  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    1/29

    Update for SPP

    Chris BeckmanArkansas Electric Coop. Corp.

    NERC GridEx II

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    2/29

    Overview

    Who, What, When.of GridEx II Lead Planner concept

    Likely participants (aka players) at your organization

    GridEx II Construct and Agenda

    Example Inject

    Regional Play (SPP GridEx II Task Force)

    Benefits of participating in GridEx II

    Accessing the GridEx II Web Portal

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    3/29

    What is GridEx II?

    Must have been a GridEx I.

    Conducted in November 2011.

    NERC-led exercise to assess the readiness of the

    electric sector to respond to a cyber incident. 75 industry and government organizations from the U.S.

    and Canada participated.

    GridEx II builds on GridEx I and combines ageographically distributed environment with a muchmore robust scenario than GridEx I.

    Designed by NERC and Booz | Allen | Hamilton

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    4/29

    What is GridEx II?

    The majority of players will participate in the GridEx IIfrom their normal places of work.

    Players will engage in both internal response activitiesand external information sharing activities across the

    sector.

    An Exercise Control (ExCon) cell, based in VA will:

    Manage scenario distribution

    Monitor exercise play

    And capture response activities

    NERC and BAH will distribute after action report.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    5/29

    Who is participating?

    102 Full Player Organizations Each assigned a Lead Planner who had a role in shaping thescenario.

    Participated in planning conferences, which culminated withthe FPC on October 1.

    Full Player orgs will respond to all exercise activities andcopy or report their responses to NERC and BAH.

    49 Monitor/Respond Organizations Should also assign a Lead Planner to coordinate the

    exercise for their org. Monitor/Respond orgs only exercise the scenario internally.

    Can gather key personnel and just act like its an internaltable top.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    6/29

    Total Registered Organizations

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    7/29

    Major Communication Paths

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    8/29

    When is Grid Ex II?

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    9/29

    Executive Table Top Nov. 15

    10 CEOs from industryselected by Electricity Sub-sector Coordinating Council(ESCC) will participate

    10 assistant secretary levelplayers from government(DOE, DHS, DOD, FEMA,etc.)

    10 facilitators to provide discussion injects, moderatediscussions, and facilitate discussion on industry responseto previous two days.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    10/29

    Where is Grid Ex II?

    Distributed Exercise

    Meaning that players will participate from where they are:

    Office

    Home Or any other area that their Lead Planner designates.

    Backup site for simulated, functional play.

    Employee meeting room for convenience.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    11/29

    How to participate

    Assign a Lead Planner.

    Will register organization as full player or monitor.

    http://events.signup4.com/exercisedirectory

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    12/29

    Lead Planner duties

    Lead Planner should contact Me orLesley Bingham to coordinate RegionalPlay.

    Lead Planner will determine and notifyindividual employees that need toparticipate.

    LP should also assign internalControllers/Evaluators to help conductexercise.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    13/29

    Likely Players per MSEL

    Internal

    Most of your Key Personnel

    Those with defined roles within your Incident Response andBusiness Continuity Plans.

    Utility Market/Trading Personnel

    Corporate IT Network and SCADA IT Security

    Physical Security

    Corporate Communications/Media Relations

    External

    Member Utilities

    Local L/E, FBI, and DHS

    NERC ES-ISAC

    DOE

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    14/29

    Exercise Control (ExCon)

    Herndon, VA

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    15/29

    ExConLead Planner

    Players

    Inject Distribution Design

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    16/29

    Must be registered w/ NERC at: http://events.signup4.com/exercisedirectory

    If and only if as a Lead Planner

    you choose, ExCon will routeinjects directly to individual players.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    17/29

    Exercise Agenda

    7

    Injects

    12 Injects

    11

    Injects

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    18/29

    Example Inject

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    19/29

    Injects will also be videos

    Lead Planner will need to coordinate video access byNov 1st.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    20/29

    Lead Planner will periodically call theSPP Conference Bridge to report

    organizations responses.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    21/29

    Regional Play (SPP GridEx II Task Force)

    SPP is going to have an openconference call during the exercise.

    To catch areas where SPP Members

    respond similarly. So that we may integrate areas that are found

    to be similar into each of our plans.

    Which would allow a coordinated, regionalresponse next time.

    And a better coordinated, regional responseduring a real emergency event on the system.

    9 00 9 15 NERC O i

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    22/29

    KCP&L

    SPP

    NPPD

    Westar

    WFEC AECC

    9:00-9:15 = NERCs OpeningRemarks

    SPP Call Opens SPP Takes a Roll Call from Scribe

    at each location. 9:30 = Official Exercise Start

    Periodically, Scribe calls in to SPPto report exercise responses

    TBD how often we call in.

    OG&E

    Inject / Video Screen

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    23/29

    How AECC will

    setup ourexercise room.

    Inject / Video Screen

    Lunch

    Lead Planner

    LunchSnacks Coffee

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    24/29

    Post Exercise SPP After-Action Review

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    25/29

    Why participate in GridEx II?

    For AECC, we have to exercise annually.To walk through our plans against a mock scenariowhen the sky is blue.

    Cross that bridgementality aint gonna work.Find where improvements in plans can be made.

    For me, its a free table top scenario.

    Im not having to draft one from scratch.Must tailor it to be effective, but if youre a

    Monitor/Respond player, you dont have to shareyour responses with NERC.

    If Ive sold you.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    26/29

    Accessing BAH Portal

    http://events.signup4.com/exercisedirectory

    2

    Need access? Contact: [email protected]

    https://pmev2.bah.com/ecs/gridex2https://pmev2.bah.com/ecs/gridex2
  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    27/29

    Player resources and education material

    Player Orientation from the FPC was recorded and itcan be sent to players.

    A link will be provided on the BAH portal.

    Planner and Player Handbooks will also be availableon the portal.

    Planner Handbook will be posted to the portal within aweek.

    Player Handbooks will be available 2 weeks prior tothe exercise.

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    28/29

    Between now and next SPP GETF call

    Use the Lead Planner Checklist

    Mainly:

    Look at the Master Scenario Event List (MSEL)spreadsheet on the BAH Portal.

    Look at Sample Customized Entity Injectsspreadsheet on BAH Portal.

    Begin to customize injects for your organization

    Im customizing my orgs with a simple PowerPoint.

    Identify and register your players @http://events.signup4.com/exercisedirectory

    Communications check on November 7th

  • 7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013

    29/29

    GridEx II Points of Contact

    Booz | Allen | Hamilton

    General Support

    BAH Web Portal Support

    RegionalCIPWG GridEx Task ForceChris Beckman

    Arkansas ElectricCooperative Corporation

    [email protected]

    CIPWG GridEx Task Force

    Lesley Bingham

    Southwest Power [email protected]

    501-688-1710

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]