Green Building and Sustainable Design
Impacts and Challenges
TU112
Richard S. Szecsy, PhD, PE
President & CEO
Texas Aggregates and Concrete Association
www.tx-taca.org
Tuesday, January 24, 2012
![Page 2: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/2.jpg)
AIA Credits
Hanley Wood is a Registered Provider with The American Institute of
Architects Continuing Education Systems. Credit earned on completion
of this program will be reported to CES Records for AIA members who
sign in with their AIA member ID. Electronic Certificates of Completion
for all attendees will be available 6-7 weeks post show.
This program is registered with the AIA/CES for continuing professional
education. As such, it does not include content that may be deemed or
construed to be an approval or endorsement by the AIA of any material
of construction or any method or manner of handling, using or
distributing or dealing in any material or product.
Questions related to specific materials, methods and
services will be addressed at the conclusion of this
Presentation.
![Page 3: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/3.jpg)
1. Recognize increasing pace of concrete technology
development and its implementation within the
industry
2. Discuss applicability of various concrete
technologies to green-building systems and
sustainable design
3. Evaluate positive and negative elements from both a
concrete supply and contracting point of view
4. Identify challenges that technologies and green-
building requirements bring to the construction
process
Learning Objectives
![Page 4: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/4.jpg)
Overview
• Green Building and Sustainable Design
• Case Examples
– High volume fly ash
– Pervious Concrete
– Reflective Concrete
– Recycled and storm water
• Issues and Challenges
![Page 5: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/5.jpg)
Sustainable Design Philosophy
Time
FunctionDesign t RequiremenDesign S
ityustainabil
• Design Requirement
– Specified level of performance necessary
• Design Function
– Specified intent for use of the structure from the Owner
![Page 6: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/6.jpg)
Sustainable Design Philosophy
ePerformanctRequiremenDesign
![Page 7: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/7.jpg)
Sustainable Design Philosophy
• Performance
– Expected result from the design as measured by a
standard method
• Function
– Intended use of structure or structural element
Time
Function ePerformancS
ityustainabil
![Page 8: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/8.jpg)
Design Philosophy
• Generally accepted design approach
• Supported by Codes and Standards
• Don’t have to exercise judgment
• Perception that it minimizes liability
ePerformanconPrescripti
![Page 9: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/9.jpg)
Design Philosophy
Time
Functionon PrescriptiS
ityustainabil
• Is it possible to “prescribe” sustainability?
• Does a prescriptive approach create an inherent
conflict?
• How do we resolve the conflict?
![Page 10: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/10.jpg)
Green Building & Sustainable Design
• Design and construction practices to
– Reduce or eliminate impact of buildings
on environment and occupants
• Five Broad Areas:
– Sustainable site planning
– Safeguarding water efficiency
– Indoor environmental quality
– Energy efficiency and renewable energy
– Conservation of materials, resources
Reference: US Green Building Council, www.usgbc.org, 2003
![Page 11: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/11.jpg)
Benefits of Green Building
• Environmental benefits
– Reduce impacts of resource
consumption
• Economic benefits
– Improve the bottom line
– High benefit at low cost (?!?!?)
– Optimize life-cycle, utility costs
• Health and safety benefits
– Enhance occupant comfort, health
• Community benefits
– Reduce strain on infrastructures
Reference: US Green Building Council, www.usgbc.org, 2003
![Page 12: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/12.jpg)
LEED® Program Participation
• System for designing, constructing, operating
and certifying “green” buildings
Energy &
Atmosphere
27%
Water
Efficiency
8%
Materials &
Resources
20%
Sustainable
Sites
22%
Indoor
Environmental
Quality
23%
Reference: US Green Building Council, www.usgbc.org, 2003
![Page 13: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/13.jpg)
Actual LEED® Points
Category Total Points % of total
Sustainable sites 14 2 14%
Water eficiency 5 0 0%
Engery and atmosphere 17 10 59%
Materials and Resources 13 6 46%
Indoor Environmental quality 15 0 0%
Innovation 4 2 50%
LEED Professional 1 0 0%
Total 69 20 29%
Using Concrete
Ref: “Using Concrete to Maximize LEED™ Points,” Concrete International, November 1, 2002
![Page 14: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/14.jpg)
20% Materials and Resources
• Construction Waste Management
– Recycled 50% by weight construction waste (1pt)
• Resource Reuse
– Specify salvaged matls for 5% of building matls (1pt)
• Recycled Content
– 25% of building matl. contain 40% post-industrial matl (1pt)
– +25% building matl contain 40% post-industrial matl (1pt)
• Local/Regional Materials
– Building materials extracted, or manufactured within 500 mi.
