gsd/pd (rev. 3/17/14)...gsd/pd (rev. 3/17/14) awarded vendor state of new mexico general services...

61

Upload: others

Post on 15-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664
Page 2: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

GSD/PD (Rev. 3/17/14)

Awarded Vendor

State of New Mexico General Services Department

Price Agreement

3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Payment Terms: Net 30

F.O.B.: Destination Telephone No . .0

Delivery: As Requested

Ship To: New Mexico Department of Transportation Procurement Specialist: Mark Lujan Various Locations '

Telephone No.: (505) 827-0564

Invoice: New Mexico Department of Transportation Various Locations

For questions regarding this contract please contact: Angela Martinez (505)827-5127

Title: Bridge Component and Settlement Repair

Term: February 14,2018- February 13,2019

This Price Agreement is made subject to the "terms and conditions" shown on the reverse side of this page, and as indicated in this Price Agreement.

Accepted for the State of New Mexico

Date: 02/14/2018

Purchasing Division: 1100 St. Francis Drive, Santa Fe, NM 87505; PO Box 6850, Santa Fe, NM 87502 (505) 827-0472

Page 3: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Terms and Conditions

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

(Unless otherwise specified)

I. General: When the State Purchasing Agent or his/her designee issues a purchase document in response to the Vendor's bid, a binding contract is created.

Page-2

2. Variation in Quantity: No variation in the quantity of any item called for by this order will be accepted unless such variation has been caused by conditions of loading, shipping, packing or allowances in manufacturing process and then only to the extent, if any, specified in this order.

3. Assignment: a. Neither the order, nor any interest therein, nor any claim thereunder, shall be assigned or transferred by the Vendor, except as set forth in Subparagraph 3b or as expressly authorized in writing by the State Purchasing Agent or his/her designee. No such assignment or transfer shall relieve the Vendor from the obligations and liabilities under this order.

b. Vendor agrees that any and all claims for overcharge resulting from antitrust violations which are borne by the State as to goods, services, and materials purchased in connection with this bid are hereby assigned to the State.

4. State Furnished Property: State furnished property shall be returned to the State upon request in the same condition as received except for ordinary wear, tear and modifications ordered hereunder.

5. Discounts: Prompt payment discounts will not be considered in computing the low bid. Discounts for payment within twenty (20) days will be considered after the award of the contract. Discounted time will be computed from the date of receipt of the merchandise invoice, whichever is later.

6. Inspection: Final inspection and acceptance will be made at the destination. Supplies rejected at the destination for nonconformance with specifications shall be removed at the Vendor's risk and expense, promptly after notice of rejection.

7. Inspection of Plant: The State Purchasing Agent or his/her designee may inspect, at any reasonable time, the part of the Contractor's, or any subcontractor's plant or place of business, which is related to the performance of this contract.

8. Commercial Warranty: The Vendor agrees that the supplies or services furnished under this order shall be covered by the most favorable commercial warranties the Vendor gives for such to any customer for such supplies or services. The rights and remedies provided herein shall extend to the State and are in addition to and do not limit any rights afforded to the State by any other clause of this order. Vendor agrees not to disclaim warranties of fitness for a particular purpose of merchantability.

9. Taxes: The unit price shall exclude all state taxes.

10. Packing, Shipping and Invoicing:

a. The State's purchasing document number and the Vendor's name, user's name and location shall be shown on each packing and delivety ticket, package, bill of lading and other correspondence in connection with the shipments. The user's count will be accepted by the Vendor as final and conclusive on all shipments not accompanied by a packing ticket.

b. The Vendor's invoice shall be submitted duly cettified and shall contain the following information: order number, description of supplies or services, quantities, unit price and extended totals. Separate invoices shall be rendered for each and every complete shipment.

c. Invoices must be submitted to the using agency and NOT the State Purchasing Agent.

II. Default: The State reserves the right to cancel all or any part of this order without cost to the State, if the Vendor fails to meet the provisions of this order and, except as otherwise provided herein, to hold the Vendor liable for any excess cost occasioned by the State due to the Vendor's default. The Vendor shall not be liable for any excess costs if failure to perform the order arises out of causes beyond the control and without the fault or negligence of the Vendor, such causes include but are not restricted to, acts of God or the public enemy, acts of the State or Federal Government,

Page 4: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-3 fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather and defaults of subcontractors due to any of the above, unless the State shall determine that the supplies or services to be furnished by the subcontractor were obtainable from other sources in sufficient time to permit the Vendor to meet the required delivery scheduled. The rights of the State provided in this paragraph shall not be exclusive and are in addition to any other rights now being provided by law or under this order.

12. Non-Collusion: In signing this bid the Vendor certifies he/she has not, either directly or indirectly, entered into action in restraint of free competitive bidding in connection with this offer submitted to the State Purchasing Agent or his/her designee.

13. Nondiscrimination: Vendor doing business with the State ofNew Mexico must be in compliance with the Federal Civil Rights Act of 1964 and Title VII of the Act (Rev. 1979) and the Americans with Disabilities Act of 1990 (Public Law 101-336).

14. The Procurement Code: Sections 13-1-28 through 13-1-199 NMSA 1978, imposes civil and criminal penalties for its violation. In addition the New Mexico criminal statutes impose felony penalties for bribes, gratuities and kickbacks.

15. Items: All bid items are to be NEW and of most current production, unless otherwise specified.

16. Payment for Purchases: Except as otherwise agreed to: late payment charges may be assessed against the user state agency in the amount and under the conditions set forth in Section 13-1-158 NMSA 1978.

17. Workers' Compensation: The Contractor agrees to comply with state laws and rules pertaining to Workers' Compensation benefits for its employees. If the Contractor fails to comply with Workers' Compensation Act and applicable rules when required to do so, this Agreement may be terminated by the contracting agency.

18. Submission of Bid: Bids must be submitted in a sealed envelope with the bid number and opening date clearly indicated on the bottom left hand side of the front of the envelope. Failure to label bid envelope will necessitate the premature opening of the bid in order to identifY the bid number.

19. Contractor Personnel: Personnel proposed in the Contractor's written bid to the Procuring Agency are considered material to any work performed under this Price Agreement. Once a Purchase Order or contract has been executed, no changes of personnel will be made by the Contractor without prior written consent of the Procuring Agency. Replacement of any Contractor personnel, if approved, shall be with personnel of equal ability, experience, and qualifications. The Contractor will be responsible for any expenses incurred in familiarizing the replacement personnel to insure their being productive to the project immediately upon receiving assignments. Approval of replacement personnel shall not be unreasonably withheld. The Procuring Agency shall retain the right to request the removal of any of the Contractor's personnel at any time.

20. Subcontracting: The Contractor shall not subcontract any portion of the Price Agreement without the prior written approval of the Procuring Agency. No such subcontracting shall relieve the Contractor from its obligations and liabilities under this Price Agreement, nor shall any subcontracting obligate payment from the Agency.

21. Records and Audit: The Contractor shall maintain detailed time and expenditure records that indicate the date, time, nature, and cost of services rendered during this Price Agreement's te1m and effect, and retain them for a period of three (3) years from the date offmal payment under this Price Agreement. The records shall be subject to inspection by the Agency, State Purchasing Division, Department of Finance and Administration, and for Information Technology contracts, State Chieflnfmmation Officer. The Agency shall have the right to audit billings, both before and after payment. Payment for services under this Price Agreement shall not foreclose the right of the Agency to recover excessive or illegal payments.

22. Subcontracts: The foregoing requirements for Contractor Personnel, Subcontracting, and Audit shall be inserted into all subcontracts from the prime contractor to the subcontractor.

Page 5: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

New Mexico Employees Health Coverage Page-4

A. If Contractor has, or grows to, six ( 6) or more employees who work, or who are expected to work, an average of at least 20 hours per week over a six ( 6) month period during the term of the contract, Contractor certifies, by signing this agreement, to have in place, and agrees to maintain for the term of the contract, health insurance for its New Mexico Employees and offer that health insurance to its New Mexico Employees if the expected annual value in the aggregate of any and all contracts between Contractor and the State exceeds $250,000 dollars.

B. Contractor agrees to maintain a record of the number of its New Mexico Employees who have (a) accepted health insurance; (b) declined health insurance due to other health insurance coverage already in place; or (c) declined health insurance for other reasons. These records are subject to review and audit by a representative of the state.

C. Contractor agrees to advise all of its New Mexico Employees of the availability of State publicly financed health care coverage programs by providing each of its New Mexico Employees with, as a minimum, the following web site link to additional information: http://www.insurenewmexico.state.nm.us/.

D. For purposes of this Paragraph, the following terms have the following meanings:

(1) "New Mexico Employee" means any resident of the State of New Mexico employed by Contractor who performs the majority of the employee's work for Contractor within the State ofNew Mexico, regardless of the location of Contractor's office or offices; and

(2) "offer" means to make available, without unreasonable restriction, enrollment in one or more health coverage plans and to actively seek and encourage participation in order to achieve the goals of Executive Order 2007-049. This could include State publicly fmanced public health coverage programs such as Insure New Mexico!

New Mexico Pay Equity Initiative

Contractor agrees, if it has ten (1 0) or more New Mexico employees OR eight (8) or more employees in the same job classification, at any time during the term of this contract, to complete and submit the PEl0-249 form on the annual anniversary of the initial report submittal for contracts up to one (1) year in duration. If contractor has (250) or more employees, contractor must complete and submit the PE250 form on the annual anniversary of the initial report submittal for contracts that are up to one (I) year in duration. For contracts that extend beyond one (1) calendar year, or are extended beyond one (1) calendar year, contractor also agrees to complete and submit the PE10-249 or PE250 form, whichever is applicable, within thirty (30) days of the annual contract anniversary date of the initial submittal date or, if more than 180 days has elapsed since submittal of the last report, at the completion of the contract, whichever comes first. Should contractor not meet the size requirement for reporting at contract award but subsequently grows such that they meet or exceed the size requirement for reporting, contractor agrees to provide the required report within ninety (90) days of meeting or exceeding the size requirement. That submittal date shall serve as the basis for submittals required thereafter.

Contractor also agrees to levy this requirement on any subcontractor(s) performing more than 10% of the dollar value of this contract if said subcontractor(s) meets, or grows to meet, the stated employee size thresholds during the term of the contract. Contractor further agrees that, should one or more subcontractor not meet the size requirement for reporting at contract award but subsequently grows such that they meet or exceed the size requirement for reporting, contractor will submit the required report, for each such subcontractor, within ninety (90) days of that subcontractor meeting or exceeding the size requirement. Subsequent report submittals, on behalf of each such subcontractor, shall be due on the annual anniversary of the initial report submittal. Contractor shall submit the required form(s) to the State Purchasing Division of the General Services Department, and other departments as may be determined, on behalf of the applicable subcontractor(s) in accordance with the schedule contained in this paragraph. Contractor acknowledges that this subcontractor requirement applies even though contractor itself may not meet the size requirement for reporting and be required to report it self.

Two (2) copies of the Pay Equity Worksheet shall be submitted prior to Award by the prospective Awarded Vendor.

The PE10-249 and PE250 worksheet is available at the following website: http://www.generalservices.state.nm.us/statepurchasing/Pay Eguity.aspx

Page 6: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Article I- Statement of Work

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Department Price Agreement Page-5

Under the terms and conditions of this Price Agreement, the using agency may issue orders for items and/or services described herein.

The terms and conditions of this Price Agreement shall form a part of each order issued hereunder.

The items and/or services to be ordered shall be listed under Article IX- Price Schedule. All orders issued hereunder will bear both an order number and this Price Agreement number. It is understood that no guarantee or warranty is made or implied by either the New Mexico State Purchasing Agent or the user that any order for any definite quantity will be issued under this Price Agreement. The Contractor is required to accept the order and furnish the items and/or services in accordance with the articles contained hereunder for the quantity of each order issued.

Article II-Term The term of this Price Agreement for issuance of orders shall be as indicated in specifications.

Article ill -Specifications Items and/or services furnished hereunder shall conform to the requirements of specifications and/or drawings applicable to items listed under A1ticle IX - Price Schedule. Orders issued against this schedule will show the applicable price agreement item(s), number(s), and price(s); however they may not describe the item(s) fully.

Article IV- Shipping and Billing Instructions Contractor shall ship in accordance with the instructions of this form. Shipment shall be made only against specific orders which the user may place with the contractor during the term indicated in Article II- Term. The Contractor shall enclose a packing list with each shipment listing the order number, price agreement number and the commercial parts number (if any) for each item. De!ive1y shall be made as indicated on page I. If vendor is unable to meet stated delivery the State Purchasing Agent must be notified.

Article V- Termination The Agency may terminate this Agreement for convenience or cause. The Contractor may only tetminate this Agreement based upon the Agency's uncured, material breach of this Agreement. Contractor shall give Agency written notice oftmmination at least thirty (30) days prior to the intended date of termination, which notice shall (i) identifY all the Agency's material breaches of this Agreement upon which the termination is based and (ii) state what the Agency must do to cure such material breaches. Contractor's notice of termination shall only be effective (i) if the Agency does not cure all material breaches within the thirty (30) day notice period or (ii) in the case of material breaches that cannot be cured within thirty (30) days, the Agency does not, within the thirty (30) day notice period, notifY the Contractor of its intent to cure and begin with due diligence to cure the material breach. Te1mination of this Contract, however, shall not affect any outstanding orders. This provision is not exclusive and shall not waive other rights and remedies afforded either party in the event of breach of contract or default. In such instances the contract may be cancelled effective immediately.

Article VI- Amendment This Price Agreement may be amended by mutual agreement of the New Mexico State Purchasing Agent or his/her designee and the Contractor upon written notice by either party to the other. An amendment to this Price Agreement shall not affect any outstanding orders issued prior to the effective date of the amendment as mutually agreed upon, and as published by the New Mexico State Purchasing Agent or his/her designee. Amendments affecting price adjustments and/or the extension of a price agreement expiration date are not allowed unless specifically provided for in the bid and price agreement specifications.

