gt-50 rf ion thruster - avant...
TRANSCRIPT
![Page 1: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/1.jpg)
GT-50 RF ION THRUSTER
![Page 2: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/2.jpg)
9%
42%
49%
Military
Commercial
Civil
SMALL SATELLITE MARKET
COMMERCIAL SMALLSAT MARKET GROWTH
On average, the small satellite market grows +12% annually during the last 10 years
The market is estimated to value 16.5B USD in 2017-2026, of which 22% (3.7B USD) is manufacturing
Cluster launches have been announced for mega-constellations:
OneWeb (x720+)
SpaceX (x4425+)
CURRENT SOLUTIONS FOR PROPULSION SYSTEMS IN CONSTELLATIONS (CHEMICAL)
Mprop = 25% Ms/c
Vprop ~ 15% Vs/c
20%
10%
70%
2006-2015$12.5 B
2016-2025$16.5 B
10 yrs
Phasing Orbit raising
Station-keeping Deorbiting
PropulsionMprop = 12% Ms/c
Vprop ~ 10% Vs/c
Mprop = 20% Ms/c
Vprop ~ 30% Vs/c
![Page 3: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/3.jpg)
THE SOLUTION
GT-50 RF ION THRUSTER
GT-50 SPECIFICATIONS
High specific impulse
Small mass and size
Exceptional maneuvering precision
Simple integration
THE AMOUNT OF PROPELLANT
REDUCED 10 TIMES
Model Power, W Thrust, mN Isp, sec Propellant Size Mass, kg Effcy, %
GT - 50 180/240 5.0/7.0 2000+ Xe < 4U Cubesat < 8 > 70
PROPULSION SYSTEM VOLUME
REDUCED 5 TIMES
![Page 4: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/4.jpg)
COMPETITORS
COMPETING COMPANIES
COMPARING WITH COMPETITORS
Model Type Development stage Manufacturer Power, WThrust,
mNIsp, sec
Thrust effcy, W/mN
1. GT-50 RF IT R&D Avant Space Systems 200 6,5 2500 30
2. BIT-3 RF ITLunar IceCube
(scheduled for SLS launch, after 2019)
Busek 75 1,15 2100 65,2
3. BHT-200 SPT
Technology missions:- TacSat-2 (2006)
- FalconSat-5 (2010)- iSat (2018)
Busek 200 12,8 1390 15,6
4. SPT-50M SPT R&D Fakel OKB 220 14 860 15,7
5. 1N HPGP Chemical Operates in Skysat 3-13 ECAPS 4,5 1000 235 -
![Page 5: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/5.jpg)
В2В BUSINESS MODEL
REALIZATION
USE CASE
FIRST INTEGRATION
SALES
USE CASE Flight test in a private-owned technology mission, university satellite, or a government civil mission.
FIRST INTEGRATION Integrating the propulsion system into a platform of one of the key manufacturers (Thales Alenia, SSTL, ISS Reshetnev, or other).
Integration costs are negated by the discount offered for future GT-50 shipments.
The launch is paid for by the primary customer (payload owner).
SALES A contract to provide propulsion systems for a satellite constellation.
COST BENEFIT illustrated by Iridium-NEXT (Iridium Satellite LLC) example
Given the 181 satellite constellation, the overall launch cost
Might be reduced by 86М USD.
Significant reduction in spacecraft size while using electric propulsion is also to be kept in mind, which might result in further launch cost reduction.
With electric propulsion system onboard, each spacecraft would need 140 kg less propellant,
which reduces the launch cost of one satellite by 474К USD.
![Page 6: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/6.jpg)
THE TEAM
KEY MEMBERS OF THE TEAM
Engineers and researchers:
Yana Kharlan – Senior Project Manager
Vladimir Kozhevnikov, Ph.D – Senior Researcher
Ivan Cherniy – System Engineer
Rodion Ayupov – Mechanical Engineer
Alexander Surminskiy –Circuit and Radio Engineer
Ruslan Rakhimov – Numerical Modelling Specialist
Anton Ossovskiy
CEO
Took part in development for DX-1 satellite by Dauria Aerospace
Was head of sales for OKB Fifth Generation (Aerospace parts producer}
Sergey Khartov
Chief research officer
D. Sc. In physics and mathematics.
Has a vast experience in RF thrusters and plasma physics.
Partners
![Page 7: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/7.jpg)
THE RESULTS
ACHIEVED RESULTS
R&D
Intellectual
property
Marketing
Marketability analysis conducted
Applicability analysis completed (possible applications in various existing and future space mission have been studied)
Marketing strategy outlined
Contacts established within aerospace industry
Media activity: Russian media publications, conference talks
Non-disclosure regulations established
Patent clearance study completed: no patents violated in Russia, USA, and Europe
Patentable solutions identified
The team and experimental base formed Subcontractors for principal thruster parts chosen GT-50 lab model developed and manufactured GT-50 lab model test cycles completed
![Page 8: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/8.jpg)
ROAD MAP [1/2]
PROJECT REALIZATION PLAN
2018 2019 2020 2021
Direct performance measurements
Follow-up and certification
Establishing production and test
flight
Subsystem development
330 000 USD 370 000 USD 370 000 USD 1 300 000 USD 200 000 USD 2 500 000 USD
2022 2023
Pilot sales Commercial shipments
![Page 9: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/9.jpg)
ROAD MAP [2/2]
STAGE REALIZATION PLAN
Thruster lab model Subsystem lab modelsSubsystem engr.
modelsThruster engr.
model
Thruster lab tests and follow-up revision
Subsystems lab tests and follow-up revision
Full-scale testing of all subsystems
Subsystems lab tests and follow-up revision, direct thrust
measurements
37%
14%
40%
4%5%
Payroll
Thruster prototype
Subcontractors
Hardware & Software
Other
1,04 М
185 000 USD155 000 USD370 000 USD330 000 USD
EXPENDITURES
![Page 10: GT-50 RF ION THRUSTER - Avant Spaceavantspace.com/upload/iblock/8ca/8ca9114849b47fed856c5814654… · Took part in development for DX-1 satellite by Dauria Aerospace Was head of sales](https://reader033.vdocument.in/reader033/viewer/2022060304/5f08ebe47e708231d4245f1a/html5/thumbnails/10.jpg)
Contact person: Julia KirichenkoE-mail: [email protected] Tel.: +7 495 660 83 65