  • 8/9/2019 GrubbRdTraffic

    1/2

    PURPOSE

    The purpose of this newslet-ter is to inform you of theplanned geometric improve-

    ments at the intersection ofGrubb Road and Blaine

    Drive. Please refer to the lo-

    cation map on the back. Theplans include the installationof new concrete medians andcrosswalks. This project will

    improve safety for both traf-fic operations and pedestrian

    access.

    INTRODUCTION

    The Montgomery CountyDepartment of Transporta-

    tions (MCDOT) Division ofTraffic Engineering and Op-erations (DTEO) has com-

    pleted engineering studies,evaluations, and recommen-

    dations that warrant safetyimprovements to enhancetraffic operations and pedes-

    trian access.

    SCOPE OF PROJECT

    Contractors will install new

    concrete traffic medianscrosswalks. This includesassociated curb and gutterand sidewalk modificationsnecessary to ensure compli-

    ance with Americans WithDisabilities Act (ADA) stan-dards. MCDOTs Division of

    Highway Services (DHS)will be managing the planned

    IMPACTS

    All construction work will be

    scheduled between the hours

    of 7 am and 5 pm, Monday

    though Friday. Continuous

    traffic will be maintained at

    all times.

    This project will necessitate

    temporary lane closures and

    temporary parking restric-

    tions. Signs will be posted

    identifying such restrictions.

    Access to homes will be

    available at all times, however

    minor delays may be experi-

    enced as flaggers manually

    direct traffic safely through

    the construction zone.

    This type of project is gener-

    ally characterized by some

    noise and dust. Please rest

    assured that DHS will do its

    best to keep the site in good

    housekeeping order.

    We apologize in advance for

    any unavoidable inconven-

    ience that the Grubb Road

    traffic project may cause. We

    are confident that residentsand users of Grubb Road will

    welcome the results of this

    project.

    Thank you for your coopera-

    tion and patience as we work

    to improve Grubb Road for

    both pedestrians and motor-

    ists.

    improvements as well as

    providing quality control.

    PROJECT WORK PLAN

    Generally, the work will pro-

    ceed as follows:

    1. Stake out the modifica-

    tions in accordance to theplan.

    2. Establish temporary MOTlane changes with temporarysigns, pavement markings,

    and traffic drums or cones.

    3. Construct new crosswalks,medians, and ADA wheel-

    chair ramps.

    4. Complete patching of theroadway in areas affected by

    construction.

    5. Install permanent traffic

    signs and pavement mark-

    ings.

    SCHEDULE

    This project is scheduled to

    begin on or about June 29,2010 and should be com-

    pleted within a few weeks,weather permitting. The traf-

    fic project, and associatedrepair work will be sched-uled between the hours of 7

    am and 5 pm, MondayThrough Friday. Temporarytraffic control devices willremain in place until the pro-

    ject is completed.

    100 Edison Park Drive, 4th Floor, Gaithersburg, Maryland 20878

    Project to Begin June 29, 2010

    GRUBB ROAD AT BLAINE DRIVE GEOMETRIC IMPROVEMENT PROJECT

    MCDOTNEWSNews f rom the M ontgomery County Depa r tment o f T ranspor t a t i on , Div i s i on of Highway Se rv i ce s

    siah Leggett, County Executive Arthur Holmes, Jr., Director, MCDO

    MCDOT NEWS No. 2010.45

    ADA Ramp

    Disturbed pavement will be repair

    Traffic Median

    Crosswalk

  • 8/9/2019 GrubbRdTraffic

    2/2

    NOTICE OF GRUBB ROAD

    TRAFFIC PROJECT

    MCDOT NEWS No. 2010.45

    MONTGOMERY COUNTY, MARYLAND

    DEPARTMENT OF TRANSPORTATION

    DIVISION OF HIGHWAY SERVICES

    100 EDISON PARK DRIVE, 4TH FLOOR, GAITHERSBURG, MD 20878

    (240) 777-6000 www.montgomerycountymd.gov/mcdot

    IMPORTANT CONTACTS

    Project Manager: Yisa Adegun 240-777-7641

    Project Contractor: D & F Construction 301-990-0008

    Traffic Engineering: Seifu Kerse 240-777-2199

    Should your questions be of a more general nature, please contact our

    Customer Service Center at 240-777-6000.

    DHS Email: [email protected]

    DHS Website:

    http://www.montgomerycountymd.gov/hwytmpl.asp?url=/content/dot/

    highway/index.asp

    On the map, click on the Silver Spring Service Area, where informa-

    tion is available describing the repair process.

    SAFETY NOTICE

    Please remember that while repair work is proceeding, construction vehicles will be moving around. Some materials may be stored in the area. Please ucaution when walking or driving through the construction zone. Children may be attracted to the noise and machinery, so please keep them under superv

    sion at all times, even after the work is completed for the day. Also, please follow the direction of flaggers and temporary signs and traffic control devic

    We appreciate your patience and cooperation while we make these much needed improvements to the infrastructure.

    PLACE MAP HERE