Article VII- Issuance or Orders Only written signed orders are valid under this Price Agreement.

Article VIII- Packing (if applicable) Packing shall be in confmmance with standard commercial practices.

Article IX- Price Schedule Prices as listed in the price schedule hereto attached are fi1m.

Page 7: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Awarded Vendors:

(AA) 0000111693 GeoStabilization International, LLC 543 31 Road Grand Junction, CO 81504 855-579-0536

(AB) 0000079897 Ram Jack of New Mexico 2425 Monroe St. NE Albuquerque, NM 87110 505-702-3833

(AC) 0000015253 Uretek USA, INC. PO Box 1929 Tomball, TX 77377 281-351-7800

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-6

Page 8: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Establish a price agreement for Bridge Component Settlement Repair for the New Mexico Department of Transportation (NMDOT). This price agreement includes materials, labor and equipment as per the specifications contained herein.

Page-7

This price agreement is applicable and available for use by New Mexico Department of Transportation, New Mexico State Agencies and New Mexico Local Public Bodies

All work performed under this contract shall meet the specifications as set forth in this price agreement, and all applicable New Mexico State Department of Transportation Standard Specifications for Highway and Bridge Construction, special provisions, standard drawings and supplemental specifications (current editions). They are available on the NMDOT website, at the following link: http://dot.state.nm.us/content/nmdot/en/Standards.html and they are available for purchase at the General Office Financial Control Section (505) 827-5159.

Pursuant to the Contractor Prequalification Rule 18.27.5 NMAC, Contractors shall obtain prequalified status with the NMDOT as a condition to submitting a bid.

The Contractor shall perform with its own organization at least 40% of the work based on the total purchase order amount and comply with section 108.1 of the New Mexico State Department of Transportation Standard Specifications for Highway and Bridge Construction, current edition.

Vendors are required to have prior product approval through the NMDOT Product Evaluation Program in order for bid item(s) to be awarded.

Terms of Price Agreement: The term of this price agreement is for a period of one (1) year from date of award with an option to extend for a period of one (I) year, by mutual agreement of both parties and the approval of the State Pmchasing Director at the same prices, terms and conditions. This price agreement shall not exceed two (2) years.

Performance, Payment and Material Bond: Upon the issuance of a purchase order, the successful awarded contractor(s) must provide a performance, payment and materials bond equal to 100% of the total purchase order. Said bond must be provided to the requesting District Engineer or their designee prior to the commencement of work. Failure to comply may result in the purchase order being issued to another vendor and difference being charged back to the awarded contractor(s).

The performance bond is to secure the NMDOT for losses and damages sustained by reason of default by vendor. A payment bond is to guarantee that subcontractors and material suppliers on the project will be paid. The materials bond is to guarantee availability of equipment and acceptance of product.

Tax Note: Item prices shall not include State Gross Receipts or Local Option Tax. Taxes shall be added to the purchase order and invoice at current rates as a separate item to be paid by users.

I

1:

I I i

! I I I I I I I I ~ !j ![ I .

Page 9: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Bidding Information:

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-8

The conditions and specifications set out in the invitation to bid are inseparable and indivisible. Any vendor, by submitting a bid, agrees to be bound by all such conditions and/or specifications. All conditions and specifications in the invitation to bid, and all other documents required to be submitted, shall be returned by the vendor in their bid package. Failure to do so or any attempt to vary or change the conditions or specifications of the invitation to bid shall, at the discretion of the State ofNew Mexico, constitute grounds for rejection of the entire bid.

The prices quoted herein represent the total compensation to be paid by the State ofNew Mexico for goods and/or services provided. It is understood that the party providing said goods and/or services to the State of New Mexico is responsible for payment of all costs of labor, equipment, tools, materials, federal taxes, permits, licenses, fees, and any other items necessary to complete the work provided. The prices quoted in this price agreement include an amount sufficient to cover such costs. Bid item cost shall be rounded to the nearest cent.

The Contractor shall be considered an independent Contractor and not an employee of the State of New Mexico. The NMDOT shall provide direction regarding the time and place of performance and compliance with rules and regulations required by this price agreement.

Vendor must indicate their Federal Tax ID Number, New Mexico Gross Receipts or Social Security Number

Bid Review: The NMDOT shall perform a bid analysis of the bids received to include a determination of qualification in accordance with the standards and requirements of the price agreement. The analysis and recommendation for award will be sent to State Purchasing for a determination.

Method of Award: Method of award shall be to multiple vendors statewide.

Vendors may bid all or individual items for bid items No. 001 through No. 008. However, vendors must bid on all bid items from No. 009 through No. 014. Failure to do so will result in the bid being deemed irregular and rejected from consideration for award.

This price agreement may be awarded to one (1) or more vendors, but not to exceed three (3) vendors. Contracts will be awarded to the lowest bidders (Contractors) based on estimated quantities for typical NMDOT projects. Multiple awards will be made to serve the best interest of the NMDOT.

Utilization of Vendors: The following procedure for the utilization of vendors shall be used on multiple award price agreements.

1. The selection of a vendor from a multiple award price agreement to complete a project shall be based on the purchase order utilizing pricing contained within this price agreement.

2. The District Engineer or their designee shall evaluate the estimated quantities, unit costs, total costs per item, and total project costs for each awarded vendor.

3. The vendor selected to perform the work on the project shall be the vendor providing services for the specific project estimate at the lowest overall cost to the NMDOT and able to meet all project delivery requirements including project schedule. A vendor not offering the lowest cost to the NMDOT can be used for the specific project if the vendor providing the lowest overall cost is unable to meet all project requirements as determined and documented by the District Engineer or their designee. Any changes to the original purchase order will require a modification form signed by the District Engineer or their designee. All supporting documentation shall be maintained in the project file.

Page 10: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Public Works Minimum Wage Act:

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-9

This is a Public Works price agreement subject to the provisions of the Public Works Minimum Wage Act, Section 13-4-11 through 13-4-17, et. Seq. NMSA 1978 as amended. Minimum Wage Rates as determined and published by the New Mexico Department of Workforce Solutions (NMDWS), Santa Fe, New Mexico shall be in effect and utilized by the vendor during the life of this Price Agreement.

This is a Federal Participation price agreement. You are hereby advised that wherever differences exist between the minimum wage rates shown under wage decisions ofNMDWS, Santa Fe, New Mexico and those shown under U.S. Department of Labor Wage Decision and any Modification thereto noted in the contract assembly, the higher wage rates shall govern.

If a Contractor or Subcontractor is willfully paying employees covered by the Public Works Minimum Wage Act, lower rates than required, the contractor or subcontractor may lose their right to proceed with the work.

Price Agreement Order: For projects over $60,000.00 where a purchase order has been issued, a Wage Rate Decision number must be requested by the NMDOT. The Wage Rate Decision number can be obtained through the New Mexico Department of Work Force Solutions, Public Works Section. The NMDOT must be registered through the Public Works website that can be accessed at: http://www.dws.state.run.us/pwaa!LRDEmployer!Core/Login.ASPX

All Projects utilizing Federal Fnnds must meet the following Requirements, these requirements do not apply to projects utilizing State Funds:

Federal Funding Requirements: Federal Funds may be utilized for this Price Agreement at the discretion of the NMDOT- The Required Contract Provisions Federal-Aid Construction Information is listed below:

NOTICE TO CONTRACTORS

Federal Requirements

I. TITLE VI II. DISADVANTAGED BUSINESS ENTERPRISE (DBE)

III. SUBCONTRACTOR PROMPT PAYMENT PROVISIONS IV. REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS

AND SUPPLEMENTS V. SUPPLEMENTAL EEO REQUIREMENTS

VI. INDIAN PREFERENCE VII. NMDOT ON THE JOB TRAINING/SUPPORTIVE SERVICES ("OJT/SS") PROGRAM

VIII. WAGE RATES IX. LABOR REPORTING AND SUBMISSION OF WEEKLY PAYROLLS X. TITLE VI ASSURANCES APPENDIX A AND APPENDIX E

CCRB July 5, 2016

References made to the New Mexico Department of Transportation ("NMDOT") web page can be accessed through the following link: http://dot.state.nm.us/en.html.

Page 11: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

I. TITLEVI

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-10

The text United States Department of Transportation (USDOT) Order No. 1 050.2A has been excerpted for this section with minimal modific~tion by the NMDOT.

The Contractor (herein referred to as the "Recipient"), HEREBY AGREES TIIAT, as a condition to receiving any Federal financial assistance from the U.S. Department of Transportation (DOT), through the NMDOT, is subject to and will comply with the following:

Statutory/Regulatory Authorities

Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); 49 C.P.R. Pmt 21 (entitled Nondiscrimination In Federally-Assisted Programs Of The Department Of Transportation-Effectuation Of Title VI Of The Civil Rights Act Of 1964); 28 C.P.R. section 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the Civil Rights Act of 1964);

The preceding statutory and regulatory cites hereinafter are referred to as the "Acts" and "Regulations," respectively.

General Assurances

In accordance with the Acts, the Regulations, and other pertinent directives, circulars, policy, memoranda, and/or guidance, the Recipient hereby gives assurance that it will promptly take any measures necessary to ensure that:

"No person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity," for which the Recipient receives Federal financial assistance from DOT, including NMDOT.

The Civil Rights Restoration Act of 1987 clarified the original intent of Congress, with respect to Title VI and other Nondiscrimination requirements (The Age Discrimination Act of 1975, and Section 504 of the Rehabilitation Act of 1973), by restoring the broad, institutional-wide scope and coverage of these nondiscrimination statutes and requirements to include all programs and activities of the Recipient, so long as any portion of the program is Federally assisted.

"The NMDOT, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S. C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively insure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award".

The NMDOT's Title VI Assurances, Appendices A and E are included in Section X at the end of this Notice to Contractors ("NTC").

For further information, contact the Title VI coordinator for the NMDOT through the following link: http://dot.state.mn.us/en/OEOP.html#f.

Page 12: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

II. DISADVANTAGED BUSINESS ENTERPRISE ("DBE") Page-l!

Per 49 C.F.R. § 26.13(b) (2014), the ContractNMDOT signs with the Contractor (and each Subcontract the Contractor signs with a Subcontractor) must include the following assurance:

"The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to: (1) withholding of monthly progress payments; (2) assessing sanctions; (3) liquidated damages; and/or ( 4) disqualifYing the contractor from future bidding as non-responsible."

For the purposes of the assurance, DOT-assisted Contracts means Contracts that receive federal funding and recipient means the NMDOT.

Terms and Definitions

Terms and Defmitions contained in 49 C.P.R.§ 26.5 are incorporated in this NTC by reference. Terms and definitions in the same control over terms that conflict with the tetms and definitions in the 2014 Edition of the NMDOT Standard Specifications for f!ighway and Bridge Construction ("Standard Specifications") Section - 101.4 "Terms and Definitions".

Pre-Award Procedures

Projects that have DBE goals established in the Advertisement are subject to race-conscious measures. When a DBE goal is established the following DBE form and NTC, or evidence of the Bidder's good faith efforts, are required in order for the Bid to be considered responsive:

a) Disadvantaged Business Enterprise Goal Form A-585 ("A-585"); and b) NTC Disadvantaged Business Enterprise (DBE) Bidder's Commitment and DBE's Confirmation Form A-644

("A-644").

In the event the Bidder is also a certified DBE Contractor, and intends to self-perform a portion of the Work, the Bidder shall list itself and any other DBE it will use on Form A-585. Failure to comply with this requirement shall render the Bid non-responsive.

Pre-Award Bidder's Good Faith Effmts

When a Project has an established DBE goal, a Bidder may meet the requirements even if it doesn't meet the goal through documenting adequate good faith efforts. This means that the Bidder must show that it took all necessary and reasonable steps to achieve a DBE goal or other requirement of this part which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient DBE participation, even if they were not fully successful. The documentation of good faith efforts shall include, but is not limited to, copies of each DBE and non-DBE quote submitted to the Bidder when a non-DBE was selected over a DBE for Work on the Contract.

Per 49 C.P.R.§ 26.53 (b)(3) (2014) and 49 C.P.R.§ 26 Appendix A the NMDOT has the responsibility to make a fair and reasonable judgment as to whether a Bidder, that did not meet the goal, made adequate good faith effmts.

Page 13: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-12 The below contains a list of types of actions, which the NMDOT may consider as part of the Bidder's good faith efforts to obtain DBE participation. This is not intended to be a mandatory checklist, nor is it intended to be exclusive or exbaustive, as other factors or types of efforts may be relevant in appropriate cases. The following is a list of the type of actions, and documentation, which the NMDOT will consider as part of the Bidder's good faith efforts to obtain DBE participation:

I) The Bidder's copies of each DBE and non-DBE subcontractor quote submitted to the Bidder when a non-DBE subcontractor was selected over a DBE for Work on the Contract to review whether DBE prices were substantially higb; and the NMDOT may contact the DBEs listed on a the Bidder's List ofQuoters submitted by the Bidder to inquire whether DBE primes were contacted by the Bidder. Pro forma mailings to DBEs requesting bids are not alone sufficient to satisfy good faith efforts under this NTC or rule;

2) The Bidder's solicitation of the interest ofDBEs as early in the acquisition process as possible and as practicable to allow the DBEs to respond to the solicitation and submit a timely offer for the Subcontract. The Bidder should determine with certainty if the DBEs are interested by taking appropriate steps to follow-up initial solicitations;

3) The Bidder's selection ofpmiions of the Work to be performed by the DBEs in order to increase the likelihood that the DBE goals will be achieved. This includes, where appropriate, breaking out Contract Work items into economically feasible units to facilitate DBE participation even when the Bidder might otherwise prefer to perform these Work items with its own forces;

4) The Bidder's negotiations in good faith with interested DBEs. It is the Bidder's responsibility to make a portion of the Work available to DBE subcontractors, sub-consultants and Suppliers and to select those portions of the Work or material needs consistent with the available DBE subcontractors, sub-consultants and Suppliers, so as to facilitate DBE participation. Evidence of such negotiations includes the names, addresses and telephone numbers of DBEs that were considered, a description of the information provided regarding the construction plans and specifications for the Work selected for subcontracting or requirements of Work, and evidence as to why additional agreements could not be reached for DBEs to perform the Work; and,

5) The Bidder's rejection of DBEs as being unqualified. The Bidder shall not reject a DBE as being unqualified without sound reasons based on a thorough investigation of their capabilities. The DEE's standing within its industry, membership in specific groups, organizations, or associations and political or social affiliations (for example union vs. non-union employee status) are not legitimate causes for the rejection or non- solicitation of Bids in the Bidder's efforts to meet the Project goal. Another practice considered insufficient good faith effort is the rejection of the DBE because its' quotations for Work were not the lowest received. However, nothing in this paragraph will be considered to require the Bidder to accept unreasonable quotes to satisfy the Contract goal.

