1. INTRODUCTION TO PROJECT 1.1 PROJECT DESCRIPTION This is the nal project for this module. For this project, we are assigned to locate a piece of land to construct something which is bene cial to the society. Therefore, the name of our project is “ Taman Mewah”. It involves Location Plan the construction of a recreational area with parks for the residences around the area, running pathway & tracks for joggers, gazebo and pergolas. The project is on the open area of a 50m x 70m ( 3500m 2 ) site just located in front of the Subang Jaya LRT Station and above Subang Parade. The site is currently not in use and it is a missed opportunity to develop a beautiful location. The agreement of the project brief is estimated to be signed on 15 June 2015. The whole construction process is approximately 4 months. 1.2 SITE ANA L YSIS Photos of the site:

Upload: quo-ming

Post on 15-Aug-2015

28 views

Category:

Design


0 download

TRANSCRIPT

1. INTRODUCTION TO PROJECT

1.1 PROJECT DESCRIPTION

This is the final project for this module.

For this project, we are assigned to

locate a piece of land to construct

something which is beneficial to the

society. Therefore, the name of our

project is “ Taman Mewah”. It involves Location Plan

the construction of a recreational area with parks for the residences around the area, running

pathway & tracks for joggers, gazebo and pergolas. The project is on the open area of a 50m x

70m ( 3500m2 ) site just located in front of the Subang Jaya LRT Station and above Subang

Parade. The site is currently not in use and it is a missed opportunity to develop a beautiful

location.

The agreement of the project brief is estimated to be signed on 15 June 2015. The whole

construction process is approximately 4 months.

1.2 SITE ANA L YSIS

Photos of the site:

3

(This site has been a large vacant space since 200* without any construction or renovation. Hence,

most areas of the site is covered with grass and soil. A site analysis shows that the site is ideal for

the construction plan due to the following reasons:

1. Large enough to occupy large amount of residences.

2. Easily accessible. Residences can take LRT or buses to reach the location.

3. Has good ventilation due to large open space.

4. Has a lot of un utilised space available for new development.

5. Able to provide a healthy and beautiful scenery for the residences around.

6. The topography of the land is flat and smooth.

7. The land is firm with soil but it is muddy sometimes when rain occurs.

8. The microclimate of the sun rises at the east side of the land and sets at the west side of

the land.

9. There is no other recreational area such as open parks nearby the area.

Major buildings around the site:

AEON BIG

SAUJANA RESIDENCY

SUBANG P ARADE

4 E- T iara Apartment

_

(Other findings:

1. Residence nearby always access to AEON BIG, Subang Parade or Subang Avenue for

shopping and spending leisure time.

2. There are a few residency around the suggested site such as Saujana Residency, Subang

Avenue, E-Tiara & Casa Tiara Condominium.

3. Large carpark in front of Subang Parade.

4. Low frequency of traffic jam will occur on the roads at the location of the site.

Transportation:

1. Transportation around the other site that can be used is Subang Jaya KTM which is located right

behind AEON BIG and Subang Parade.

2. There is also a bus stop in front of AEON BIG .

5_