guide stone

3
Report to accompany the estimate for Supplying and fixing of guide stone, guard stone, Kilometer and Hectometer stones along with Road Signs. From km. 0/0 To 3.500 of Approach road to T.G.P camp colony K.R.Dam Estimate: Rs.479, 400 The formation of Kandaleru Reservoir was completed in the year 1997 and water was let out to Chenni City an approach road from Podalakur – Rapur Road @ km 15/0 to T.G.P Camp colony K,R.Dam was formed in the year 1984 and maintenance works are done. The Kandaleru Reservoirs is developing as a Tourist spot and visitors are increasing year by year. The Tourism department is going to develop the vacant lands in near by Kandaleru Reservoir as Tourist spot. During the year 2007 the approach road from km 0/0 to 3.50 was renevewled and widens a length of first 200 mts. During the this year an Entrance Gate is constructing and proposed to be opened by the honorable Chief Minister of A P in the Month of April / May 2008. In this connection the Road side sign boards, guide stone guard stones Kilometer and Hectometer stone are required for this Roads from km 0/0 to 3.50 of T.G.P Camp colony K.R.Dam There are no sign boards guide stones, guard stone along the approach Road. The Honorable Chief Minister will pass through this road during his inaugural function. Hence providing of Guide stone, guard stone kilometer and hectometer stone and road sign board are required for this road. Hence this estimate was prepared with the following provisions. 1. Supplying and fixing of RCC Guide stones of size 800mm X150mmX 150mm in 8mm Dia steel for verticals 4 nos and 6mm Dia steel for stirups @ 15 cem,C/C with 60% of 20mm and 40% of 12mm HBGMC metel in C.C 1:2:4 concrect including excavation of pit, conveyance of stone to pit area, fixing

Upload: api-3710215

Post on 10-Apr-2015

206 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: guide stone

Report to accompany the estimate for Supplying and fixing of guide stone, guard stone, Kilometer and Hectometer stones along with Road Signs. From km. 0/0 To 3.500 of Approach road to T.G.P camp colony K.R.Dam

Estimate: Rs.479, 400

The formation of Kandaleru Reservoir was completed in the year 1997 and water

was let out to Chenni City an approach road from Podalakur – Rapur Road @ km 15/0 to

T.G.P Camp colony K,R.Dam was formed in the year 1984 and maintenance works are

done. The Kandaleru Reservoirs is developing as a Tourist spot and visitors are increasing

year by year. The Tourism department is going to develop the vacant lands in near by

Kandaleru Reservoir as Tourist spot. During the year 2007 the approach road from km 0/0 to

3.50 was renevewled and widens a length of first 200 mts. During the this year an Entrance

Gate is constructing and proposed to be opened by the honorable Chief Minister of A P in

the Month of April / May 2008.

In this connection the Road side sign boards, guide stone guard stones Kilometer

and Hectometer stone are required for this Roads from km 0/0 to 3.50 of T.G.P Camp colony

K.R.Dam There are no sign boards guide stones, guard stone along the approach Road.

The Honorable Chief Minister will pass through this road during his inaugural function.

Hence providing of Guide stone, guard stone kilometer and hectometer stone and road sign

board are required for this road. Hence this estimate was prepared with the following

provisions.

1. Supplying and fixing of RCC Guide stones of size 800mm X150mmX 150mm in 8mm Dia steel for verticals 4 nos and 6mm Dia steel for stirups @ 15 cem,C/C with 60% of 20mm and 40% of 12mm HBGMC metel in C.C 1:2:4 concrect including excavation of pit, conveyance of stone to pit area, fixing the stone and refeling the trench with excavated soil etc. complete.

2. Supplying and fixing of RCC Guard stones of size 1200mm X200mmX 200mm in 8mm Dia steel for verticals 4 nos and 6mm Dia steel for stirups @ 15 cem,C/C with 60% of 20mm and 40% of 12mm HBGMC metel in C.C 1:2:4 concrect including excavation of pit, conveyance of stone to pit area, fixing the stone and refeling the trench with excavated soil etc. complete.

3. Supplying and fixing of RCC Kilometer stones of size 1100mm X370mmX 150mm in 10mm Dia steel for verticals 6 nos and 6mm Dia steel for stirups @ 10 cem,C/C with 60% of 20mm and 40% of 12mm HBGMC metel in C.C 1:2:4 concrect including excavation of pit, conveyance of stone to pit area, fixing the stone and refeling the trench with excavated soil etc. complete.

4. Supplying and fixing of RCC Hectometer stones of size 900mm X200mmX 200mm in 8mm Dia steel for verticals 4 nos and 6mm Dia steel for stirups @ 15 cem,C/C with 60% of 20mm and 40% of 12mm HBGMC metel in C.C 1:2:4 concrect including excavation of pit, conveyance of stone to pit area, fixing the stone and refeling the trench with excavated soil etc. complete.

Page 2: guide stone

5. Painting to Guide stone, guard stone, kilometer stone, Hectameter stone with best enamil paint in 2 cots over the initial coat of wall primary coat including cost and conveyance of all meterials and labour charges etc. complete.

6. Supplying and fixing of Hot pressed compression moulded smc sing plates of size 600mm Dia circular plate for making road sing boards as per the approved diemensions of national High way authority of India complete for finished item of work inculuding cost of 2 1/2" X 2 1/2" ieron angle of 2.4 meters hight post, earth work excavation, fixing in CC 1:2:4 concrect and paintaing the vertical post with best enamil paint in 2 costs over the intial coat of primary etc. compte

7. Provision towards 4% VAT on ECV

8. Provision towards 1% Labour cess on ECV

9. Provision towards Technical Agent

10. Provision towards Insurence coverage @ 0.68% on ECV

Pr

ogramme of work: the above is programmed to be taken up 10.4.08 and

completed by 30.4.08

Funds:

The Expenditure is charge bul to 4701 C.O.L on Magor and Medium Irrigation,

( (01)Major irrigation (commercial) 123 TGP 26 D& A works , 530 Major works 531

other Expenditure..

Assistant Engineer Deputy Executive Engineer Executive EngineerSSLC & SB Section Camps SSLC & SB Sub Division No.4 SSLC & SB Divison No.2

KR Dam KR Dam Nellore.

Rates :- The above Estimate was prepared with current SSR for the year 07-08 and Local market Rate.

Page 3: guide stone