5 MT/M existing and 40 MT/M, proposed). Chip waste (69 MT/M, existing and 6 MT/M, proposed), sweeping PTA waste lot (12 MT/M, existing and 10 MT/M proposed), FDY-waste (17.5 MT/M, existing) and POY-waste (13.2 MT/M, existing) will be sold to actual end users. The quantity of the polymer waste may be varying due to power failure and break down. Ash (9 MTPD existing and 38-60 MTPD, proposed) will be sold to end-user like RMC (Ready Mix Concrete) plant operators, brick manufacturers, concrete block manufacturers and cement manufacturers etc.

be sold to GPCB authorized Vendors. Polymer waste, Chip waste, Sweeping PTA waste lot, FDY-waste and POY-waste will be sold to actual end users.

Fly Ash will be sold to end-user like RMC (Ready Mix Concrete) plant operators, brick manufacturers, concrete block manufacturers & cement manufacturers etc.

7. The Petrochemical based processing units are listed at Serial No. 5(e) of schedule of EIA Notification, 2006 and categorized under “A” or “B” category depending upon the location of the plant outside or inside the notified industrial area. In the instant case the unit is located outside the notified industrial area, hence it is “A’ Category project. The Expert Appraisal Committee (I) considered the project in its 93rd meeting held on 14-16the April, 2009 and committee recommended the proposal for grant of environmental clearance as per para 7(ii) of EIA Notification, 2006 exempting the project from public hearing.

--

8. Based on the information submitted by the project proponent, the Ministry Environment and Forests hereby accords environmental clearance to above project under the provisions of EIA Notification, dated 14th September 2006 subject to the compliance of the following Specific and General Conditions.

--

(A) SPECIFIC CONDITIONS : i) The company shall install full-fledged ETP to comply with the GPCB

norm for discharge of effluent into sea and all necessary clearances shall also be obtained. The company shall construct a guard pond for treated effluent and shall carry out the bioassay test by collecting the treated effluent into the guard pond before discharging into Khadi. The reports shall be submitted to CPCB and Ministry’s Regional Office at Bhopal.

We are having full-fledged ETP in our premises to bring GPCB prescribed norms.

We have already constructed a Guard Pond for treated effluent.

ii) The water consumption shall not exceed 8,828 m3/d and waste water generation shall not exceed 3,523 m3/d. The company shall install the waste water monitoring facility and records shall be maintained.

Water consumption will be always below or equal as per given limits from the board.

iii) The company shall obtain permission for drawl of ground water from the Central Ground Water Authority/Central Ground Water Board as may be applicable and copy shall be submitted to the Ministry’s Regional Office.

We have already obtained permission from Irrigation department to take water for industrial use, having capacity of 1,438 Kl/Day.

iv) Particulate emissions from the coal fired boiler and coal fired heaters shall be controlled by installation of electrostatic precipitators and emissions shall be dispersed through stack of adequate height as per CPCB standards. During use of furnace oil as fuel the company shall ensure the emission of SO2 as per the norms prescribed by the SPCB and height of the stacks shall be as per CPCB norms. The company shall provide the monitoring agreement with the stack and regular monitoring shall be carried out and reports submitted to the SPCB, CPCB and Ministry’s Regional Office at Bhopal.

We have provided adequate stack height and installed electrostatic precipitators to control emission. We ensure you that our norms will not be increased then the GPCB prescribed norms.

v) The proponent shall upload the status of compliance of the stipulated environmental clearance conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office of CPCB and the State Pollution Control Board. The

We regularly update it.

Page 37: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

pollutant levels namely, SPM, RSPM, SO2, NOx (ambient levels as well as stack emissions) shall be monitored and displayed at a convenient location near the main gate of the company in the public domain.

vi) Fugitive emissions in the work zone environment, product, and raw material storage area shall be regularly monitored. The emissions shall confirm to the limits imposed by SPCB.

We regularly monitor it.

vii) The project authorities shall strictly comply with the rules and regulation and guidelines under Manufacture, Storage and Import of Hazardous Chemicals Rules 1989 as amended Authorization from the SPCB shall be obtained for collection, treatment, storage and disposal of hazardous wastes.

We regularly comply it.

viii) The project authority shall obtain the membership of TSDF within three months for disposal of solid and hazardous waste and copy of the same shall be submitted to the Ministry and Ministry’s Regional Office at Bhopal. The company shall maintain valid member ship.