If the NMDOT determines that the Bidder has failed to make adequate good faith efforts to meet the DBE goal requirements, the NMDOT shall reject the Bid as non-responsive. The Bidder may dispute this determination and rejection of the Bid through the procedures in Standard Specification Section - I 03.3 "Bidding Dispute Resolution Procedures".

Post-Award

Counting DBE Participation Toward Goals

This section in no way alters the obligations in Standard Specification Section - I 08.1 "Subcontracting" and is only used to determine DBE patiicipation levels for each Bidder. The Contractor must still comply with Standard Specification Section- 108.1 and perform with its own organization at least 40% of the Work based on the Total Bid Amount.

Page 14: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-13 Only the value of the Work actually performed by the DBE will be counted towards DBE Project goals. DBE participation shall be credited as follows:

I) Count the entire amount of that portion of the Contract Work that is performed by the DBE's own forces. Include the cost of supplies and Materials obtained by the DBE for the Work including supplies purchased or equipment leased by the DBE. Supplies and equipment purchased or leased by a DBE from a prime contractor shall not be counted toward the DBE Project goal.

2) Count the entire amount of fees or commissions charged by a DBE for providing a bona fide service, such as professional, technical, consultant, or managerial services, or for providing bonds or insurance specifically required of the performance of the Contract, toward DBE goals, provided NMDOT determines the fee to be reasonable and not excessive as compared with fees customarily allowed for similar services.

3) When a DBE subcontracts part of its Work to another firm, the value of the subcontracted Work may be counted toward DBE goals only if the DBE's Subcontractor is itself a DBE. Work that a DBE subcontracts to a non­DBE does not count toward DBE goals.

When a DBE performs as a pa1ticipant in a joint venture, count the portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work of the Contract that the DBE performs with own forces toward DBE goals.

The NMDOT counts expenditures to a DBE toward DBE goals only if the DBE is performing a commercially useful function ("CUF'') on the Contract.

I) A DBE performs a CUF when it is responsible for execution of the Work of the Contract and is canying out its responsibilities by actually perfmming, managing, and supervising the Work involved. To perform a CUF, the DBE must also be responsible, with respect to Materials and supplies used on the Contract, for negotiating price, determining quality and quantity, ordering the Material and installing (where applicable) and paying for the Material itself.

2) A DBE does not perform a CUF if its role is limited to that of an extra participant in a transaction, Contract, or Project through which funds are passed in order to obtain the appearance of DBE participation.

3) If a DBE Contractor, Subcontractor, at any tier, or Supplier does not perform or exercise responsibility for at least 30% of the total cost of its Contract with its own forces, or the DBE subcontracts a greater portion of the Work of a Contract than would be expected on the basis of normal industry practice for the type of Work involved, it will be presumed that the DBE is not performing a CUF.

4) When a DBE is presumed not to be performing a CUF as provided in paragraph 3 of this section, the DBE may present evidence to rebut this presumption.

5) Decisions concerning CUF matters are n~t administratively appealable to USDOT.

DBE Trucking

Per the Standard Specification Section 108.1 "Subcontracting" ... "A Trucker is not a Subcontractor unless the Contractor is using the Trucker to meet the DBE requirement associated with the Project". The following factors shall be used to determine whether DBE trucking Subcontractors are performing a CUF:

I. The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular Contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals.

Page 15: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-14

2. The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the Contract.

3. The DBE receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs.

4. The DBE may lease trucks from another DBE, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract.

5. The DBE may also lease trucks from a non-DBE, including from an owner-operator. The DBE that leases trucks equipped with drivers from a non-DBE is entitled to credit for the total value of transportation services provided by non-DBE leased trucks equipped with drivers not to exceed the value of transportation services on the Contract provided by DBE-owned llucks or leased trucks with DBE employee drivers. Additional participation by non-DBE owned trucks equipped with drivers receives credit only for the fee or commission it receives as a result of the lease arrangement.

6. The DBE may lease trucks without drivers from a non-DBE truck leasing company. If the DBE leases trucks from a non-DBE truck leasing company and uses its own employees as drivers, it is entitled to credit for the total value of these hauling services.

7. For purposes of this DBE trucking section a lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the DBE, so long as the lease gives the DBE absolute priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE.

DBE Supplying Materials

I) If the Materials or supplies are obtained from a DBE manufacturer, count 100 % of the cost of the Materials or supplies toward the DBE goal. A DBE manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises the Materials, supplies, articles, or Equipment required under the Contract.

2) If the Materials or supplies are purchased from a DBE regular dealer, count 60% of the cost of the Materials or supplies toward DBE goals. A DBE regular dealer is a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the Materials, supplies, articles or Equipment required under the Contract are bought, kept in stock and regularly sold or leased to the public in the usual course of business. The DBE regular dealer, must be an established regular business that engages, as its principal business and under its own name, in the purchase and sale or lease of the products in question.

A DBE may be a regular dealer in such bulk items as petroleum products, steel, cement, gravel, stone, or asphalt without owning, operating, or maintaining a place of business as required in paragraph 1 of this section if the DBE both owns and operates distribution equipment for the products. Any supplementing of regular dealers' own distribution equipment shall be by a long-term lease agreement and not on ad hoc or contract-by-contract basis.

Packagers, brokers, manufacturers' representatives, or other person who arrange or expedite transactions are not regular dealers for the purpose of paragraph 2 of this section.

Page 16: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-15 3) With respect to Materials or supplies purchased from a DBE which is neither a manufacturer nor a regular

dealer, count the entire amount of fees and commissions charged for assistance in the procurement of the Materials and supplies, or fees or transportation charges for the delivery of Materials and supplies required on a job site, toward DBE goals, provided the NMDOT determines the fees to be reasonable and not excessive as compared with fees customarily allowed for similar services. The cost of the Materials or supplies themselves is not creditable toward DBE goals.

Credit for Work performed shall not be counted toward the DBE project goal until the amount committed has been paid to the DBE.

Pre-Award Substitution/Replacement and Post-Award Termination ofDBE for Projects Having a DBE Goal

The Contractor shall use the DBE listed on the A-585 and confirmed on the A-644 to perform the specific Work identified. The Contractor shall not substitute, replace or terminate a DBE listed on the A-585 and confrrmed on the A-644 (or an approved substitute DBE) without the prior written consent of NMDOT. The NMDOT considers it an improper DBE substitution, replacement or termination when a Contractor performs Work originally designated for a DBE with its own forces or those of an affiliate, or with a non-DBE, or with a substitute DBE. Unless NMDOT consent is provided, the Contractor shall not be entitled to any payment for Work or Materials unless it is performed by the listed DBE.

NMDOT will provide written consent to the termination request only if NMDOT agrees, for reasons stated in its concurrence document, that the Contractor has good cause to terminate the DBE. For purposes of this paragraph, good cause includes the following circumstances:

I) The listed DBE fails or refuses to execute a written Contract;

2) The listed DBE fails or refuses to perform the Work consistent with normal industry standards, provided, however, that good cause does not exist if the failure or refusal to perform results from the bad faith or discriminatory action of th~ Contractor;

3) The listed DBE fails or refuses to meet the Contractor's reasonable, nondiscriminatory bond requirements;

4) The listed DBE becomes bankrupt, insolvent, or exhibits credit unworthiness;

5) The listed DBE is ineligible to Work on public works projects because of suspension or debarment proceedings pursuant to 26 CFR Parts 180, 215 or 1200 or applicable state law;

6) The listed DBE is n~t a responsible Contractor;

7) The listed DBE voluntarily withdraws from the Project and provides to NMDOT written notice of its withdrawal;

8) The listed DBE is ineligible to receive DBE goal credit for the type of Work required;

9) A DBE owner dies or becomes disabled with the result that the listed DBE is unable to complete its Work on the Project; or

I 0) Other documented good cause that NMDOT determines compels the termination of the DBE. Provided that good cause does not exist if the Contractor seeks to tenninate a DBE it relied on to obtain the Contract so that the Contractor can self-perform the Work for which the DBE was engaged or so that the Contractor can substitute another DBE or non-DBE after Contract Award.

Page 17: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-16

Before seeking concurrence from the NMDOT to substitute, replace or terminate a DBE (or an approved substitute DBE) the Contractor must provide the DBE written notice including the reason of its intent to substitute, replace or terminate and give the DBE 5 Days to respond to the Contractor's notice. If required in a particular case as a matter of public necessity the NMDOT may allow a response period shorter than 5 Days. The DBE in response to the notice may provide the Contractor and NMDOT with the reasons, if any, why it objects to the proposed substitution, replacement or termination and why NMDOT should not approve the Contractor's request.

After receipt and review of the DBE response the NMDOT will provide a written response to the Contractor's request. NMDOT's decision is not appealable to US DOT.

After an approved termination of a DBE the Contractor shall make good faith efforts to subcontract with a substitute DBE which can perform the same type of work on the Project as the substituted, replaced or terminated DBE or to subcontract with a replacement DBE which can perform other types of work remaining on the Project. The good faith efforts shall be documented by the Contractor. The NMDOT may request a copy of the documented good faith efforts and the Contractor shall submit the same in 7 Days, which may be extended to an additional 7 Days at the request of the Contractor. The NMDOT will provide a written determination stating whether or not good faith efforts have been demonstrated. The Contractor may refer to Appendix A of 49 C.P.R. § 26 for guidance on good faith efforts.

NMDOT may allow a DBE contract goal waiver, adjust the DBE goal, or assess construction contract liquidated damages or design contract liquidated damages as may be appropriate, depending on the individual project's overall circumstances. NMDOT's decision to waive or adjust the contract goal is not appealable to USDOT.

Record Keeping Requirements

The Contractor shall keep such records as necessary to ensure compliance with its DBE utilization obligations, in accordance with Standard Specification Section- 107.28 "Contractor Records".

Compliance Procedures

The Contractor is solely responsible and obligated to ensure DBE compliance at all tiers until the final payment is made in accordance with Standard Specification Section - I 09 .I 0 "Project Closure".

If it is found that the Contractor or Subcontractor at any tier is not in compliance with this NTC and DBE program, NMDOT will notify the non-compliant party in writing. Failure to be compliant is a material breach of the Contract and may result including, but not limited to, the NMDOT exercising the remedies below. The NMDOT may conduct a compliance conference with the non-compliant party or parties to discuss the area(s) of non-compliance. In the event that the non-compliant party or parties fails or refuses to perform in compliance the NMDOT will send the non­compliant party or parties a "Notice of Non-Compliance" containing a deadline for the compliance. If the non-compliant party becomes compliant after the "Notice of Non-Compliance" the NMDOT will rescind the "Notice of Non­Compliance" and notify the party or pa1iies. If the deficiencies are not corrected, NMDOTwill initiate administrative action against the non-compliant party or parties, which may include but not be limited to:

1) Termination of the Contract;

2) Withholding of monthly progress payments;

3) Initiation of appropriate suspension or debarment proceedings;

4) Referral of any unlawful actions to the appropriate enforcement agencies; or

Page 18: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

5) Other actions as appropriate, at the discretion ofNMDOT.

ill. SUBCONTRACTOR PROMPT PAYMENT PROVISIONS

Page-17

This NTC does not alter the sole discretion of the NMDOT to make good cause determinations concerning Contractor prompt payment matters.

To ensure that all obligations to promptly pay Subcontractors are met Contractors shall pay all Subcontractors, Suppliers and Fabricators their respective Subcontract amount by electronic transfer, if available, for NMDOT undisputed Accepted Work within the timeframes specified in the Standard Specification Section 108.1- "Subcontracting".

The Contractor is solely responsible and obligated to ensure prompt payment obligations and compliance reporting through all tiers until the fmal payment is made in accordance with Standard Specification Section 109.10 - "Project Closure". Contractors, Subcontractors or Suppliers, at all tiers, shall be required to submit payment information, as provided for in the B2GNow supporting software system, indicating when payments are made to any Subcontractor, Supplier and or Fabricator, regardless ofDBE status. The Subcontractor, Supplier or Fabricator shall in B2GNow timely select whether payment was or was not received for the undisputed and Accepted Work. The NMDOT may recognize supporting documentation of such payment(s) in one or more of the following fmms:

I) Proof of the timely deposit of funds into the Subcontractor, Supplier and or Fabricator bank account;

2) Proof of timely hand delivery of payment to the Subcontractor, Supplier and or Fabricator; or

3) Proof of timely mailing payment to the Subcontractor, Supplier and or Fabricator.

The Contractor shall notifY the NMDOT in all situations when it will not make full prompt payment to its Subcontractor, Supplier or Fabricator before the payment becomes due. The Contractor shall also notifY the Subcontractor, Supplier or Fabricator in all situations when it will not make full prompt payment before the payment becomes due. A Contractor will be required to fully document any alleged disputes with its Subcontractors, Suppliers and or Fabricators and provide the documentation to the NMDOT upon request.

