guia rapida super adobe
TRANSCRIPT
8/11/2019 Guia Rapida Super Adobe
http://slidepdf.com/reader/full/guia-rapida-super-adobe 1/3
EMERGENCY
ANDBAG
HELTER:
UICK
RAININGUIDE
1) Collect
he tools
above.
2) Preparehe earth mix which
s stabilized
with cement,
ime,or asphaltemulsion.
3)
A
water o
ball ogether
when squeezed,
et
not leave he hand
wet. lf no cement,
ime or
barbedwire s available,
(clay-sand)
or a
temporary helter.
Experimental:
ry
snow
n
bags
and compact.)
otu*#@*
tü o
EXTRY
%'
DOME PLAN
EMERGENCY
HELTER
4)
Place
he door
away rom
wind and rain.5) Dig
he
foundation
rench
L2
(3O
cm) deep.
6) Leveland compact
7) Place
he
bag
n
the
trench,
old
the end under o close,
and start
f i l l ing upright
¡kea short
column
using
ong
standard
andbags).
he oundation
wil l
be
2-3
completed
ag
rows.
8) Always
ut
in
2-3 cans of earth and shake o the end.
9) Use
gravity's
help by sloping he bag
on
your
eg, and
backwards
s
it f i l ls.
Do not strain
(if
it is
hardand eels
heavy
ou
are
not doing
t right).Let he
bag i l l as
full as
check
he
position
with he compass ool.
10)
Twistand
uck under
he bag ends
o close.
11)
Compact
he
illedbagas
hardas
you
can
using
tamper,
o make
a smooth, olid,
uniform lock.
Only om
earth
becomes
trong.
2)Attach ontinuousarbed
ire:1 wire
ordomes
p o 12 ft
(3.7m),
wires
or arger
breaks
ccur,
verlap
he wiresby
2ft.
(65
cm).13)Continue
oil ing
ags.
8/11/2019 Guia Rapida Super Adobe
http://slidepdf.com/reader/full/guia-rapida-super-adobe 2/3
14
15
CenterCompass
Height
Compass
1,4, 5) You
must use 2 Compasses o
make
he dome
shape.
Use
chainsor other
non-stretchy able-rope. ttachon
center CenterCompass), nd extend h e lengthat every owaccordingo a secondone at the perimeter HeightCom
bagsdo not conform
o the comoass
emove
hem and re-build.
16) Pre-cut ags
or a dooruray
nock-out
anel,
or for
windows.
f
stabilized,he earth
must be cut
after ampingat e
don't let the
cut bags stick
ogether
a$ain.
7)
Punch
out
pre-cut anels
o open he door or
window
after at
least
5 b
aboveare completed.
8) Insert
pipes
or vents
or windows,
loped o
outside or rain.
19) Coil upper
ows,but
don't stand
on the wet
bag. 20) Fi lland
place
each bag
parallel
o the
row
belowand
work t
nwards
o meet he compass
circle
pull
or tamp).Tamp
he bag with a
gentle
slope o the outside.Close he top or
l
skylight.
1) Add a
protect¡ve
ntrance
door
vault)
o
buttress he door opening.
Entry s archedor sloped,short
or
ta
22) Plaster
he exteriorbeforebagsdlsintegrate
nd 23) waterproofwith ocally uitablematerials o resist
moisture
a
24) On op,
finish
with
a
water-resistant
ementor lime
plaster
such as Reptile
stabil¡zed
arth mud-balls)
ayered ro
:cp, or
25) a smooth
cementor l ime
plaster
in ish.
r
q
f
, ,k
{.- T-T,ertfussti|tst*
,¡;',t'.
8/11/2019 Guia Rapida Super Adobe
http://slidepdf.com/reader/full/guia-rapida-super-adobe 3/3
Left:
Axonometric
f the
dome co
better
show
he domed
shape,
h
walls,
door ault,
andwindow
ye
not
shown n
this
drawing.)
3i*3
. t ,
.
n? ñ
i'
,{
i¡ .
'
-*.
, r . .
- ,
;.$*
¡-
q
üARKER
R¡NGS
Above:
Using
he wo chain
omp
tt
{¡
í r&.
,'J
, ,
(
f.
,
t
t
i
24 Dome rows (
.
-$p¡i¡gli¡¿
2 Base ows
3 Foundationro
4¿¿
rn
Emergency
Shelter:
l0
ft.
/
3.0 m. interior
diameter
dome
(same
or
8
-
12 t.
I
Z.S 3.7
m range)
Compass
section,
Springline,
and
essential dimensions
,
,{
*
t
h. '
' , i
'
t
i '
(
l ' t
'q ' { '
| ;'
,i
l
.:¡,)
.\',r'
i
'
-
.
,'.
'
-
i
u*r , ' . l l -
,^ '
,
* ' r
.1 . ;
l
l i r.
C>
,.¡
+
o
o
E
,g
t
tl
I
+
(o
o
Trench or
foundation
ows
* ru-q,9-9