We have already obtained membership of TSDF of M/s. NEPL, Naroda for the disposal of Solid/Hazardous waste.

ix) The company shall develop 12,500 sq. m. out of the total area as green belt as per the CPCB guidelines to mitigate the effect of fugitive emissions.

Enough plantations has been carried out by our company.

x) Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act.

Regular medical check up has been carried out for workers.

xi) The company shall make arrangement for protection of possible fire hazards during manufacturing process in material handling.

We have provided proper arrangement for fire hazards during manufacturing process in material handling.

(B) GENERAL CONDITIONSi) The project authorities shall strictly adhere to the stipulations made by

the SPCB/state government or any statutory body. Complied.

ii) No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. In case of deviations or alterations in the project proposal from those submitted to this Ministry for clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental protection measures required. If any.

We will do.

iii) At no time, the emissions shall exceed the prescribed limits. In the event of failure of any pollution control system adopted by the unit, the unit shall be immediately put out of operation and shall not be restated until the desired efficiency has been achieved.

Complied.

iv) The gaseous emissions (NOx, SO2 and SPM) and Particulate matter along with RSPM levels from various process units shall conform to the standards prescribed by the concerned authorities from time to time. At no time, the emission levels shall go beyond the stipulated standers. In the event of failure of pollution control systems(s) adopted by the unit, the respective to achieve the desired efficiency. Stack monitoring for SO2, NOx and SPM shall be carried.

Complied.

v) The gaseous emissions (NOx, SO2 and SPM) and Particulate matter along with RSPM levels from various process units shall conform to the standards prescribed by the concerned authorities from time to time. At no time, the emission levels shall go beyond the stipulated standards. In the event of failure of pollution control systems(s) adopted by the unit, the respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency. Stack monitoring for SO2, NOx and SPM shall be carried.

We have provided adequate stack height to control process emission.

vi) The locations of ambient air quality monitoring stations shall be decided in consultation with the State Pollution Control Board (SPCB) and it shall be ensured that at least one stations is installed in the up wind and downwind direction as well as where maximum ground level concentrations are anticipated.

We have carried out and found satisfactory.

Page 38: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

vii) The Overall noise levels in and around the plant area shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act, 1986 Rules, 1989 viz. 75 dbA (day time) and 70 dBA (night time).

We have carried out and found satisfactory.

viii) The project proponent shall also comply with all the environment protection measures and safeguards proposed in the project report submitted to the Ministry. All the recommendations made in respect of environmental management measures project shall be implemented.

Complied.

ix) The company will undertake all relevant measures for improving the Socioeconomic conditions of the surrounding area CSR activates will be undertaken by involving local villages and administration.

Complied.

x) The company shall undertake eco-developmental measures including community welfare measures in the project area for the overall improvement of the environment.

We will do.

xi) A separate Environmental Management Cell equipped with full fledged laboratory facilities shall be set up carry out the Environmental Management and Monitoring functions.

We have provided our separate environment management cell

xii) The a project authorities shall earmark adequate funds to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government along with the implantation schedule for all the conditions stipulated herein. The funds so provided shall not be diverted for any other purpose.

We will do.

xiii) The implementation of project vis-à-vis environmental action plans shall be monitored by concerned Regional Office of the Ministry/SPCB/CPCB A six monthly compliance status report shall be submitted to monitoring agencies and shall be posted on the website of the Company.

Regularly, we send compliance status to concern authorities.

xiv) A copy of the clearance letter shall be sent by the proponent to concerned Panchayat, Zila Parisad/ Municipal Corporation, Urban local Body and the local NGO, if any from who suggestions/ representations if any were receives while processing the proposal.

We will do.

xv) The project proponent shall also submit six monthly status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by e-mail) the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the State Pollution Control Board.

We regularly submit it.

xvi) The project proponent shall inform the public that project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with SPCB/Committee and may also be seen at Website of the Ministry at http://envfor.nic.in This shall be advertised within seven days from the date of issue of the clearance letter at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the concerned Regional Office of the Ministry.

Company has already given notice in the local newspapers regarding Environmental Clearance. It has been advertised in one Gujarati news paper “Sandesh” and one English news paper “Times of India” dated 22/06/’09 and we have informed GPCB and MOEF, too.

xvii) The project authorities shall inform the regional Office as well as the Ministry, the date of financial closure and final approval of the concerned authorities and the date of start of the project.

We will do.

