guidance integrated fuze / course correcting fuze (gif) (ccf) · 2017-05-30 · guidance integrated...

of 12/12
NDIA 48th Annual Fuze Conference Guidance Integrated Fuze / Course Correcting Fuze (GIF) (CCF) Chad Finch - NSWCDD (Code G34: Phone 540-653-5493 or e-mail [email protected]) GIF Project Manager Robert Werko - ARDEC (AETC: Phone 973-724-5854 or e-mail [email protected]) CCF DPO

Post on 09-May-2020

45 views

Category:

Documents

11 download

Embed Size (px)

TRANSCRIPT

  • NDIA 48th Annual Fuze ConferenceGu id a n ce In t eg r a t ed Fu ze / Co u r s e

    Co r r ect in g Fu z e (GIF)(CCF)

    Chad Finch - NSWCDD(Code G34: Phone 540-653-5493or e-mail [email protected])

    GIF Project Manager

    Robert Werko - ARDEC(AETC: Phone 973-724-5854

    or e-mail [email protected])

    CCF DPO

  • GIF & CCF

    � GIF is a Technology Demonstration Program atNSWCDD Sponsored by OSD-ATL

    � GIF is being co-developed by the Army & Navy asthe design concept for the Army CCF Program

    � US Army is developing a requirement for CCF.OPM CAS is the developer for USAFAS

  • Benefits of CCF

    15 km

    20 km

    25 km

    30 km

    � Increases Effectiveness – Killstargets quicker� Increases Stowed Kills perPlatform� Reduces Collateral Damage� Reduces Logistics Burden� Allows closer support of friendlytroops

    (Major Improvements to Cannon Artillery Effectiveness)

    CEP vs. Range

    < 50m

    < 50m

    < 50m

    95m

    115m

    140m

    275m

    < 50m

    w/CCF

    w/o C

    CF

  • What is GIF?� GIF is a low-cost, fuze-sized module

    that is intended to replace a “NATOstandard” fuze

    � GIF corrects the ballistictrajectory in 2D, resulting in asmall terminal miss distance

    � GIF provides “First Round - Steelon Target”

    � GIF technology can be applied toliterally millions of existing 155mm,105mm, 5”, 76mm projectiles, and120mm and 81mm mortars.

  • How does GIF Work?

    Unguided Impact

    Guided Impact At Target

    GPS Satellites

    � Ballistic Solution� Initialize Fuze

    � Despin Nose� Acquire GPS

    � Predict Miss� Deploy Controls� Steer to Target

  • COTS Batteries (CR2) & Drive Motor

    Replace MOFA Battery

    “Waffle” Fins Provide High Lift without StallRequired to Steer (Heavy) Army Ammo

    2 GPS Antennae

    (Top & Bottom)

    Differential Cant Between the Waffles

    Provides Anti-Roll Torque After the

    Covers are Discarded.

    Setter Coils and Standard MOFA Radar

    Standard Primer and S&A

    Untouched by GIF Mods

    Covers Protect Waffle Canards Prior to the Initiation of Guidance

    Pair of Anti-Roll Strakes (One on each Cover)

    Roll Brake System

    How does GIF Work?

    Roll Bearing Test Fuze with Tactical Strakes

  • How does GIF Work?

    GPS Receiver

    Roll Rate Sensor

    CPU

    PIC Processor

    Connector Magnetometer

    Connectors

    Roll Brake and Bearing Assembly

    Guidance and Electronics Unit

    HOB/DCI Module

  • Program Plan� Complete Technology Demonstration Phase w/ closed loop

    guided gun firing

    � Award up to 2 Contracts (from NSWC) for development of GIFbased on Gov’t TDP� 100 Fuzes for qualification testing� Proposals may deviate from GIF baseline TDP to improve

    performance, reduce cost or schedule

    � Down select for following options� Build 1000 GIFs for Army user test� Course Correcting Fuze development (SDD)

    � Army to take GIF design into CCF SDD program in FY06

    � CCF Initial Operational Capability in FY10

  • Program Plan

    FY04 FY05 FY06 FY07 FY08 FY09 FY11FY10FY03

    Kr1GIF1 Design – 80% Solution

    GIF TDP

    Increment 1

    Technology DevelopmentTT

    DS

    Risk ReductionSoftware SAASM / Anti-Jam

    Award

    MSB IOC

    TT System Development & DemonstrationAwardCCF SDD1 Design –100% SDD

    Increment 2

    Kr2

    Risk Reduction100% Req TRL

    6

    Guided Demo/ Release

    CompetitiveRFP

    Deliveries

    IOTEFAT Materiel ReleaseFields to LW155 / NLOS C

    MSC FDTE

    CDRSRRPDR

    Full Rate Production

    1,000 Unit BuildFor Army User Test

  • Requirements

    20 Years7 YearsN/AShelf Life

    -45 to +145oF0 to +120oFAmbientTemperature

    P(Y) SAASMC/AC/AGPS

    EPIAFSEPIAFSBenchSetter

    Prox, PD, ET, DelayProx, PDN/AFuzing Function

    HE / DPICMHEInertMunition Type

    All 155mm / 8SM549 / 8SM483 / 7RAmmo / Zone

    50m CEP50m CEP50mAccuracy

    Increment 2(IOC FY10)

    Increment 1(FY07)

    Demo(FY04)

  • GIF / CCF Team

    Technical ManagementChad Finch - Rob Werko

    Chief Engineer - John Fraysse

    Technical Risk• Cost• Schedule• Performance

    RiskManagement

    Board

    ElectronicsMary Collings

    AeroSung Chung

    MechanicalMark Engel

    T&EEd Larach

    Operational M&SIngrid Dombroski

    Programmatic Risk• Cost• Schedule• Performance

    Sys IntegrationWayne Worrell

    Program ManagementOSD / OPM CAS / PEO IWS-3C

  • Conclusion

    � Closed loop guided demo shot currentlyscheduled for October of this year

    � Gov’t plans to hold pre-solicitationconference prior to RFP release� Review baseline design and SOW� Look for a FedBizOpps announcement this

    summer/fall