group project mba -lscm qt 12
TRANSCRIPT
-
7/28/2019 Group Project Mba -Lscm Qt 12
1/4
University of Petroleum & Energy Studies
MBA (LSCM) Sem- I Batch 2012-14
QUANTITATIVE TECHNIQUES FOR MANAGERS
(MBCQ 721)
GROUP PROJECTSINSTRUCTIONS
Last date of submission:
Group 1, 3, 5, 7, 9, 11, 13, 15: 30.10. 2012Group 2, 4, 6, 8, 10, 12, 14: 07.11. 2012
1. No Project will be accepted after the date of submission.
2. Report has to be prepared in soft as well as hard copy (*.doc format) and may besupported by Excel sheet wherever necessary.
3. Every sub-group has to make a presentation (.ppt file) after submission. (Max.
time: 5 Min. per individual student), the schedule would be notified in the class.
In case, presentations are not held, it will be evaluated under viva-voce.
4. All the Projects preferably make use of statistical softwares (Solver/Matlab etc.)
5. References must be given at the end or as footnotes.
6. The project report should have minimum 30 pages but not exceed 40 pages.7. The topic, subject, subject code, the Name, Roll No., Programme, Semester, Date
of Submission, Name of the University, Submitted to (Name of faculty) should be
mentioned on the Cover page (as attached for your reference).
Dr. Neeraj AnandAssociate Professor
-
7/28/2019 Group Project Mba -Lscm Qt 12
2/4
UNIVERSITY OF PETROLEUM&ENERGY STUDIESDEHRADUN
Group ProjectTOPIC
QUANTITATIVE TECHNIQUES(MBCQ 721)
Submitted to:
Dr. NEERAJ ANAND
Associate Professor & HOD QT/RM/OperationsCMES
Submitted by :
Roll No. ..Names..
MBA (LSCM) Sem I
Batch 2012-14
-
7/28/2019 Group Project Mba -Lscm Qt 12
3/4
University of Petroleum & Energy Studies
MBA (LSCM) Sem - I (Batch 2012-14) Quantitative Techniques
(MBCQ 721)
GROUP PROJECT
S.No. TOPIC OF GROUP PROJECTGr. 1 Application of Descriptive Statistics in Aviation Sector (Average of
Passengers/cargo volume for last five years in India)Gr. 2 Application of Descriptive Statistics (Measures of Central
tendency, Dispersion etc.) A Comparison of volume of cargohandled by trucks in various states/cities
Gr. 3 Role of Replacement Models in Transport Sector - ReplacementPolicy for Buses for UTC (Uttarakhand Transport Corporation)/DTC.
Gr. 4 Optimization of Transportation cost/Route/Time of Full Truck Load from Okhla to Dehradun and Number of mineral Plyboardthat can be shipped.
Gr. 5 Optimization of Transportation Cost and Time elapsed for a Trailor of Bollero from Haridwar to Mundra Port.
Gr. 6 Transportation cost of an Oil Tanker (Diesel) from Oil Terminal,Land hour (Roorkee) to Dehradun City.
Gr. 7 Data Analysis: Average, Standard Deviation, Skewness, COV of
export of any electronic good for last 5 years. Draw a histogramshowing the sales year-wise.
Gr. 8 Overview of Infrastructure in Indian Railways, No. of GoodsTrains/ Routes/Traffic Intensity/Type of Wagons and their applications.
Gr. 9 Role of a Courier Company: Tariff fixation/RoutePlanning/Distribution/Arrival/Service Pattern
Gr. 10 Methods of Demand Forecasting, Forecast No. of Public Carriers in
-
7/28/2019 Group Project Mba -Lscm Qt 12
4/4
a city for next 3 years. (Refer to RTO)Gr. 11 Application of ABC and XYZ Analysis Selected Cases in
Pharmaceutical Industry.Gr. 12 Quantitative/Statistical Measures in Delhi Metro (DMRC):
Capacity/Routes/Staff/Accidents
Gr. 13 Inventory Management of a Retail Outlet: Total No. of SKUs,Stacking Norms, EOQ, Buffer Stock, Ordering/CarryingCost/Shortage Cost for various SKUs
Gr. 14 Importance of ICD in Transport of Cargo: capacity/trafficintensity/commodity volume analysis
Gr. 15 Overview of Dehradun Airport: Runway/Capacity for Passengers/Routes/Cargo Handling
(Dr. Neeraj Anand)Associate Professor
Date: 26.07.2012