9. The Ministry revoke or suspend the clearance, if implementation of any of the above conditions is not satisfactory

Point is noted.

10. The Ministry reserves the right to stipulate additional conditions, if found necessary the company in a time bound manner will implement conditions.

--

11. Any appeal against this environmental clearance shall lie with the National Appellate Authority, if preferred within a period of 30 days as prescribed under section 11 of the National Environment Appellate Authority Act, 1997

--

Page 39: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

12. The above conditions will be enforced, inter-alia the provisions of the Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of water Pollution) Act, 1981 the Environment (Protection) Act, 1986 Hazardous Wastes (Management and Handling) Rules, 2003/ 2008 and the Public Liability Insurance Act, 1991 along with their amendments and rules.

--

Page 40: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-II

Page 41: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 42: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 43: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 44: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 45: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 46: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 47: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 48: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-IIA

COMPLIANCE FOR CC&A/CTO RE-NEWAL

SR.

NO. COMPLIANCE REMARKS

1. Consent Order No.: AWH–42144, Date of Issue: 02/06/2011 --

2. The consent shall be valid up to 29/03/2016 for use of outlet for the dischargeof trade effluent & emission due to operation of industrial plant for manufacture of the following items/products;

Sr.No.

Product Quantity (MT/Year)

1. POLYESTER CHIPS 5,45,600 2. POLYESTER FILAMENT YARN

a. FULLY DRAWN YARN (FDY) 23,000b. POLYESTER ORIENTED YARN (POY) 90,600

3. ELECTRICT POWER NATURAL GAS BASED CAPTIVE POWER PLANT

I PHASE I & II 13.49 MW(2 X.745)

II PHASE III 8.4 MW

4. BY PRODUCT DEGRADED POLYMER (OLIGOMER)

39

--

SPECIFIC CONDITION:The applicant shall comply with all the conditions stipulated in the Environmental Clearance Certificate issued by the MoEF vide letter No.: J-11011/1048/2007-1 A-ll (I) dated: 07/04/2008 and letter No.: J-11011/124/2009-1A-11(1) dated 10/06/2009.

--

3. CONDITIONS UNDER THE WATER ACT -1974:3.1 The total quantity of trade effluent from the factory due to manufacturing of

above products shall not exceed 3,065 M3/Day.Complied.

3.2 The quantity of Sewage effluent from the factory shall not exceed 65.8 M3/Day. Complied. 3.3 TRADE EFFLUENT:

3.3.1 The applicant shall provide and operate efficiently adequate effluent treatment system in order to achieve the quality of treated effluent as per the GPCB norms mentioned below;

PARAMETERS GPCB NORMSTemperature 40u C pH 6.5 To 8.5 .Colour (Pt. Co. Scale) in units 100 unitsSuspended Solids 100 mq/lOil and Grease 10 mg/l Phenolic Compounds 1 mq/lSulphide 0.5 mg/lAmmonical Nitrogen 50 mq/l Total Chromium 2 mq/l Hexavalent Chromium 0.1 mg/lCopper 2 mq/l Zinc 5 mq/l BOD (5 days at 20UC) 30 mq/l COD 100 mg/l

We have provided adequate ETP in our premises to bring GPCB prescribed norms of industrial effluent.

Page 49: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

All efforts shall be made to remove colour & unpleasant odour as far as practicable.

3.3.2 The treated effluent conforming to the above standards shall be discharged in to Kadodara Khadi through closed pipeline (own operated) up to final discharge point as per commitment made vide your letter dated 01/07/2004 to this Board. The permission of competent authority like NIO be obtained in this respect.

Complied.

3.3.3 Domestic effluent shall be disposed off through Septic tank/soak pit system and shall be discharged conforming to the following standards:

BOD{20°C5days) Less than 20 mq/l Suspended Solids Less than 30 mg/l Residual Chlorine Minimum 0.5 ppm

Complied.

4. CONDITIONS UNDER THE AIR ACT -1981:4.1 The following shall be used as a fuel;

Sr. No.

Fuel Quantity

1. Furnace Oil 132 KL/Day 2. Natural Gas 16,50,792 SCM/Month 3. Imported Coal

ORIndian Coal

230 MT/Day OR

330 MT/Day4. Lubricating Oil 0.34 MT/Day

Complied.