radius of project (1pt)
![Page 15: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/15.jpg)
Recycled Equations
)(Weight Total
(%)Content IndustrialPost )(Weight MaterialContent Recycled
lbs
lbs
PriceSellingVolumeContent RecycledValueContent Recycled
($)Cost MaterialsTotal
($) ValueContent Recycled(%) teContent Ra Recycled
Reference: Concrete in Focus, Fall 2004, pg 30-34
![Page 16: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/16.jpg)
Recycled Calculation Example
Reference: Concrete in Focus, Fall 2004, pg 30-34 and Engineering News Record, December 4, 2006
Cement Fly Ash Total
8039 $88.72 41Concrete Paving
3500 psi5.53 25% 390 130 3926
Mix # QtySelling
Price% AshDescription
Per Yard (lbs)Sack
)(Weight Total
(%)Content IndustrialPost )(Weight MaterialContent Recycled
lbs
lbs
%31.33926
%100130Content Recycled
lb
lb
![Page 17: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/17.jpg)
Recycled Calculation Example
Cement Fly Ash Total
8039 $88.72 41Concrete Paving
3500 psi5.53 25% 390 130 3926
Mix # QtySelling
Price% AshDescription
Per Yard (lbs)Sack
PriceSellingVolumeContent RecycledValueContent Recycled
44.120$72.88$14%31.3ValueContent Recycled yds
Reference: Concrete in Focus, Fall 2004, pg 30-34 and Engineering News Record, December 4, 2006
![Page 18: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/18.jpg)
Recycled Calculation Example
Cement Fly Ash Total
8039 $88.72 41Concrete Paving
3500 psi5.53 25% 390 130 3926
Mix # QtySelling
Price% AshDescription
Per Yard (lbs)Sack
($)Cost MaterialsTotal
($) ValueContent Recycled(%) teContent Ra Recycled
%31.352.3637$
44.120$(%) teContent Ra Recycled
Reference: Concrete in Focus, Fall 2004, pg 30-34 and Engineering News Record, December 4, 2006
What about manufactured sand?
![Page 19: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/19.jpg)
Recycled Calculation Example
($)Cost MaterialsTotal
($) ValueContent Recycled(%) teContent Ra Recycled
%09.1952.3637$
58.694$(%) RateContent Recycled
Reference: Concrete in Focus, Fall 2004, pg 30-34 and Engineering News Record, December 4, 2006
Mix # Qty Description Sack % Ash Per Yard (lbs)
Cmt Ash Mansand Fiber Color Total
8039 41
Concrete
Paving 3500
psi
5.53 25% 390 130 1411 0 0 4035
![Page 20: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/20.jpg)
LEED for New Construction 2.2
![Page 21: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/21.jpg)
Bonus Points: Innovation & Design
• 4 points for innovation
– High volume fly ash?
– Water recycling?
– Self compacting concrete?
• Double dipping is allowed
![Page 22: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/22.jpg)
Technology Example - HVFA
• What happens over 30%?
– History is not kind…
• Why not 40%, 50%, 60%?
• Equal performance
– Set time, strength, etc.
• Changes in contracting
– Finishing, curing, etc.
• Proprietary Mix Designs
Video provided by: Lattimore Materials Company, 972-221-4646 www.lattimorematerials.com
![Page 23: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/23.jpg)
HVFA - 3 day Performance Data
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
Mix B Mix C Mix A Mix B Mix C
Av
era
ge
Co
mp
res
siv
e S
tre
ng
th (
ps
i)
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
Tim
e o
f In
itia
l S
et
(ho
urs
)
3 day
Initial Set
Lab Produced* Field Produced**
![Page 24: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/24.jpg)
HVFA - 28 day Performance Data
4000
4500
5000
5500
6000
6500
7000
7500
8000
8500
9000
9500
10000
Mix B Mix C Mix A Mix B Mix C
Av
era
ge
Co
mp
res
siv
e S
tre
ng
th (
ps
i)
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
Tim
e o
f In
itia
l S
et
(ho
urs
)28 day
Initial Set
Lab Produced* Field Produced**
![Page 25: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/25.jpg)
HVFA - Performance Data (Class C)
![Page 26: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/26.jpg)
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
2
3
7
28
56
5 sack
6 sack7 sack
Co
mp
ress
ive s
tren
gth
(p
si)
Age
(day
s)
HVFA - Performance Data (Class F)
![Page 27: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/27.jpg)
HVFA Results – Azure Tower
![Page 28: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/28.jpg)
Pervious Concrete
• No fines, porous
• Mono-sized
• %15 to 35% voids
• 8 to 20 gal/min/ft2
• 2000 to 4000 psi?