The Contractor shall have good cause for any failure to fully or partially provide prompt payment for Accepted Work. The NMDOT determines good cause. Good cause recognized by the NMDOT to excuse a failure to promptly pay includes, but is not limited to, a claim concerning the Subcontractor's or Supplier's Work, failure to provide certified payrolls, and other required Project documentation. The amount withheld cannot exceed the amount in dispute between the Contractor and Subcontractor or Supplier. The Contractor has the burden to support the Contractor's assertion of good cause. If the failure to fully or partially provide prompt payment is based on a claim, the Contractor shall submit a verifiable explanation and/or proof of the claim between the parties to the Project Manager.

Page 19: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Retainage

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-18

The NMDOT will require Contractors to pay all retainage owed to the Subcontractor, Supplier or Fabricator within 30 Days of the Progress Payment indicating Acceptance of the completed Subcontract Work, even if the NMDOT continues to withhold retainage from the Contractor. The Subcontract Work is completed when all the tasks called for in the Subcontract have been accomplished, documented and Accepted by the NMDOT. The Contractor may request partial acceptance in accordance with Standard Specifications Section- I 05.18.1 "Partial Acceptance" upon satisfactory completion of the Subcontract Work. Good cause recognized by the NMDOT to excuse a failure to promptly release retainage includes, but is not limited to, a claim concerning the Subcontractor's or Supplier's Work, failure to provide certified payrolls, and other required Project documentation. The amount withheld cannot exceed the amount in dispute between the Contractor and Subcontractor or Supplier. The Contractor has the burden to support the Contractor's assertion of good cause for the failure to promptly release retainage. If the failure to promptly release retainage is based on a claim, the Contractor shall submit verifiable explanation and/or proof of the claim between the parties to the Project Manager.

Cross-Project Offsets

The NMDOT will not recognize cross-Project offsets as "good cause" excusing untimely payment for Accepted Work. The Contractor's Contract with Subcontractors or Suppliers shall not contain any provision that allows the Contractor to withhold payment from the Subcontractor or Supplier as a result of the Subcontractor's or Supplier's performance on separate Contract( s ). Any such provision will be without effect, and shall not be recognized as good cause excusing a failure to make prompt payment.

IV. REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS AND SUPPLEMENTS

FHWA-1273 --Revised May I, 2012

REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS

I. General

II. Nondiscrimination

III. Non-segregated Facilities

IV. Davis-Bacon and Related Act Provisions

V. Contract Work Hours and Safety Standards Act Provisions

VI. Subletting or Assigning the Contract

VII. Safety: Accident Prevention

VIII. False Statements Concerning Highway Projects

IX. Implementation of Clean Air Act and Federal Water Pollution Control Act

X. Compliance with Govermnent-wide Suspension and Debarment Requirements

XI. Certification Regarding Use of Contract Funds for Lobbying

Page 20: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

I. GENERAL

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-19

1. Form FHWA-1273 must be physically iucorporated in each construction contract funded under Title 23 (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must iusert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase' orders, rental agreements and other agreements for supplies or services).

The applicable requirements of Form FHW A-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Form FHW A-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and iu lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Contracting agencies may reference Form FHW A-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically iucorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract).

2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract.

3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension I debarment or any other action determiued to be appropriate by the contracting agency and FHW A.

4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. The tetm Federal-aid highway does not iuclude roadways functionally classified as local roads or rural minor collectors.

II. NONDISCRIMINATION

The provisions of this section related to 23 CFR Part 230 are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engiueeriug, or architectural service contracts.

In addition, the contractor and all subcontractors must comply with the followiug policies: Executive Order 11246, 41 CFR 60,29 CFR 1625-1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations includiug 49 CFR Parts 21, 26 and 27; and 23 CFRParts 200,230, and 633.

The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3.

Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627. The contracting agency and the

I

I I I I' I li ,, ,,

I i! i

I ' I I II

I I •I

I

Page 21: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-20 FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633.

The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements.

1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35,29 CFR 1630,29 CFR 1625-1627,41 CFR 60 and 49 CFR 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities ofEEO:

a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract.

b. The contractor will accept as its operating policy the following statement:

"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."

2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so.

3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:

a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer.

b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.

c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.

d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.

Page 22: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-21 e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of

employees by means of meetings, employee handbooks, or other appropriate means.

4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area Ji'om which the project work force would nmmally be derived.

a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identity sources of potential minority group employees, and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.

b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.

c. The contractor will encourage its present employees to refer minontws and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees.

5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of eve1y type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability. The following procedures shall be followed:

a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.

b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices.

c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.

d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal.

6. Training and Promotion:

a. The contractor will assist in locating, qualifYing, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.

Page 23: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-22 b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations,

the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a).

c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each.

d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion.

7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:

a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifYing more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may quality for higher paying employment.

b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability.

c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certifY to the contracting agency and shall set forth what efforts have been made to obtain such information.

d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, tlnough independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notifY the contracting agency.

8. Reasonable Accommodation for Applicants I Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship.

9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

a. The contractor shall notifY all potential subcontractors and suppliers and lessors of their EEO obligations under this contract.

Page 24: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

10. Assurance Required by 49 CFR 26.13(b):

Page-23

a. The requirements of 49 CFR Part 26 and the State DOT's U.S. DOT-approved DBE program are incorporated by reference.

b. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agency deems appropriate.

11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHW A.

a. The records kept by the contractor shall document the following:

(1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;

(2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and

(3) The progress and efforts being made in locating, hiring, training, qualifYing, and upgrading minorities and women;

b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project, indicating the number of minority, women, and non-minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July.

III. NONSEGREGATED FACILITIES

This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more.

The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes.

Page 25: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-24 IV. DAVIS-BACON AND RELATED ACT PROVISIONS

This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right­of-way of a roadway that is functionally classified as Federal-aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects.

The following provisions are from the U.S. Department of Labor regulations in 29 CPR 5.5 "Contract provisions and related matters" with minor revisions to conform to tbe FHW A-1273 fotmat and FHW A program requirements.

I. Minimum wages

a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CPR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between tbe contractor and such laborers and mechanics.

b.

Contributions made or costs reasonably anticipated for bona fide fringe benefits under section l(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph J.d. of this section; also, regular contributions made or costs incurred for more tban a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CPR 5.5(a)(4). Laborers or mechanics performing work in more tban one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided; That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph l.b. of this section) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at tbe site of the work in a prominent and accessible place where it can be easily seen by the workers.

(1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:

(i) The work to be performed by tbe classification requested is not petformed by a classification in the wage determination; and

(ii) The classification is utilized in the area by tbe construction industry; and

(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.

(2) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount

Page 26: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-25 designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.

(3) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for detetmination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.

(4) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs l.b.(2) or l.b.(3) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.

c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.

d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as pati of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

2. Withholding

The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the satne prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the satne prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.

3. Payrolls and basic records

a. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section l(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretmy of Labor has found under 29 CFR 5.5(a)(l )(iv) that the wages of any laborer or mechanic include the

I, I' II II I I I I I II

I I

Page 27: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

b.

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-26 amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

(1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifYing number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHW A or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency ..

(2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certifY the following:

(i) That the payroll for the payroll period contains the information required to be provided under §5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under §5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete;

(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set fmth in Regulations, 29 CFR part 3;

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

(3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfY the requirement for submission of the "Statement of Compliance" required by paragraph 3.b.(2) of this section.

(4) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code.

Page 28: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-27 c. The contractor or subcontractor shall make the records required under paragraph 3.a. ofthis section available for

inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHW A, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessmy to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

4. Apprentices and trainees

a. Apprentices (progrmns of the US DOL).

Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship progrmn, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.

The allowable ratio of apprentices to joumeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice petforming work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is perfonning construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the joumeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed.

Every apprentice must be paid at not less than the rate specified in the registered progrmn for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specifY fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination.

In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetetmined rate for the work performed until an acceptable program is approved.

Page 29: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

b. Trainees (programs of the US DOL). Page-28

Except as provided in 29 CFR 5 .16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration.

The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration.

Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fi·inge benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and pmticipating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee perfmming work on the job site in excess of the ratio petmitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed.

In the event the Employment and Training Administration withdraws approval of a training progrmn, the contractor will no longer be permitted to utilize trainees at less than the applicable predetetmined rate for the work performed until an acceptable program is approved.

c. Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended and 29 CFR part 30.

d. Apprentices and Trainees (programs of the U.S. DOT).

Apprentices and trainees working under apprenticeship and skill training progrmns which have been cettified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program.

5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.

6. Subcontracts. The contractor or subcontractor shall insert Form FHW A-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR5.5.

7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be gtounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.

Page 30: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Pmchasing Division Price Agreement#: 80-805-17-16664

Page-29 8. Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and

Related Acts contained in 29 CFR parts I, 3, and 5 are herein incorporated by reference in this contract.

9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set fmth in 29 CFR patts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.

10. Certification of eligibility.

a. By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or fitm who has an interest in the contractor's fitm is a person or ftrm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(l).

b. No part of this contract shall be subcontracted to any person or ftrm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(l).

c. The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001.

V. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT

The following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards.

1. Overtime requirements. No contractor or subcontractor contracting for any patt of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty homs in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.

2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set fmth in paragraph (1.) of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph ( 1.) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1.) of this section.

3. Withholding for unpaid wages and liquidated damages. The FHW A or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be detetmined to be necessaty to satisfY any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2.) of this section.

Page 31: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-30 4. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1.)

through (4.) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1.) through ( 4.) of this section.

VI. SUBLETTING OR ASSIGNING THE CONTRACT

This provision is applicable to all Federal-aid constmction contracts on the National Highway System.

1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage •if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116).

a. The term "perform work with its own organization" refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing fum meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions:

(1) the prime contractor maintains control over the supervision of the day-to-day activities of the leased employees;

(2) the prime contractor remains responsible for the quality of the work of the leased employees;

(3) the prime contractor retains all power to accept or exclude individual employees from work on the project; and

( 4) the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements.

b. "Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract.

2. The contract amount upon which the requirements set forth in paragraph (I) of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions.

3. The contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract.

4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfilhnent of the contract. Written consent will be given only after the contracting agency has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract.

Page 32: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-31

5. The 30% self-performance requirement of paragraph (1) is not applicable to design-build contracts; however, contracting agencies may establish their own self-perfmmance requirements.

VII. SAFETY: ACCIDENT PREVENTION

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect propetty in connection with the performance of the work covered by the contract.

2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR 1926) promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act ( 40 u.s.c. 3704).

3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C.3704).

VIII. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, Form FHW A-1 022 shall be posted on each Federal-aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project:

18 U.S.C. 1020 reads as follows:

"Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, finn, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be perfmmed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or

Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or

I I I I I I I I I l'i li ji

II

Page 33: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-32 Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July I, 1916, (39 Stat. 355), as amended and supplemented;

Shall be fined under this title or imprisoned not more than 5 years or both."

IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

By submission of this bid/proposal or the execution of this contract, or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows:

I. That any person who is or will be utilized in the performance of this contract is not prohibited from receiving an award due to a violation of Section 508 of the Clean Water Act or Section 306 of the Clean Air Act.

2. That the contractor agrees to include or cause to be included the requirements of paragraph (I) of this Section X in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements.

X. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION

This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more- as defined in 2 CFR Parts 180 and 1200.

1. Instructions for Certification- First Tier Participants:

a. By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below.

b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's detetmination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualifY such a person from participation in this transaction.

c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective patticipant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default.

d. The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

Page 34: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-33

e. The terms "covered transaction," "debaiTed," "suspended, 11 "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. "First Tier Covered Transactions" refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).

f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the depmtment or agency entering into this transaction.

g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold.

h. A participant in a covered trm1saction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or othe1wise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.govQ, which is compiled by the General Services Administration.

i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

j. Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Goverrunent, the department or agency may terminate this transaction for cause or default.

2. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion- First Tier Participants:

a. The prospective first tier pmticipant certifies to the best of its knowledge and belief, that it and its principals:

(1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency;

(2) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property;

Page 35: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-34 (3) Are not presently indicted for or otherwise criminally or civilly charged by a govermnental entity (Federal,

State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and

(4) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) te1minated for cause or default.

b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

3. Instructions for Certification - Lower Tier Participants:

(Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHW A approval or estimated to cost $25,000 or more- 2 CFRParts 180 and 1200)

a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below.

b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Govermnent, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.

c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances.

d. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. "First Tier Covered Transactions" refers to any covered transaction between a grantee or sub grantee of Federal funds and a participant (such as the prime or general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).

e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated.

f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Ce1tification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold.

Page 36: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-35 g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier

covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, deban·ed, or otherwise ineligible to participate in covered transactions. To verity the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.govO, which is compiled by the General Services Administration.

h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required .to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment.

Certification Regarding Debarment, Suspension, Ineligibility and Voluntaty Exclusion--Lower Tier Participants:

I. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debmment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency.

2. Where the prospective lower tier participant is unable to certifY to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

XI. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20).

1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:

a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.

b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions.

I

' I I I 1 i

I ~

il II

II II !i

!I

i l i I I I l

I I I l 1

Page 37: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-36 2. This certification is a material representation of fact upon which reliance was placed when this transaction was made

or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

3. The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such recipients shall certifY and disclose accordingly.

V. SUPPLEMENTAL EEO REQUIREMENTS

Incorporated in this Contract, by reference, are supplemental requirements to the Department of Labor, Office of Federal Contract Compliance Programs ("OFCCP") Equal Employment Opportunity Program ("EEO"). The supplemental requirements are:

(1) Exec. Order No. 11246, 30 FR 12319 (September 24, 1965); (2) 41 C.P.R.§ 60-4.1 through 60-4.9 (2015); (3) Exec. Order No. 13665 Non-Retaliation for Disclosure of Compensation Information (April 8, 2014); and (4) Further Amendments to Exec. Order No. 11478, Equal Employment Opportunity in the Federal Govermnent

and Exec. Order No. 11246, Equal Employment Opportunity (July 21, 2014).