4.2 The applicant shall install and operate air pollution control system in order to achieve norms prescribed below:

We have provided adequate APC Measure to

Page 50: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

4.3 Flue gas emission from the stack attached to the thermo pack shall conform to the following standards;

Sr.No

Stack attached to

Stack height

(Meter)

Air PollutionControlSystem

Parameter Permissible Limit

1. Steam Boiler (1&2)

32 — Particulate Matter

SO2

NOx

150 mg/NM3

100 ppm 50 ppm

2. Thermo pack - 3Nos.

52 —

3. Heat TransferFluid - 3 Nos

52 —

4. Gas Engine &WHRB1

30 —

5. Gas Engine & WHRB2

30 —

6. Gas Engine & WHRB3

30 —

7. Coal Fired Heaters(1&2)

45 Electrostatic Precipitator

Particulate Matter

SO2

NOx

150 mg/NM3

100 ppm 50 ppm

8. Coal Fired Heaters(3&4)

45 Electrostatic Precipitator

9. Thermo pack (Common stack for 3 Nos.)

52 —

achieve GPCB prescribed norms of air emission.

4.4 There shall be no process emission from various stacks/vents of reactors, process vessels.

--

4.5 The concentration of the following parameters in the ambient air within the premises of the industry for 24 hour average shall not exceed the limits specified hereunder:

Parameter Permissible limit

Annual Av. 24 hrs. AverageParticulate matter-10 60 microgram/NMJ 100 microgram/NMb

Particulate matter-2.5 40 microgram/NMJ 60 microgram/NM3

SO2 50 microgram/NMJ 80 microgram/NMJ

NOx 40 microgram/NM3 80 microgram/ NMJ

Complied.

4.6 The applicant shall provide portholes, ladder, platform etc at chimney(s) for monitoring the air emissions and the same shall be open for inspection to/and for use of Board’s staff. The chimney(s) vents attached to various sources of emission shall be designed by numbers such as S-1, S-2, etc. and these shall be painted/displayed to facilitate identification.

Already provided it.

4.7 The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75 dB(a) during day time and70 dB (A) during night time. Daytime is reckoned in between 6a.m. and10 p.m. and night time is reckoned between 10 p.m. and 6 a.m.

Complied.

4.8 The applicant shall at its own cost get samples of ambient ah" quality collected and analyzed from an approved laboratory once in two months and shall submit the reports in duplicate to the Board by the 10th of succeeding month. The applicant shall also maintain records of analytical results properly and shall keep these records/charts open for inspections.

Complied.

4.9 The consent to operate shall lapse if at any time the parameters of the gaseous emission are not within the tolerance limit as mentioned above.

Complied.

5 AUTHORISATION FOR THE MANAGEMENT & HANDLING OF HAZARDOUS WASTES Form-2 (See rule 3 (c) & 5 (5)):

Page 51: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

5.1 Authorization No.: AWH–42144, Date of Issue: 02/06/2011

5.2 M/s. Garden Silk Mills Ltd. (CP division) is, hereby, granted an authorization for following hazardous wastes on the premises situated at Plot No. 196, 197, 124/A, 202-5, 225/7, 229, 230, Jolwa, Tal.: Palsana, Dist: Surat;

Sr. No.

Waste Quantity Schedule-IProcess

No

Facility

1. ETP Waste 13.05 MT/Month

34,3 Collections, Storage Transportation,Disposal at TSDF, NEPL –

d2. Used Oil 1,550 Litre/Year

5.1 Collections, Storage,Transportation, Disposalby selling toRegistered re-refiners.

FO Sludge 1,200 Litre/Year

5.1

3. Discarded Containers (Catalyst/ Additives

360 Nos./Month

33.3 Collection, Storage, Deconta-mination and disposal by selling to authorized recycler.

PP Liner Lot

4,650Kg/Month

33.3

4. Polymer Waste

45.5MT/Month

— Collection, Storage, Transportation and disposal by selling to actual end users tike hosiery mfg. utilize as raw materials for pillow, soft toys, mattress, carpet etc.)

5. Chip Waste 75 MT/Month

6. Sweeping PTA Waste

Lot

22MT/Month

FDY Waste 17.5 MT/Month

POY Waste 13.2 MT/Month

7. Fly Ash 270 MT/Month

(as per 9 MT/day)

Collection, Storage, Trans-portation and disposal byselling to actual end userslike Cement Manufacturers,RMC (Ready Mix Concrete)Plant Operators, BrickC t Bl k

Complied.

