greg ausland, pe, project manager, … · greg ausland, pe, project manager, [email protected] tony...

31
Bridge Owner: Lane County Greg Ausland, PE, Project Manager, [email protected] Tony LaMorticella, PE, SE, Sr. Project Engineer, [email protected] OBEC Consulting Engineers 165-foot-long heavy timber Howe truss main span Bridge Location: Vida, Oregon

Upload: nguyenxuyen

Post on 01-Sep-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Bridge Owner:

Lane County

Greg Ausland, PE, Project Manager, [email protected]

Tony LaMorticella, PE, SE, Sr. Project Engineer, [email protected]

OBEC Consulting Engineers

165-foot-long heavy

timber Howe truss

main span

Bridge Location:

Vida, Oregon

Page 2: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 2

Under the supervision of veteran bridge builder Arthur C. Striker

Page 3: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Original construction invoice

3

Under construction 1938

Page 4: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 4

Page 5: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Fast pristine water, good fishing, home to many listed species of aquatic life

5

from Google Earth

Page 6: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Aerial view – Google Earth

6

Page 7: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Looking east up highway

Goodpasture Covered Bridge 7

Page 8: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

With H10 truck of the day

8

Page 9: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 9

Substantially

heavier than

design load

Hazard to covered bridges even when empty

One-log loads,

once common, now rare

Page 10: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 10

Inspector’s notes documenting broken bottom chord splices

Page 11: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 11

Welded steel plate anchors fastened to

bottom chord segments with lag screws and

2½" diameter tie rods passing through

timber truss diagonal members.

Page 12: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 12

Broken splices leaving gaps to ½"

Some rods were never engaged

Gaps not

closed by

tie rods

Page 13: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Approved overload request from 1998 GVW is 177,000 lbs.

13

Page 14: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Very heavy cement/wood fiber

composite roofing was leaking

14

Replaced with much lighter and historically

more appropriate cedar shingles

Page 15: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 15

2012 photo

Page 16: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 16

Bridge soffit approximately 30 feet above hard rock stream bed, fast and deep water.

In-water work period is only 6 weeks, July 15 to September 1.

Page 17: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 17

Water level can rise several feet in a few days

Page 18: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Temporary rail installed

and deck cut

18

Installing the first temporary steel

truss during night-time closure

Page 19: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Temporary rail in place,

ready for traffic

19

Standing vertical

Bearing on concrete pier

Page 20: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Ready to lift timber bridge

One of twenty 50-ton hydraulic jacks

Goodpasture Covered Bridge 20

Page 21: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Between bottom chord and siding

21

Between rail post and bottom chord

Page 22: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Six ½" strands each side of each bottom chord, each pulled to 20,000 pounds

22

Page 23: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Reinstalling bridge rail

Goodpasture Covered Bridge

Removing temporary steel trusses

23

Page 24: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Spiking done during night closures

24

Page 25: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Looking northwest, March 11, 2013

25

Page 26: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 26 Goodpasture Covered Bridge 26

Page 27: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 27

Page 28: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 28

Page 29: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Prior to rehabilitation local residents

strung lights with extension cords

29

Circuitry

concealed

behind

wrap-

around

siding

Programmable LED lighting installed

Page 30: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge

Fall 2012

(prior to rehabilitation)

30

Page 31: Greg Ausland, PE, Project Manager, … · Greg Ausland, PE, Project Manager, gausland@obec.com Tony LaMorticella, PE, SE, Sr. Project Engineer, ... timber Howe truss main span Bridge

Goodpasture Covered Bridge 31

GOODPASTURE COVERED BRIDGE, 2013