gridex ii: electric grid failure drill - november 13-14, 2013
TRANSCRIPT
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
1/29
Update for SPP
Chris BeckmanArkansas Electric Coop. Corp.
NERC GridEx II
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
2/29
Overview
Who, What, When.of GridEx II Lead Planner concept
Likely participants (aka players) at your organization
GridEx II Construct and Agenda
Example Inject
Regional Play (SPP GridEx II Task Force)
Benefits of participating in GridEx II
Accessing the GridEx II Web Portal
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
3/29
What is GridEx II?
Must have been a GridEx I.
Conducted in November 2011.
NERC-led exercise to assess the readiness of the
electric sector to respond to a cyber incident. 75 industry and government organizations from the U.S.
and Canada participated.
GridEx II builds on GridEx I and combines ageographically distributed environment with a muchmore robust scenario than GridEx I.
Designed by NERC and Booz | Allen | Hamilton
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
4/29
What is GridEx II?
The majority of players will participate in the GridEx IIfrom their normal places of work.
Players will engage in both internal response activitiesand external information sharing activities across the
sector.
An Exercise Control (ExCon) cell, based in VA will:
Manage scenario distribution
Monitor exercise play
And capture response activities
NERC and BAH will distribute after action report.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
5/29
Who is participating?
102 Full Player Organizations Each assigned a Lead Planner who had a role in shaping thescenario.
Participated in planning conferences, which culminated withthe FPC on October 1.
Full Player orgs will respond to all exercise activities andcopy or report their responses to NERC and BAH.
49 Monitor/Respond Organizations Should also assign a Lead Planner to coordinate the
exercise for their org. Monitor/Respond orgs only exercise the scenario internally.
Can gather key personnel and just act like its an internaltable top.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
6/29
Total Registered Organizations
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
7/29
Major Communication Paths
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
8/29
When is Grid Ex II?
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
9/29
Executive Table Top Nov. 15
10 CEOs from industryselected by Electricity Sub-sector Coordinating Council(ESCC) will participate
10 assistant secretary levelplayers from government(DOE, DHS, DOD, FEMA,etc.)
10 facilitators to provide discussion injects, moderatediscussions, and facilitate discussion on industry responseto previous two days.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
10/29
Where is Grid Ex II?
Distributed Exercise
Meaning that players will participate from where they are:
Office
Home Or any other area that their Lead Planner designates.
Backup site for simulated, functional play.
Employee meeting room for convenience.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
11/29
How to participate
Assign a Lead Planner.
Will register organization as full player or monitor.
http://events.signup4.com/exercisedirectory
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
12/29
Lead Planner duties
Lead Planner should contact Me orLesley Bingham to coordinate RegionalPlay.
Lead Planner will determine and notifyindividual employees that need toparticipate.
LP should also assign internalControllers/Evaluators to help conductexercise.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
13/29
Likely Players per MSEL
Internal
Most of your Key Personnel
Those with defined roles within your Incident Response andBusiness Continuity Plans.
Utility Market/Trading Personnel
Corporate IT Network and SCADA IT Security
Physical Security
Corporate Communications/Media Relations
External
Member Utilities
Local L/E, FBI, and DHS
NERC ES-ISAC
DOE
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
14/29
Exercise Control (ExCon)
Herndon, VA
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
15/29
ExConLead Planner
Players
Inject Distribution Design
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
16/29
Must be registered w/ NERC at: http://events.signup4.com/exercisedirectory
If and only if as a Lead Planner
you choose, ExCon will routeinjects directly to individual players.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
17/29
Exercise Agenda
7
Injects
12 Injects
11
Injects
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
18/29
Example Inject
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
19/29
Injects will also be videos
Lead Planner will need to coordinate video access byNov 1st.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
20/29
Lead Planner will periodically call theSPP Conference Bridge to report
organizations responses.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
21/29
Regional Play (SPP GridEx II Task Force)
SPP is going to have an openconference call during the exercise.
To catch areas where SPP Members
respond similarly. So that we may integrate areas that are found
to be similar into each of our plans.
Which would allow a coordinated, regionalresponse next time.
And a better coordinated, regional responseduring a real emergency event on the system.
9 00 9 15 NERC O i
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
22/29
KCP&L
SPP
NPPD
Westar
WFEC AECC
9:00-9:15 = NERCs OpeningRemarks
SPP Call Opens SPP Takes a Roll Call from Scribe
at each location. 9:30 = Official Exercise Start
Periodically, Scribe calls in to SPPto report exercise responses
TBD how often we call in.
OG&E
Inject / Video Screen
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
23/29
How AECC will
setup ourexercise room.
Inject / Video Screen
Lunch
Lead Planner
LunchSnacks Coffee
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
24/29
Post Exercise SPP After-Action Review
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
25/29
Why participate in GridEx II?
For AECC, we have to exercise annually.To walk through our plans against a mock scenariowhen the sky is blue.
Cross that bridgementality aint gonna work.Find where improvements in plans can be made.
For me, its a free table top scenario.
Im not having to draft one from scratch.Must tailor it to be effective, but if youre a
Monitor/Respond player, you dont have to shareyour responses with NERC.
If Ive sold you.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
26/29
Accessing BAH Portal
http://events.signup4.com/exercisedirectory
2
Need access? Contact: [email protected]
https://pmev2.bah.com/ecs/gridex2https://pmev2.bah.com/ecs/gridex2 -
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
27/29
Player resources and education material
Player Orientation from the FPC was recorded and itcan be sent to players.
A link will be provided on the BAH portal.
Planner and Player Handbooks will also be availableon the portal.
Planner Handbook will be posted to the portal within aweek.
Player Handbooks will be available 2 weeks prior tothe exercise.
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
28/29
Between now and next SPP GETF call
Use the Lead Planner Checklist
Mainly:
Look at the Master Scenario Event List (MSEL)spreadsheet on the BAH Portal.
Look at Sample Customized Entity Injectsspreadsheet on BAH Portal.
Begin to customize injects for your organization
Im customizing my orgs with a simple PowerPoint.
Identify and register your players @http://events.signup4.com/exercisedirectory
Communications check on November 7th
-
7/27/2019 GridEx II: Electric Grid Failure Drill - November 13-14, 2013
29/29
GridEx II Points of Contact
Booz | Allen | Hamilton
General Support
BAH Web Portal Support
RegionalCIPWG GridEx Task ForceChris Beckman
Arkansas ElectricCooperative Corporation
CIPWG GridEx Task Force
Lesley Bingham
Southwest Power [email protected]
501-688-1710
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]