gssa datacenter solutions

29
© This document contains confidential and proprietary information of GSS America. It is furnished for evaluation purposes only. Except with the express prior written permission of GSS America, this document and the information contained herein may not be published, disclosed, or used for any other purpose. | www.gssamerica.com Data Center Services

Upload: gss-america

Post on 22-Nov-2014

947 views

Category:

Technology


3 download

DESCRIPTION

Gssa data center solutions

TRANSCRIPT

Page 1: Gssa datacenter solutions

© This document contains confidential and proprietary information of GSS America. It is furnished for evaluation purposes only. Except with the express prior written permission of GSS America, this document and the information contained

herein may not be published, disclosed, or used for any other purpose. | www.gssamerica.com

Data Center Services

Page 2: Gssa datacenter solutions

GSS Data Center Service Offerings

Page 3: Gssa datacenter solutions

© This document contains confidential and proprietary information of GSS America. It is furnished for evaluation purposes only. Except with the express prior written permission of GSS America, this document and the information contained herein may not be published, disclosed, or used for any other purpose. | www.gssamerica.com

Page 4: Gssa datacenter solutions

GSS – Data Center Design & Build

ImplementAcquireDesignPrepare

PO on Suppliers

Project Phases

Page 5: Gssa datacenter solutions

GSS – Our unique approach of designing a Datacenter

3

Study of Customer’s short-term & long-

term goals (business & aligned IT Goals)

Designing Cost-effective but scalable &

Modular solutions (2-3 options) for

Datacenter.

Providing detailed BoQ & specifications of

the components for the accepted solution

complying Industry standards (ANSI / TIA-

942).

Page 6: Gssa datacenter solutions

GSS – Our unique approach of Building a Datacenter

3

Design Validation (if already done by customer) and suggesting corrections if required to meet the Industry standards.

Vetting BoQ (if already prepared by customer) and suggesting cost-effective, reliable, scalable and Modular components if required.

Submitting entire Project Plan with clear scope of work & Responsibility matrix – phase-wise break-up of work, etc.

Execution of work as per the agreed project plan / time-lines.

Vendor / third-party coordination wherever required.

Phase-wise User Acceptance.

Final UAT & User Acceptance.

Handing-over to Ops team with SOPs.

Page 7: Gssa datacenter solutions

GSS – Data Center Design & Build Cont…

12

ImplementAcquireDesignPrepare

Requirements and Study

Evaluate the Level of

Redundancy (Tier Level)

Develop Concept

Requirements and Study

Evaluate the Level of

Redundancy (Tier Level)

Develop Concept

Page 8: Gssa datacenter solutions

GSS – Data Center Design & Build Cont…

12

ImplementAcquireDesignPrepare

Page 9: Gssa datacenter solutions

GSS – Data Center Design & Build Cont…

12

ImplementAcquireDesignPrepare

Site Coordination

Equipment Delivery (Shipment)

Factory Acceptance Test

(Equipment Verification)

Site Coordination

Equipment Delivery (Shipment)

Factory Acceptance Test

(Equipment Verification)

Page 10: Gssa datacenter solutions

GSS – Data Center Design & Build Cont…

12

ImplementAcquireDesignPrepare

Page 11: Gssa datacenter solutions

© This document contains confidential and proprietary information of GSS America. It is furnished for evaluation purposes only. Except with the express prior written permission of GSS America, this document and the information contained herein may not be published, disclosed, or used for any other purpose. | www.gssamerica.com

Page 12: Gssa datacenter solutions

GSS – Data Center Operations and Management Cont…

12

Our Standard Services:

Server Management

Storage Management

Platform Hardening

Systems Integration

Database Administration

Our Value-added Services:

Disaster Preparedness Recovery

High Availability Strategies

Business Continuity

Automation of operations

Standards-based management (ITIL)

Data center management requires a highly skilled IT staff with the appropriate tools and Processes to Manage the complex operations such as:

GSSA will drive cost efficiencies and operational effectiveness through the optimization of the underlying infrastructure technologies, as well as the supporting operational processes, based upon ITIL V3, and tools.

Page 13: Gssa datacenter solutions

GSS Managed Server Services

Platforms Supported• Windows Server – Win 2000, Win

2003, Win 2008, Win 2008 R2 • Unix Server – HP-UX, IBM-AIX• Linux Server – RHEL 5• Exchange Server – 2003, 2007,

2010• AD Server – 2003, 2008• UC Server – 2007, 2010

Wintel Server Services

Unix ServerServices

Database Server Services

Tools • SCCM• Altiris • RDP, Dameware• BMC• MOM/SCOM• Quest• RHN Satellite

3

Windows Server

Services

Unix Server

Services

Linux Server

Services

UC Services

AD Services

Exchange Sever

Services

Page 14: Gssa datacenter solutions

GSS Server Services

5

Build/DeployBuild/Deploy 24x7 Operational Offshore Support

Center(GOCC)

Flexible Delivery and Pricing Model

ITIL based Service Delivery Framework

Shared and Dedicated Service Models

High-Skilled Work Force

24x7 Operational Offshore Support

Center(GOCC)

