green rating for integrated habitat assessment (griha) ar. partha ranjan das
TRANSCRIPT
Green Rating for Integrated HabitatAssessment (GRIHA)
Ar. Partha Ranjan Das
v
v
GRIHA GUIDELINES FOR GREEN BUILDINGS 7 DIFFERENT ASPECTS OF GREEN BUILDING DESIGN
1. Site Planning 2. Building envelope design3. Building system design – HVAC, Electrical, PHE4. Integration of renewable energy sources to generate energy on site5. Water and waste management6. Selection of ecologically sustainable materials a) High recycled content b) Rapidly renewable resources c) Low emission potential 7. Indoor environment quality
BASIC FEATURES
1. Pre-construction stage 2. Building Planning and construction stages – land, water, energy, air, green cover 3. Building maintenance and operation stage
v
v
v
SITE PLANNING
A. Conservation and efficient utilization of resources
Criteria 1. Site selection2. Preserve and Protect the landscape3. Soil conservation (till post construction)4. Design to include existing site features5. Reduce hard paving6. Enhance outdoor lighting system efficiency
7. Plan utilities efficiently and optimize on site circulation efficiency
B. Health and well being Criteria 8. Provide at least, the minimum level of sanitation/safety facilities
for construction workers 9. Reduce air pollution during construction C. Water
Criteria 10. Reduce landscape water requirement11. Reduce building water use
12. Efficient water use during construction
v
v
v
v
vD. Energy and use Criteria 13. Optimize building design to reduce the conventional energy demand
14. Optimize the energy performance of the building within specified comfort limits
E. Energy embodied and construction Criteria 15. Utilization of fly ash in the building structure
16. Reduce volume, weight, and time of construction by adopting anefficient technology (e.g. pre-cast systems, ready-mix concrete etc.)
17. Use low-energy material in the interiors F. Energy renewable Criteria 18. Renewable energy utilization 19. Renewable energy – based hot water system G. Recycle, recharge and reuse of water Criteria 20. Waste – water treatment
21. Water recycle and reuse (including rainwater) H. Water management Criteria 22.
23. Reduction in waste during construction 24. Efficient waste segregation 25. Storage and disposal of waste 26. Resource recovery from waste
v
v
v
I. Health and well-being Criteria 27. Minimize ozone depleting substances
28. Ensure water quality29. Acceptable outdoor and indoor noise levels30. Tobacco and smoke control
31. Universal accessibility J. Building operation and maintenance Criteria 32. Energy audit and validation 33. Operation and maintenance protocol for electrical and
mechanical equipment K. Innovation Criteria 34. Innovation points
1. Alternative transportation2. Environmental education3. Company policy on green supply chain4. Life cycle cost analysis5. Any other criteria proposed by applicant
Points scored Rating
50-60 One star
61-70 Two stars
71-80 Three stars
81-90 Four stars
90-100 Five stars
L. Scoring points for Griha
v
List of criteria and points for GRIHACriteria Points
Criteria 1 Site Selection 1 Partly mandatory
Criteria 2 Preserve and protect landscape during construction/compensatory depository forestation.
5 Partly mandatory
Criteria 3 Soil conservation (post construction) 4
Criteria 4 Design to include existing site features 2 Mandatory
Criteria 5 Reduce hard paving on site 2 Partly mandatory
Criteria 6 Enhance outdoor lighting system efficiency and use RE system for meeting outdoor lighting requirement
3
Criteria 7 Plan utilities efficiently and optimize on site Circulation efficiency
3
Criteria 8 Provide at least, minimum level of sanitation/safety Facilities for construction workers
2 Mandatory
Criteria 9 Reduce air pollution during construction 2 Mandatory
Criteria 10 Reduce landscape water requirement 3
Criteria 11 Reduce building water use 2
Criteria 12 Efficient water use during construction 1
Criteria 13 Optimize building design to reduce conventional energy demand
6 mandatory
M. Evaluation procedure of criterion of GRIHA
v
Criteria 14 Optimize energy performance of building within specified comfort
12
Criteria 15 Utilisation of fly ash in building structure 6Criteria 16 Reduce volume, weight and time of construction by adopting efficient technology (e.g. pre-cast systems, ready-mix concrete, etc.)
4
Criteria 17 Use low-energy material in interiors 4Criteria 18 Renewable energy utilization 5 Partly mandatoryCriteria 19 Renewable energy based hot water system 3Criteria 20 Waste water treatment 2Criteria 21 Water re-cycle and re-use (including rainwater) 5Criteria 22 Reduction in waste during construction 2Criteria 23 Efficient waste segregation 2Criteria 24 Storage and disposal of waste 2Criteria 25 Resource recovery from waste 2Criteria 26 Use of low VOC paints / adhesives / sealant 4Criteria 27 Minimize Ozone depleting substances 3 MandatoryCriteria 28 Ensure water quality 2 MandatoryCriteria 29 Acceptable outdoor and indoor noise levels 2Criteria 30 Tobacco and smoke control 1Criteria 31 Universal Accessibility 1Criteria 32 Energy audit and validation MandatoryCriteria 33 Operations and Maintenance protocol for electrical And mechanical equipment
2 Mandatory
Total score 100Criteria 34 Innovation (beyond 100) 4
104
v
INCENTIVE FOR EXTRA FAR VS INCENTIVE FOR REDUCTION OF
MUNICIPAL TAX
1. SANCTIONED PLAN TO SHOW
a. Solar Panels for 1 MWb. Roof Gardenc. Green wall on 50% of west façaded. Rain water harvestinge. Use of Fly ash bricks or concrete blocksf. Planting of trees
SOME EXAMPLES
CHICAGO CITY HALL
THE CALHOUN SCHOOL, NEW YORK
ROOFTOP GARDEN, ROCKEFELLER CENTER
NANYANG TECHNOLOGY UNIVERSITY, SINGAPORE
ACROS FUKUOKA PREFECTURAL INTERNATIONAL HALL, JAPAN
NEW PROVIDENCE WHARF, LONDON
VANCOUVER CONVENTION CENTRE, CANADA
MARINA BARRAGE, SINGAPORE
THANK YOU