Per 41 C.P.R. § 60-4.2 all federally-assisted Contracts shall include (information has been interlineated applicable to this Contract as required):

"(a) All Federal contracting officers and all applicants shall include the notice set forth in paragraph (d) of this section and the Standard Federal Equal Employment Opportunity Construction Contract Specifications set forth in § 60-4.3 of this part in all solicitations for offers and bids on all Federal and federally assisted construction contracts or subcontracts to be performed in geographical areas designated by the Director pursuant to § 60--4.6 of the part. Administering agencies shall require the inclusion of the notice set forth in paragraph (d) of this section and the specifications set forth in § 60--4.3 of this part as a condition of any grant, contract, subcontract, loan, insurance or guarantee involving federally assisted construction covered by this part 60--4.

(b) All non-construction contractors covered by Executive Order 11246 and the implementing regulations shall include the notice in paragraph (d) of this section in all construction agreements which are necessary in whole or in part to the performance of the covered non-construction contract.

(c) Contracting officers, applicants and non-construction contractors shall give written notice to the Director within 10 working days of award of a contract subject to these provisions. The notification shall include the name, address and telephone number of the contractor; employer identification number; dollar amount of the contract, estimated starting and completion dates of the contract; the contract number; and geographical area in which the contract is to be performed.

(d) The following notice shall be included in, and shall be a part of, all solicitations for offers and bids on all Federal and federally assisted construction contracts or subcontracts in excess of $10,000 to be performed in geographical areas designated by the Director pursuant to § 60--4.6 of this part (see 41 CFR 60--4.2(a)):

Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity (Executive Order 11246)

1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Specifications" set forth herein.

Page 38: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-37 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

The most cunent participation goals for minorities and females http://www.dol.gov/ofccp/TAguides/TAC FedContractors JRF QA 508c.pdf and are:

New Mexico:

160 Albuquerque, NM: SMSA Counties. 0200 Albuquerque, NM-38.3% NM Bernalillo; NM Sandoval. Non-SMSA Couuties-45.9%

can be found at

NM Catron. NM Colfax; NM De Baca; NM Guadalupe; NM San Juan; NM San Miguel; NM Santa Fe; NM Socono; NM Taos; NM Torrance; NM Valencia.

Goals for females: Nationwide goal-6.9%

These goals are applicable to all the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor also is subject to the goals for both its federally involved and non-federally involved construction.

The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.

3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs within 10 working days of award of any constmction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.

The most cunent OFFCP staffing can be found at http://www.dol.gov/ofccp/contacts/regkevo.htm and are:

SOUTHWEST and ROCKY MOUNTAIN REGION

Covered States/Territories: Arkansas, Colorado, Louisiana, Montana, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, Utah, Wyoming

Regional Director: Melissa L. Speer

Deputy Regional Director: Aida Collins

! ~

li

I

! il ft I•

I !

' I I i I I I I I I ~

Page 39: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Regional Outreach Coordinator: E. Michelle Hernandez

Contact Information: U.S. Department of Labor for OFCCP Federal Building, Room 840 525 South Griffin St. Dallas, TX 75202 (972) 850-2550 (972) 850-2552 (Fax) (877) 889-5627 (TTY-National Office) Pre-Award Email Address: [email protected] For Complaints: [email protected]

Page-38

4. As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is in the Advertisement."

VI. INDIAN PREFERENCE

This Contract preference requirement is an expansion of the prov!stons of the equal employment opportunity responsibilities for Contractors contained elsewhere in this NTC and the provisions contained under FHWA-1273.

If the Project is located on or near a reservation the Contractor, or its Subcontractor at any tier, may be required to extend a publically announced preference in employment to Indians living on or near an Indian reservation in connection with employment opportunities on or near an Indian reservation. The word "near" includes all areas where a person seeking employment could reasonably expected to commute in the course of a work day. Contractors or Subcontractors, at any tier, shall not discriminate among Indians on the basis of religion, sex, tribal affiliation, and the use of such a preference shall not excuse compliance with the remaining EEO provisions of this NTC.

If the Contractor extends an Indian preference, then this NTC requires that Contractors shall afford preference to initial hiring, reassignment, transfer, competitive promotion, reappointment, reinstatement, or any personnel action to fill a vacant position to qualified and enrolled members of federally recognized Indian tribe. The extended preference shall extend to Indians and not extend to a specific tribe or tribal affiliation. There may be tribal laws and regulations that the Contractor is required to follow if an Indian preference is extended. Contractors shall make themselves aware of any labor requirements, taxes, fees, licenses, permits or conditions that may be imposed by the affected tribes for the Project work performed in the area. In order to be apprised of the tribal law or regulation requirements, the Contractor shall establish a liaison with local tribe employment offices and provide this individual's name and contact information to the Project Manager at the Pre-Construction Conference per Standard Specification Section 108.2 "Notice to Proceed and Pre-Construction Conference". The tribe's employment office may then assist the Contractor in in identifYing qualified and tribally enrolled individuals and assist in guidance related to applicable tribal laws or regulations. Verification of available, qualified and enrolled individuals will be provided to the Contractor by the tribe's employment office. A list of contacts to facilitate the Contractor's coordination with the tribal liaison is at:

http://dot.state.nm.us/content/dam/nmdot/planning/Tribal Contact Listing.pdf

VII. NMDOT ON THE JOB TRAINING/SUPPORTIVE SERVICES ("OJT/SS") PROGRAM

The primary objective of the Special Provisions referenced in the below-link is to address the underrepresentation of minority and female workers in the construction trades through the assignment of OJT goals. To that end, the primary objective of the OJT program is the training and upgrading of minorities and females to journeyman status on NMDOT state lead, federal-aid contracts. Accordingly, the Contractor shall make every effort to email minority, women and economically disadvantaged persons to the extent that such persons are available within a reasonable area of

Page 40: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement #: 80-805-17-16664

Page-39 recruitment. This training commitment is not intended, and will not be used to discriminate against any applicant for training, whether or not he/she is a member of a minority group.

If Federal-aid funding is available and the NMDOT elects that the Project will be subject to the OJT/SS requirements then the Contractor or Subcontractor, at any tier, shall comply with the procedures outlined in Appendix B to Subpart A of 230 C.P.R. § 230. The OJT/SS program implemented by the Contractor or Subcontractor, at any tier, must be formally approved by the NMDOT before use of the program. In lieu of the use of a formally approved OJT/SS program the Contractor, or Subcontractor at any tier, may submit its own individual OJT/SS program for NMDOT consideration and approval. Until formal approval is received from the NMDOT CCRB through ACNM the individual Contractor or Subcontractor OJT/SS program cannot be used.

http://dot.state.mn.us/en/OEOPFormsManuals.html#OTJforms.

Contractors meeting the selection criteria for implementation of an OJT/SSS program, and who have a formally approved OJT/SSS program will be notified by the NMDOT's CCRB of its training assignment at the beginning of the reporting year, typically commencing with the calendar year beginning in January through December. The reporting year and the training assignment will be identified in the notification from the NMDOT's CCRB.

The Contractor shall fulfill all of the requirements of the OJT training program including the maintenance of records and submittal of periodic reports documenting program performance. The requirements and reports related to the OJT/SSS program shall include the Contractor's use of forms A-2201, A-2202, A-2203. The forms are incorporated herein by reference. The Contractor shall submit Form A-2202 by the tenth (lOth) of each month of the reporting period or as indicated on the form itself.

The Contractor has the option to pay its trainees either the full prevailing wage for the trainee's job classification or at least 60% of the minimum prevailing wage for the trainee's job classification for the first half of the training period, 75% for the third quarter, and 90% for the last quarter respectively. Prevailing wages are those specific to this Contract.

For federally-funded Projects, and if requested the Contractor may be reimbursed $0.80 per training hour by the NMDOT. Requests for reimbursement shall be submitted by the Contractor to the Project Manager in writing and after Substantial Completion for the Project is declared. Reimbursement is not available for 100% state-funded Projects.

Noncompliance with the responsibilities and requirements of this section, including being a non-responsive participant in the program, may be cause for the NMDOT to issue a show cause notice and other action as deemed necessary by the NMDOT.

VIII. WAGERATES

The higher wage rates shall govern in the event of a discrepancy between the minimum wage rates in the Wage Decision of the DWS and the U.S. Department of Labor Wage Decision applicable to this Contract.

IX. LABOR REPORTING AND SUBMISSION OF WEEKLY PAYROLLS

Contractors and Subcontractors must pay employees weekly. Certified Payrolls and Statements of Compliance on federally funded Projects are due to the NMDOT seven (7) Days after date that the actual payment is processed by Contractor or Subcontractor, at any tier, to its employee.

The date that the actual payment is processed to the employee may be different that the payroll end date in some situations. Notwithstanding the difference between a payroll end date and actual payment date, the Contractor or Subcontractor at any tier shall make actual full payment to the employee no later than seven (7) Days after the payroll end date. And then shall submit the Certified Payrolls and Statements of Compliance no later than seven (7) Days after the actual payment date.

Page 41: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-40

The Contractor and Subcontractors at all tiers Working on federal-aid Projects shall use the following EEO Software Programs to report specific EEO, Labor Compliance and DBE information as required by the Contract and as specified by this NTC. The two software programs are:

• B2GNow software • LCPtracker software

Use of B2GNow and LCPtracker software programs is required and shall be considered Incidental. Failure of a Contractor or Subcontractor to use the required software programs to report specific EEO, Labor Compliance and DBE information may result in the issuance of a Non-Conformance per Standard Specification Section - 109.8.2 "Non­Conformance" or other Contract remedies.

B2GNow - (Business to Government Now), is a web-based software program used to collect, verifY and manage payment information for Contractors and Subcontractors working on federal-aid Projects. Additionally, the software is used to collect and report DBE participation and utilization on federal-aid Projects. Infmmation related to the use of the software is available at https://nmdot.dbesystem.com/.

The Contractor shall upload the fully executed contract between the Contractor and Subcontractor at any tier, the completed petmission to subcontract form and associated attachments, and subcontract checklist to B2GNow.

LCPtracker- (Labor Compliance Program Tracker) is a web-based software program used to collect, verifY and manage prevailing wage certified payrolls and related labor compliance documentation for Contractors and Subcontractors on federal-aid Projects. Information related to the use of the software is available at https://lcpprod.lcptracker.net/.

On all Projects, the Contractor shall submit and shall ensure all Subcontractors submit weekly payroll information into the LCPtracker software program.

To adequately track timely submission of weekly payrolls the Contractor shall enter the actual payment date in the field on the weekly Certified Payroll reporting form in LCPtracker titled "payment date".

Information on access to the software programs, log-on information, use of the programs, available training, user manuals, etc. can be obtained by accessing the web page referenced in this NTC.

X. TITLE VI Assurances Appendix A and E

Appendix A of the Title VI Assurances 49 C.F.R. §Pt. 21, App. A

Appendix A of the Title VI Assurances

During the performance of this contract, the contractor, for itself, its assignees and successors in interest (hereinafter referred to as the "contractor") agrees as follows:

1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time-to-time, (hereinafter referred to as the "Regulations"), which are herein incorporated by reference and made a part of this contract.

Page 42: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-41 2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not

discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate either directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of the 49 CFR Part 21.

3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Non­discrimination on the grounds of race, color, or national origin.

4. Information and Reports: The contr·actor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the New Mexico Department of Transportation or the Federal Highway Administration to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any infmmation required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the New Mexico Department of Transportation (NMDOT), or the Federal Highway Administration, as appropriate, and will set forth what efforts it has made to obtain the infmmation.

5. Sanctions for Noncompliance: In the event of the contractor's non-compliance with the nondiscrimination provisions of this contract, the New Mexico Deparhnent of Transportation (NMDOT) will impose such contract sanctions as it or the Federal Highway Administration may detennine to be appropriate, including, but not limited to:

a. withholding payments to the contractor under the contract until the contractor complies; and/or b. cancelling, terminating or suspending the contract, in whole or in part.

6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor shall take such action with respect to any subcontract or procurement as the NMDOT or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the NMDOT to enter into any litigation to protect the interests of the NMDOT. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.

Appendix E of the Title VI Assurances

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following non-discrimination statutes and authorities; including but not limited to:

Pertinent Non-Discrimination Authorities:

• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et. seq., 78 stat. 252), (prohibits discrimination on the basis ofrace, color national origin); and 49 CFR Part 21.

• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaces or whose property has been acquired because of Federal or Federal­aid programs and projects);

Page 43: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

• Federal-Aid Highway Act of 1973, (29 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); Page-42

• Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27;

• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age);

• Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex);

• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the program or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);

• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131- 12189) as implemented by Department of Transportation regulations at 49 C.P.R. parts 37 and 38;

• The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex);

• Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low­Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or enviromnental effects on minority and low­income populations;

• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your program (70 Fed. Reg. at 74087 to 74100);

• Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (U.S.C. 1681 et seq.)

Contractor Requirements:

The Contractor Agrees T Oj',:.

A. Provide competent supervision and skilled personnel to perform all work covered by this price agreement.

B. Comply with all local, state, and federal laws governing safety, health and sanitation. The Contractor shall provide all safeguards, safety devices and protective equipment, and take any other needed actions necessary to protect the safety and health of employees on-the-job, the safety of the public, and to protect property in connection with the performance of the work covered by the price agreement.

C. IndemnifY and hold harmless The State ofNew Mexico, its officers and employees, against liability, claims, damages, losses and/or expenses arising out of bodily injuty to persons or damage to property caused by, or resulting from, Contractor's and/or its employees, own negligent act(s) or omission(s) while Contractor, and/or its employees, perform(s) or fails to perform its obligations and duties under the terms and conditions of this price agreement. This hold harmless and indemnification clause is subject to the immunities, provisions and limitations of the tort claims act (41-4-1, et seq., N.M.S.A. 1978 comp.) and section 56-7-1 N.M.S.A. 1978 comp. and any amendments thereto.

Page 44: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-43 It is specifically agreed between the parties executing this price agreement that it is not intended by any of the provisions of any part of the price agreement to create the public or any member thereof a third party beneficimy or to authorize anyone not a party to the price agreement to maintain a suit(s) for wrongful death(s), bodily and/or personal injmy(ies) to person(s), dmnage(s) to property(ies) and/or any other claim(s) whatsoever pursuant to the provisions of this price agreement.