Flexible Delivery and Pricing Model

ITIL based Service Delivery Framework

Shared and Dedicated Service Models

High-Skilled Work Force

UpgradeUpgrade

ConsolidateConsolidate

GSS Advantages

Platform MigrationPlatform Migration

SERVICES

SERVICES

Monitor & ManageMonitor & Manage

Offshore – Onsite Hybrid Model Industry Best Practices Tool Based Approach

Proven & Tested Transition framework

Page 15: Gssa datacenter solutions

Monitor & ManageMonitor & Manage

GSS Storage Services

5

Design SAN / NAS with HA / DRDesign SAN / NAS with HA / DR

Offshore – Onsite Hybrid Model Industry Best Practices Tool Based Approach

Proven & Tested Transition framework

Installation and configuration of HBAs, LUNsInstallation and configuration of HBAs, LUNs

Storage provisioning & consolidation including Dynamic MultipathStorage provisioning & consolidation including Dynamic Multipath

Security configurationsSecurity configurations

SERVICES

SERVICES

Page 16: Gssa datacenter solutions

GSS – Data Center Operations and Management contd…

12

Our unique approach of taking over the existing Datacenter Operations & Management is as follows:

•Study of the customer’s existing setup (due diligence)

•Proposal with agreed SLAs, SoW, Responsibility matrix, and Project plan for transitioning, etc, including the suggestions to improve existing setup/ processes, etc.

•Signing the contact

•Implementation of Tools, etc

•Connectivity with GSSA’s Global Operations Command Center

•Transition

•Running operations as per the agreed SLAs and providing MIS reports, etc

•Periodic reviews with customer SPOC

Page 17: Gssa datacenter solutions

GSS Remote Server Monitoring & Management

Win

do

ws, U

nix &

Lin

ux S

erve

rs

Datacenters – Distributed / Centralized

GOCC Remote Management & Monitoring Infrastructure

GSS Global Operations Command Center

GO

CC

Su

pp

ort

te

am

Monitoring & Management

Console

Backup Management System Management

Performance Management

User Environment Management

Server Monitoring

7

Page 18: Gssa datacenter solutions

GSS – Data Center Migration Services Cont…

12

Why Datacenter Migration

IT cost reduction initiative Regulatory requirement Business service risk mitigation plan Newer datacenter operations strategy Legacy datacenter environments incapable of hosting modern & dense IT Infrastructure

GSS America bring together years of combined industry experience, required expertise straightforward strategies and cost-saving solutions to ensure that your migration is a success. ….

Page 19: Gssa datacenter solutions

GSS – Data Center Migration Services Cont…

12

Our Approach:

Study of the existing IT setup / processes and SLAs with

clients of the customer Designing the migration plan Dry run Customer acceptance of migration plan & SoW Submitting detailed Project plan with detailed step-by-step

activity plan Executing the migration plan

Aim of moving data center functions can reduce costs, increase flexibility, and improve security with near-zero disruption of business environment.

Page 20: Gssa datacenter solutions

GSS – Data Center Migration Services Cont…

12

Executing the migration plan – Our Approach

Stand-by arrangements for business continuity

Pack & ship Datacenter equipment

Re-Install and configure

Restore Data

UAT

Move to Production

Transition to Ops

Operational Support

Page 21: Gssa datacenter solutions

© This document contains confidential and proprietary information of GSS America. It is furnished for evaluation purposes only. Except with the express prior written permission of GSS America, this document and the information contained herein may not be published, disclosed, or used for any other purpose. | www.gssamerica.com

Page 22: Gssa datacenter solutions

GSS – Datacenter Consolidation / upgrade

12

Our approach of Datacenter Consolidation is as follows:

Identify the current state: Study of the existing IT setup / processes and

Review the Customer’s Strategic needs: Understanding the IT Road map of the customer (Conducting the tests / audits on the existing IT setup and processes, etc)

Develop detailed consolidation Plan: Submitting the solution with detailed BoM and probable savings / value additions out of implementing the new solution. This also includes the Project Plan with detailed SoW statement.

Implementation: Execution of work as per the agreed timelines and

Sign-off: Organizing UAT, Handholding and User Trainings including handing over SOPs and finally handing over to the Operations team.

Page 23: Gssa datacenter solutions

GSS – Datacenter Consolidation / upgrade contd…

12

Our approach of Datacenter Consolidation is as follows:

•Identify the current state: Study of the existing IT setup / processes and

•Review the Customer’s Strategic needs: Understanding the IT Road map of the customer (Conducting the tests / audits on the existing IT setup and processes, etc)

•Develop detailed consolidation Plan: Submitting the solution with detailed BoM and probable savings / value additions out of implementing the new solution. This also includes the Project Plan with detailed SoW statement.

•Implementation: Execution of work as per the agreed timelines and

•Sign-off: Organizing UAT, Handholding and User Trainings including handing over SOPs and finally handing over to the Operations team.