5.3 The authorization is granted to operate a facility for collection, storage within factory premises, transportation and ultimate disposal of hazardous waste as mentioned above.

Complied.

5.4 The authorization shall be in force for a period up to 29/03/2016. Complied. 5.5 The authorization is subject to the conditions stated below and such other

conditions as may be specified in the rules from time to time under the Environment (Protection) Act-1986.

6. TERMS AND CONDITIONS OF AUTHORISATION:6.1 The applicant shall comply with the provisions of the Environment (Protection)

Act -1986 and the rules made there under.Point is noted.

6.2 The authorization shall be produced for inspection at the request of an officer authorized by the Gujarat Pollution Control Board.

Point is noted.

6.3 The persons authorized shall not rent, lend, sell, and transfer of otherwise transport the hazardous wastes without obtaining prior permission of the Gujarat Pollution Control Board.

Point is noted.

6.4 Any change in personnel, equipment or working conditions as mentioned in the, authorization order by the persons authorized shall constitute a breach of this authorization.

Point is noted.

6.5 It is the duty of the authorized person to take prior permission of the Gujarat Pollution Control Board to close down the facility.

Point is noted.

6.6 An application for the renewal of an authorization shall be made as laid down in rule 5 (7) (ii).

Point is noted.

Page 52: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

6.7 Industry shall submit annual report within 15 days and sub squinty by 31s1

January every year.Point is noted.

6.8 Industry shall have to manage waste oil; discarded containers etc as per the Rules 2008 and shall apply Authorization/submit details for all the applicable waste as per the Rules 2008 within 15 days.

Point is noted.

7.0 GENERAL CONDITIONS: -7.1 Applicant shall also comply with the general conditions given in Annexure-I --

7.2 Industry shall have to display the relevant information with regard to hazardous waste as indicated in the Hon. Supreme order in W.P. No.657 of 1995 dated: 14lh October 2003.

Point is noted.

7.3 Industry shall have to display on-line data outside the main factory gate with regard to quantity and nature of hazardous chemicals being handled in the plant, including wastewater and air emissions and solid hazardous waste generated within the factory premises.

Point is noted.

Page 53: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

COMPLIANCE OF NOC/CTE FOR PRODUCT MIX

SR. NO.

COMPLIANCE REMARKS

Without prejudice to the powers of this Board under the Water (Prevention and Control of Pollution) Act-1974, the Air Act-1981 and the Environment (Protection) Act-1986 and without reducing your responsibilities under the said Acts in any way, this is to inform you that this Board grants Consent to Establish for setting up of industrial plant/activities for product mix at Plot No. 196, 197, 124/A, 202-5, 225/7, 229, 230 for the manufacturing of following products:

Sr.No.

Product Quantity (MT/Year)

Existing Change in

Quantity

Total after Product Mix

1. POLYESTER CHIPS 5,45,600 -2,12,076 3,33,524

2. POLYESTER FILAMENT YARN

(a) FULLY DRANW YARN (FDY) 23,000 + 74, 484 97,484

(b) PARTIALLY ORIENTED YARN(POY)

90,600 + 1,37,592 2,28,192

3. POWER

(a) NATURAL GAS BASED POWER PLANT PHASE 1 & II 13.49 MW -- 13.94 MW

PHASE III 8.4 MW -- 8.4 MW

(b) COAL BASED POWER PLANT 18 MW -- 18 MW (c) FO BASED POWER PLANT 10.5 MW -10.5MW NIL

4. BY-PRODUCT

DEGRADED POLYMER (OLIGOMER)

39 -- 39

Herewith we are applying for getting CC&A/CTO of product mix.

SPECIFIC CONDITION:The applicant shall comply with all the conditions stipulated in the Environmental Clearance Certificate issued by the MoEF vide letter No. J-11011/1048/2007-IA-ll (l), dated: 07/04/2008 and letter No.: J-11011/124/2009-IA-ll(l) dated 10/06/2009.

Complied.

THIS CONSENT TO ESTABLISH (NOC) IS SUBJECT TO THE FOLLOWING CONDITIONS.

--

1. The Validity period of the order will be Five years i.e. up to 13/07/2014.

--

2. CONDITIONS UNDER WATER ACT 1974:2.1 The total quantity of industrial wastewater generated due to manufacturing

processes as well as other ancillary operation shall not exceed 3,035M3/Day.

Point is noted.

