semantic PDM Using a Graph Data Model at Toy Manufacturer Schleich GmbH Semantic Product Data Management Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 1

Upload: neo4j-the-fastest-and-most-scalable-native-graph-database

Post on 08-Jan-2017

1.310 views

Category:

Technology


0 download

TRANSCRIPT

semantic PDM

Using a Graph Data Model at Toy Manufacturer Schleich GmbH

Semantic Product Data Management

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 1

semantic PDM

about Schleich GmbHtoy figurines with realistic and naturalistic design

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 2

semantic PDM

equipped for tomorrow‘s challenges

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 3

chemical riskassessment ….

tomorrow

trackability traceability

today

productconformity

A B C N

.. yet another data silo?

semantic PDM

the idea

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 4

Is there any critical

Substance included?

?product

materials

substances

lab tests

measured

values

limit values

legislation

local context

lots

bearded dragon 14675

(lot 11A1)

process steps

semantic PDM

the idea

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 5

• cross company (along the entire value chain)• steady data model (no matter which ERP systems are used)• simple to understand and simple to be used• scalable and extendable (agile development!)• offering all data for answering the questions coming from customers• … and from officials

the development of a simple, cost efficient, flexible and scalable system for managing product data of toys (produced in China)

a concept beyond the well known existing systems

semantic PDM

products and processes

(ERP)

legislation (critical) substances

one .. consistent data model

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 6

Bringing together different „languages“

semantic PDM

why „semantic“

„there is an added value of data objects which is based on their relationship“

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 7

Thus ..

• focus on those relationships• treat them as dedicated data objects• give them a name ..• and make them usable in your queries / business logic

• semantics is the study of meaning• How can your data get more „meaning“?

semantic PDM

It‘s all about nodes and edges

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 8

developing a ‚Schleich onthology‘ ‚nodes‘ = subjects/objects

‚edges‘ = predicates

product idea

briefing boardconcept board

budget

project

model

project

profile

product

version

product

components

(bill of material BOM)

bill of substances

(BOS) DIN EN 71-3

limit value ‚lead‘

component X

moldtechnical specs

and documents

production process

(bill of operations BOS)

semantic PDM

Anvantage of using a semantic PDMstart small and focused …

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 9

semantic PDM

Advantage of using a semantic PDMstart small and focused … and grow as needed

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 10

semantic PDM

getting an answer means ..

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 11

semantic PDM

getting an answer means .. finding the right path

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 12

semantic PDM

SAP

Oracle

connectors(mapping)

„Micro Apps“

functional oriented applications for

• browser

• graphical Navigator

• mobile devices

• …

BOM

BOSSVHC

XML

from ECHA

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 13

Data delivered by all stakeholdersHow the data net is filled

semantic PDM

data silos

product-management

documentmanagement

ERP QC / LIMS PDMengineers

meta data

common focus in the industryconsolidating metadata from different data silos

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 14

semantic PDM

semanticProduct DataMangement

functionalfocusedSW products

product-management

documentmanagementERP QC / LIMS technical

PDM

middleware

one semantic PDM – the data poolincrementally building the data net during product development

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 15

semantic PDMtraceability concept Schleich GmbH | 12.01.2013 | Page 16 | Dr. Andreas Weber

product

component/sub assembly

raw material

Why not simply using my ERP?

„my ERP“

supplier ERP

Subsupplier ERP

semantic PDMtraceability concept Schleich GmbH | 12.01.2013 | Page 17 | Dr. Andreas Weber

product

component/sub assembly

raw material

Who is internal, who is external?

semantic PDMtraceability concept Schleich GmbH | 12.01.2013 | Page 18 | Dr. Andreas Weber

product

component/sub assembly

raw material

Who is internal, who is external?

view for my company

It‘s a matter of views ..

semantic PDMtraceability concept Schleich GmbH | 12.01.2013 | Page 19 | Dr. Andreas Weber

product

component/sub assembly

raw material

Who is internal, who is external?

view for „subsupplier“

It‘s a matter of views ..

semantic PDM

• simple and stableeasy to understand – „processes change, data stays“

• scalablestart small and grow on demand

• cross companyapplicable to each level of production process

• independent from software vendors and hardwarebeyond any ‚SAP update‘ – accessable and workable with the common technology

• collaborative and mobile (browser based)basic model for working in parallel independent of time and place

• load sharingspecial topics like ‚regulations‘ could be built up by third party and imported

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 20

Why does Schleich follow this way

semantic PDM

• Concentrating relevant data into one demand specific screen

• Giving a quick overview of approval situation

• Context sensitive document management

• Creating working lists based on far filter criterias

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 21

Some use cases

semantic PDMDr. Andreas Weber | semantic PDM | 26.04.2016 | page 22

concentrating relevant data

semantic PDMDr. Andreas Weber | semantic PDM | 26.04.2016 | page 23

the explaining path ..

concentrating relevant data

semantic PDM

test

scenario

product

product

version

product

model

packaging

molded

part

label

is base for

1:n

Everything in its place

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 24

1:n

supplier

costs

and approved ..

catalog #

price

franchise

launch

date

modeler

forecast

painting

instruct.

attributes

objects

semantic PDMDr. Andreas Weber | semantic PDM | 26.04.2016 | page 25

a quick overview of approval situation

semantic PDMDr. Andreas Weber | semantic PDM | 26.04.2016 | page 26

a BOM at a glance

semantic PDM

Context based document management

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 27

document

„Questionaire“

valid for

offered by

Supplier X

Pigment A

Pigment B

Campaign 2016got in

semantic PDM

Creating working lists„Show me the status of all molds for products for January launch 2016“

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 28

semantic PDM

recommendations

Dr. Andreas Weber | semantic PDM | 26.04.2016 | page 29

• Invest into workshopsanalyze your company language - „win your staff over“

• Use data interfaces at an early stageimport and export data from and to e.g. ERP as „daily business“

• Start smallin initial stage focus on one area of data with an immediate valuable benefit

• Grow step by stepdon‘t get lost in the shuffle of excited whishes