6/19/2012 1 Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS) Concepts & Background Larry Jones Assistant State Structures Design Engineer & State Geotechnical Engineer GRS-IBS Introduction to the concept Research Performed Design Guide Design Method Construction FDOT Implementation Developmental Specification 549 Developmental Standard 6025

Upload: doanthien

Post on 06-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

1

Geosynthetic Reinforced Soil

Integrated Bridge System (GRS-IBS)

Concepts & Background

Larry Jones Assistant State Structures Design Engineer

& State Geotechnical Engineer

GRS-IBS

•Introduction to the concept

•Research Performed

•Design Guide

•Design Method

•Construction

•FDOT Implementation

•Developmental Specification 549

•Developmental Standard 6025

Page 2: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

2

Acknowledgement

Thank-you to Daniel Alzamora, Jennifer Nicks and Michael Adams with Federal Highway (FHWA) for allowing me to draw from their experience and training materials including many of the slides in this presentation.

Page 3: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

3

FHWA’s EDC Web Site www.fhwa.dot.gov/everydaycounts

“Taking effective, proven and market–ready technologies and getting them into widespread use”

FHWA’s EDC Web Site www.fhwa.dot.gov/everydaycounts/technology/grs_ibs/

Ancient Secrets, Modern Science: Geosynthetic Reinforced Soil (GRS) Integrated Bridge System (IBS)

Page 4: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

4

FHWA’s EDC Web Site http://www.fhwa.dot.gov/everydaycounts/technology/grs_ibs/multimedia.cfm

Multimedia: Videos, Webinars & Pictures

GRS – IBS

Page 5: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

5

GRS MSE

Reinforcement spacing

36” 30” 24” 18” 12” 6”

Degree of Composite Behavior

Why Do This?

•FHWA & States with experience report:

• Reduced construction cost (25 - 60%)

• Reduced construction time

• Flexible design - easily field modified for unforeseen site conditions (e.g. obstructions, utilities, different site conditions)

• Easier to maintain (fewer bridge parts)

• QA/QC Advantages

• Smooth Transition

GRS Fundamentals

Page 6: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

6

GRS FUNDAMENTALS

Definitions

•GRS - Geosynthetic Reinforced Soil •An engineered, well compacted granular fill

with closely spaced (< 12”) layers of geosynthetic reinforcement

•IBS - Integrated Bridge System •A fast, cost-effective method of bridge

support blending the roadway into the superstructure using GRS technology

GRS Fundamentals

Page 7: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

7

Cut-away of a GRS Mass

GRS Fundamentals

Cross-Section of GRS-IBS

GRS Fundamentals

Page 8: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

8

Site Selection

•Simple span (currently ≤ 140 ft)

•Single or Multiple Span Bridges

•≤ 30 ft abutment height

•Grade separation

•9 fps Water Velocity (or higher?)

•Cost Effective to Excavate for RSF Below Scour Elevation?

GRS Fundamentals

Site Selection

GRS Fundamentals

•Tolerable Settlements

•Steel or concrete superstructures

•New or replacement structures

•On or Off System

•Approval Needed for Interstate or Multi-Land Roadways

Page 9: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

9

Facing Elements

•Split face CMU Block

• Dimensions: 7-5/8” x 7-5/8” x 15-5/8” (nominal 8x8x16)

• Readily available

• Inexpensive

• Compatible with the frictional connection to the reinforcement

• Material Specifications:

• Compressive strength ≥ 4,000 psi

• Water absorption limit: 5%

GRS Fundamentals

Geosynthetic Reinforcement •Geosynthetic reinforcement material can include:

•HDPE, PP, or PET Geogrids

•PP or PET Woven geotextiles

•Ultimate Strength: Tult = 4800 lb/ft (both directions)

•Strength at 2% Strain (T2%): Tensile Load @ 2% ε

GRS Fundamentals

Tf

T@2%

Page 10: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

10

Geosynthetic Reinforcement Continued

•Cross Machine vs. Machine Direction

•Uniaxial (strength in one direction)

•Biaxial (strength in both directions)

GRS Fundamentals

Granular Backfill

•Well graded

• Spec 204 Graded Aggregate

• ≥ 38o

•Open graded

•#57

• #67

• #89

• ≥ 38o

GRS Fundamentals

Page 11: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

11

FHWA Research: Performance

Testing and Monitoring

Performance Tests

•Also known as “Mini-Pier” experiments

•Provides material strength properties of a particular GRS composite

•Procedure involves axially loading the GRS mass to measure lateral and vertical deformation

GRS Fundamentals

Page 12: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

12

Performance Tests Continued

4.5 ft

3.2 ft

1.3 ft

4.5 ft

6.4 ft

Top View Side View

GRS Fundamentals

Performance Tests Continued

GRS Fundamentals

Page 13: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

13

Performance Test Results

0

5

10

15

20

25

30

35

40

0 1 2 3 4 5 6

Applie

d P

ressure

(ksf)