2.2 The applicant shall provide and operate efficiently adequate effluent treatment system so that treated effluent from the industrial plant shall conform to the standards mentioned below:

PARAMETERS GPCB NORMS

Temperature 40" C

pH 6.5 To 8.5

Colour {Ft. Co. Scale) in units 100 units

Suspended Solids 100 mg/l

Oil and Grease 10 mg/I

Phenolic Compounds 1 mg/l

We have provided adequate ETP in our premises to bring GPCB prescribed norms.

Page 54: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Sulphide 0.5 mg/l

Ammonical Nitrogen 50 mg/l

Total Chromium 2 mg/l

Hexavalent Chromium 0.1 mg/l

Copper 2 mg/l

Zinc 5 mg/l

BOD (5 days at 20UC) 30 mg/l

COD 100 mg/l

Total Dissolved Solids 2100 mg/l

Chloride 600 mg/l

Sulphate 1000 mg/l

2.3 The treated effluent conforming to the above standards shall be discharged in to Kadodara Khadi through closed pipeline (own operated) up to final discharge point as per commitment made vide your letter dated: 01/07/2004 to this Board. The permission of competent authority like NIO be obtained in this respect

Complied.

2.4 The quantity of the domestic waste water (sewage) shall not exceed 65.8 M3/Day.

Complied.

2.5 Sewage shall be disposed off through Septic tank/soak pit system and shall be discharged conforming to the following standards:

BOD (20° C - 5 days) Less than 20 mg/l

Suspended Solids Less than 30 mg/l

Residual Chlorine Minimum 0.5 ppm

Complied.

3 CONDITIONS UNDER AIR ACT 1981:3.1 There shall be no change in existing utilities and hence no change in type

and quantities of fuel used by the applicant. Complied.

3.2 There shall be no change in air emission as there is no change in existing utilities.

Complied.

3.3 Ambient air quality within the premises of the industry shall conform to the following standards:

PARAMETER PERMISSIBLE LIMITAnnual Av. 24 hrs. Average

Particulate Matter-10 60 microgram/NM3 100 microgram/NM3

Particulate Matter-2.5 40 microgram/NMa 60 microgram/NM3

SO2 50 microgram/NM3 80 microgram/NM3

NOx 40 microgram/NM3 80 microgram/NM3

Complied.

3.4 All measures for the control of environmental pollution shall be provided before commencing production.

Complied.

4. CONDITIONS UNDER HAZARDOUS WASTE RULES 2008:4.1 The Applicant shall have to comply with provisions of Hazardous Waste

(Management, Handling & Transboundry Movement) Rules-2008 as amended from time to time.

Point is noted.

4.2 The applicant shall obtain membership of common TSDF site for disposal of Hazardous Solid Waste as categorized in Hazardous Waste (Management, Handling & Transboundry Movement) Rules-2008 as amended from time to time, whenever applicable.

Point is noted.

4.3 The applicant shall obtain membership of common Hazardous Waste incinerator for disposal off incinerable waste, whenever applicable.

Point is noted.

4.4 The applicant shall provide temporary storage facilities for each type of Hazardous Waste as per Hazardous Waste (Management, Handling & Transboundry Movement) Rules- as amended from time to time.

Point is noted.

5. GENERAL CONDITION:

Page 55: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

5.1 Adequate plantation shall be carried out all along the periphery of the industrial premises in such a way that the density of plantation is at least 1000 trees per acre of land and a green belt of 5 meters width is developed.

Point is noted.

5.2 The applicant shall have to submit the returns in prescribed form regarding water consumption and shall have to make payment of water cess to the Board under the Water Cess Act-1977.

Point is noted.

5.3 In case of change of ownership/management the name and address of the new owners / partners / directors / proprietor should immediately be intimated to the Board.

Point is noted.

5.4 The applicant shall however, not without the prior consent of the Board bring into use any new or altered outlet for the discharge of effluent or gaseous emission or sewage waste from the proposed industrial plant. The applicant is required to make applications to this Board for this purpose in the prescribed forms under the provisions of the Water Act-1974, the Air Act-1981 and the Environment (Protection) Act-1986.

Point is noted.

5.5 The applicant also comply with the General conditions as per Annexure -1 attached herewith (No.1 to 38) (whichever applicable).

Point is noted.

5.6 The concentration of Noise in ambient air within the premises of industrial unit shall not exceed following levels: Between 6 A.M. and 10 P.M.: 75 dB(A) Between 10 P.M. and 6 A.M.: 70 dB(A)

Point is noted.