D. Comply with state laws and rules pertaining to worker's compensation insurance coverage for its employees. If the Contractor fails to comply with the Worker's Compensation Act and applicable rules when required to do so, the purchase order may be cancelled effective immediately.

E. The Contractor must make all necessary arrangements with the appropriate railroad personnel for the railroad to provide flagging operations when required. The Contactor shall submit the invoice for the railroad flagging costs to the District Engineer or their designee and the Contractor will be reimbursed at invoice cost.

Insurance Requirements: The Contractor shall procure and maintain at the Contractors expense insurance of the kinds and in amounts herein provided. This insurance shall be provided by insurance companies authorized to do business in the State ofNew Mexico and shall cover all operations under the price agreement, whether performed by the Contractor, the Contractor's agents or employees or by Sub-Contractors. All insurance provided shall remain in full force and effect for the entire period of the work, up to and including final acceptance, and the removal of all equipment, employees, agents and Sub­Contractors therefrom.

(A) Public Liability and Automobile Liability Insurance

I. General Liability: bodily injury liability and property damage liability insurance applicable in full to the subject project shall be provided in the following minimum amounts:

Bodily Injury Liability: $1,000,000 each person; $2,000,000 each occurrence (annual aggregate)

Property Damage Liability: $2,000,000 each occurrence (annual aggregate)

a. The policy to provide this insurance is to be written on a Comprehensive General Liability Form or Commercial General Liability Form which must include the following:

1. Coverage for liability arising out of the operation of independent Contractors 2. Completed operation coverage 3. Attachment of the Broad F orrn Comprehensive General Liability Endorsement

b. In the event that the use of explosives is a required part of the price agreement, the Contractor's insurance must include coverage for injury to or destruction of property arising out of blasting or explosion.

c. In the event that a form of work next to an existing building or structure is a required part of price agreement, the Contractor's insurance must include coverage for injury to or destruction of property arising out of:

1. The collapse of or structural injury to building or structures due to excavation, including burrowing, filling or backfilling in connection therewith, or to tunneling, cofferdam work or caisson work or to moving, shoring, underpinning, razing or demolition of building or structures or removal or rebuilding of structural supports thereof.

Page 45: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-44

d. Coverage must be included for injury to or destruction of property arising out of injury to or destruction of wires, conduits, pipes, mains, sewers or other similar property or any apparatus in connection therewith below the surface of the ground. If such injury or destruction is caused by or occurs during the use of mechanical equipment for the purpose of excavating, digging, or drilling, or to injury to or destruction of property at any time resulting there from.

2. Automobile liability insurance coverage for the Contractor (whether included in the policy providing general liability insurance or in a separate policy) must provide liability for tbe ownership, operation and maintenance of owned, non-owned, and hired cars. The limits of liability for automobile liability insurance shall be provided in the following amounts:

Bodily Injury Liability:

$1,000,000 each person; $2,000,000 each occurrence (annual aggregate)

Property Damage Liability:

$2,000,000 each occurrence (annual aggregate)

(B) Worker's compensation insurance: The Contractor shall also carry Worker's Compensation Insurance or otherwise fully comply witb provisions of the New Mexico Workman's Compensation Act and Occupational Disease Disablement Law.

If the Contractor is an "owner-operator" of such equipment, it is agreed that the State of New Mexico assumes no responsibility, financial or otherwise, for any injuries sustained by tbe "owner-operator" during the performance of said price agreement.

(C) Certificate oflnsurance/Department as Additional Insured: The Contractor being awarded Price Agreement shall furnish evidence of Contractor's insurance coverage by a Certificate of Insurance. The Certificate of Insurance shall be submitted prior to award of the Price Agreement.

The Contractor shall have the New Mexico Department of Transportation named as an additional insured on tbe Comprehensive General Liability Form or Commercial General Liability Form furnished by the Contractor pursuant to Paragraph (A) I and (A) 2, of this subsection. The Certificate of Insurance shall state tbat tbe coverage provided under tbe policy is primary over any other valid and collectible insurance.

The Certificate oflnsurance shall also indicate compliance with these specifications and shall certifY that the coverage shall not be changed, cancelled or allowed to lapse without giving the New Mexico Department of Transportation thirty (30) days written notice. Also, a Certificate oflnsurance shall be furnished to the NMDOT on renewal of a policy or policies as necessary during tbe terms of this price agreement.

The NMDOT shall not issue a notice to proceed until such time as the above requirements have been met.

(D) Umbrella Coverage: The insurance limits cited in the above paragraphs are minimum limits. This specification is no way intended to define what constitutes adequate insurance coverage for individual Contractor. The NMDOT will recognize following form excess coverage (Umbrella) as meeting the requirements of Subsection (A) l.a of this price agreement, should such insurance otherwise meet all requirements of such subsections.

(E) Other Required Insurance: The Contractor shall procure and maintain, when required by tbe NMDOT, form and types of Bailee insurance such as, but not limited to, builder's risk insurance, Contractor's equipment

Page 46: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-45 insurance, rigger's liability property insurance, etc. In an amount necessary to protect the NMDOT against claims, losses, and expenses arising from the damage, disappearance or destruction of property of others in the care, custody or control of the Contractor, including property of others being installed, erected or worked upon by the Contractor, his agents, or Sub-Contractors.

(F) Railroad Insurance: In the event that railroad property is affected by the subject price agreement, the Contractor, in addition to the above requirements, shall be required to fumish a Railroad Protective Liability policy in the name of the railroad company involved. In addition, on those rails that are used by the National Railroad Passenger Corporation (NRPC), the Contractor will also obtain a Railroad Protective Liability Policy in the name ofNRPC.

The limits of liability for the Railroad Protective Liability Policy (or policies) must be negotiated with the railroad company on a hazard and risk basis. In no event will the limits exceed the following:

Bodily Injury Liability, Property Damage Liability:

$2,000,000 each occurrence

Liability and Physical Damage to Property:

$6,000,000 aggregate

The limits of liability stated above apply to the coverage's as set forth in the Railroad Protective Liability Endorsement Form, subject to the terms, conditions, and exclusions found in the form.

The policy must afford coverage as provided in the Standard Railroad Protective Liability Endorsement (AASHTO Form).

The conditions listed in the above paragraphs are an integral part of this bid and shall be the conditions regulating the perfmmance of any price agreement between the Bidder and the State of New Mexico and any Commission, Divisions, or Department thereof.

SPECIFICATIONS FOR BRIDGE COMPONENT SETTLEMENT REP AIR:

The NMDOT and the Contractor shall agree in writing prior to the beginning of any work to the following:

• Which bid items as shown in "APPENDIX A" will be used in a Work assignment. Bid item quantities will be agreed to. When applicable, the special provisions as shown in "APPENDIX B" will be followed. Some items may be estimated and stated as such at the beginning of the work assignment when field conditions or other factors may prevent an actual measurement. The Agreement of work shall be signed by both parties when a work assignment is issued.

• Location, schedule and time restraint of work assignments.

• Other specific NMDOT requirements.

The District Engineer or their designee shall have the option to suspend the Contractor's operation during special events such as the New Mexico State Fair, Albuquerque Intemational Balloon Fiesta, etc.

The District Engineer or their designee shall clearly define the limits of the settlement repair for bridges over a railroad and shall contact the NMDOT Bridge and Rail Bureaus to detetmine if additional requirements are needed.

I I I i I I ~ l !I I

l l'i l

Page 47: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-46 The Contractor shall begin the necessary work at a specific location within fifteen ( 15) calendar days after receiving written notification. If the initial contractor is unable to start the work within the fifteen (15) calendar days, the District Engineer or their designee will have the option of going to the next lowest bidding contractor to provide the services requested.

The Contractor shall complete all work at any one location within the time period specified in the written notification from the NMDOT. Failure to do so, unless caused by weather delay or other factors not attributable to the Contractor, will result in Liquidated Damages as called out in the NMDOT' s Standard Specifications for Highway and Bridge Construction, current edition, and being deducted from the money due to the Contractor for that approved work.

The Contractor shall be responsible for all cleanup work on the project site and at the equipment storage areas prior to the final inspection and acceptance. The Contractor shall be responsible for the disposal of all debris resulting from any work performed and the disposal of all debris generated by removal and repair operations at the Contractor's cost. Final payment may be withheld subject to written approval by the District Engineer or their designee.

The Contractor shall be liable for satisfactory workmanship of all operations for a period of one (I) year after initial acceptance. Any defects attributed to faulty workmanship or faulty material shall be satisfactorily repaired, at no cost to the State, in an acceptable manner and within the time limits set by the District Engineer or their designee. Defects attributed to faulty material will be resolved by the Contractor, Supplier and/or Manufacturer. If warranties are called for in the Specifications or given by a Manufacturer in excess of one (I) year, all defects shall be corrected as stated in the Specification or as given by the Manufacturer.

Material: All material used shall be specified and approved by the District Engineer or their designee. Only material incorporated into a structure at any given location shall be paid for; unauthorized excess material ordered wasted materials or materials which are unacceptable to the District Engineer or their designee shall not be paid for. Any and all material ordered by the Contractor under written authorization, but not incorporated into the work shall be paid for at invoice cost (unless the Contractor breeches the terms of this Contract in any way) upon termination of the Contract, and said material shall become the property of the NMDOT.

General Requirements:

Traffic Control: The Contractor shall abide with the New Mexico State Department of Transpmtation Standard Specifications for Highway and Bridge Construction, special provisions, supplemental specifications, Section 700 on traffic control devices and with the Manual of Uniform Traffic Control Devices, Part 6- Temporary Traffic Control (current edition). The Contractor shall submit a traffic control plan to the District Engineer or their designee three weeks prior to actual construction. The traffic control plan shall include the proposed signing, location of signs and location and type of all traffic channelization devices to be utilized, and all lane closures and detours. The traffic control plan must be approved by the Traffic Engineer or their designee prior to the beginning of operations.

The Contractor shall also provide sufficient flagmen, when deemed necessary by the District Engineer or their designee, to assist with the traffic control during operations. The Contractor shall also remove or cover temporary signing that is required during nonworking hours and night-time hours. At least one lane shall remain open to traffic, with adequate flagging, when working on two lane road and treated roadways shall be reopened to traffic during night-time or nonworking hours.

Furnish directly (or provide through an approved subcontractor) all traffic control at locations specified including submittals of Traffic Control Plans (TCP), in accordance with the Manual on Unifmm Traffic Control Devices (MUTCD). No traffic control at any given location shall be paid for if no work is being performed and the location could be (or is) open to traffic. At the discretion of the District Engineer or their designee, the TCP shall be submitted on

Page 48: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-47 ll"xl7" sheets and shall be computer generated. The TCP will be submitted at least five (5) working days before Work is to commence and will be approved by the District Engineer or their designee.

Traffic Control Locations

I. Urban traffic control - (within corporate limits of urban areas as designated by the District Engineer or their designee) to include all signing and traffic channelization devices for adequate handling of traffic in accordance with the MUTCD, including furnishing plans for same, per lane per site typically including (but not limited to) sequential arrow display, delineation devices, signing and ban·icades.

2. Rural traffic control - (areas not within designated corporate limits or as designated by the District Engineer or their designee) to include all signing and traffic channelization devices for adequate handling oftraffic in accordance with the MUTCD, including furnishing plans for same, per lane per site typically including (but not limited to) sequential arrow display, delineation devices, signing and barricades.

Payment for traffic control items will commence when the Contractor begins setting up traffic control operations. Payment will end when the assigned work has been completed. There will be no payment for time taken to remove tt·affic control.

Payments and Invoicing: Within fifteen (15) days after the date the NMDOT receives written notice from the Contractor that payment is requested for services, constt·uction or items of tangible personal property delivered on site and received, the NMDOT shall issue a written certification of complete or partial acceptance or rejection of the services, construction or items of tangible personal property. If the New Mexico Department of Transportation fmds that the services, construction or items of tangible personal property are not acceptable, it shall, within thirty (30) days after the date of receipt of written notice from the Contractor that payment is requested, provide to the Contractor a letter of exception explaining the defect or objection to the services, construction or delivered tangible personal property along with details of how the Contractor may proceed to provide remedial action. Upon certification by the NMDOT that the services, construction or items of tangible personal property have been received and accepted, payment shall be tendered to the Contractor within thirty (30) days after the date of certification. If payment is made by mail, the payment shall be deemed tendered on the date it is postmarked. After the thirtieth day from the date that written certification of acceptance is issued, late payment charges shall be paid on the unpaid balance due on the purchase order to the Contractor at the rate of one and a half (I Y,) percent per month. For purchases funded by state or federal grants to local public bodies, if the public body has not received the funds from the federal or state funding agency, but has already ce1tified that the services or items of tangible personal property have been received and accepted, payments shall be tendered to the Contractor within five ( 5) working days of receipt of funds from that funding agency.

Final payment shall be made within thirty (30) days after the work has been approved and accepted by the New Mexico Department of Transportation's Secretary of his/her duly authorized representative. The Contractor agrees to comply with state laws and rules pertaining to worker's compensation insurance coverage for its employees. If Contractor fails to comply with the workers' compensation act and applicable rules when required to do so the purchase order may be canceled effective immediately.

Page 49: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Invoice To:

NM Department of Transportation General Office P.O. Box 1149 Santa Fe, NM 87504-1149

NM Department of Transportation District One P.O. Box231 Deming, NM88030-0231

NM Department of Transportation District Two P.O. Box 1457 Roswell, NM 88202-1457

NM Department of Transpotiation District Three P. 0. Box 91750 Albuquerque, NM 87199-1750

NM Department of Transportation District Four P.O. Box 10 Las Vegas, NM 87701-0010

NM Department of Transportation District Five P.O. Box 4127 Santa Fe, NM 87502-4127

NM Department of Transportation District Six P.O. Box2160 Milan, NM 87021-2159

Escalation Clause:

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-48

In the event of a product cost increase, an escalation request will be reviewed by this office on an individual basis. This measure is not intended to allow any increase in profit margin, only to compensate for an actual cost increase.