Vertical Strain (%)

Vegas mini-pier

FHW pier

Defiance mini-pier

GSGC test

4800 lb/ft @ 8” Spacing

Performance Tests Continued

Before After

GRS Fundamentals

Page 14: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

14

Performance Test 2400 lb/ft @ 8” Spacing

Before After

0.5 ksf (25 kPa)

Page 15: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

15

3.1 ksf (148 kPa)

4.1 ksf (196 kPa)

Page 16: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

16

4.9 ksf (235 kPa)

5.9 ksf (282 kPa)

Page 17: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

17

6.8 ksf (326 kPa)

8.5 ksf (407 kPa)

Page 18: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

18

10.3 ksf (493 kPa)

11.3 ksf (541 kPa)

Page 19: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

19

13.9 ksf (666 kPa)

15.3 ksf (733 kPa)

Page 20: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

20

16.7 ksf (800 kPa)

18.1 ksf (867 kPa)

Page 21: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

21

0

2

4

6

8

10

12

14

16

18

20

0 2 4 6 8 10 12 14 16

Applie

d P

ressure

(ksf)

Vertical Strain (%)

2400 lb/ft @ 8” Spacing

GRS differences:

• Composite Structure

• Friction Connections

• Close Spacing

GRS Has Composite Behavior

Page 22: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

22

Settlement Monitoring Continued

Performance Monitoring

Settlement Monitoring Continued

• Settlement is recorded for both the wall face and the superstructure

• The difference between the settlement on the wall face and the superstructure is the compression within the GRS mass

Performance Monitoring

Settlement of superstructure

Settlement of wall face

Page 23: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

23

Settlement Monitoring Continued

-0.17

-0.15

-0.13

-0.11

-0.09

-0.07

-0.05

-0.03

-0.01

0.01

0.03

0 100 200 300 400 500 600 700 800 900 1000

Se

ttle

me

nt

(ft)

Time (Days)

East Beam Avg

West Beam Avg

East Face Avg

West Face Avg

Δ = 0.6 in

• EDM survey

• Bowman Road (82’ Bridge)

• 7 y/o

• No Bump

Performance Monitoring

~0.85 in

~0.25 in

Settlement Monitoring Continued

-0.25

-0.20

-0.15

-0.10

-0.05

0.00

0 50 100 150 200 250 300 350 400

Se

ttle

me

nt

(ft)

Time (Days)

North footing

North Wall

South footing

South Wall

1.0 “

1.1”

• EDM survey

• Tiffin River (140’ Bridge)

• 3 y/o

• No bump

Performance Monitoring

~0.6”

~1.7”

Page 24: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

24

Vertical Deformation Continued

0

1

2

3

4

5

6

0 5 10 15 20 25 30

Verti

ca

l S

tra

in (

%)

Applied Vertical Load (ksf)

Envelope Huber Vine Bowman Stever Glenburg

Design of GRS-IBS

Lateral Deformation Continued

Performance Monitoring

Page 26: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

26

•Generic Service Loading •qb + qLL ≤ 4000 psf

Design Method

LRFD Design

•LRFD External Stability • Sliding, φ=1.0

• Bearing, φ=0.65

– AASHTO also limits eccentricity

• Global Stability, φ=0.65

Page 27: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

27

LRFD Design

•Internal Stability • Factored Tensile Strength

(strength limit state, φ=0.45)

• Strength at 2% strain

(service limit state, controls deformation)

• Uses Boussinesq theory for lateral stress in reinforcements

Is a 35’ single span flat slab feasible here?

What is the tolerable settlement ?

Page 28: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

28

CONSTRUCTION OF GRS-IBS

QA/QC

• Block alignment

• Compaction

• Reinforcement placement

• Quality of construction materials

• Scour protection

• Drainage details

Construction of GRS-IBS

Page 29: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

29

Compaction

•Compaction of the fill is extremely important

•Compact GAB to 95% of modified proctor, or Gravel to no movement

Construction of GRS-IBS

Labor and Equipment

•Common labor

•Equipment: Non-specialized

• Hand tools

• Measuring devices

• Heavy equipment

Construction of GRS-IBS

Page 30: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

30

Excavation

Reinforced Soil Foundation (RSF)

•Provides embedment and increased bearing area

Construction of GRS-IBS

Page 31: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

31

Page 32: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

32

GRS Abutment •The first layers are important for leveling and alignment

Construction of GRS-IBS

Page 33: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

33

Page 34: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

34

Construction of GRS-IBS

Page 35: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

35

• Wall Corners:

• Right angle wall corners constructed with CMU corner blocks that have architectural detail on two sides

• Walls with angles ≠ 90 degrees require cutting of the corner blocks resulting in a vertical seam or joint. Fill with a dry concrete mix and install bent rebar

GRS Abutment Continued

Construction of GRS-IBS

• Top of Facing Wall:

• The top three courses of CMU block are filled with concrete wall mix and pinned together with No. 4 rebar

• The reinforcement in these cells needs to be cleared with a razor knife or burning to open the core for placement of concrete wall fill

GRS Abutment Continued

Construction of GRS-IBS

Page 36: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

36

• Coping:

• After filling the top three courses of block, a thin layer of the same concrete mix is placed on top of the block, to form the coping

• Then hand trowel the coping either square or round and slope to drain

GRS Abutment Continued

Construction of GRS-IBS

Scour Countermeasure

Construction of GRS-IBS

Page 37: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

37

Page 38: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

38

Beam Seat

Construction of GRS-IBS

1) Place pre-cut foam board of 4 in” thickness on the top of the bearing bed reinforcement. The foam board should be butted against the back face of the CMU block.

Construction of GRS-IBS

Beam Seat

Page 39: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

39

2) Set a 4” solid concrete block on top of the foam board, across the entire length of the bearing area.

Construction of GRS-IBS

Beam Seat

3) The first 4” wrapped layer of compacted fill is the thickness to the top of the foam board

4) The second 4” wrapped layer of compacted backfill is to the top of the 4” solid block creating the clear space

Construction of GRS-IBS

Beam Seat

Page 40: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

40

5) Grade the surface aggregate of the beam seat slightly high (to about 0.5”) to seat the superstructure level and maximize contact with the bearing area

Construction of GRS-IBS

Beam Seat

Superstructure

Construction of GRS-IBS

Page 41: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

41

• Set Back: The distance between the back of the facing block and the front of the beam seat (use width of foam, currently 12”)

Construction of GRS-IBS

Superstructure

• Clear Space: The distance between the top of the wall face and the bottom of the superstructure

Construction of GRS-IBS

3” min or 2% of wall height

Superstructure

Page 42: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

42

Page 43: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

43

Approach Integration

Construction of GRS-IBS

1) Trim reinforcement sheet to provide planned length after it is wrapped and place behind the beam end. The width of the sheet should allow for wrapping of the sides after the fill layer is placed and compacted. Wrapping of the sides prevents migration of the fill laterally.

Approach Integration Continued

Construction of GRS-IBS

Page 44: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

44

2) Place a 6” lift of GAB and compact per Specification 204

3) Cover with reinforcement and wrap sides. Wrapping of the sides prevents migration of the fill laterally.

Approach Integration Continued

Construction of GRS-IBS

Approach Integration Continued

Page 45: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

45

FDOT Implementation

•Structures Design Bulletin 12-06: Evaluation of GRS Abutments for Single Span Bridges, Bridges with Simply Supported End Spans and GRS Walls

http://www.dot.state.fl.us/structures/Memos/StructuresDesignBulletin12-06.pdf

FDOT Implementation

•Structures Design Bulletin 12-06

• Revises Sections 3.12.12 & 3.13.4 of the January 2012 Structures Design Guidelines regarding (GRS) Walls and Abutments

•Contains Links to:

• FHWA Implementation Guide

• Developmental Specification 549

• Developmental Standard 6025

Page 46: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

46

CONSTRUCTION OF GRS-IBS

•Developmental Specification 549

•Request use of Developmental Spec for your project through the District Specifications Office.

•DSO sends request to SSO, who then forwards the DS for the project specific Specs Package.

CONSTRUCTION OF GRS-IBS Developmental Specification 549

http://www.dot.state.fl.us/specificationsoffice/

Page 47: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

47

CONSTRUCTION OF GRS-IBS Developmental Specification 549 http://www.dot.state.fl.us/specificationsoffice/OtherFDOTLinks/Developmental/Default.shtm

Developmental Design Standard 6025

(D6025 or D06025)

Page 48: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

48

DDS D6025

DDS D6025 http://www.dot.state.fl.us/rddesign/DesignStandards/Standards.shtm

Page 49: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

49

DDS D6025 http://www.dot.state.fl.us/rddesign/DS/Dev.shtm

DDS D6025 http://www.dot.state.fl.us/rddesign/DS/Dev.shtm

Page 50: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

50

DDS D6025 http://www.dot.state.fl.us/rddesign/DS/Dev.shtm

DDS D6025

http://www.dot.state.fl.us/rddesign/DS/Dev/D06025.pdf

Page 51: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

51

DDS D6025 http://www.dot.state.fl.us/rddesign/DS/Dev/IDDS-D06025.pdf

FDOT Implementation

• Invitation to Innovation Website

Page 52: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

52

FDOT Implementation

• Invitation to Innovation Website

FDOT Implementation

• Invitation to Innovation Website

Page 53: GRS-IBS - Florida Department of · PDF file•A fast, cost-effective method of bridge support blending the roadway into the ... Construction of GRS-IBS 1) Trim reinforcement sheet

6/19/2012

53

FDOT Implementation

• Invitation to Innovation Website

Questions?

[email protected]