• Fixed proportions?
Video provided by: http://www.chargerconcrete.com/perviousconcrete.htm, August 2004
![Page 29: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/29.jpg)
Pervious Concrete
• No fines, porous
• Mono-sized
• %15 to 35% voids
• 8 to 20 gal/min/ft2
• 2000 to 4000 psi?
• Fixed proportions?
Video provided by: www.judimedozablogspot.com, January 19, 2007
![Page 30: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/30.jpg)
Reflective Concrete…Cool Pavements
• Higher reflectivity reduces air
temperatures
– 0.1 increase 10oF decrease
– Heat island effect
• Solar Reflective Index (SRI)
– ASTM E1980
• “Albedo” is unit of measurement
– ASTM C1549
• When are they measured?
![Page 31: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/31.jpg)
Reflective Concrete…Cool Pavements
• Time and expense of testing
• Function of available materials
– Test panels are critical
– No historical data
– Beware the “this combination worked
on the last job…”
• What if it does not work?
– Contract liabilities?
• Sunset provisions in Contract
![Page 32: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/32.jpg)
Innovation: Self Compacting Technology
• Placement without
segregation
• Non-segregating
• Free flowing
• Not a new concrete!
• Energy reduction???
Video provided by: Lattimore Materials Company, 972-221-4646 www.lattimorematerials.com
![Page 33: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/33.jpg)
Recycled Water and Stormwater
• The problem we all have…
• …we are at zero discharge
• Why would a specification
not support its use?
• Batch panel controls
• Document each load
![Page 34: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/34.jpg)
Green Cement
• Based on emissions from
cement
• Requires contractor/supplier
certification/verification
• More limited/specialty a
source material…
– more expensive it could become
– greater potential concrete
expense
“…A cement kiln
that has met the
emission standard
of 1.7 lb of NOx
per ton of clinker
released into the
atmosphere…”
![Page 35: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/35.jpg)
Opportunity: Proprietary Mix Designs
• Prescriptive vs. Performance
• Let the best technology win
• Performance basis?
– w/cm vs permeability, etc.
• Commodity to engineered…
• National focus, NRMCA
![Page 36: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/36.jpg)
Issues and Challenges
• Our industry does not
like change
• Green Building is Architect
and Owner Driven
– Industry giving input?
• Industry Communication?
– Engineers
– Contractors
– Testing Labs
![Page 37: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/37.jpg)
Issues and Challenges: Engineers
• Green Building = Performance
• What performance is needed?
– Verification of performance
– Do your homework
• Be explicit, not implicit!
– Set time
– What strength at what day?
• Must see the mix design…why?
![Page 38: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/38.jpg)
Issues and Challenges: Architects
• Often don’t understand own
specification
• Material experience is rarely
first hand, based on last
major problem…
• What is the metric for
performance?
• Cost awareness is essential!
![Page 39: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/39.jpg)
Issues and Challenges: Contractors
• “Any change is a bad change”
– Changes in placing
– Changes in finishing
• Someone else is the expert
• $/ft2 can be the deal breaker
• Performance is too good?
• Contradictions?
– Remove the Environmental fee?!?
![Page 40: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/40.jpg)
Issues and Challenges: Testing Labs
• Verify performance for owner
– Based on job specs (explicit!)
– NOT based on speculation
or assumption
• New concrete and old
assumptions = problems
• Mix design?
• When to include in process
![Page 41: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/41.jpg)
Forward Thinking
• This is not an industry fad!
• Leadership within industry
• Where is the resistance?
• Industry must get involved!
• There are hidden gems
– 1st mover advantage
– Proprietary mix designs
– Concrete based on performance
– Best technology wins
![Page 42: Green Building and Sustainable Design · PDF fileGreen Building and Sustainable Design ... for all attendees will be available 6-7 weeks post show. ... Created Date: 20120130142348Z](https://reader031.vdocument.in/reader031/viewer/2022013014/5a8dd6917f8b9a7f398cacf3/html5/thumbnails/42.jpg)
Richard S. Szecsy, PhD, PE President & CEO
Texas Aggregates and Concrete Association
www.tx-taca.org
512-451-5100 phone
214-202-1379 cell
This concludes the American Institute of Architects
Continuing Education Systems Program.
Any Questions?