5.7 Applicant is required to comply with the Manufacturing, Storage and Import of Hazardous Chemicals Rules-1989 framed under the Environment (Protection) Act-1986.

Point is noted.

5.8 If it is established by any competent authority that the damage is caused due to their industrial activities to any person or his property in that case they are obliged to pay the compensation as determined by the competent authority.

Point is noted.

Page 56: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

COMPLIANCE OF CC&A-coal based CPP

SR.

NO.

CONDITIONS REMARKS

1. The unit shall also permit to manufacture/ as mention in the following

product condition no.: (2) Of CC&A Order;

SR NO. PRODUCT CAPACITY

1. Electricity (C.P.P) 18 MWH

Complied.

2. CONDITION UNDER THE WATER ACT 1974:

2.1 The quantity of trade effluent from the factory shall not exceed 423

KL/day and shall be treated in the existing ETP and shall be discharge in

the existing facility.

Complied.

Always below

or equal.

3. CONDITIONS UNDER THE AIR ACT 1981:

3.1 The following shall be used as fuel.

Sr. No. Fuel Quantity

1. Imported Coal

OR

Indian Coal

288 MT/day

OR

360 MT/day

Complied.

4. The flue gas emission through stack shall conform to the following

standards:

Stack

No.

Stack

attached

to

Stack

height in

meter

Air

Pollution

Control

System

Parameters Permissible

Limit

1. Steam

Boiler (90

TPH)

72 Electrostatic

Precipitator

Particular

Matter

SO2

NOx

150 mg/NM³

100 ppm

50 ppm

Complied.

We have

installed

Electrostatic

Precipitator

with the Boiler

to control the

air pollution

generated from

the Boiler.

5. The validity of the consent order no. 42144 dated: 2/06/2011 is valid

up to 29/03/2016 shall remain unchanged.

---

Page 57: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-III

Page 58: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 59: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 60: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 61: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 62: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 63: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 64: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 65: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-IV

Page 66: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 67: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 68: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 69: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-V

Page 70: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 71: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 72: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 73: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 74: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 75: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 76: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:
Page 77: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-V A

COMPLIANCE OF RECOMMENDATIONS BY AUDITORS’ FOR THE PERIOD OF 2011

SR.

NO.

RECOMMENDATIONS BY AUDITORS’ COMPLIANCE BY CLIENT

1. Most of the conditions of the Consent are complied.

The company is recommended to get the stack

monitored regularly.

Complied.

It is already checked and

found satisfactory.

Page 78: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-VI

Justification for Water Permission: -

A) Water (Existing project)

Water permission till date:

PERMITTING BOARD PERMISSION

CGWA Permission 1 7153 KLD

CGWA Permission 2 1675 KLD

Irrigation Canal 1438.35 KLD

Total Water Permission 10266.35 KLD

Water requirement for GSML:

Water Requirement Quantity

As per Consent total permission (till date) 8827.8 KLD

As Actual (as per average of last 5 months)

5102 KLD

B) Water (Proposed project)

Water Requirement 4351.4 KLD

Water Permission Canal / CGWA

Page 79: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-VII

Water Balance of Figure-2.4

Page 80: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure VIII

Justification for Domestic and green belt development water requirement:

SR. NO. PURPOSE

WATER CONSUMPTION (KL/DAY)

EXISTING PROPOSED TOTAL

A. DOMESTIC 368

(88 KL for drinking/toiletr

y+

280 Kl for gardening + canteen + other use)

11(for drinking /

toiletry)

379

B. INDUSTRIAL

I Processing 262.8 392.64 655.44

II Cooling and Boiler 7,885 3327.36 11212.36

III Washing 176 105.6 281.6

IV D. M. Plant 136 145.2 281.2

V Other Use (Green belt, floor washing etc.)

-- 369.6 369.6

Total (industrial) 8739.8 4340.4 12800.2

Total (A+B) (KL/DAY) 8827.8 4351.4 13179.2

For the Existing Greenbelt around 128KLDof water is used from the Domestic water (280KLD)

For proposed project, 50 KLD water is used from 369.6KLD (other use water) for greenbelt (12500 sq. mtr) development.