Page 24: Gssa datacenter solutions

GSS – Datacenter – GreenIT initiatives Cont…

12

Our services for Green-IT initiatives include the following: 

Facility Structural Changes:

Datacenter Cooling – Airflow optimization techniques, thermal zones, supplemental high-density cooling, Liquid/Pumped refrigerant based cooling, etc

Rack Space optimization, Modular UPS system designs, etc

Proper Site selection, etc

 Non - Structural Changes

Power Management techniques – Server & storage Virtualization, Monitoring and control of power usage by different datacenter equipment, etc

IT Infrastructure Consolidation

Page 25: Gssa datacenter solutions

GSS – Datacenter Compliance Audit

12

The datacenter compliance Certification is an extensive survey of the datacenter according to internationally recognized standards.

1) The output of the Datacenter Compliance Audit is an extensive report with findings, risk analysis and recommendations for risk reduction, all in accordance with International standards.

2) You will receive a Report indicating a “rating” in each measured area and an overall rating of the total datacenter environment.

Page 26: Gssa datacenter solutions

26

GSS America provides end-to-end Datacenter Services...

ACTIVITIES

RESULTS

Needs assessment Initial situation Capacity requirements Reliability requirements Security requirements Expansion plans

location analysis Risk analysis Functional concept Floor concept Preliminary dimensioning of technical equipment Cost estimate Budget cross check

Needs assessment Initial situation Capacity requirements Reliability requirements Security requirements Expansion plans

location analysis Risk analysis Functional concept Floor concept Preliminary dimensioning of technical equipment Cost estimate Budget cross check

Concept describing: capacity, reliability and Security, equipment, costs Road map for planning and implementation

Concept describing: capacity, reliability and Security, equipment, costs Road map for planning and implementation

Consulting1

Preliminary design functional schemes description of technical

systems and building

client´s acceptance + adjustments

Final design detailed drawings of

systems and building detailed specification of

systems cost calculation

Preliminary design functional schemes description of technical

systems and building

client´s acceptance + adjustments

Final design detailed drawings of

systems and building detailed specification of

systems cost calculation Preliminary design

documents Client´s acceptance Final design documents Cost calculation Basis for functional

tendering

Preliminary design documents

Client´s acceptance Final design documents Cost calculation Basis for functional

tendering

Design2

Supervision of the execution planning

Construction details Construction drawings Graphic projection and

dimensioning of installation

Instructions for installation Detailed lists of required

material with quantities Time schedules and

interfaces

Supervision of the execution planning

Construction details Construction drawings Graphic projection and

dimensioning of installation

Instructions for installation Detailed lists of required

material with quantities Time schedules and

interfaces

Construction and installation documents

Construction drawings Material lists

Construction and installation documents

Construction drawings Material lists

Execution Planning4

Selection of suppliers or setting up short lists

Purchasing of equipment and services, or

Handling of tendering tender documents tendering assessment contract awards

control and approval of delivery

Selection of suppliers or setting up short lists

Purchasing of equipment and services, or

Handling of tendering tender documents tendering assessment contract awards

control and approval of delivery

Tender prepared and executed

Equipment and services purchased

Tender prepared and executed

Equipment and services purchased

Procurement3

Page 27: Gssa datacenter solutions

27

RESULTS

ACTIVITIES construction and

installation supervision project management

monitoring time, quality and costscoordinating interfaces

of different specialist works

monitoring the compliance with specifications, drawings and building approvals

construction and installation

supervision project management

monitoring time, quality and costscoordinating interfaces

of different specialist works

monitoring the compliance with specifications, drawings and building approvals

data center ready for final checks and handing over

data center ready for final checks and handing over

Construction +Installation

5

Performing tests runs System performance checks Preparing the necessary documents

manuals, technical descriptions, as is- drawingsoperation instructions test certificates

Defining inspection and maintenance operations Training operational staff Official handing over

Performing tests runs System performance checks Preparing the necessary documents

manuals, technical descriptions, as is- drawingsoperation instructions test certificates

Defining inspection and maintenance operations Training operational staff Official handing over

data center ready for operation

data center ready for operation

Handing Over6

IT operation (different SLAs)

Infrastructure operation Security services Facility management

services Controlling warranty

periods Monitoring and checking

defined performance levels

IT operation (different(SLAs

Infrastructure operation Security services Facility management

services Controlling warranty

periods Monitoring and checking

defined performance levels

operation of the data center

operation of the data center

Operation7

Regular audits Energy efficiency checks Continuous adjustment to changes of equipment and of loads certifications

Regular audits Energy efficiency checks Continuous adjustment to changes of equipment and of loads certifications

continuously updated data center

continuously updated data center

Constant Improvement

8

Datacenter Services

Page 28: Gssa datacenter solutions

Q & A

12

Page 29: Gssa datacenter solutions

© This document contains confidential and proprietary information of GSS America. It is furnished for evaluation purposes only. Except with the express prior written permission of GSS America, this document and the information contained herein may not be published, disclosed, or used for any other purpose. | www.gssamerica.com