Effective dates for increase will not be any sooner than fifteen days from the date the written request is received by this office. To facilitate prompt consideration, all requests for price increase must include all information listed below:

1. Price Agreement Item Number 2. Current Item Price 3. Proposed New Price 4. Percentage of Increase 5. Mill/Supplier Notification of price increase indicating percentage of increase including justification for increase.

This escalation policy will be terminated as soon as the market stabilizes. Should you have questions concerning this policy, please contact the State Purchasing Division.

Page 50: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Mobilization:

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-49

Mobilization for moves within the State ofNew Mexico to any job site as required. No payment will be made for moves ofless than twenty-five (25) miles. Mileage will be measured and paid from the Contractor's designated base station to the job site or when applicable mileage will be measured from an existing job site to the new job site and payment will be for whichever distance is less. No payment will be made for the Contractor's return to his/her designated base station. The District Engineer or their designee will approve the distance used for payment and their decision shall be fmal. For the purpose of this item, the Contractor shall designate a New Mexico base station ____________ _

All quantities are to be measured by the District Engineer or their designee and shall be considered to be final and all payments for the same will be made on this basis.

Quantities: The approximate quantities for each item are estimated and are for bidding purposes only. Actual requirements will be as determined by the District Engineer or their designee and quantities may be increased or decreased as necessary to meet actual field requirements. The State ofNew Mexico does not guarantee any amount of work.

Items Explanation:

APPENDIX "A" Pay Items

Item 001

Item 002

Item 003

Item 004

Item 005

Item 006

Item 007

Item 008

Item 009

Item 010

Cementitious Grout for Void Filling or Slab Jacking at Structure Grade- As per requirements of Special Provisions for Section I (Cementitious Grout Injection into Foundation Soils)

Drilling for Cementitious Compaction Grouting and Casing Installation- As per requirements of Special Provisions for Section I (Cementitious Grout Injection into Foundation Soils)

Below Grade Cementitious Grout Injection (Process and Material)- As per requirements of Special Provisions for Section 1 (Cementitious Grout Injection into Foundation Soils) Polyurethane for Void Filling or Slab Jacking at Structure Grade- As per requirements of Special Provisions for Section 2 (Polyurethane Injection into Foundation Soils)

Below Grade Polyurethane Injection (Process and Material)- As per requirements of Special Provisions for Section 2 (Polyurethane Injection into Foundation Soils)

Below Grade Polyurethane Injection (Process and Material)- As per requirements of Special Provisions for Section 2 (Polyurethane Injection into Foundation Soils)

Below Grade Polyurethane Injection (Process and Material)- As per requirements of Special Provisions for Section 2 (Polyurethane Injection into Foundation Soils)

Below Grade Polyurethane Injection (Process and Material)- As per requirements of Special Provisions for Section 2 (Polyurethane Injection into Foundation Soils)

Dynamic Cone Penetrometer Test- As per requirements of Special Provisions for Section 1 (Cementitious Grout Injection into Foundation Soils) and Section 2 (Polyurethane Injection into Foundation Soils)

Mobilization- As per requirements of Section 621 (Mobilization)

!

i I I I I I i I i I I I ' I I I! ,,

II 'i

Page 51: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Item 011

Item 012

Item 013

Item 014

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-50 Urban Traffic Control- As per requirements of Section 618 (Traffic Control Management), Section 701 (Traffic Signs and Sign Structures), Standard Drawings for Section 702, Section 702 (Construction Traffic Control Devices) and the current edition of the Manual of Uniform Traffic Control Devices (MUTCD)

Rural Traffic Control- As per requirements of Section 618 (Traffic Control Management), Section 701 (Traffic Signs and Structures), Standard Drawings for Section 702, Section 702 (Construction Traffic Control Devices) and the current edition ofthe Manual of Uniform Traffic Control Devices (MUTCD)

Variable Message Board- As per requirements of Section 702 (Construction Traffic Control Devices)

Truck Mounted Attenuator- As per requirements of Section 720 (Vehicular Impact Attenuator Units)

APPENDIX "B" SPECIAL PROVISIONS

SECTION 1: CEMENTITIOUS GROUT INJECTION INTO FOUNDATION SOILS

1.1 DESCRIPTION

This Work shall consist of furnishing all labor, equipment and materials necessary to inject a low-slump cement grout under high pressure into foundation soils beneath roadway structures to compact soils, fill voids and/or raise roadway structures to an acceptable grade.

Cementitious grout shall be injected into the soils beneath the roadway structures through injection tubes inserted into drilled holes at locations and depths as agreed or as directed by the Project Manager.

1.2 MATERIALS

1.2.1 Cementitious Grout The cementitious grout shall consist of a combination ofPmtland cement, fine aggregates and water. In addition, fly ash may be added as approved by the Project Manager. No bentonite or other clay of medium to high plasticity shall be used.

1. The grout mix shall have a slump of less than 1.5 inches when tested in accordance with AASHIO T119 (ASTM C143). The unconfmed compressive strength of the compaction grout shall be a minimum of200 psi at 28 days when measured in accordance with AASHTO T22 (ASTMC39).

2. Site conditions andre-leveling requirements shall determine the exact proportions of cement, water and soil. The grout mix shall generally consist of sandy soil with up to 12% cement by weight and water to form a very stiff mortar-like mixture. No admixtures shall be used without the Project Manager's approval and previous testing.

3. Mix design and test results of grout mixture must be submitted and approved by the Project Manager 15 Days prior to the commencement of the Work.

1.2.2 Portland Cement Portland cement shall conform to Section 509 ofNMDOT's most current edition of Standard Specifications for Highway and Bridge Construction.

Page 52: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

1.2.3 Fine Aggregates

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Fine aggregates shall be natural siliceous material, consisting of hard, clean, strong, durable and uncoated particles, conforming to the latest version of ASTM Cl44 aggregate for masonry mortar.

Page-51

The aggregate shall contain sufficient silt-sized material to provide grout plasticity, together with sufficient well-graded sand to develop the required internal friction. Pea gravel may be added to the grout mix to help internal friction. The fine aggregate gradation shall be submitted to the Project Manager for review by the Geotechnical Design Section of the NMDOT Materials Laboratory. The gradation of the mix shall be such that sand blocking is eliminated at the grout working pressures specified.

Property Test Method Maximum Liquid Limit AASHTOT89 25

Plasticity Index AASHTOT90 10

Natural fines may be supplemented by fly ash to achieve the specified percent passing the No. 200 sieve.

Fly ash shall conform to the requirements of Subsection 509.2.3.

1.2.4 Water Water used in the grout shall conform to Subsection 509.2.6.

1.2.5 Submittals Submit the manufacturer's recommendations for the proposed Material to the Project Manager 15 Days before use. Provide a certified report from a Department approved Laboratory and the manufacturer certification verifying the Materials are in accordance with this specification. The Department will maintain confidentiality of the data. The Contractor shall provide a work schedule outlining mobilization, drilling (sequence and location), grouting and demobilization.

1.2.6 Materials The Project Manager will accept the Materials based on the certified Laboratory report.

1.2. 7 Storage of Materials Protect cement I fly ash from moisture. Store different brands or types of cement I fly ash, or cement I fly ash from different production facilities separately. Provide separate, identifiable blended portland-fly ash cement storage of the Project site. Portland cement and portland-fly ash cement ~hall be stored separately.

1.3 CONSTRUCTION REQUIREMENTS

1.3.1 Preparation The Contractor shall prepare a profile to determine the areas that require lifting and determine the locations of the injection holes for each treated area. The Contractor shall obtain approval for the final proposed grades and the location of injection holes.

The Contractor shall submit a plan for approval of the proposed grout injection methods for the designated project areas. The plan shall include, but not be limited to: proposed diameter of casing, depth of placement, angle of inclination, injection tube spacing and project staging.

Page 53: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-52

The plan shall include monitoring procedures to ensure that damage will not occur to any existing stmctures due to the injection process. Monitoring devices shall be installed on mechanically stabilized earth retaining systems and between approach slabs and approach slab footings or other components to help prevent damage.

The Contractor shall keep complete grouting records for review by the Project Manager. Records shall include record of volumes, pressures, time and refusal condition for each grout injection and shall be available to the Project Manager at the end of each working day.

1.3.2 Drilling The Contractor shall drill a pattern of holes as proposed in his plan and authorized by the Project Manager. The holes shall be located in a manner that the soil stabilization and structure lifting process does not affect any adjoining stmctures, such as mechanically stabilized earth retaining walls. Holes shall not be drilled within 4" of the edge of the slab, construction joints or major cracks. No more holes shall be drilled and tubes installed during the day than can be filled during that day.

The drilling method to be used shall be capable of simultaneously drilling the hole and advancing the casing to prevent collapsing of the hole. The drilling equipment shall be capable of drilling through the reinforced approach slab I sleeper footer, asphalt pavement and subsurface materials. The casing shall be installed such that there is contact with the drilled hole in order to prevent grout leakage and/or premature upward movement of the casing during injection of high pressure compaction grout. External packing or other means of assuring grout delivery to the bottom of the hole may be used as approved by the Project Manager.

No drilling fluids other than air or air-injected foam shall be employed to install grout pipes, unless approved by the Project Manager. In deep collapsible soils, water may be utilized if approved in advance by the Project Manager. All grout pipes shall be installed to within five degrees of vertical, or as directed by the Project Manager.

1.3.3 Grout Pipe Installation Flush joint steel casing with minimum inside diameter of 2 inches shall be used. The steel casing shall have adequate strength to maintain the hole and to withstand the required jacking and pumping pressures. The drilling equipment shall be capable of installing the casing to be used.

The riser elbow shall have a minimum 1 foot radius curve to minimize the potential for grout blockage.

1.3.4 Grout Injection Procedures The initial lift shall be at the sleeper footer when applicable. The Contractor shall lift the sleeper footer and the approach slab to the desired elevation by injecting material under the structures with care to assure cementitious material is not placed between the sleeper footer and the approach slab. The Project Manager may require that all sleeper footers be raised with Cementitious Grout Injection into Foundation Soils to avoid the risk of cementitious material being injected between the sleeper footer and the approach slab.

The entire approach slab and adjacent roadway slab shall be raised in increments of Yz" to avoid slab cracking before raising any portion to the next increment.

Grouting pressure and flow rate shall be continuously monitored at the group pipe head and at the pump by pressure gauges and flow meters, suitably protected to prevent grout clogging or damage from handling, vibration or shock.

Compaction grouting shall begin with the primary holes. The secondary holes shall begin with the completion of the primary holes.

The criteria for raising the grout pipe to the next increment shall be when one of the following occurs:

Page 54: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-53 1. The grout pressure at the gauge located at the grout pipe head exceeds 300 psi. This can be modified for deep fill

treatment.

2. More than 5 cubic feet of grout has been injected per 1 foot interval at a pressure of 100 psi or greater.

3. Wing wall, abutment wall, or undesirable slab movement occurs, as determined by the Project Manager.

1.3.5 Repairs As directed by the Project Manager, repair any pavement slab or bridge approach slab that has cracked, has excessive lifting or where the slab is left uneven as a result of the Contractor's operation without any additional compensation.

Injection holes are to be sealed with concrete per Section 533, Concrete Structure Repair, ofNMDOT's Standard Specifications for Highway and Bridge Construction, current edition or as directed by the Project Manager.

The Contractor shall be responsible for any pavement blowouts, excessive lifting, uneven pavement or damage to any adjoining bridge components resulting from the process and shall repair the damaged area to the satisfaction of the Project Manager with no additional cost to the Department.

1.3.6 Acceptance The finished pavement and/or bridge component elevations shall substantially conform to the elevations approved by the Project Manager. The Contractor shall perform both pre and post field surveys in order to determine/confirm the subject desired pavement and or bridge component elevations. The survey data and the quantity of material used at each location shall be reported to the Project Manager as part of the request for payment.

Final elevations shall be within \4'' of the elevation proposed by profile or as approved by the Project Manager. A tight string line may be used to monitor and verifY elevations for slab lengths of 50 feet or less. For longer sections, a laser level will be used to monitor and verifY elevations.

In the event that the Project Manager determines that continued injection of material at a specific location is no longer feasible, the Project Manager may direct the Contractor to suspend operations at the location. All traffic shall be kept off the slab until sufficient time has elapsed for the material to achieve the compressive strength required by this Contract.

1.3.7 Protection and Cleanup During work operations, the Contractor shall take such precautions as may be necessary to prevent drill cuttings, equipment exhaust, oil, wash water and grout from defacing or damaging the landscape.

The Contractor shall furnish such pumps as may be necessary to handle wastewater and grout from the operations, and clean up all waste resulting from the operations.

1.3.8 Equipment The Contractor shall provide a list of major components to be used, such as pumps, hoses, pipe, fittings and drilling equipment, and the list shall include manufacturers' data on size, type, pressure rating, capacity and other critical characteristics for each item prior to the commencement of Work.

I

! I ! I ~

! .! • I

I I I ! I I f.'

I I i

I

Page 55: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

1.3.8.1 Compaction Grouting Mixer

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-54

The compaction grouting mixer shall be of a type to ensure complete mixing of the stiff grout, as approved by the Project Manager. The compaction grout mixer shall be of sufficient capacity to continuously deliver grout having a slump of less than 1.5 inches at pressures up to 1,000 psi, at flow rates ranging from 0.1 to 5.0 cubic feet per minute. Gauges shall be provided at the pump and the grout pipe head to measure pressure and rate of flow. Type and location of gauges shall be as approved by the Project Manager. A dial gauge or meter capable of measuring to 0.5 cubic feet or less shall be provided to measure the amount of grout pumped into the hole. A pressure gauge shall be graduated in 10-psi increments or less and used to measure the applied pressure. All gauges shall have a ce~tified accuracy to within+/-2%. Certification shall be submitted to the Project Manager for review.