Page 81: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-IX

Page 82: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure-X

Page 83: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

Annexure XI

Justification for Domestic and green belt development water requirement:

A) Ambient Air Monitoring Date

S N Project Site Jolva Tantithaiya Sanki Bagumura Vankaneda

Date Date Date Date Date Date

1. 06/03/11 06/03/11 08/03/11 08/03/11 10/03/11 10/03/11 2. 07/03/11 07/03/11 09/03/11 09/03/11 11/03/11 11/03/11 3. 13/03/11 13/03/11 15/03/11 15/03/11 17/03/11 17/03/11 4. 14/03/11 14/03/11 16/03/11 16/03/11 18/03/11 18/03/11 5. 20/03/11 20/03/11 22/03/11 22/03/11 24/03/11 24/03/11 6. 21/03/11 21/03/11 23/03/11 23/03/11 25/03/11 25/03/11 7. 27/03/11 27/03/11 29/03/11 29/03/11 31/03/11 31/03/11 8. 28/03/11 28/03/11 30/03/11 30/03/11 01/04/11 01/04/11 9. 03/04/11 03/04/11 05/04/11 05/04/11 07/04/11 07/04/11

10. 04/04/11 04/04/11 06/04/11 06/04/11 08/04/11 08/04/11

11. 10/04/11 10/04/11 12/04/11 12/04/11 14/04/11 14/04/11

12. 11/04/11 11/04/11 13/04/11 13/04/11 15/04/11 15/04/11

13. 17/04/11 17/04/11 19/04/11 19/04/11 21/04/11 21/04/11

14. 18/04/11 18/04/11 20/04/11 20/04/11 22/04/11 22/04/11

15. 24/04/11 24/04/11 26/04/11 26/04/11 28/04/11 28/04/11

16. 25/04/11 25/04/11 27/04/11 27/04/11 29/04/11 29/04/11

17. 31/04/11 31/04/11 02/05/11 02/05/11 04/05/11 04/05/11

18. 01/05/11 01/05/11 03/05/11 03/05/11 05/05/11 05/05/11

19. 07/05/11 07/05/11 09/05/11 09/05/11 11/05/11 11/05/11

20. 08/05/11 08/05/11 10/05/11 10/05/11 12/05/11 12/05/11

21. 14/05/11 14/05/11 16/05/11 16/05/11 18/05/11 18/05/11

22. 15/05/11 15/05/11 17/05/11 17/05/11 19/05/11 19/05/11

23. 21/05/11 21/05/11 23/05/11 23/05/11 25/05/11 25/05/11

24. 22/05/11 22/05/11 24/05/11 24/05/11 26/05/11 26/05/11

B) Water sample collection

Sr. No.: Sampling Date Location

1. 21/05/2011 Project Site bore (GW1)

2. 21/05/2011 Jolva (GW 2)

3. 21/05/2011 Tantithiya (GW 3)

4. 21/05/2011 Sanki (GW 4)

5. 21/05/2011 Bagumura (GW 5)

6. 21/05/2011 Vankaneda (GW 6)

7. 21/05/2011 Canal Water near Bagumara (SW1)

8. 25/05/2011 Gangadhara pond (SW2)

9. 25/05/2011 Dastan Khadi (SW3)

10. 25/05/2011 Baleshwara Pond (SW4)

Page 84: gpcb.gujarat.gov.inapplication. It is noted that M/s. Garden Silk Mills Ltd. have proposed for expansion of Polyester Chips and Polyester Filament Yarn manufacturing unit at Village:

C) Soil sample collection

D) Noise sample collection

Sr. No.: Sampling Date Location

1. 22/05/2011 Mankna

2. 22/05/2011 Valthan

3. 22/05/2011 Parab

4. 22/05/2011 Dastan

5. 24/05/2011 Vareli

6. 24/05/2011 Bagumara

7. 24/05/2011 Karala

8. 24/05/2011 Haripura

9. 26/05/2011 Vankaneda

10. 26/05/2011 Haldharu

11. 26/05/2011 Karan

12. 26/05/2011 Jolva

Sr. No.: Sampling Date Location

1. 03/04/11 Mankna

2. 04/04/11 Valthan

3. 05/04/11 Parab

4. 06/04/11 Dastan

5. 08/04/11 Vareli

6. 10/04/11 Bagumara

7. 11/04/11 Karala

8. 12/04/11 Haripura

9. 13/04/11 Vankaneda

10. 14/04/11 Haldharu

11. 15/04/11 Karan

12. 17/04/11 Jolwa

13. 10/04/11 N.H. No. 6