Compaction grout hose shall have a minimum inside diameter of 2 inches with non-restrictive full flow couplings. The hose shall be of sufficient strength for the pressures anticipated, and shall be in good condition.

1.3.8.2 Laser Levels or Dial Indicators The Contractor shall utilize laser levels or dial indicator devices capable of monitoring movement at the surface of the pavement to verifY that the injected base, sub-base and sub-grade soils have been properly injected.

1.3.8.3 Dynamic Cone Penetrometer The Contractor shall utilize a portable Dynamic Cone Penetrometer (DCP) for on-site soils investigation to assist in location of weak sub-base soils and determination of injection pattern through tubes to compact weak soils.

1.3.9 Sampling and Testing

1.3.9.1 Drilling Reports The Contractor shall prepare drilling reports which shall contain at least the following information: Name of driller, type of drill and method being used, date started, date completed, type of flushing, location of hole, depth of hole and type of depth of material encountered.

1.3.9.2 Grouting Reports The Contractor shall prepare grouting reports which contain at least the following information: Name of grouting technician, constituents and proportions of grout, log of quantity injected per five foot of hole, date, rate of pumping, grouting pressure at the hole, type of pump, grouting pressure at the pump and depth of hole. Drilling reports and grouting reports shall be made available to the Project Manager at the end of each working day.

1.3.9.3 Test Samples. A minimum of three, 3-inch diameter by 6-inch long cylindrical grout samples, shall be prepared per day. Unconfined compression tests shall be performed at 3, 7 and 28 Days. This work shall be considered incidental to the grouting work and no separate payment shall be made.

1.3.9.4 Dynamic Cone Penetrometer (DCP) Testing As directed by the Project Manager, the Contractor shall utilize a portable Dynamic Cone Penetrometer (DCP) for on­site soils investigation to assist in locating weak sub-base soils and determination of injection'pattern through tubes to compact weak soils. 1'esting procedures are to be performed per the manufacturer's testing recommendations or as directed by the Project Manager.

1.4 METHOD OF MEASUREMENT Payment for drilling hole will be made for the number of linear feet measured as provided above at the contract unit price, and shall constitute full compensation for drilling holes, furnishing and installing casing, disposal of the drill cuttings, enviromnental protection, and all other work necessary for completion of the Work in accordance with Subsection 109.3.

Page 56: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-55 Payment for cement grout will be made for the number of cubic feet injected, measured as provided above, at the contract price. Payment shall constitute full compensation for all materials, labor, equipment, mixing, pumping, waste, cleanup and environmental protection.

1.5 BASIS OF PAYMENT

Pay Item Cement Grout Drilling and Casing Installation Dynamic Cone Penetrometer (DCP) Testing

1.5.1 Work Included in Payment

Pay Unit Cubic Feet Linear Feet Each

The following work and items will be considered as included in the payment for the main items and will not be measured or paid for separately: all labor, tools equipment and incidentals necessary for the completion of the project.

Depending on the results of the planned grouting operation, it may be necessa1y to add grout holes to adequately compact subsmface material. Any additional drilling and grouting work directed by the Project Manager will be paid for at the contract unit prices.

SECTION 2: POLYURETHANE INJECTION INTO FOUNDATION SOILS

2.1 DESCRIPTION

This Work shall consist of furnishing all labor, equipment and materials necessary to inject high density polyurethane into the foundation soils beneath roadway structures to compact soils, fill voids and/or raise roadway structures to an acceptable grade.

Polyurethane material shall be injected into the soils beneath the roadway structure through drilled holes at locations and depths as agreed or as directed by the Project Manager.

2.2 MATERIALS 2.2.1 Polyurethane The material shall be a two part 1:1 ratio by volume, polyurethane-forming mixture, having a water insoluble diluent, which permits the formation of polyurethanes in excess water.

The material shall reach 90% Compressive strength in 30 minutes such that traffic may be returned to roadway within 30 minutes after last injection of material.

Table 1 Polyurethane Free-Rise Physical Properties

Property I Units Density- lb/cf

Tensile Strength- psi

Compressive Strength at Yield Point -psi

ASTM Minimum Maximum D 1622 3.0 lb./cf 6.0 lb.lcf

D 1623 80 psi

D 1621 60 psi

I

I I I

I I ' I ' I I ' '

I I ' '

Page 57: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

2.2.2 Submittals

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Submit the manufacturer's recommendations for the proposed Material to the Project Manager 15 Days before use. Provide a certified report from a Department approved Laboratory and the manufacturer certification verifying the Materials are in accordance with this specification. The Department will maintain confidentiality of the data.

2.2.3 Certificates of Compliance and Product Data Sheets

Page-56

At least 15 Days before using the polyurethane, submit a notarized Certificate of Material compliance to the Project Manager. List batch numbers and the manufacture date for all components of each Material in the Certificate of Compliance and on the Material containers. Submit detailed Material Safety Data Sheets for polyurethane components.

2.2.4 Materials The Project Manager will accept the Materials based on the certified Laboratory report.

2.2.5 Safety Provisions Use personnel certified in the safe handling of Materials in accordance with the manufacturer's requirements.

2.2.6 Storage of Materials Store Materials must be in accordance with the manufacturer's recommendations.

2.2.7 Temperature Limitations Follow the manufacturer's temperature recommendations.

2.3 CONSTRUCTION REQUIREMENTS

2.3.1 Preparation The Contractor shall prepare a profile to determine the areas that require lifting and determine the locations of the injection holes for each treated area. The Contractor shall obtain approval for the final proposed grades and the location of injection holes.

The Contractor shall submit a plan for approval of the proposed polyurethane injection methods for the designated project areas. The plan shall include, but not be limited to: proposed diameter of casing (if required), depth of placement, angle of inclination, injection tube spacing and project staging.

The plan shall include monitoring procedures to ensure that damage will not occur to any existing structures due to the injection process. Monitoring devices shall be installed on mechanically stabilized earth retaining systems and between approach slabs and approach slab footings or other components to help prevent damage.

2.3.2 Drilling The Contractor shall drill a pattern of holes as proposed in his plan and authorized by the Project Manager. The holes shall be located in a manner that the soil stabilization and structure lifting process does not affect any adjoining structures, such as mechanically stabilized earth retaining walls. Holes shall not be drilled within 4" of the edge of the slab, construction joints or major cracks. No more holes shall be drilled and tubes installed during the day than can be filled during that day.

2.3.3 Injecting The initial lift shall be at the sleeper footer when applicable. The Contractor shall lift the sleeper footer and the approach slab to the desired elevation by injecting material under the structures with care to assure that polyurethane material is not placed between the sleeper footer and the approach slab. The Project Manager may require that all sleeper footers be raised with Polyurethane Injection into Foundation Soils to avoid the risk of polyurethane foam being injected between the sleeper footer and the approach slab. The amount of rise shall be controlled by regulating the rate of injection of the high density polyurethane material. When the nozzle is removed from the hole, any excessive polyurethane material shall be removed from the area.

Page 58: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

2.3.4 Curing Time

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

The high density polyurethane formulation shall reach 90% of full compressive strength within 30 minutes from injection.

2.3.5 Repairs

Page-57

As directed by the Project Manager, repair any pavement slab or bridge approach slab that has cracked, or that has excessive lifting or where the slab is left uneven, that is the result of the Contractor's operation without any additional compensation.

Injection holes are to be sealed with concrete per Section 533, Concrete Structure Repair, ofNMDOT's Standard Specifications for Highway and Bridge Construction, current edition or as directed by the Project Manager.

The Contractor shall be responsible for any pavement blowouts, excessive lifting, uneven pavement or damage to any adjoining bridge components resulting from the process and shall repair the damaged area to the satisfaction of the Project Manager with no additional cost to the Department.

2.3.6 Acceptance The finished pavement and/or bridge component elevations shall substantially conform to the elevations approved by the Project Manager. The Contractor shall perform both pre and post field surveys in order to determine/confi1m the subject desired pavement and or bridge component elevations. The survey data and the quantity of material used at each location shall be reported to the Project Manager as part of the request for payment.

Final elevations shall be within 114" ofthe proposed profile elevations or as approved by the Project Manager. A tight string line may be used to monitor and verifY elevations for slab lengths of 50 feet or less. For longer sections, a laser level will be used to monitor and verifY elevations.

In the event that the Project Manager determines that continued injection of material at a specific location is no longer feasible, the Project Manager may direct the Contractor to suspend operations at the location. All traffic shall be kept off the slab until sufficient time has elapsed for the material to achieve the compressive strength required by this Contract.

2.3.7 EQUIPMENT

2.3.7.1 Flow Meter The Contractor shall utilize a pumping unit equipped with a certified flow meter for each chemical component to measure the amount of high-density polyurethane injected at each location. The certified flow meter shall have a digital output in both pounds and gallons.

A quality check shall be performed, using the flow meters, on the ratio of the two part chemical system. Prior to performing the work each day, the Contractor shall reset the flow meters on the pumping units to zero and perform a test shot of material. The ratio of part A (Resin) to the part B (ISO) shall be maintained as a I: I ratio by volume (between 0.95 and 1.05) and per the manufacturer's recommendations. The Contractor shall repeat the quality check for all the injection guns.

2.3.7.2 Pressure and Temperature Controlled Devices The Contractor shall utilize pressure and temperature control devices capable of maintaining proper temperature and proportionate mixing of the polyurethane component materials.

2.3.7.3 Laser Levels or Dial Indicators The Contractor shall utilize laser levels or dial indicator devices to continuously monitor movement at the smface of the pavement to verifY that the injected base, sub-base and sub-grade soils have been properly injected.

Page 59: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

2.3.7.4 Dynamic Cone Penetrometer

State ofNew Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Page-58

As directed by the Project Manager, the Contractor shall utilize a portable Dynamic Cone Penetrometer (DCP) for on­site soils investigation to assist in locating weak sub-base soils and determination of injection pattern through tubes to compact weak soils. Testing procedures are to be performed per the manufacturer's testing recommendations or as directed by the Project Manager.

2.3.8 Warranty The Contractor shall provide a two-year unconditional warranty against movement of more than Y., inch of the pavement. In the event that movement of more than Y., inch in the injected areas occurs, the Contractor shall return to inject the affected area to lift to proper grade at no cost to the State. One exception to the warranty: if subsequent testing reveals that the settlement is as a result of deep consolidation below the treated depths, the warranty is not valid.

2.4 METHOD OF MEASUREMENT The accepted quantities of polyurethane material as displayed by the certified flow meters and all DCP testing as requested by the Project Manager shall be paid for at the contract unit price.

2.5 BASIS OF PAYMENT

Pay Item

Void Filling or Slab Jacking at Structure Grade Below Grade Polyurethane Injection, _ft. to_ ft. Dynamic Cone Penetrometer (DCP) Testing

2.5.1 Work Included in Payment

Pay Unit

Pounds Pounds Each

The following work and items will be considered as included in the payment for the main items and will not be measured or paid for separately: all labor, tools equipment and incidentals necessary for the completion of the project.

Payment will be full compensation for raising, undersealing, furnishing, applying and pumping polyurethane material and all other incidentals necessary to complete the Work.

Page 60: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

Item Approx_ Unit

No. Qty.

001 250 C.F.

002 500 L.F.

003 2,000 C.F.

004 1,000 LBS.

005 10,000 LBS.

006 1,000 LBS.

007 1,000 LBS.

008 500 LBS.

009 10 EACH

010 200 MILE

011 20 HRS.

012 20 HRS.

013 80 DAYS

014 10 DAYS

*** 14 Items Awarded ***

State of New Mexico General Services Department

Purchasing Division Price Agreement#: 80-805-17-16664

Description

Cementitious Grout for Void Filling or Slab Jacl<ing at Structure Grade. (Process and Material)

Drilling for Cementitious Compaction Grouting and Casing Installation.

Below Grade Cementitious Grout Injection. (Process and Material)

Polyurethane for Void Filling or Slab Jacking at Structure Grade. (Process and Material)

Below Grade Polyurethane Injection. (Process and Material) Grade to 4ft.

Below Grade Polyurethane Injection. (Process and Material) Depth Greater than 4 ft. to I 0 ft.

Below Grade Polyurethane Injection. (Process and Material) Depth Greater than I 0 ft. to 20 ft.

Below Grade Polyurethane Injection. (Process and Material) Depth Greater than 20 ft.

Dynamic Cone Penetrometer Test.

Mobilization. Moving change from within the state ofNew Mexico to any worksite as requested (one way). No payment will be made of moves less than twenty-five (25) miles.

Urban Traffic Control. In accordance with the current edition ofthe Manual on Uniform Traffic Control Devices (MUTCD).

Rural Traffic Control. In accordance with the current edition ofthe Manual on Uniform Traffic Control Devices (MUTCD).

Variable Message Board. Provide, place and maintain each variable message board required by the District during traffic control operations.

Truck Mounted Attenuator. Provide a truck mounted attenuator per MUTCD Standards or as directed by the Department.

Page-59

Unit Price

(AA} $21.00 (AB} $9.25

(AA} $170.00 (AB} $16.89

(AA} $21.00 (AB} $10.37

(AA} $9.00 (AB} $6.00 (AC}~4.45

(AA} $10.00 (AB} $6.75 (AC}$5.25

(AC}$6.50

(AC} $7.00

(AC} $9.25

(AA} $1500.00 (AB} $650.00 (AC} $500.00

(AA} $24.60 (AB} $8.00

(AC} Included in Price

(AA} $270.00 (AB} $194.25 (AC} $200.00

(AA} $225.00 (AB} $162-75 (AC} $200-00

(AA} $300-00 (AB} $131.25 (AC} $125.00

(AA} $1750.00 (AB} $787.50 (AC} $750.00

Page 61: GSD/PD (Rev. 3/17/14)...GSD/PD (Rev. 3/17/14) Awarded Vendor State of New Mexico General Services Department Price Agreement 3 Vendors (See Page 6) Price Agreement Number: 80-805-17-16664

I

I

I

I